Deck 14: Managing Projects

ملء الشاشة (f)
exit full mode
سؤال
User concerns and designer concerns are usually the same at the beginning of the project but may diverge later as the system is built.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The goal of sociotechnical design is to create systems with better user interfaces and contribute to fewer health issues.
سؤال
Scoring models are used most commonly to support decisions rather than as the final arbiters of system selection.
سؤال
The relationship between users and information systems specialists has traditionally been a problem area for information systems implementation efforts.
سؤال
Transaction and clerical systems that displace labor and save space typically produce more measurable, tangible benefits than management information systems.
سؤال
A Gantt chart graphically depicts project tasks and their interrelationships.
سؤال
A benefit of using TCO analysis to evaluate an information technology investment is that it is able to incorporate intangible and "soft" factors such as benefits and complexity costs.
سؤال
An information systems plan contains a statement of corporate goals and specifies how information technology will support the attainment of those goals.
سؤال
The larger the systems project, the more risk the project runs in terms of being completed on time, within budget, and according to project requirements.
سؤال
Mandatory use of a system is one effective way of overcoming user resistance to an information system.
سؤال
The systems analyst is the catalyst for the entire change process and is responsible for making sure that everyone involved accepts the changes created by a new system.
سؤال
The design of jobs, health issues, and the end-user interface of information systems are all considerations in the field of ergonomics.
سؤال
The cost of a project is based on the time taken to complete the project.
سؤال
The information systems steering committee is composed of information systems managers and end-user managers responsible for overseeing several specific information systems projects.
سؤال
Counterimplementation refers to a deliberate strategy to thwart the implementation of an information system or an innovation in an organization.
سؤال
If an intended benefit of an IT project is improved decision making, managers should develop a set of metrics to quantify the value of an improved decision.
سؤال
More timely information is a tangible benefit of information systems.
سؤال
Real options pricing models use the concept of options valuation borrowed from the financial industry.
سؤال
Intangible benefits cannot be immediately quantified but may lead to quantifiable gains in the long run.
سؤال
An information system project's scope is directly related to its business requirements.
سؤال
A road map indicating the direction of systems development, the rationale, the current systems, new developments to consider, the management strategy, the implementation plan, and the budget is called a(n)

A) project plan.
B) portfolio analysis.
C) information systems plan.
D) enterprise analysis.
سؤال
Which method would you use to develop risk profiles for a firm's information system projects and assets?

A) information systems plan
B) scoring model
C) portfolio analysis
D) TCO
سؤال
The central method used in a portfolio analysis is to

A) inventory all of the organization's information systems projects and assets.
B) perform a weighted comparison of the criteria used to evaluate a system.
C) survey a large sample of managers on their objectives, decision-making process, and uses and needs for data and information.
D) interview a small number of top managers to identify their goals and criteria for achieving success.
سؤال
The ________ reviews and approves plans for systems in all divisions.

A) project management group
B) project team
C) IS steering committee
D) corporate strategic planning committee
سؤال
The criteria used for evaluation in a scoring model are usually determined by

A) lengthy discussions among the decision-making group.
B) portfolio analysis.
C) the IS steering committee.
D) systems analysts.
سؤال
The worth of systems from a financial perspective essentially revolves around the issue of

A) total cost of ownership.
B) adherence to information requirements.
C) asset utilization.
D) return on invested capital.
سؤال
The ________ is directly responsible for the individual systems project.

A) project management group
B) project team
C) IS steering committee
D) corporate strategic planning committee
سؤال
As discussed in the chapter, which of the following is not one of the immediate consequences of inadequate software project management?

A) cost overruns
B) organizational conflict
C) time slippage
D) technical shortfalls
سؤال
You have been hired by a pharmaceutical company to evaluate its inventory of systems and IT projects. Which types of projects would be best avoided?

A) any high-risk projects
B) any low-benefit projects
C) all high-risk, low-benefit projects
D) none, any project might be beneficial
سؤال
At the top of the management structure for information systems projects in a large company is

A) project management.
B) the CIO.
C) the corporate strategic planning group.
D) the board of directors.
سؤال
On average, private sector IT projects underestimated budget and delivery time of systems by ________ percent.

A) 30
B) 40
C) 50
D) 60
سؤال
Which of the following project management variables indicates how well the project satisfies management objectives?

A) goals
B) risk
C) quality
D) scope
سؤال
You are using a capital budgeting method to assess the worth of your company's new information system. Which of the following costs would you include in measuring the cash outflow?

A) increased sales of products
B) hardware and software expenditures
C) labor expenditures
D) reduced costs in production and operation
E) both A and D F) both B and C
G) A, B, C and D
سؤال
Which method is used to assign weights to various features of a system?

A) information systems plan
B) scoring model
C) portfolio analysis
D) TCO
سؤال
The central method used in a scoring model is to

A) inventory all of the organization's information systems projects and assets.
B) perform a weighted comparison of the criteria used to evaluate a system.
C) survey a large sample of managers on their objectives, decision-making process, and uses and needs for data and information.
D) interview a small number of top managers to identify their goals and criteria for achieving success.
سؤال
In using a portfolio analysis to determine which IT projects to pursue, you would

A) select the most low-risk projects from the inventory.
B) limit work to those projects with great rewards.
C) select only low-risk, high-reward projects.
D) balance high-risk, high reward projects with lower-risk projects.
سؤال
You have been hired to implement an enterprise system that will automate much of the billing and accounting work for a statewide HVAC services company. Which of the following would you prepare to describe how the new system will affect a firm's structure and operations?

A) information systems plan
B) internal integration report
C) sociotechnical design report
D) organizational impact analysis
سؤال
The ________ consists of systems analysts, specialists from the relevant end-user business areas, application programmers, and perhaps database specialists.

A) project management group
B) project team
C) IS steering committee
D) corporate strategic planning committee
سؤال
Which of the following is not one of the five main variables affecting project success?

A) risk
B) goals
C) time
D) quality
سؤال
All of the following are indications of a failed information systems project except

A) employees are refusing to switch to the new system.
B) employees have created a spreadsheet solution to manipulate the data generated by the system.
C) a redesigned Web site has fewer visits to the customer support pages.
D) employees require training to properly use the system.
سؤال
Internal integration tools

A) enable a project to have sufficient technical support for project management and development.
B) enable a project manager to properly document and monitor project plans.
C) portray a project as a network diagram with numbered nodes representing project tasks.
D) consist of ways to link the work of the implementation team with users at all organization levels.
سؤال
The project risk will rise if the project team and the IS staff lack

A) legacy applications as a starting point.
B) good equipment.
C) the required technical expertise.
D) financial studies and plans.
سؤال
Which of the following tools would you use to control risk factors in an information systems project?

A) internal integration tools
B) external integration tools
C) formal planning tools and formal control tools
D) A and B
E) A and C F) all of the above
سؤال
One example of an implementation problem is

A) poor user interface.
B) inadequate user training.
C) project running over budget.
D) changes in job activities and responsibilities.
سؤال
ROPMs value information systems similar to stock options, in that

A) ROPMs can be bought and sold like stocks.
B) a company's worth can be evaluated by the worth of their ROPMs.
C) initial expenditures on IT projects are seen as creating the right to pursue and obtain benefits from the system at a later date.
D) expenditures and benefits from IT projects are seen as inflows and outflows of cash that can be treated themselves like options.
سؤال
According to your reading of the chapter, change management is a process that

A) should be addressed before a project is developed.
B) begins when a project is implemented.
C) is used primarily to mandate user acceptance.
D) must be addressed in all systems development.
سؤال
Which of the following types of projects is most likely to fail?

A) integration of a third-party automated payment system
B) replacement of middleware with Web services for legacy application integration
C) a business process redesign project that restructures workflow and responsibilities
D) redesigning a user interface to an online investment site
سؤال
All of the following are intangible benefits of information systems except

A) improved asset utilization.
B) increased organizational learning.
C) improved operations.
D) reduced workforce.
سؤال
Which of the following statements best describes the effect that project structure has on overall project risk?

A) Highly structured projects are more complex, and run a higher risk of programmers and users misunderstanding the ultimate goals.
B) Projects with relatively undefined goals are more likely to be subjected to users changing requirements and to run a higher risk of not satisfying project goals.
C) Highly structured projects tend to be larger, affecting more organizational units, and run both the risk of out-of-control costs and becoming too difficult to control.
D) Less structured projects are more able to be quickly developed, tested, and implemented using cutting-edge RAD and JAD development techniques, and pose less risk of running up unforeseen costs.
سؤال
Which of the following is not one of the activities of the systems analyst?

A) acting as a change agent
B) communication with users
C) mediating between competing interest groups
D) formulation of capital budgeting models
سؤال
Which of the following is a limitation of using a financial approach to evaluate information systems?

A) inability to measure ROI
B) inability to control vendor costs
C) inability to assess risk
D) inability to assess costs from organizational disruption
سؤال
The principal capital budgeting models for evaluating information technology projects are the payback method, the accounting rate of return on investment (ROI), the net present value, and the

A) future present value.
B) internal rate of return.
C) external rate of return.
D) ROPM.
سؤال
Which of the following statistics from studies on failed projects is not true?

A) Between 30 and 40 percent of software projects fail in terms of budget, schedule, and quality.
B) Thirty-two percent of technology investments are completed on time, within budget, and with requirements met.
C) The average cost overrun of IT projects is 60 percent.
D) One in six IT projects have an average cost overrun of 200 percent.
سؤال
To best evaluate, from a financial standpoint, an IT investment whose benefits cannot be firmly established in advance, you would use

A) capital budgeting.
B) the real option pricing model.
C) a scoring model.
D) the net present value.
سؤال
Which of the following is not a responsibility of effective change management?

A) integrating legacy systems
B) dealing with fear and anxiety about new systems
C) training users of the new system
D) enforcing user participation at all stages of system development
سؤال
Which of the following projects is the riskiest?

A) a project that managers are concerned will affect their roles and job descriptions
B) a project that requires technical expertise that your firm's IT employees do not have
C) a project that has a strict deadline, or sales will suffer
D) a project that will automate many clerical duties
سؤال
Which of the following is not a tangible benefit of information systems?

A) reduced rate of growth in expenses
B) lower computer expenses
C) improved resource control
D) increased productivity
سؤال
The organizational activities working toward the adoption, management, and routinization of a new information system are called

A) production.
B) maintenance.
C) implementation.
D) acceptance.
سؤال
In working with ROPMs and options valuation, a call option is a(n)

A) obligation to purchase an asset at a later date at a fixed price.
B) obligation to either purchase or sell an asset at a later date at a strike price.
C) right to purchase an asset at a later date at a strike price.
D) right to purchase or sell an asset at a later date at a fixed price.
سؤال
Users prefer systems that

A) are oriented to facilitating organizational tasks and solving business problems.
B) work with existing DBMS.
C) are able to provide optimum hardware and software efficiency.
D) are capable of storing much more data than they need.
سؤال
A planned series of related activities for achieving a specific business goal is called a(n) ________.
سؤال
A user-designer ________ occurs when there is a difference in background, interests and priorities that impedes discussion and problem solving among users and IS specialists.
سؤال
Which type of planning tool shows each task as a horizontal bar whose length is proportional to the time required to complete it?

A) PERT chart
B) Gantt chart
C) both A and B
D) neither A nor B
سؤال
Formal planning and control tools

A) enable a project to have sufficient technical support for project management and development.
B) enable a project manager to properly document and monitor project plans.
C) portray a project as a network diagram with numbered nodes representing project tasks.
D) consist of ways to link the work of the implementation team with users at all organization levels.
سؤال
________ is the interaction of people and machines in the work environment, including the design of jobs, health issues, and the end-user interface of information systems.
سؤال
A(n) ________ is a method for deciding among alternative systems based on a system of ratings for selected objectives.
سؤال
The ________ is the part of the system that users interact with.
سؤال
The most widely used project management software today is

A) Vertabase.
B) IBM Project Guide.
C) Microsoft Project.
D) Microsoft Excel.
سؤال
________ refers to the application of knowledge, skills, tools and techniques to achieve specific targets within specified budget and time constraints.
سؤال
In one strategic approach to determining information requirements, managers select a small number of ________ that reflect firm success and profitability.
سؤال
One of the five major variables in project management, ________ is an indicator of how well the project satisfies management objectives.
سؤال
________ methods rely on measures of cash flows into and out of the firm.
سؤال
An example of using an internal integration tool would be to

A) define task dependencies.
B) include user representatives as active members of the project team.
C) create a PERT chart.
D) hold frequent project team meetings.
سؤال
An example of using an external integration tool would be to

A) define task dependencies.
B) include user representatives as active members of the project team.
C) create a PERT chart.
D) hold frequent project team meetings.
سؤال
To review a project's tasks and their interrelationships, you would use a

A) PERT chart.
B) Gantt chart.
C) either A or B.
D) neither A nor B.
سؤال
In sociotechnical design

A) separate sets of technical and social design solutions are developed and compared.
B) ergonomic features of a system and the system's technical design are given equal importance.
C) systems analysts with proven backgrounds in sociological concerns rate and compare a system's social and technical aspects.
D) all of the above.
سؤال
External integration tools

A) enable a project to have sufficient technical support for project management and development.
B) enable a project manager to properly document and monitor project plans.
C) portray a project as a network diagram with numbered nodes representing project tasks.
D) consist of ways to link the work of the implementation team with users at all organization levels.
سؤال
Which type of tool helps project managers identify bottlenecks in project development?

A) internal integration tools
B) external integration tools
C) formal planning and control tools
D) both B and C
سؤال
Successful system building requires careful ________ management to minimize organizational resistance.
سؤال
Which of the following is not an organizational factor in systems planning and implementation?

A) standards and performance monitoring
B) government regulatory compliance
C) health and safety
D) user interface
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/90
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 14: Managing Projects
1
User concerns and designer concerns are usually the same at the beginning of the project but may diverge later as the system is built.
False
2
The goal of sociotechnical design is to create systems with better user interfaces and contribute to fewer health issues.
False
3
Scoring models are used most commonly to support decisions rather than as the final arbiters of system selection.
True
4
The relationship between users and information systems specialists has traditionally been a problem area for information systems implementation efforts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
5
Transaction and clerical systems that displace labor and save space typically produce more measurable, tangible benefits than management information systems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
6
A Gantt chart graphically depicts project tasks and their interrelationships.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
7
A benefit of using TCO analysis to evaluate an information technology investment is that it is able to incorporate intangible and "soft" factors such as benefits and complexity costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
8
An information systems plan contains a statement of corporate goals and specifies how information technology will support the attainment of those goals.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
9
The larger the systems project, the more risk the project runs in terms of being completed on time, within budget, and according to project requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
10
Mandatory use of a system is one effective way of overcoming user resistance to an information system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
11
The systems analyst is the catalyst for the entire change process and is responsible for making sure that everyone involved accepts the changes created by a new system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
12
The design of jobs, health issues, and the end-user interface of information systems are all considerations in the field of ergonomics.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
13
The cost of a project is based on the time taken to complete the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
14
The information systems steering committee is composed of information systems managers and end-user managers responsible for overseeing several specific information systems projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
15
Counterimplementation refers to a deliberate strategy to thwart the implementation of an information system or an innovation in an organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
16
If an intended benefit of an IT project is improved decision making, managers should develop a set of metrics to quantify the value of an improved decision.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
17
More timely information is a tangible benefit of information systems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
18
Real options pricing models use the concept of options valuation borrowed from the financial industry.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
19
Intangible benefits cannot be immediately quantified but may lead to quantifiable gains in the long run.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
20
An information system project's scope is directly related to its business requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
21
A road map indicating the direction of systems development, the rationale, the current systems, new developments to consider, the management strategy, the implementation plan, and the budget is called a(n)

A) project plan.
B) portfolio analysis.
C) information systems plan.
D) enterprise analysis.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
22
Which method would you use to develop risk profiles for a firm's information system projects and assets?

A) information systems plan
B) scoring model
C) portfolio analysis
D) TCO
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
23
The central method used in a portfolio analysis is to

A) inventory all of the organization's information systems projects and assets.
B) perform a weighted comparison of the criteria used to evaluate a system.
C) survey a large sample of managers on their objectives, decision-making process, and uses and needs for data and information.
D) interview a small number of top managers to identify their goals and criteria for achieving success.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
24
The ________ reviews and approves plans for systems in all divisions.

A) project management group
B) project team
C) IS steering committee
D) corporate strategic planning committee
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
25
The criteria used for evaluation in a scoring model are usually determined by

A) lengthy discussions among the decision-making group.
B) portfolio analysis.
C) the IS steering committee.
D) systems analysts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
26
The worth of systems from a financial perspective essentially revolves around the issue of

A) total cost of ownership.
B) adherence to information requirements.
C) asset utilization.
D) return on invested capital.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
27
The ________ is directly responsible for the individual systems project.

A) project management group
B) project team
C) IS steering committee
D) corporate strategic planning committee
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
28
As discussed in the chapter, which of the following is not one of the immediate consequences of inadequate software project management?

A) cost overruns
B) organizational conflict
C) time slippage
D) technical shortfalls
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
29
You have been hired by a pharmaceutical company to evaluate its inventory of systems and IT projects. Which types of projects would be best avoided?

A) any high-risk projects
B) any low-benefit projects
C) all high-risk, low-benefit projects
D) none, any project might be beneficial
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
30
At the top of the management structure for information systems projects in a large company is

A) project management.
B) the CIO.
C) the corporate strategic planning group.
D) the board of directors.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
31
On average, private sector IT projects underestimated budget and delivery time of systems by ________ percent.

A) 30
B) 40
C) 50
D) 60
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
32
Which of the following project management variables indicates how well the project satisfies management objectives?

A) goals
B) risk
C) quality
D) scope
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
33
You are using a capital budgeting method to assess the worth of your company's new information system. Which of the following costs would you include in measuring the cash outflow?

A) increased sales of products
B) hardware and software expenditures
C) labor expenditures
D) reduced costs in production and operation
E) both A and D F) both B and C
G) A, B, C and D
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
34
Which method is used to assign weights to various features of a system?

A) information systems plan
B) scoring model
C) portfolio analysis
D) TCO
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
35
The central method used in a scoring model is to

A) inventory all of the organization's information systems projects and assets.
B) perform a weighted comparison of the criteria used to evaluate a system.
C) survey a large sample of managers on their objectives, decision-making process, and uses and needs for data and information.
D) interview a small number of top managers to identify their goals and criteria for achieving success.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
36
In using a portfolio analysis to determine which IT projects to pursue, you would

A) select the most low-risk projects from the inventory.
B) limit work to those projects with great rewards.
C) select only low-risk, high-reward projects.
D) balance high-risk, high reward projects with lower-risk projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
37
You have been hired to implement an enterprise system that will automate much of the billing and accounting work for a statewide HVAC services company. Which of the following would you prepare to describe how the new system will affect a firm's structure and operations?

A) information systems plan
B) internal integration report
C) sociotechnical design report
D) organizational impact analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
38
The ________ consists of systems analysts, specialists from the relevant end-user business areas, application programmers, and perhaps database specialists.

A) project management group
B) project team
C) IS steering committee
D) corporate strategic planning committee
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
39
Which of the following is not one of the five main variables affecting project success?

A) risk
B) goals
C) time
D) quality
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
40
All of the following are indications of a failed information systems project except

A) employees are refusing to switch to the new system.
B) employees have created a spreadsheet solution to manipulate the data generated by the system.
C) a redesigned Web site has fewer visits to the customer support pages.
D) employees require training to properly use the system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
41
Internal integration tools

A) enable a project to have sufficient technical support for project management and development.
B) enable a project manager to properly document and monitor project plans.
C) portray a project as a network diagram with numbered nodes representing project tasks.
D) consist of ways to link the work of the implementation team with users at all organization levels.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
42
The project risk will rise if the project team and the IS staff lack

A) legacy applications as a starting point.
B) good equipment.
C) the required technical expertise.
D) financial studies and plans.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
43
Which of the following tools would you use to control risk factors in an information systems project?

A) internal integration tools
B) external integration tools
C) formal planning tools and formal control tools
D) A and B
E) A and C F) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
44
One example of an implementation problem is

A) poor user interface.
B) inadequate user training.
C) project running over budget.
D) changes in job activities and responsibilities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
45
ROPMs value information systems similar to stock options, in that

A) ROPMs can be bought and sold like stocks.
B) a company's worth can be evaluated by the worth of their ROPMs.
C) initial expenditures on IT projects are seen as creating the right to pursue and obtain benefits from the system at a later date.
D) expenditures and benefits from IT projects are seen as inflows and outflows of cash that can be treated themselves like options.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
46
According to your reading of the chapter, change management is a process that

A) should be addressed before a project is developed.
B) begins when a project is implemented.
C) is used primarily to mandate user acceptance.
D) must be addressed in all systems development.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
47
Which of the following types of projects is most likely to fail?

A) integration of a third-party automated payment system
B) replacement of middleware with Web services for legacy application integration
C) a business process redesign project that restructures workflow and responsibilities
D) redesigning a user interface to an online investment site
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
48
All of the following are intangible benefits of information systems except

A) improved asset utilization.
B) increased organizational learning.
C) improved operations.
D) reduced workforce.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
49
Which of the following statements best describes the effect that project structure has on overall project risk?

A) Highly structured projects are more complex, and run a higher risk of programmers and users misunderstanding the ultimate goals.
B) Projects with relatively undefined goals are more likely to be subjected to users changing requirements and to run a higher risk of not satisfying project goals.
C) Highly structured projects tend to be larger, affecting more organizational units, and run both the risk of out-of-control costs and becoming too difficult to control.
D) Less structured projects are more able to be quickly developed, tested, and implemented using cutting-edge RAD and JAD development techniques, and pose less risk of running up unforeseen costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
50
Which of the following is not one of the activities of the systems analyst?

A) acting as a change agent
B) communication with users
C) mediating between competing interest groups
D) formulation of capital budgeting models
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
51
Which of the following is a limitation of using a financial approach to evaluate information systems?

A) inability to measure ROI
B) inability to control vendor costs
C) inability to assess risk
D) inability to assess costs from organizational disruption
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
52
The principal capital budgeting models for evaluating information technology projects are the payback method, the accounting rate of return on investment (ROI), the net present value, and the

A) future present value.
B) internal rate of return.
C) external rate of return.
D) ROPM.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
53
Which of the following statistics from studies on failed projects is not true?

A) Between 30 and 40 percent of software projects fail in terms of budget, schedule, and quality.
B) Thirty-two percent of technology investments are completed on time, within budget, and with requirements met.
C) The average cost overrun of IT projects is 60 percent.
D) One in six IT projects have an average cost overrun of 200 percent.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
54
To best evaluate, from a financial standpoint, an IT investment whose benefits cannot be firmly established in advance, you would use

A) capital budgeting.
B) the real option pricing model.
C) a scoring model.
D) the net present value.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
55
Which of the following is not a responsibility of effective change management?

A) integrating legacy systems
B) dealing with fear and anxiety about new systems
C) training users of the new system
D) enforcing user participation at all stages of system development
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
56
Which of the following projects is the riskiest?

A) a project that managers are concerned will affect their roles and job descriptions
B) a project that requires technical expertise that your firm's IT employees do not have
C) a project that has a strict deadline, or sales will suffer
D) a project that will automate many clerical duties
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
57
Which of the following is not a tangible benefit of information systems?

A) reduced rate of growth in expenses
B) lower computer expenses
C) improved resource control
D) increased productivity
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
58
The organizational activities working toward the adoption, management, and routinization of a new information system are called

A) production.
B) maintenance.
C) implementation.
D) acceptance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
59
In working with ROPMs and options valuation, a call option is a(n)

A) obligation to purchase an asset at a later date at a fixed price.
B) obligation to either purchase or sell an asset at a later date at a strike price.
C) right to purchase an asset at a later date at a strike price.
D) right to purchase or sell an asset at a later date at a fixed price.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
60
Users prefer systems that

A) are oriented to facilitating organizational tasks and solving business problems.
B) work with existing DBMS.
C) are able to provide optimum hardware and software efficiency.
D) are capable of storing much more data than they need.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
61
A planned series of related activities for achieving a specific business goal is called a(n) ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
62
A user-designer ________ occurs when there is a difference in background, interests and priorities that impedes discussion and problem solving among users and IS specialists.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
63
Which type of planning tool shows each task as a horizontal bar whose length is proportional to the time required to complete it?

A) PERT chart
B) Gantt chart
C) both A and B
D) neither A nor B
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
64
Formal planning and control tools

A) enable a project to have sufficient technical support for project management and development.
B) enable a project manager to properly document and monitor project plans.
C) portray a project as a network diagram with numbered nodes representing project tasks.
D) consist of ways to link the work of the implementation team with users at all organization levels.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
65
________ is the interaction of people and machines in the work environment, including the design of jobs, health issues, and the end-user interface of information systems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
66
A(n) ________ is a method for deciding among alternative systems based on a system of ratings for selected objectives.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
67
The ________ is the part of the system that users interact with.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
68
The most widely used project management software today is

A) Vertabase.
B) IBM Project Guide.
C) Microsoft Project.
D) Microsoft Excel.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
69
________ refers to the application of knowledge, skills, tools and techniques to achieve specific targets within specified budget and time constraints.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
70
In one strategic approach to determining information requirements, managers select a small number of ________ that reflect firm success and profitability.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
71
One of the five major variables in project management, ________ is an indicator of how well the project satisfies management objectives.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
72
________ methods rely on measures of cash flows into and out of the firm.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
73
An example of using an internal integration tool would be to

A) define task dependencies.
B) include user representatives as active members of the project team.
C) create a PERT chart.
D) hold frequent project team meetings.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
74
An example of using an external integration tool would be to

A) define task dependencies.
B) include user representatives as active members of the project team.
C) create a PERT chart.
D) hold frequent project team meetings.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
75
To review a project's tasks and their interrelationships, you would use a

A) PERT chart.
B) Gantt chart.
C) either A or B.
D) neither A nor B.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
76
In sociotechnical design

A) separate sets of technical and social design solutions are developed and compared.
B) ergonomic features of a system and the system's technical design are given equal importance.
C) systems analysts with proven backgrounds in sociological concerns rate and compare a system's social and technical aspects.
D) all of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
77
External integration tools

A) enable a project to have sufficient technical support for project management and development.
B) enable a project manager to properly document and monitor project plans.
C) portray a project as a network diagram with numbered nodes representing project tasks.
D) consist of ways to link the work of the implementation team with users at all organization levels.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
78
Which type of tool helps project managers identify bottlenecks in project development?

A) internal integration tools
B) external integration tools
C) formal planning and control tools
D) both B and C
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
79
Successful system building requires careful ________ management to minimize organizational resistance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
80
Which of the following is not an organizational factor in systems planning and implementation?

A) standards and performance monitoring
B) government regulatory compliance
C) health and safety
D) user interface
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.