Deck 8: Managing Risk

ملء الشاشة (f)
exit full mode
سؤال
Addressing risks proactively will increase the chances of accomplishing the project objective.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Historical information from past projects is another source that can be helpful in identifying possible risks.
سؤال
Some level of risk planning should be done during the initiating phase of the project life cycle to make sure that a contractor understands the risks involved with bidding on a proposed project.
سؤال
If the risks seem too great, the contractor may decide to not bid on a proposed project.
سؤال
Addressing risks ____ will increase the chances of accomplishing the project objective.

A) reactively
B) inactively
C) hyperactively
D) proactively
سؤال
____ includes determining which risks may adversely affect the project objective and what the impact of each risk might be if it occurs.

A) Risk modification
B) Risk avoidance
C) Risk identification
D) Risk acceptance
سؤال
The project team should not change the estimated impacts of previously identified risks as the project progresses.
سؤال
Managing risk includes taking action to foster the likelihood of occurrence or the impact of such unfavorable events.
سؤال
Waiting for unfavorable events to occur and then reacting to them

A) is part of a well designed response plan.
B) reflects much planning and consideration of consequences.
C) is a cost saving measure by not planning.
D) can result in panic and costly responses.
سؤال
Risk management involves identifying, assessing, and responding to project risks in order to minimize the likelihood of occurrence and/or potential impact of adverse events on the accomplishment of the project objective.
سؤال
Waiting for problematic events to occur and then reacting to them can result in panic and costly responses.
سؤال
A risk is an uncertain event that, if it occurs,

A) must be accepted.
B) can jeopardize accomplishing the project objective.
C) must be avoided.
D) helps to achieve the project objective.
سؤال
____ includes taking action to prevent or minimize the likelihood of occurrence or the impact of such unfavorable events.

A) Managing risk
B) Taking chances
C) Identifying the trigger point
D) Naming the person responsible for the risk response plan
سؤال
The risks should be those that are somewhat likely to occur and/or can have a significant positive impact on accomplishing the project objective.
سؤال
With knowledge of potential risks, the contractor can include contingency or management reserve amounts in the bid price.
سؤال
____ involves identifying, assessing, and responding to project risks in order to minimize the likelihood of occurrence and/or potential impact of adverse events on the accomplishment of the project objective.

A) Risk response
B) Risk management
C) Risk responsibility
D) Risk acceptance and avoidance
سؤال
The project team can progressively elaborate and identify new risks as more information is known or becomes clear.
سؤال
A risk is an uncertain event that, if it occurs, can jeopardize accomplishing the project objective.
سؤال
Risk identification is determining which risks may adversely affect the development of the project work breakdown structure and what the impact of each risk might be if it occurs.
سؤال
The project manager needs to set the tone for encouraging open and timely discussion of risks among the project team.
سؤال
Risks ____ should be given higher priority because if the risk occurs, it would have a greater impact on the schedule than if it was associated with activities on a path that has a large positive value of total slack.

A) that occur first in the project
B) that affect the most costly activities
C) on the critical path
D) that affect the activities near the end of the project
سؤال
If the risks seem ____, the contractor may decide to not bid on a proposed project.

A) too great
B) within reason
C) acceptable
D) easily mitigated
سؤال
Risks are prioritized based on

A) the likelihood of occurrence and degree of impact.
B) the order they are identified.
C) the gut feeling of the project team.
D) the priorities set in a different project.
سؤال
____ can be to avoid the risk, mitigate the risk, or accept the risk.

A) A risk response plan
B) A risk assessment
C) A risk management strategy
D) A risk impact statement
سؤال
A common approach to identifying the sources of risks is

A) brainstorming.
B) developing a contingency plan.
C) elaboration.
D) evaluating the probability.
سؤال
____ contains the steps for how to mitigate the risk if it should occur during the project.

A) The action trigger
B) The response plan
C) The mitigation plan
D) The degree of impact
سؤال
____ is a defined set of actions to prevent or reduce the likelihood of occurrence or the impact of a risk, or to implement if the risk event occurs.

A) A risk response plan
B) A risk assessment
C) A risk management strategy
D) A risk impact statement
سؤال
____ involves developing an action plan to reduce the likelihood of occurrence or potential impact of each risk, establishing a trigger point for when to implement the actions to address each risk, and assigning responsibility to specific individuals for implementing each response plan.

A) Risk assessment
B) Risk management strategy
C) Risk response planning
D) Risk impact statement
سؤال
To be able to communicate risks to the contractor, sometimes a sponsor identifies major risks for the project in

A) the lessons learned after the project.
B) the project charter when the project is authorized.
C) the contract for service.
D) the project evaluation meeting.
سؤال
____ is a list of the potential outcomes if the risk were to occur.

A) The mitigation plan
B) The priority order
C) The impact of a risk
D) The action trigger
سؤال
____ is the warning flag for when to implement the action plan for the risk.

A) The action trigger
B) The priority order
C) The mitigation plan
D) The degree of impact
سؤال
____ involves determining the likelihood that the risk event will occur and the degree of impact the event will have on the project objective.

A) Priority alignment
B) Responding to a risk
C) Assessing each risk
D) Risk planning
سؤال
A risk assessment matrix is a tool for

A) making a person responsible for the risk.
B) stating if the risk will be avoided, accepted, or mitigated.
C) examining the results of the project.
D) assessing and managing risks.
سؤال
Risks may change as the project progresses and should be reflected in

A) the Risk Assessment Matrix.
B) the action trigger point.
C) the risk response plan.
D) the risk management strategy.
سؤال
____ is a rating of low, medium, or high based upon the expected probability of a risk occurring during the project.

A) The action trigger
B) The priority order
C) The mitigation plan
D) The likelihood of occurrence
سؤال
____ is a rating of low, medium, or high based on the expected level of change in completing the project's objective if the risk were to occur during the project.

A) The action trigger
B) The priority order
C) The mitigation plan
D) The degree of impact
سؤال
Some level of risk planning should be done during ____ of the project life cycle to make sure that a contractor understands the risks involved with bidding on a proposed project.With knowledge of potential risks, the contractor can include contingency or management reserve amounts in the bid price.

A) the planning phase
B) the performing phase
C) the initiating phase
D) the closing phase
سؤال
Project prices and budgets should include ____ to pay for additional costs associated with implementing response plans.

A) a padded budget
B) a contingency or management reserve
C) expenses for other charges in the office to help
D) extra overhead
سؤال
Establishing risk categories may help to identify and evaluate risks.Some categories to help identify risks include all the following except:

A) technical and schedule.
B) cost and human resources.
C) previously identified risks.
D) external factors, sponsor and customer.
سؤال
Risks can be identified by using all the following except:

A) historical information.
B) progressive elaboration.
C) previously identified risks.
D) ignoring potential problems.
سؤال
___ is the possibility that an unwarranted circumstance will occur that can result in some loss.

A) Risk
B) Contingency
C) Anticipated loss
D) Management reserve
سؤال
The most common method of identifying the sources of risks is:

A) work analysis chart
B) network diagram
C) brainstorming
D) initiation reports
سؤال
Establishing risk categories may help to identify and evaluate risks.List some categories to help identify risks.
سؤال
Risk ____ involves identifying, assessing, and responding to project risks in order to minimize the likelihood and impact of the consequences of adverse events on the achievement of the project objective.

A) management
B) assessment
C) identification
D) response generation
سؤال
A defined set of actions to prevent or reduce the likelihood of occurrence or the impact of risk is the

A) risk assessment matrix
B) the action trigger
C) risk identification brainstorming session
D) risk response plan
سؤال
Regularly review and evaluate ____ to determine if there are any changes to the likelihood of occurrence or the potential impact of any of the risks.

A) all risks
B) only those risks of highest priority
C) risks that have yet to be identified
D) risks that have occurred to see if they will happen again
سؤال
____ involves regularly reviewing the risk management matrix throughout the project.

A) Risk assessing
B) Risk planning
C) Risk monitoring
D) Risk avoidance
سؤال
For risks that have occurred in a project, the team should

A) track and document the risks and store the information in lessons learned.
B) expect that the other risks are going to occur so they should increase resources for those tasks impacted.
C) add more resources to the tasks that are impacted by the risk occurring.
D) talk about the risk without recording the minutes of the meeting.
سؤال
This involves taking action to reduce the likelihood that the risk event will occur or reducing the potential impact.

A) Risk identification
B) Avoiding the risk
C) Accepting the risk
D) Mitigating the risk
سؤال
As the project progresses, the project team should

A) expect the risks to remain the same throughout to project.
B) incorporate a new technology system to manage risks even if the system wasn't on their project plan.
C) regularly review the risk management matrix to evaluate any changes.
D) change the project scope just in case the remaining identified risks occur.
سؤال
The agenda for project status review meetings should include an item for:

A) risk assessment
B) risk identification
C) risk monitoring
D) risk contingency matrix
سؤال
Risk management involves identifying, assessing, and responding to project risks to

A) add extra costs to the project
B) pass the expense of the risks to the customer
C) reduce the likelihood of occurrence and their potential impact
D) inform the project team so they can ignore the consequences
سؤال
____ are a good forum for regularly reviewing, updating, and addressing risks.

A) Social gatherings of the team
B) Project meetings
C) Problem solving meetings
D) Project planning meetings
سؤال
Track and document which risks ____ and the impact of those risks.

A) were avoided
B) had the highest priority
C) may affect the critical path
D) actually occurred
سؤال
Which of the following statements about risks is true?

A) Risks only occur in projects that are long term projects.
B) Risks are higher in long term projects.
C) The consequence of a risk can be positive for the project.
D) Only risks that impact the critical path of the project are important to mitigate.
سؤال
The _______ should be those that are somewhat likely to occur and/or can have a significant negative impact on accomplishing the project objective.

A) risk response plans
B) action triggers
C) impacts
D) risks
سؤال
A good forum for regularly reviewing, updating, and addressing risks is

A) phone conversation with project stakeholders.
B) project meeting.
C) during social events to get inside information from others.
D) the meeting for addressing the risk after it has occurred.
سؤال
The trigger point in the risk response plan is when the project team should

A) implement the action plan for each risk.
B) stop working on the project because it cannot be completed.
C) avoid the risk by moving onto the next activity.
D) brainstorm for ideas on how to manage the risk.
سؤال
____ risk involves determining the likelihood that the risk event will occur and the degree of impact the event will have on the project objective.

A) Assessing
B) Identifying
C) Response planning
D) Monitoring
سؤال
A realistic approach to managing risk is to

A) wait until the risk occurs then manage it.
B) brainstorm possible risks and assess their likelihood of occurrence and level of impact.
C) determine all the possible risks that could occur and add in contingencies into the project.
D) have a staff member assigned to only work on mitigating risks for projects.
سؤال
Risk response planning involves all the following except

A) developing an action plan to reduce the likelihood of occurrence or potential impact of each risk.
B) establishing a trigger point for when to implement the actions to address each risk.
C) assigning responsibility to specific individuals for implementing each response plan.
D) brainstorming the possible risks that could occur in the project.
سؤال
Which of the following is not an example of a risk?

A) technology advances make the technology planned obsolete before project completion.
B) non-availability of resources with the needed skills.
C) encountering a large amount of rock while digging the foundation for a construction project.
D) have signs made to give additional directions to attendees.
سؤال
A possible action trigger for rain or snow on the day of an event is

A) reserve an indoor space for the event.
B) low attendance at the event.
C) review the weather report two days before the event.
D) move the event to the rain date scheduled.
سؤال
The possible response plan for vendor delay in delivery of critical equipment is

A) check the order status one week before delivery needed.
B) project task completion delayed until equipment arrives.
C) contact secondary vendor to supply the part.
D) financial loss due to the delay.
سؤال
A risk is

A) an uncertain event that, if it occurs, can jeopardize accomplishing the project objective.
B) something that increases the susceptibility of occurrence.
C) venture capital to support a project.
D) a harmless event or activity.
سؤال
The possible impact for rain or snow on the day of an event is

A) reserve an indoor space for the event.
B) low attendance at the event.
C) review the weather report two days before the event.
D) move the event to the rain date scheduled.
سؤال
When assigning responsibility for a risk, it is best to

A) assign responsibility to more than one person.
B) assign responsibility to a single person.
C) assign responsibility to the project team.
D) not assign responsibility to those risks with low risk of occurrence.
سؤال
Risks can be prioritized based on

A) the likelihood of occurrence and degree of impact.
B) the project team member that identified the risk.
C) the amount of time the project team has to manage the risk.
D) the amount of funds planned to manage the risk.
سؤال
Risks on the critical path should be

A) given lower priority than those activities with positive total slack.
B) given equal priority than those activities with positive total slack.
C) given higher priority than those activities with positive total slack.
D) given higher priority than those activities with no total slack.
سؤال
A contingency or management reserve to pay for additional costs associated with implementing response plans should be

A) absorbed as a cost of doing business.
B) planned into the project prices and budgets.
C) requested to be paid by the project sponsor in addition to the costs of doing the project.
D) added to the budget of the next project with the same sponsor.
سؤال
A risk response plan can

A) ignore the risk or pay for the risk.
B) examine the risk.
C) avoid the risk, mitigate the risk, or accept the risk.
D) record the risk for lessons learned.
سؤال
How do the initial risks identified change as the project progresses?

A) The risks are the same as the project progresses.
B) Some risks at the start of the project are no longer risks as the project progresses.
C) The sponsor identified all the risks while writing the project charter.
D) The risks always increase as the project progresses.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/72
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 8: Managing Risk
1
Addressing risks proactively will increase the chances of accomplishing the project objective.
True
2
Historical information from past projects is another source that can be helpful in identifying possible risks.
True
3
Some level of risk planning should be done during the initiating phase of the project life cycle to make sure that a contractor understands the risks involved with bidding on a proposed project.
True
4
If the risks seem too great, the contractor may decide to not bid on a proposed project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
5
Addressing risks ____ will increase the chances of accomplishing the project objective.

A) reactively
B) inactively
C) hyperactively
D) proactively
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
6
____ includes determining which risks may adversely affect the project objective and what the impact of each risk might be if it occurs.

A) Risk modification
B) Risk avoidance
C) Risk identification
D) Risk acceptance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
7
The project team should not change the estimated impacts of previously identified risks as the project progresses.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
8
Managing risk includes taking action to foster the likelihood of occurrence or the impact of such unfavorable events.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
9
Waiting for unfavorable events to occur and then reacting to them

A) is part of a well designed response plan.
B) reflects much planning and consideration of consequences.
C) is a cost saving measure by not planning.
D) can result in panic and costly responses.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
10
Risk management involves identifying, assessing, and responding to project risks in order to minimize the likelihood of occurrence and/or potential impact of adverse events on the accomplishment of the project objective.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
11
Waiting for problematic events to occur and then reacting to them can result in panic and costly responses.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
12
A risk is an uncertain event that, if it occurs,

A) must be accepted.
B) can jeopardize accomplishing the project objective.
C) must be avoided.
D) helps to achieve the project objective.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
13
____ includes taking action to prevent or minimize the likelihood of occurrence or the impact of such unfavorable events.

A) Managing risk
B) Taking chances
C) Identifying the trigger point
D) Naming the person responsible for the risk response plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
14
The risks should be those that are somewhat likely to occur and/or can have a significant positive impact on accomplishing the project objective.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
15
With knowledge of potential risks, the contractor can include contingency or management reserve amounts in the bid price.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
16
____ involves identifying, assessing, and responding to project risks in order to minimize the likelihood of occurrence and/or potential impact of adverse events on the accomplishment of the project objective.

A) Risk response
B) Risk management
C) Risk responsibility
D) Risk acceptance and avoidance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
17
The project team can progressively elaborate and identify new risks as more information is known or becomes clear.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
18
A risk is an uncertain event that, if it occurs, can jeopardize accomplishing the project objective.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
19
Risk identification is determining which risks may adversely affect the development of the project work breakdown structure and what the impact of each risk might be if it occurs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
20
The project manager needs to set the tone for encouraging open and timely discussion of risks among the project team.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
21
Risks ____ should be given higher priority because if the risk occurs, it would have a greater impact on the schedule than if it was associated with activities on a path that has a large positive value of total slack.

A) that occur first in the project
B) that affect the most costly activities
C) on the critical path
D) that affect the activities near the end of the project
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
22
If the risks seem ____, the contractor may decide to not bid on a proposed project.

A) too great
B) within reason
C) acceptable
D) easily mitigated
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
23
Risks are prioritized based on

A) the likelihood of occurrence and degree of impact.
B) the order they are identified.
C) the gut feeling of the project team.
D) the priorities set in a different project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
24
____ can be to avoid the risk, mitigate the risk, or accept the risk.

A) A risk response plan
B) A risk assessment
C) A risk management strategy
D) A risk impact statement
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
25
A common approach to identifying the sources of risks is

A) brainstorming.
B) developing a contingency plan.
C) elaboration.
D) evaluating the probability.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
26
____ contains the steps for how to mitigate the risk if it should occur during the project.

A) The action trigger
B) The response plan
C) The mitigation plan
D) The degree of impact
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
27
____ is a defined set of actions to prevent or reduce the likelihood of occurrence or the impact of a risk, or to implement if the risk event occurs.

A) A risk response plan
B) A risk assessment
C) A risk management strategy
D) A risk impact statement
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
28
____ involves developing an action plan to reduce the likelihood of occurrence or potential impact of each risk, establishing a trigger point for when to implement the actions to address each risk, and assigning responsibility to specific individuals for implementing each response plan.

A) Risk assessment
B) Risk management strategy
C) Risk response planning
D) Risk impact statement
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
29
To be able to communicate risks to the contractor, sometimes a sponsor identifies major risks for the project in

A) the lessons learned after the project.
B) the project charter when the project is authorized.
C) the contract for service.
D) the project evaluation meeting.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
30
____ is a list of the potential outcomes if the risk were to occur.

A) The mitigation plan
B) The priority order
C) The impact of a risk
D) The action trigger
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
31
____ is the warning flag for when to implement the action plan for the risk.

A) The action trigger
B) The priority order
C) The mitigation plan
D) The degree of impact
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
32
____ involves determining the likelihood that the risk event will occur and the degree of impact the event will have on the project objective.

A) Priority alignment
B) Responding to a risk
C) Assessing each risk
D) Risk planning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
33
A risk assessment matrix is a tool for

A) making a person responsible for the risk.
B) stating if the risk will be avoided, accepted, or mitigated.
C) examining the results of the project.
D) assessing and managing risks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
34
Risks may change as the project progresses and should be reflected in

A) the Risk Assessment Matrix.
B) the action trigger point.
C) the risk response plan.
D) the risk management strategy.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
35
____ is a rating of low, medium, or high based upon the expected probability of a risk occurring during the project.

A) The action trigger
B) The priority order
C) The mitigation plan
D) The likelihood of occurrence
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
36
____ is a rating of low, medium, or high based on the expected level of change in completing the project's objective if the risk were to occur during the project.

A) The action trigger
B) The priority order
C) The mitigation plan
D) The degree of impact
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
37
Some level of risk planning should be done during ____ of the project life cycle to make sure that a contractor understands the risks involved with bidding on a proposed project.With knowledge of potential risks, the contractor can include contingency or management reserve amounts in the bid price.

A) the planning phase
B) the performing phase
C) the initiating phase
D) the closing phase
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
38
Project prices and budgets should include ____ to pay for additional costs associated with implementing response plans.

A) a padded budget
B) a contingency or management reserve
C) expenses for other charges in the office to help
D) extra overhead
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
39
Establishing risk categories may help to identify and evaluate risks.Some categories to help identify risks include all the following except:

A) technical and schedule.
B) cost and human resources.
C) previously identified risks.
D) external factors, sponsor and customer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
40
Risks can be identified by using all the following except:

A) historical information.
B) progressive elaboration.
C) previously identified risks.
D) ignoring potential problems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
41
___ is the possibility that an unwarranted circumstance will occur that can result in some loss.

A) Risk
B) Contingency
C) Anticipated loss
D) Management reserve
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
42
The most common method of identifying the sources of risks is:

A) work analysis chart
B) network diagram
C) brainstorming
D) initiation reports
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
43
Establishing risk categories may help to identify and evaluate risks.List some categories to help identify risks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
44
Risk ____ involves identifying, assessing, and responding to project risks in order to minimize the likelihood and impact of the consequences of adverse events on the achievement of the project objective.

A) management
B) assessment
C) identification
D) response generation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
45
A defined set of actions to prevent or reduce the likelihood of occurrence or the impact of risk is the

A) risk assessment matrix
B) the action trigger
C) risk identification brainstorming session
D) risk response plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
46
Regularly review and evaluate ____ to determine if there are any changes to the likelihood of occurrence or the potential impact of any of the risks.

A) all risks
B) only those risks of highest priority
C) risks that have yet to be identified
D) risks that have occurred to see if they will happen again
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
47
____ involves regularly reviewing the risk management matrix throughout the project.

A) Risk assessing
B) Risk planning
C) Risk monitoring
D) Risk avoidance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
48
For risks that have occurred in a project, the team should

A) track and document the risks and store the information in lessons learned.
B) expect that the other risks are going to occur so they should increase resources for those tasks impacted.
C) add more resources to the tasks that are impacted by the risk occurring.
D) talk about the risk without recording the minutes of the meeting.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
49
This involves taking action to reduce the likelihood that the risk event will occur or reducing the potential impact.

A) Risk identification
B) Avoiding the risk
C) Accepting the risk
D) Mitigating the risk
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
50
As the project progresses, the project team should

A) expect the risks to remain the same throughout to project.
B) incorporate a new technology system to manage risks even if the system wasn't on their project plan.
C) regularly review the risk management matrix to evaluate any changes.
D) change the project scope just in case the remaining identified risks occur.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
51
The agenda for project status review meetings should include an item for:

A) risk assessment
B) risk identification
C) risk monitoring
D) risk contingency matrix
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
52
Risk management involves identifying, assessing, and responding to project risks to

A) add extra costs to the project
B) pass the expense of the risks to the customer
C) reduce the likelihood of occurrence and their potential impact
D) inform the project team so they can ignore the consequences
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
53
____ are a good forum for regularly reviewing, updating, and addressing risks.

A) Social gatherings of the team
B) Project meetings
C) Problem solving meetings
D) Project planning meetings
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
54
Track and document which risks ____ and the impact of those risks.

A) were avoided
B) had the highest priority
C) may affect the critical path
D) actually occurred
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
55
Which of the following statements about risks is true?

A) Risks only occur in projects that are long term projects.
B) Risks are higher in long term projects.
C) The consequence of a risk can be positive for the project.
D) Only risks that impact the critical path of the project are important to mitigate.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
56
The _______ should be those that are somewhat likely to occur and/or can have a significant negative impact on accomplishing the project objective.

A) risk response plans
B) action triggers
C) impacts
D) risks
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
57
A good forum for regularly reviewing, updating, and addressing risks is

A) phone conversation with project stakeholders.
B) project meeting.
C) during social events to get inside information from others.
D) the meeting for addressing the risk after it has occurred.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
58
The trigger point in the risk response plan is when the project team should

A) implement the action plan for each risk.
B) stop working on the project because it cannot be completed.
C) avoid the risk by moving onto the next activity.
D) brainstorm for ideas on how to manage the risk.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
59
____ risk involves determining the likelihood that the risk event will occur and the degree of impact the event will have on the project objective.

A) Assessing
B) Identifying
C) Response planning
D) Monitoring
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
60
A realistic approach to managing risk is to

A) wait until the risk occurs then manage it.
B) brainstorm possible risks and assess their likelihood of occurrence and level of impact.
C) determine all the possible risks that could occur and add in contingencies into the project.
D) have a staff member assigned to only work on mitigating risks for projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
61
Risk response planning involves all the following except

A) developing an action plan to reduce the likelihood of occurrence or potential impact of each risk.
B) establishing a trigger point for when to implement the actions to address each risk.
C) assigning responsibility to specific individuals for implementing each response plan.
D) brainstorming the possible risks that could occur in the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
62
Which of the following is not an example of a risk?

A) technology advances make the technology planned obsolete before project completion.
B) non-availability of resources with the needed skills.
C) encountering a large amount of rock while digging the foundation for a construction project.
D) have signs made to give additional directions to attendees.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
63
A possible action trigger for rain or snow on the day of an event is

A) reserve an indoor space for the event.
B) low attendance at the event.
C) review the weather report two days before the event.
D) move the event to the rain date scheduled.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
64
The possible response plan for vendor delay in delivery of critical equipment is

A) check the order status one week before delivery needed.
B) project task completion delayed until equipment arrives.
C) contact secondary vendor to supply the part.
D) financial loss due to the delay.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
65
A risk is

A) an uncertain event that, if it occurs, can jeopardize accomplishing the project objective.
B) something that increases the susceptibility of occurrence.
C) venture capital to support a project.
D) a harmless event or activity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
66
The possible impact for rain or snow on the day of an event is

A) reserve an indoor space for the event.
B) low attendance at the event.
C) review the weather report two days before the event.
D) move the event to the rain date scheduled.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
67
When assigning responsibility for a risk, it is best to

A) assign responsibility to more than one person.
B) assign responsibility to a single person.
C) assign responsibility to the project team.
D) not assign responsibility to those risks with low risk of occurrence.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
68
Risks can be prioritized based on

A) the likelihood of occurrence and degree of impact.
B) the project team member that identified the risk.
C) the amount of time the project team has to manage the risk.
D) the amount of funds planned to manage the risk.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
69
Risks on the critical path should be

A) given lower priority than those activities with positive total slack.
B) given equal priority than those activities with positive total slack.
C) given higher priority than those activities with positive total slack.
D) given higher priority than those activities with no total slack.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
70
A contingency or management reserve to pay for additional costs associated with implementing response plans should be

A) absorbed as a cost of doing business.
B) planned into the project prices and budgets.
C) requested to be paid by the project sponsor in addition to the costs of doing the project.
D) added to the budget of the next project with the same sponsor.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
71
A risk response plan can

A) ignore the risk or pay for the risk.
B) examine the risk.
C) avoid the risk, mitigate the risk, or accept the risk.
D) record the risk for lessons learned.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
72
How do the initial risks identified change as the project progresses?

A) The risks are the same as the project progresses.
B) Some risks at the start of the project are no longer risks as the project progresses.
C) The sponsor identified all the risks while writing the project charter.
D) The risks always increase as the project progresses.