Deck 26: Learning Curves

ملء الشاشة (f)
exit full mode
سؤال
Which one of the following statements about learning curves is TRUE?

A)A learning curve assumes that the direct labor requirements per unit will DECREASE at an INCREASING rate as cumulative production increases.
B)A larger learning curve rate implies faster (greater)learning.
C)A learning curve graph usually follows a negative exponential curve.
D)Learning curves can be used only for individuals,not for the whole organization.
E)The formula describing the learning curve principle of doubling is computed differently when computing unit cost as opposed to unit time.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The fact that human activities typically improve when they are done on a repetitive basis is described by a:

A)normal distribution curve.
B)binomial distribution curve.
C)learning curve.
D)Poisson distribution curve.
E)repetition curve.
سؤال
The earliest industrial application of learning curves came from a report by ________.
سؤال
The fundamental premise underlying learning curve analysis is that:

A)tasks can be easily learned in organizations.
B)organizations and people become better at their tasks as the tasks are repeated.
C)learning takes place when people in organizations change.
D)total labor costs decrease as the number of production units increases.
E)doubling output cuts labor requirements per unit in half.
سؤال
Learning curves (or experience curves)were first applied to industry by ________ who was studying ________.

A)Frank Lloyd Wright;architecture
B)Frank Gilbreth;worker efficiency
C)T.P.Wright;air frame manufacture
D)Lilian Gilbreth;factory efficiency
E)Frederick W.Taylor;scientific management
سؤال
A 100% learning curve implies that:

A)learning is taking place for all products and workers.
B)learning is taking place at the best possible level.
C)a 100% reduction in the direct labor time takes place each time the production is doubled.
D)no learning is taking place.
E)None of the above is true.
سؤال
Which of the following statements is most appropriate with respect to a 70% learning curve?

A)There will be a 70% decrease in direct labor per unit each time the production volume doubles.
B)Each successive unit of production will take 70% of the direct labor of the previous unit.
C)There will be a 30% decrease in direct labor per unit each time production volume doubles.
D)Thirty percent of the production will be defective until full learning takes place.
E)None of the above is true.
سؤال
A 90% learning curve implies that each time the production volume is doubled,the direct time per unit is reduced to 90% of its previous value.
سؤال
Experience curves are the opposite of learning curves-as one rises,the other falls.
سؤال
Experience curves may be valid for industrial applications,but have no role in services such as health care procedures.
سؤال
If the first unit in a series of units takes 200 days to complete,and the learning curve is 80%,then the second unit will take 160 days.
سؤال
The earliest application of learning curves appears in the work of architect Frank Lloyd Wright.
سؤال
Learning curves can only be applied to labor.
سؤال
An 80% learning curve means that with each unit increase in production,labor requirements fall by 20%.
سؤال
If the learning curve for a process is 100 percent,then each unit in a series of units will have the same labor requirements.
سؤال
Which of the following best conveys the essence of learning curves?

A)As the number of repetitions increases,time per unit increases.
B)As the number of repetitions decreases,time per unit increases.
C)As the number of repetitions increases,time per unit decreases.
D)As the number of repetitions increases,time per unit remains constant.
E)As the number of repetitions increases,time per unit doubles.
سؤال
A job with a 90% learning curve required 20 hours for the initial unit.The fourth unit should require approximately how many hours?

A)16.0
B)16.2
C)18.0
D)20.0
E)54.2
سؤال
The learning curve rate is:

A)the percentage of time it will take to make each unit when the production rate doubles.
B)the log-log of the annual rate change divided by the average unit cost.
C)always based on constant value dollars.
D)only considered valid after one year of data is accumulated.
E)equal to at least 75%.
سؤال
A learning curve:

A)plots man-hours per dollar versus time.
B)is mathematically described by a parabola.
C)should be plotted on polar coordinate graph paper.
D)is based on the premise that organizations learn from experience.
E)follows a normal distribution.
سؤال
Learning curves are based on the premise that people and organizations become better at their tasks as the tasks are repeated.
سؤال
The learning curve may not be permanent;it can be disrupted by changes in process,personnel,or product.
سؤال
Learning curves can be used to establish budgets.
سؤال
________ are based on the premise that people and organizations get better at their tasks as the tasks are repeated.
سؤال
Which of the following statements regarding the usefulness of learning curves is FALSE?

A)An external use of learning curves is in supply chain negotiations.
B)A strategic use of learning curves is in evaluating company and industry performance.
C)An internal use of learning curves is in establishing costs.
D)An internal use of learning curves is in labor forecasting.
E)A strategic use of learning curves is in establishing budgets.
سؤال
A project manager bases his time and labor estimates on a learning curve of 86%.The actual learning curve turns out to be 89%.The manager,because of the decreased learning,will complete his project in more time and with more labor use than his estimate suggested.
سؤال
What problems in scheduling can arise if adjustments for learning curve effects in operations are not made?
سؤال
If the learning curve for a process is 80 percent,that same process has a 20 percent ________.
سؤال
In addition to labor,to which other variables have learning curves been applied?
سؤال
Which of the following statements comparing learning curve rates (L)to improvement rates is TRUE?

A)The learning curve rate is the same as the improvement rate.
B)The learning curve rate is a decimal value while the improvement rate is a percentage.
C)A 90 percent learning curve corresponds to a 10 percent rate of improvement.
D)Learning curve rates apply to labor only,while improvement rates apply to all resources.
E)"Learning curve rates" is American usage,while "improvement rates" is British.
سؤال
When comparing a 70% learning curve versus a 90% learning curve,which one results in a more rapid reduction in labor requirements? Why?
سؤال
Why do different organizations have different learning curves?
سؤال
Describe the earliest application of learning curve concepts to industry.
سؤال
What is the basic premise underlying the learning curve?
سؤال
Explain how learning curves might be applied in a scheduling application.
سؤال
The learning curve in the steel industry and the learning curve in heart transplants have both been estimated at 79 percent.
سؤال
Learning curves are:

A)the same for all products but different for different organizations.
B)the same for all organizations but different for different products.
C)the same for all organizations and all products.
D)different for different organizations and different products.
E)appropriate in services but not in manufacturing.
سؤال
Learning curves can be applied to a variety of purposes internal to a firm,including:

A)labor forecasting.
B)scheduling.
C)establishing costs.
D)establishing budgets.
E)all of the above
سؤال
"By tradition,learning curves are defined in terms of the complements of their improvement rates." Explain.
سؤال
Learning curves have a variety of purposes.Your text places them into which three broad categories?

A)services,industry,and military
B)internal,external,and strategic
C)wholesale,distribution,and retail
D)doubling,formula,and learning curve table
E)positive learning,neutral learning,and negative learning
سؤال
Failure to consider the effects of learning can lead to ________ of labor needs.
سؤال
The first unit of production took 10 hours with an 80% learning curve.How long will it take to complete both the first and second units?

A)10 hours
B)8 hours
C)18 hours
D)15.7 hours
E)There is not enough information to solve the problem.
سؤال
The learning curve for a product is 80 percent.The first unit took 100 hours to complete.The manufacturer wants to determine how many hours the fifth unit will take by using the formula approach.What is the coefficient b for that calculation?

A)-.0969
B)-.2231
C)-.3219
D).80
E)1.903
سؤال
Suppose that there are two products with the same first product time.However,product A has an improvement rate of 10% while product B has an improvement rate of 20%.How much longer will it take to make the 10th unit of product A compared to product B?

A)Both will have the identical time for the 10th unit.
B)A will take 48% more time.
C)A will take 48% less time.
D)A will take 23% less time.
E)none of the above
سؤال
The first unit took 10 hours and the third unit took 5.68 hours.What is the improvement rate?

A)70%
B)30%
C)50%
D)90%
E)10%
سؤال
Explain how learning curves might be applied in a bid preparation application.
سؤال
It took 18 hours to complete the first two products with an 80% learning curve.How long did the second product take?

A)8.0 hours
B)10.0 hours
C)18.0 hours
D)8.1 hours
E)none of the above
سؤال
The second unit of production took 9 hours.If the learning curve is 90% how long did the first unit take?

A)9 hours
B)10 hours
C)8.1 hours
D)8.5 hours
E)none of the above
سؤال
The first unit took 10 hours and the fourth unit 8.1 hours.What is the improvement rate?

A)99%
B)95%
C)90%
D)15%
E)10%
سؤال
A company negotiates a price for two aircraft that includes a reduction in labor on the second aircraft consistent with a 70% learning curve.Suppose the first aircraft took 100 hours.If the improvement rate changes to 20%,how will the total time to complete both aircraft change?

A)no change
B)-10 hours
C)+ 10 hours
D)-50 hours
E)+ 50 hours
سؤال
The first unit of a product took 832 hours to build,and the learning curve is 75%.How long will it take to make the 30th unit? (Use at least three decimals in the exponent if you use the formula approach. )

A)less than 200 hours
B)from 200 to 225 hours
C)from 225 to 250 hours
D)from 2501 to 275 hours
E)275 or more hours
سؤال
The formula approach to learning curve calculations allows us to determine the hours required for any unit.
سؤال
If it took 1000 hours to produce the first unit of a product,and the learning curve is 70%,how long will it take to produce units 26 through 50?

A)12,307 hours
B)8,404 hours
C)134 hours
D)3,903 hours
E)none of the above
سؤال
The first unit of a product took 832 hours to build,and the learning curve is 75%.How long will it take to make the 10th unit? (Use at least three decimals in the exponent if you use the formula approach. )

A)less than 250 hours
B)from 251 to 275 hours
C)from 276 to 300 hours
D)from 301 to 325 hours
E)325 or more hours
سؤال
The first unit took 10 hours and the fourth unit took 8.1 hours to complete.What is the learning curve?

A)100%
B)99%
C)95%
D)90%
E)80%
سؤال
The learning-curve table approach may be simpler to use than the formula approach,but it requires the presence of a table of learning-curve coefficients.
سؤال
The doubling approach to learning curve calculations allows us to determine the hours required for any unit.
سؤال
The learning rate for a product is 90 percent.The first unit took 10 hours to complete.The manufacturer wants to determine how many hours the fourth unit will take by using the formula approach.What is the coefficient b for that calculation?

A)-.1053
B)-.1520
C)-.3219
D).6931
E)8.1
سؤال
The first product took 10 hours to build and the learning curve is estimated to be 90%.How long will it take to make the fourth unit?

A)10 hours
B)9 hours
C)8.1 hours
D)7.5 hours
E)none of the above
سؤال
The first unit took 10 hours and the eighth unit took 1.25 hours.What is the learning curve?

A)50%
B)90%
C)80%
D)12.5%
E)none of the above
سؤال
In the formula to compute the time for the Nth unit,TN = T1(Nb),the exponent b is the learning curve rate L,expressed as a decimal.
سؤال
In the Learning-Curve Coefficients table for 70 percent learning,the sixth unit has a unit time value of 0.398.Verify that table entry by use of the formula approach.Use five decimals in your work.
سؤال
Your firm has a contract to make 20 specialty lenses for night vision equipment.The first one took 40 hours.Learning is expected at the 85% learning curve.How long will it take to finish all 20 units?
سؤال
It took 60 hours to make the first unit of a product.After the second and third units were made,the learning curve was estimated to be 80%.At $10 per hour,estimate the labor bill for the fourth unit.(Use at least three decimals in the exponent if you use the formula approach. )

A)$400 or less
B)from $400 to $420
C)from $420 to $440
D)from $1800 to $2000
E)over $2000
سؤال
A manager is trying to estimate the appropriate learning curve for a certain job.The manager notes that the first four units had a total time of 30 minutes.Which learning curve would yield approximately this result if the first unit took 9 minutes? (Use Table E.3. )

A)0.70
B)0.75
C)0.80
D)0.85
E)0.90
سؤال
The first unit of a product took 50 hours to build,and the learning curve is 80%.How long will it take to make the third unit? (Use at least three decimals in the exponent if you use the formula approach. )

A)under 30 hours
B)about 32 hours
C)about 35 hours
D)about 50 hours
E)about 75 hours
سؤال
In the formula approach to learning curve calculations,you have used the formula TN = T1 (Nb).Your manager shows you a problem for which b is specified as -.18443.What learning curve does that value represent?
سؤال
The first unit of a product took 50 hours to build,and the learning curve is 85%.How long will it take to make the 10th unit? (Use at least three decimals in the exponent if you use the formula approach. )

A)less than 24 hours
B)from 25 to 30 hours
C)from 30 to 35 hours
D)from 35 to 40 hours
E)more than 40 hours
سؤال
In the formula approach to learning curve calculations,you have used the formula TN = T1 (Nb).For a problem with a 92 percent learning curve,what is b?
سؤال
Your firm has expertise with a special type of hand-finished furniture.The learning curve is known to be 82%.If the first piece of furniture took 6 hours,estimate (using the doubling approach)how long it will take to complete the third unit.
سؤال
A defense contractor has just started producing engines for a new government contract.The first engine took 800 hours to produce.If the learning curve is 80%,how long will it take to produce the first 20 engines?

A)less than or equal to 1000 hours
B)from 1000 to 8000 hours
C)from 8000 to 8500 hours
D)from 8500 to 10000 hours
E)10,000 or more hours
سؤال
Your firm has expertise with a special type of hand-finished furniture.The learning curve is known to be 82%.If the first piece of furniture took 6 hours,use the formula approach to determine how long it will take to make the third unit.
سؤال
The first unit of a product took 900 hours to build and the learning curve is 90%.How long will it take to make the first 3 units? (Use Table E.3)

A)less than or equal to 2,470 hours
B)from 2,470 to 2,472 hours
C)from 2,472 to 2,475 hours
D)from 2,475 to 2,478 hours
E)from 2,478 to 2,481 hours
سؤال
A defense contractor has just started producing turbines for a new government contract.The first turbine took 7000 hours to produce.If the learning curve is 90%,how long will it take to produce the 10th turbine? (Use at least three decimals in the exponent if you use the formula approach. )

A)less than 4800 hours
B)from 4800 to 4900 hours
C)from 4900 to 5000 hours
D)from 5000 to 5100 hours
E)over 5100 hours
سؤال
The first unit of a product took 1,000 hours to build and the learning curve is 85%.How long will it take to make the first 5 units? (Use Table E.3)

A)less than 4,005 hours
B)from 4,005 to 4,015 hours
C)from 4,015 to 4,025 hours
D)from 4,025 to 4,035 hours
E)from 4,035 to 4,045 hours
سؤال
The first unit of a product took 832 hours to build,and the learning curve is 90%.How long will it take to make the 25th unit? (Use at least three decimals in the exponent if you use the formula approach. )

A)time ≤ 500 hours
B)500 < time ≤ 525
C)525 < time ≤ 530
D)530 < time ≤ 550
E)time > 550
سؤال
Identify one advantage and one disadvantage of the doubling approach over the formula approach to learning curve calculations.
سؤال
To use the table of learning-curve coefficients,you must specify ________ and ________.
سؤال
The Learning-Curve Coefficients table reports that for 70 percent learning,the eighth unit has a unit time value of 0.343.Verify that table entry by use of the doubling method.
سؤال
The first unit of a product took 80 work days.The learning curve is estimated to be 90%.The time for the fourth unit will be about ________ work days and the time for the first four units will be about ________ work days.(Use Table E.3)

A)51;250
B)250;51
C)65;285
D)51;cannot be determined
E)65;cannot be determined
سؤال
The ________ is the simplest approach to learning curve problems.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/110
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 26: Learning Curves
1
Which one of the following statements about learning curves is TRUE?

A)A learning curve assumes that the direct labor requirements per unit will DECREASE at an INCREASING rate as cumulative production increases.
B)A larger learning curve rate implies faster (greater)learning.
C)A learning curve graph usually follows a negative exponential curve.
D)Learning curves can be used only for individuals,not for the whole organization.
E)The formula describing the learning curve principle of doubling is computed differently when computing unit cost as opposed to unit time.
C
2
The fact that human activities typically improve when they are done on a repetitive basis is described by a:

A)normal distribution curve.
B)binomial distribution curve.
C)learning curve.
D)Poisson distribution curve.
E)repetition curve.
C
3
The earliest industrial application of learning curves came from a report by ________.
T.P.Wright
4
The fundamental premise underlying learning curve analysis is that:

A)tasks can be easily learned in organizations.
B)organizations and people become better at their tasks as the tasks are repeated.
C)learning takes place when people in organizations change.
D)total labor costs decrease as the number of production units increases.
E)doubling output cuts labor requirements per unit in half.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
5
Learning curves (or experience curves)were first applied to industry by ________ who was studying ________.

A)Frank Lloyd Wright;architecture
B)Frank Gilbreth;worker efficiency
C)T.P.Wright;air frame manufacture
D)Lilian Gilbreth;factory efficiency
E)Frederick W.Taylor;scientific management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
6
A 100% learning curve implies that:

A)learning is taking place for all products and workers.
B)learning is taking place at the best possible level.
C)a 100% reduction in the direct labor time takes place each time the production is doubled.
D)no learning is taking place.
E)None of the above is true.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
7
Which of the following statements is most appropriate with respect to a 70% learning curve?

A)There will be a 70% decrease in direct labor per unit each time the production volume doubles.
B)Each successive unit of production will take 70% of the direct labor of the previous unit.
C)There will be a 30% decrease in direct labor per unit each time production volume doubles.
D)Thirty percent of the production will be defective until full learning takes place.
E)None of the above is true.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
8
A 90% learning curve implies that each time the production volume is doubled,the direct time per unit is reduced to 90% of its previous value.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
9
Experience curves are the opposite of learning curves-as one rises,the other falls.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
10
Experience curves may be valid for industrial applications,but have no role in services such as health care procedures.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
11
If the first unit in a series of units takes 200 days to complete,and the learning curve is 80%,then the second unit will take 160 days.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
12
The earliest application of learning curves appears in the work of architect Frank Lloyd Wright.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
13
Learning curves can only be applied to labor.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
14
An 80% learning curve means that with each unit increase in production,labor requirements fall by 20%.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
15
If the learning curve for a process is 100 percent,then each unit in a series of units will have the same labor requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
16
Which of the following best conveys the essence of learning curves?

A)As the number of repetitions increases,time per unit increases.
B)As the number of repetitions decreases,time per unit increases.
C)As the number of repetitions increases,time per unit decreases.
D)As the number of repetitions increases,time per unit remains constant.
E)As the number of repetitions increases,time per unit doubles.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
17
A job with a 90% learning curve required 20 hours for the initial unit.The fourth unit should require approximately how many hours?

A)16.0
B)16.2
C)18.0
D)20.0
E)54.2
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
18
The learning curve rate is:

A)the percentage of time it will take to make each unit when the production rate doubles.
B)the log-log of the annual rate change divided by the average unit cost.
C)always based on constant value dollars.
D)only considered valid after one year of data is accumulated.
E)equal to at least 75%.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
19
A learning curve:

A)plots man-hours per dollar versus time.
B)is mathematically described by a parabola.
C)should be plotted on polar coordinate graph paper.
D)is based on the premise that organizations learn from experience.
E)follows a normal distribution.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
20
Learning curves are based on the premise that people and organizations become better at their tasks as the tasks are repeated.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
21
The learning curve may not be permanent;it can be disrupted by changes in process,personnel,or product.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
22
Learning curves can be used to establish budgets.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
23
________ are based on the premise that people and organizations get better at their tasks as the tasks are repeated.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
24
Which of the following statements regarding the usefulness of learning curves is FALSE?

A)An external use of learning curves is in supply chain negotiations.
B)A strategic use of learning curves is in evaluating company and industry performance.
C)An internal use of learning curves is in establishing costs.
D)An internal use of learning curves is in labor forecasting.
E)A strategic use of learning curves is in establishing budgets.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
25
A project manager bases his time and labor estimates on a learning curve of 86%.The actual learning curve turns out to be 89%.The manager,because of the decreased learning,will complete his project in more time and with more labor use than his estimate suggested.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
26
What problems in scheduling can arise if adjustments for learning curve effects in operations are not made?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
27
If the learning curve for a process is 80 percent,that same process has a 20 percent ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
28
In addition to labor,to which other variables have learning curves been applied?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
29
Which of the following statements comparing learning curve rates (L)to improvement rates is TRUE?

A)The learning curve rate is the same as the improvement rate.
B)The learning curve rate is a decimal value while the improvement rate is a percentage.
C)A 90 percent learning curve corresponds to a 10 percent rate of improvement.
D)Learning curve rates apply to labor only,while improvement rates apply to all resources.
E)"Learning curve rates" is American usage,while "improvement rates" is British.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
30
When comparing a 70% learning curve versus a 90% learning curve,which one results in a more rapid reduction in labor requirements? Why?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
31
Why do different organizations have different learning curves?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
32
Describe the earliest application of learning curve concepts to industry.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
33
What is the basic premise underlying the learning curve?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
34
Explain how learning curves might be applied in a scheduling application.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
35
The learning curve in the steel industry and the learning curve in heart transplants have both been estimated at 79 percent.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
36
Learning curves are:

A)the same for all products but different for different organizations.
B)the same for all organizations but different for different products.
C)the same for all organizations and all products.
D)different for different organizations and different products.
E)appropriate in services but not in manufacturing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
37
Learning curves can be applied to a variety of purposes internal to a firm,including:

A)labor forecasting.
B)scheduling.
C)establishing costs.
D)establishing budgets.
E)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
38
"By tradition,learning curves are defined in terms of the complements of their improvement rates." Explain.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
39
Learning curves have a variety of purposes.Your text places them into which three broad categories?

A)services,industry,and military
B)internal,external,and strategic
C)wholesale,distribution,and retail
D)doubling,formula,and learning curve table
E)positive learning,neutral learning,and negative learning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
40
Failure to consider the effects of learning can lead to ________ of labor needs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
41
The first unit of production took 10 hours with an 80% learning curve.How long will it take to complete both the first and second units?

A)10 hours
B)8 hours
C)18 hours
D)15.7 hours
E)There is not enough information to solve the problem.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
42
The learning curve for a product is 80 percent.The first unit took 100 hours to complete.The manufacturer wants to determine how many hours the fifth unit will take by using the formula approach.What is the coefficient b for that calculation?

A)-.0969
B)-.2231
C)-.3219
D).80
E)1.903
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
43
Suppose that there are two products with the same first product time.However,product A has an improvement rate of 10% while product B has an improvement rate of 20%.How much longer will it take to make the 10th unit of product A compared to product B?

A)Both will have the identical time for the 10th unit.
B)A will take 48% more time.
C)A will take 48% less time.
D)A will take 23% less time.
E)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
44
The first unit took 10 hours and the third unit took 5.68 hours.What is the improvement rate?

A)70%
B)30%
C)50%
D)90%
E)10%
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
45
Explain how learning curves might be applied in a bid preparation application.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
46
It took 18 hours to complete the first two products with an 80% learning curve.How long did the second product take?

A)8.0 hours
B)10.0 hours
C)18.0 hours
D)8.1 hours
E)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
47
The second unit of production took 9 hours.If the learning curve is 90% how long did the first unit take?

A)9 hours
B)10 hours
C)8.1 hours
D)8.5 hours
E)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
48
The first unit took 10 hours and the fourth unit 8.1 hours.What is the improvement rate?

A)99%
B)95%
C)90%
D)15%
E)10%
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
49
A company negotiates a price for two aircraft that includes a reduction in labor on the second aircraft consistent with a 70% learning curve.Suppose the first aircraft took 100 hours.If the improvement rate changes to 20%,how will the total time to complete both aircraft change?

A)no change
B)-10 hours
C)+ 10 hours
D)-50 hours
E)+ 50 hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
50
The first unit of a product took 832 hours to build,and the learning curve is 75%.How long will it take to make the 30th unit? (Use at least three decimals in the exponent if you use the formula approach. )

A)less than 200 hours
B)from 200 to 225 hours
C)from 225 to 250 hours
D)from 2501 to 275 hours
E)275 or more hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
51
The formula approach to learning curve calculations allows us to determine the hours required for any unit.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
52
If it took 1000 hours to produce the first unit of a product,and the learning curve is 70%,how long will it take to produce units 26 through 50?

A)12,307 hours
B)8,404 hours
C)134 hours
D)3,903 hours
E)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
53
The first unit of a product took 832 hours to build,and the learning curve is 75%.How long will it take to make the 10th unit? (Use at least three decimals in the exponent if you use the formula approach. )

A)less than 250 hours
B)from 251 to 275 hours
C)from 276 to 300 hours
D)from 301 to 325 hours
E)325 or more hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
54
The first unit took 10 hours and the fourth unit took 8.1 hours to complete.What is the learning curve?

A)100%
B)99%
C)95%
D)90%
E)80%
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
55
The learning-curve table approach may be simpler to use than the formula approach,but it requires the presence of a table of learning-curve coefficients.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
56
The doubling approach to learning curve calculations allows us to determine the hours required for any unit.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
57
The learning rate for a product is 90 percent.The first unit took 10 hours to complete.The manufacturer wants to determine how many hours the fourth unit will take by using the formula approach.What is the coefficient b for that calculation?

A)-.1053
B)-.1520
C)-.3219
D).6931
E)8.1
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
58
The first product took 10 hours to build and the learning curve is estimated to be 90%.How long will it take to make the fourth unit?

A)10 hours
B)9 hours
C)8.1 hours
D)7.5 hours
E)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
59
The first unit took 10 hours and the eighth unit took 1.25 hours.What is the learning curve?

A)50%
B)90%
C)80%
D)12.5%
E)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
60
In the formula to compute the time for the Nth unit,TN = T1(Nb),the exponent b is the learning curve rate L,expressed as a decimal.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
61
In the Learning-Curve Coefficients table for 70 percent learning,the sixth unit has a unit time value of 0.398.Verify that table entry by use of the formula approach.Use five decimals in your work.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
62
Your firm has a contract to make 20 specialty lenses for night vision equipment.The first one took 40 hours.Learning is expected at the 85% learning curve.How long will it take to finish all 20 units?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
63
It took 60 hours to make the first unit of a product.After the second and third units were made,the learning curve was estimated to be 80%.At $10 per hour,estimate the labor bill for the fourth unit.(Use at least three decimals in the exponent if you use the formula approach. )

A)$400 or less
B)from $400 to $420
C)from $420 to $440
D)from $1800 to $2000
E)over $2000
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
64
A manager is trying to estimate the appropriate learning curve for a certain job.The manager notes that the first four units had a total time of 30 minutes.Which learning curve would yield approximately this result if the first unit took 9 minutes? (Use Table E.3. )

A)0.70
B)0.75
C)0.80
D)0.85
E)0.90
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
65
The first unit of a product took 50 hours to build,and the learning curve is 80%.How long will it take to make the third unit? (Use at least three decimals in the exponent if you use the formula approach. )

A)under 30 hours
B)about 32 hours
C)about 35 hours
D)about 50 hours
E)about 75 hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
66
In the formula approach to learning curve calculations,you have used the formula TN = T1 (Nb).Your manager shows you a problem for which b is specified as -.18443.What learning curve does that value represent?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
67
The first unit of a product took 50 hours to build,and the learning curve is 85%.How long will it take to make the 10th unit? (Use at least three decimals in the exponent if you use the formula approach. )

A)less than 24 hours
B)from 25 to 30 hours
C)from 30 to 35 hours
D)from 35 to 40 hours
E)more than 40 hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
68
In the formula approach to learning curve calculations,you have used the formula TN = T1 (Nb).For a problem with a 92 percent learning curve,what is b?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
69
Your firm has expertise with a special type of hand-finished furniture.The learning curve is known to be 82%.If the first piece of furniture took 6 hours,estimate (using the doubling approach)how long it will take to complete the third unit.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
70
A defense contractor has just started producing engines for a new government contract.The first engine took 800 hours to produce.If the learning curve is 80%,how long will it take to produce the first 20 engines?

A)less than or equal to 1000 hours
B)from 1000 to 8000 hours
C)from 8000 to 8500 hours
D)from 8500 to 10000 hours
E)10,000 or more hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
71
Your firm has expertise with a special type of hand-finished furniture.The learning curve is known to be 82%.If the first piece of furniture took 6 hours,use the formula approach to determine how long it will take to make the third unit.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
72
The first unit of a product took 900 hours to build and the learning curve is 90%.How long will it take to make the first 3 units? (Use Table E.3)

A)less than or equal to 2,470 hours
B)from 2,470 to 2,472 hours
C)from 2,472 to 2,475 hours
D)from 2,475 to 2,478 hours
E)from 2,478 to 2,481 hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
73
A defense contractor has just started producing turbines for a new government contract.The first turbine took 7000 hours to produce.If the learning curve is 90%,how long will it take to produce the 10th turbine? (Use at least three decimals in the exponent if you use the formula approach. )

A)less than 4800 hours
B)from 4800 to 4900 hours
C)from 4900 to 5000 hours
D)from 5000 to 5100 hours
E)over 5100 hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
74
The first unit of a product took 1,000 hours to build and the learning curve is 85%.How long will it take to make the first 5 units? (Use Table E.3)

A)less than 4,005 hours
B)from 4,005 to 4,015 hours
C)from 4,015 to 4,025 hours
D)from 4,025 to 4,035 hours
E)from 4,035 to 4,045 hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
75
The first unit of a product took 832 hours to build,and the learning curve is 90%.How long will it take to make the 25th unit? (Use at least three decimals in the exponent if you use the formula approach. )

A)time ≤ 500 hours
B)500 < time ≤ 525
C)525 < time ≤ 530
D)530 < time ≤ 550
E)time > 550
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
76
Identify one advantage and one disadvantage of the doubling approach over the formula approach to learning curve calculations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
77
To use the table of learning-curve coefficients,you must specify ________ and ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
78
The Learning-Curve Coefficients table reports that for 70 percent learning,the eighth unit has a unit time value of 0.343.Verify that table entry by use of the doubling method.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
79
The first unit of a product took 80 work days.The learning curve is estimated to be 90%.The time for the fourth unit will be about ________ work days and the time for the first four units will be about ________ work days.(Use Table E.3)

A)51;250
B)250;51
C)65;285
D)51;cannot be determined
E)65;cannot be determined
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
80
The ________ is the simplest approach to learning curve problems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.