Deck 15: Economics of Public Sector Decisions

ملء الشاشة (f)
exit full mode
سؤال
The marginal social cost of a good reflects the value of resources used in its production.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The benefit-cost ratio B/C) for an activity is equal to the total value of its benefits divided by the total value of its cost.
سؤال
The marginal social cost of a good is equal to any marginal external costs imposed on third parties by its production.
سؤال
Where the production of public goods is concerned, no incremental activity j) should be undertaken where MSCj > MSBj.
سؤال
Economists consider a pure public good to be indivisible if it is difficult or impossible to keep it from consumers who do not pay for it.
سؤال
The net social benefit of a good is equal to its total social benefit less its total social cost.
سؤال
The marginal social benefit of a good is equal to any additional external or third-party benefits the good provides.
سؤال
The marginal social benefit of a good is equal to the marginal private benefits the good provides plus any additional external or third-party benefits.
سؤال
The marginal social cost of a good includes the value to consumers of any alternative product of products whose production is reduced or eliminated as a result of the production of an incremental unit of output.
سؤال
To maximize the net social benefit received from a good or service, it should be produced up to the point where its total social benefit is equal to its total social cost.
سؤال
Economists consider a pure public good to be indivisible if one person cannot consume a unit of it apart from other units.
سؤال
State representative James Smith has proposed a new state supported convention facility in the state's capitol. The convention facility would provide the state with $400,000 in net cash flow lease receipts) and would cost $3,000,000. The state Planning Department normally uses a 9% discount rate when evaluating capital projects. If the project has a 15 year life, the state should accept the proposal.
سؤال
A pure public good is a product or service that is indivisible and non-excludable.
سؤال
Economists consider a pure public good to be non-excludable if it is difficult or impossible to keep it from consumers who do not pay for it.
سؤال
The indirect costs of a project are those costs related to externalities that are outputs of the project not accounted for in outlays of the government for project components.
سؤال
City Council member Alfred Garcia has proposed a new airport facility. The airport facility would provide the city with $200,000 in net cash flow landing fees, rent, etc.) and would cost $1,900,000. The city's Planning Department normally uses a 10% discount rate when evaluating capital projects. If the project has a 20 year life, the city council should adopt Garcia's proposal.
سؤال
The benefit-cost ratio B/C) for an activity is equal to the present value of its benefits divided by the present value of its cost.
سؤال
To maximize the net social benefit received from a good or service, it should be produced up to the point where its marginal social benefit is equal to its marginal social cost.
سؤال
The marginal social cost of a good is equal to marginal private cost of producing it plus any marginal external costs imposed on third parties by its production.
سؤال
In calculating direct costs of a public investment project some items will be difficult to calculate because they are implicit.
سؤال
The indirect benefits of a project or activity are external, or third party, benefits.
سؤال
Which of the following would be considered an indirect cost of a public good?

A) Initial capital outlay.
B) Research and planning outlays.
C) Maintenance expenses over the life of the project.
D) Disruption of traffic caused by subway construction.
E) Operating expenses over the life of the project.
سؤال
One of the strengths of cost-benefit analysis is that the relatively low cost of performing a credible cost-benefit analysis makes the approach practicable for many public investment decisions.
سؤال
One of the strengths of cost-benefit analysis is that when indirect benefits must be estimated there are strict standards which prevent the analysis from being "cooked" to show what its sponsors wish to show.
سؤال
One of the pitfalls of cost-benefit analysis is that indirect benefits must be estimated but no strict standards are used.
سؤال
The State Legislature is attempting to choose two projects from the following:
The State Legislature is attempting to choose two projects from the following:   If the state uses a discount rate of 6% and all the above projects are estimated to have a life of 20 years, the Legislature should accept Project C.<div style=padding-top: 35px>
If the state uses a discount rate of 6% and all the above projects are estimated to have a life of 20 years, the Legislature should accept Project C.
سؤال
In the United States, public sector purchases of goods and services:

A) amount to about 33 percent of GDP.
B) amount to about 15 percent of GDP.
C) amount to about 29 percent of GDP.
D) amount to about 10 percent of GDP.
E) are not included in the calculation of GDP.
سؤال
To maximize the net social benefit received from a good or service, it should be produced up to the point where:

A) total social benefit is equal to its total social cost.
B) its marginal private benefit is equal to its marginal social cost.
C) its marginal social benefit is equal to its marginal social cost.
D) its marginal social benefit is equal to its marginal private cost.
E) its marginal private benefit is equal to its marginal private cost.
سؤال
All of the following would be considered a direct cost of a public good EXCEPT:

A) initial capital outlay.
B) research and planning outlays.
C) maintenance expenses over the life of the project.
D) disruption of traffic caused by subway construction.
E) operating expenses over the life of the project.
سؤال
In calculating costs of a public investment project, indirect costs, because of their partly nonmarket nature, are often easily estimated.
سؤال
The direct benefits of a project or activity are the benefits obtained by the users of the project or activity.
سؤال
In calculating costs of a public investment project, indirect costs are always difficult to estimate because of their partly nonmarket nature.
سؤال
A pure public good is a product or service that:

A) is divisible and nonexcludable.
B) is indivisible and nonexcludable.
C) is indivisible and excludable.
D) is divisible and excludable.
E) is invisible and nonexclusive.
سؤال
One of the pitfalls of cost-benefit analysis is that the opportunity-cost approach to the social rate of discount may bias the analysis against worthwhile public undertakings.
سؤال
The benefit-cost ratio for an activity is equal to:

A) the total value of its benefits divided by the total value of its cost.
B) the marginal private benefits the good provides less any additional external or third-party benefits.
C) the present value of its benefits divided by the present value of its cost.
D) the marginal private benefits the good provides divided by any additional external or third-party costs.
E) the present value of its benefits less the present value of its cost.
سؤال
The marginal social benefit of a good is equal to:

A) the marginal private benefits the good provides plus any additional external or third-party benefits.
B) any additional external or third-party benefits the good provides.
C) the marginal private benefits the good provides.
D) the marginal private benefits the good provides less any additional external or third-party benefits.
E) the present value of its benefits divided by the present value of its cost.
سؤال
One of the pitfalls of cost-benefit analysis is that the sheer cost of performing a credible cost-benefit analysis makes the approach unfeasible for many public investment decisions.
سؤال
One of the strengths of cost-benefit analysis is that the opportunity-cost approach to the social rate of discount is an unbiased method of introducing cost of funds into the analysis of worthwhile public undertakings.
سؤال
The social rate of discount is the discount rate appropriate for evaluating public sector projects.
سؤال
Economists consider a pure public good to be nonexcludable if:

A) it is difficult but not impossible to keep it from consumers who do not pay for it.
B) it is difficult or impossible to keep it from consumers who do not pay for it.
C) it is difficult but not impossible for one person to consume a unit of it apart from other units.
D) one person cannot consume a unit of it apart from other units.
E) one person cannot keep it from consumers who do not pay for it.
سؤال
Which of the following projects would be acceptable from a cost-benefit standpoint if the applicable discount rate is 9%? Which of the following projects would be acceptable from a cost-benefit standpoint if the applicable discount rate is 9%?  <div style=padding-top: 35px>
سؤال
Which of the following projects would be acceptable from a cost-benefit standpoint if the applicable discount rate is 6%? <strong>Which of the following projects would be acceptable from a cost-benefit standpoint if the applicable discount rate is 6%?  </strong> A) A only B) B only C) A & B D) A & C E) B & C <div style=padding-top: 35px>

A) A only
B) B only
C) A & B
D) A & C
E) B & C
سؤال
Which of the following projects would be acceptable from a cost-benefit standpoint if the applicable discount rate is 9%? <strong>Which of the following projects would be acceptable from a cost-benefit standpoint if the applicable discount rate is 9%?  </strong> A) A only B) B only C) A & B D) A & C E) B & C <div style=padding-top: 35px>

A) A only
B) B only
C) A & B
D) A & C
E) B & C
سؤال
State representative James Smith has proposed a new state supported convention facility in the state's capitol. The convention facility would provide the state with $400,000 in net cash flow lease receipts) and would cost $3,000,000. The state Planning Department normally uses a 9% discount rate when evaluating capital projects. Should the state legislature adopt Smith's proposal if the project has a 15 year life? Why or why not?
سؤال
City Council member Connie Jefferson has proposed a new basketball facility. The basketball facility would provide the city with $300,000 in net cash flow rent, etc.) and would cost $1,500,000. The city's Planning Department normally uses a 10% discount rate when evaluating capital projects. Should the city council adopt Jefferson's proposal if the project has a 10 year life? Why or why not?
سؤال
All of the following are pitfalls of cost-benefit analysis of a public good EXCEPT:

A) When indirect benefits must be estimated there are strict standards which prevent the analysis from being "cooked" to show what its sponsors wish to show.
B) Even though indirect benefits must be estimated no strict standards are used.
C) An analysis can be "cooked" to show what its sponsors wish to show.
D) The opportunity-cost approach to the social rate of discount may bias the analysis against worthwhile public undertakings.
E) The sheer cost of performing a credible cost-benefit analysis makes the approach unfeasible for many public investment decisions.
سؤال
The State Legislature is attempting to choose one project from the following:
The State Legislature is attempting to choose one project from the following:   If the state uses a discount rate of 6% and all the above projects are estimated to have a life of 20 years, which project should the Legislature accept?<div style=padding-top: 35px>
If the state uses a discount rate of 6% and all the above projects are estimated to have a life of 20 years, which project should the Legislature accept?
سؤال
The State Legislature is attempting to choose two projects from the following: <strong>The State Legislature is attempting to choose two projects from the following:   If the state uses a discount rate of 6% and all the above projects are estimated to have a life of 20 years, which project should the Legislature accept?</strong> A) A only B) B only C) A & B D) A & C E) B & C <div style=padding-top: 35px>
If the state uses a discount rate of 6% and all the above projects are estimated to have a life of 20 years, which project should the Legislature accept?

A) A only
B) B only
C) A & B
D) A & C
E) B & C
سؤال
Which of the following projects would be acceptable from a cost-benefit standpoint if the applicable discount rate is 9%?
Which of the following projects would be acceptable from a cost-benefit standpoint if the applicable discount rate is 9%?  <div style=padding-top: 35px>
سؤال
City Council member Alfred Garcia has proposed a new airport facility. The airport facility would provide the city with $200,000 in net cash flow landing fees, rent, etc.) and would cost $1,900,000. The city's Planning Department normally uses a 10% discount rate when evaluating capital projects. Should the city council adopt Garcia's proposal if the project has a 20 year life? Why or why not?
سؤال
Which of the following projects would be acceptable from a cost-benefit standpoint if the applicable discount rate is 6%?
Which of the following projects would be acceptable from a cost-benefit standpoint if the applicable discount rate is 6%?  <div style=padding-top: 35px>
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/51
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 15: Economics of Public Sector Decisions
1
The marginal social cost of a good reflects the value of resources used in its production.
True
2
The benefit-cost ratio B/C) for an activity is equal to the total value of its benefits divided by the total value of its cost.
False
3
The marginal social cost of a good is equal to any marginal external costs imposed on third parties by its production.
False
4
Where the production of public goods is concerned, no incremental activity j) should be undertaken where MSCj > MSBj.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
5
Economists consider a pure public good to be indivisible if it is difficult or impossible to keep it from consumers who do not pay for it.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
6
The net social benefit of a good is equal to its total social benefit less its total social cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
7
The marginal social benefit of a good is equal to any additional external or third-party benefits the good provides.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
8
The marginal social benefit of a good is equal to the marginal private benefits the good provides plus any additional external or third-party benefits.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
9
The marginal social cost of a good includes the value to consumers of any alternative product of products whose production is reduced or eliminated as a result of the production of an incremental unit of output.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
10
To maximize the net social benefit received from a good or service, it should be produced up to the point where its total social benefit is equal to its total social cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
11
Economists consider a pure public good to be indivisible if one person cannot consume a unit of it apart from other units.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
12
State representative James Smith has proposed a new state supported convention facility in the state's capitol. The convention facility would provide the state with $400,000 in net cash flow lease receipts) and would cost $3,000,000. The state Planning Department normally uses a 9% discount rate when evaluating capital projects. If the project has a 15 year life, the state should accept the proposal.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
13
A pure public good is a product or service that is indivisible and non-excludable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
14
Economists consider a pure public good to be non-excludable if it is difficult or impossible to keep it from consumers who do not pay for it.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
15
The indirect costs of a project are those costs related to externalities that are outputs of the project not accounted for in outlays of the government for project components.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
16
City Council member Alfred Garcia has proposed a new airport facility. The airport facility would provide the city with $200,000 in net cash flow landing fees, rent, etc.) and would cost $1,900,000. The city's Planning Department normally uses a 10% discount rate when evaluating capital projects. If the project has a 20 year life, the city council should adopt Garcia's proposal.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
17
The benefit-cost ratio B/C) for an activity is equal to the present value of its benefits divided by the present value of its cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
18
To maximize the net social benefit received from a good or service, it should be produced up to the point where its marginal social benefit is equal to its marginal social cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
19
The marginal social cost of a good is equal to marginal private cost of producing it plus any marginal external costs imposed on third parties by its production.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
20
In calculating direct costs of a public investment project some items will be difficult to calculate because they are implicit.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
21
The indirect benefits of a project or activity are external, or third party, benefits.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
22
Which of the following would be considered an indirect cost of a public good?

A) Initial capital outlay.
B) Research and planning outlays.
C) Maintenance expenses over the life of the project.
D) Disruption of traffic caused by subway construction.
E) Operating expenses over the life of the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
23
One of the strengths of cost-benefit analysis is that the relatively low cost of performing a credible cost-benefit analysis makes the approach practicable for many public investment decisions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
24
One of the strengths of cost-benefit analysis is that when indirect benefits must be estimated there are strict standards which prevent the analysis from being "cooked" to show what its sponsors wish to show.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
25
One of the pitfalls of cost-benefit analysis is that indirect benefits must be estimated but no strict standards are used.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
26
The State Legislature is attempting to choose two projects from the following:
The State Legislature is attempting to choose two projects from the following:   If the state uses a discount rate of 6% and all the above projects are estimated to have a life of 20 years, the Legislature should accept Project C.
If the state uses a discount rate of 6% and all the above projects are estimated to have a life of 20 years, the Legislature should accept Project C.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
27
In the United States, public sector purchases of goods and services:

A) amount to about 33 percent of GDP.
B) amount to about 15 percent of GDP.
C) amount to about 29 percent of GDP.
D) amount to about 10 percent of GDP.
E) are not included in the calculation of GDP.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
28
To maximize the net social benefit received from a good or service, it should be produced up to the point where:

A) total social benefit is equal to its total social cost.
B) its marginal private benefit is equal to its marginal social cost.
C) its marginal social benefit is equal to its marginal social cost.
D) its marginal social benefit is equal to its marginal private cost.
E) its marginal private benefit is equal to its marginal private cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
29
All of the following would be considered a direct cost of a public good EXCEPT:

A) initial capital outlay.
B) research and planning outlays.
C) maintenance expenses over the life of the project.
D) disruption of traffic caused by subway construction.
E) operating expenses over the life of the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
30
In calculating costs of a public investment project, indirect costs, because of their partly nonmarket nature, are often easily estimated.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
31
The direct benefits of a project or activity are the benefits obtained by the users of the project or activity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
32
In calculating costs of a public investment project, indirect costs are always difficult to estimate because of their partly nonmarket nature.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
33
A pure public good is a product or service that:

A) is divisible and nonexcludable.
B) is indivisible and nonexcludable.
C) is indivisible and excludable.
D) is divisible and excludable.
E) is invisible and nonexclusive.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
34
One of the pitfalls of cost-benefit analysis is that the opportunity-cost approach to the social rate of discount may bias the analysis against worthwhile public undertakings.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
35
The benefit-cost ratio for an activity is equal to:

A) the total value of its benefits divided by the total value of its cost.
B) the marginal private benefits the good provides less any additional external or third-party benefits.
C) the present value of its benefits divided by the present value of its cost.
D) the marginal private benefits the good provides divided by any additional external or third-party costs.
E) the present value of its benefits less the present value of its cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
36
The marginal social benefit of a good is equal to:

A) the marginal private benefits the good provides plus any additional external or third-party benefits.
B) any additional external or third-party benefits the good provides.
C) the marginal private benefits the good provides.
D) the marginal private benefits the good provides less any additional external or third-party benefits.
E) the present value of its benefits divided by the present value of its cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
37
One of the pitfalls of cost-benefit analysis is that the sheer cost of performing a credible cost-benefit analysis makes the approach unfeasible for many public investment decisions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
38
One of the strengths of cost-benefit analysis is that the opportunity-cost approach to the social rate of discount is an unbiased method of introducing cost of funds into the analysis of worthwhile public undertakings.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
39
The social rate of discount is the discount rate appropriate for evaluating public sector projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
40
Economists consider a pure public good to be nonexcludable if:

A) it is difficult but not impossible to keep it from consumers who do not pay for it.
B) it is difficult or impossible to keep it from consumers who do not pay for it.
C) it is difficult but not impossible for one person to consume a unit of it apart from other units.
D) one person cannot consume a unit of it apart from other units.
E) one person cannot keep it from consumers who do not pay for it.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
41
Which of the following projects would be acceptable from a cost-benefit standpoint if the applicable discount rate is 9%? Which of the following projects would be acceptable from a cost-benefit standpoint if the applicable discount rate is 9%?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
42
Which of the following projects would be acceptable from a cost-benefit standpoint if the applicable discount rate is 6%? <strong>Which of the following projects would be acceptable from a cost-benefit standpoint if the applicable discount rate is 6%?  </strong> A) A only B) B only C) A & B D) A & C E) B & C

A) A only
B) B only
C) A & B
D) A & C
E) B & C
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
43
Which of the following projects would be acceptable from a cost-benefit standpoint if the applicable discount rate is 9%? <strong>Which of the following projects would be acceptable from a cost-benefit standpoint if the applicable discount rate is 9%?  </strong> A) A only B) B only C) A & B D) A & C E) B & C

A) A only
B) B only
C) A & B
D) A & C
E) B & C
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
44
State representative James Smith has proposed a new state supported convention facility in the state's capitol. The convention facility would provide the state with $400,000 in net cash flow lease receipts) and would cost $3,000,000. The state Planning Department normally uses a 9% discount rate when evaluating capital projects. Should the state legislature adopt Smith's proposal if the project has a 15 year life? Why or why not?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
45
City Council member Connie Jefferson has proposed a new basketball facility. The basketball facility would provide the city with $300,000 in net cash flow rent, etc.) and would cost $1,500,000. The city's Planning Department normally uses a 10% discount rate when evaluating capital projects. Should the city council adopt Jefferson's proposal if the project has a 10 year life? Why or why not?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
46
All of the following are pitfalls of cost-benefit analysis of a public good EXCEPT:

A) When indirect benefits must be estimated there are strict standards which prevent the analysis from being "cooked" to show what its sponsors wish to show.
B) Even though indirect benefits must be estimated no strict standards are used.
C) An analysis can be "cooked" to show what its sponsors wish to show.
D) The opportunity-cost approach to the social rate of discount may bias the analysis against worthwhile public undertakings.
E) The sheer cost of performing a credible cost-benefit analysis makes the approach unfeasible for many public investment decisions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
47
The State Legislature is attempting to choose one project from the following:
The State Legislature is attempting to choose one project from the following:   If the state uses a discount rate of 6% and all the above projects are estimated to have a life of 20 years, which project should the Legislature accept?
If the state uses a discount rate of 6% and all the above projects are estimated to have a life of 20 years, which project should the Legislature accept?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
48
The State Legislature is attempting to choose two projects from the following: <strong>The State Legislature is attempting to choose two projects from the following:   If the state uses a discount rate of 6% and all the above projects are estimated to have a life of 20 years, which project should the Legislature accept?</strong> A) A only B) B only C) A & B D) A & C E) B & C
If the state uses a discount rate of 6% and all the above projects are estimated to have a life of 20 years, which project should the Legislature accept?

A) A only
B) B only
C) A & B
D) A & C
E) B & C
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
49
Which of the following projects would be acceptable from a cost-benefit standpoint if the applicable discount rate is 9%?
Which of the following projects would be acceptable from a cost-benefit standpoint if the applicable discount rate is 9%?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
50
City Council member Alfred Garcia has proposed a new airport facility. The airport facility would provide the city with $200,000 in net cash flow landing fees, rent, etc.) and would cost $1,900,000. The city's Planning Department normally uses a 10% discount rate when evaluating capital projects. Should the city council adopt Garcia's proposal if the project has a 20 year life? Why or why not?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
51
Which of the following projects would be acceptable from a cost-benefit standpoint if the applicable discount rate is 6%?
Which of the following projects would be acceptable from a cost-benefit standpoint if the applicable discount rate is 6%?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.