Deck 7: Risk Management

ملء الشاشة (f)
exit full mode
سؤال
The PRAM model for risk management proposes that risk management follow a life cycle much as projects follow a life cycle.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The PRAM model for risk management proposes different risk management strategies be deployed at various points in the project life cycle.
سؤال
As risk decreases in the project life cycle,opportunity increases.
سؤال
Contingency reserves require a construction company to hold back some funds in an account just in case something happens that increases the overall project cost.
سؤال
The PRAM model for risk management proposes a "pick and choose" approach to risk management.
سؤال
The peak of the combined risk impact curve is during the ________ and ________ phases of the project.
سؤال
Technical risk is the probability that the project will not perform to the required standards or produce substandard products or have excessive operating cost consumption.
سؤال
Risk cannot be transferred because ultimately your own project will suffer the consequences if the event occurs.
سؤال
Opportunity emerges from favorable project circumstances and risk from unfavorable events.
سؤال
Early in the life cycle of a project,both risk and opportunity are ________.
سؤال
The probability that the investments made to fund the front-end activities will be lost due to project abandonment is financing risk.
سؤال
Opportunity and risk are at their peak during the ________ phase of the project.
سؤال
One approach to risk mitigation is simply to accept it.
سؤال
PRAM (project risk analysis and management)should be conducted as a "one-shot" activity during the project planning phase.
سؤال
Risk is a function of the probability of an adverse event occurring and its ________.
سؤال
Every one of the nine phases of the PRAM methodology has a deliverable.
سؤال
The risk is highest in the earliest phase of the project life cycle.
سؤال
Risks can be quantified by multiplying the likelihood a failure will occur by the severity of the failure.
سؤال
The highest dollar value of reserves is typically task contingency.
سؤال
________ is defined as the art and science of identifying,analyzing,and responding to risk factors throughout the life of a project and in the best interests of its objectives.
سؤال
To protect his poultry from meteorites,the gentleman farmer made hard hats for each bird and installed a meteor detection system that opened umbrellas throughout the yard if a meteor were detected.The safety of his flock thus assured,the farmer was surprised when he read his latest issue of Risk Management Magazine and discovered that this event was:

A)high in consequence and high in probability.
B)low in consequence and low in probability.
C)low in probability and high in consequence.
D)high in probability and low in consequence.
سؤال
The first step in the risk management process is ________.
سؤال
A risk impact matrix displays an event's ________ and ________.
سؤال
A rule of thumb for project risk score calculations is that a risk score of ________ is considered high risk.
سؤال
The first step of the Project Risk Analysis and Management program,define,requires that planners make sure the ________ is well-defined.
سؤال
The amount a company has at stake in a project rises above the dollar value of opportunity in the:

A)implementation phase.
B)development phase.
C)concept phase.
D)termination phase.
سؤال
Project risk is lowest during the:

A)concept stage of the project life cycle.
B)implementation stage of the project life cycle.
C)termination stage of the project life cycle.
D)development stage of the project life cycle.
سؤال
A(n)________ process as part of risk mitigation strategies requires a useful documentation system that all partners in the project can access.
سؤال
A common method of transferring the risk of a cost overrun is to establish a(n)________.
سؤال
Risk and opportunity:

A)both increase throughout the project life cycle.
B)vary inversely throughout the project life cycle.
C)both decrease throughout the project life cycle.
D)do not vary throughout the project life cycle.
سؤال
Jim knew instinctively that his professor wouldn't appreciate it if he brought his single scoop of vanilla ice cream into the lecture hall with him.He could almost hear the inevitable question,"Did you bring enough for everyone?" To avert such an embarrassment,he practically inhaled his frozen confection as he raced down the hall.He had eaten ice cream in this fashion before and knew he would soon have an ice cream headache,which could be described as:

A)high in consequence and high in probability.
B)low in consequence and low in probability.
C)low in probability and high in consequence.
D)high in probability and low in consequence.
سؤال
Leave it to the Europeans to develop a fabulous,integrated program of risk management to address the project's entire life cycle.This program is known as ________.
سؤال
An agreement between two firms that has provisions for fixed costs or liquidated damages contains an element of ________
سؤال
There is always a chance that different entities that should work together to complete a project won't be able to do so.This likelihood is called ________.
سؤال
One technique that can be used to identify risk factors associated with a project is ________.
سؤال
The greatest project opportunity occurs when:

A)the project is in the concept phase.
B)the project is in the development phase.
C)the project is in the implementation phase.
D)the project is in the termination phase.
سؤال
The greatest project risk occurs when:

A)the probability of the event is high and the consequences of the event are high.
B)the probability of the event is high and the consequences of the event are low.
C)the probability of the event is low and the consequences of the event are high.
D)the probability of the event is low and the consequences of the event are low.
سؤال
Project risk is highest during the:

A)termination stage of the project life cycle.
B)concept stage of the project life cycle.
C)implementation stage of the project life cycle.
D)development stage of the project life cycle.
سؤال
The difference between projects that fail and those that are ultimately successful has to do with:

A)the plans that have been made to deal with problems as they arise.
B)the fact that a successful project doesn't encounter problems.
C)whether the project is for an internal or external customer.
D)whether the problem is time- or budget-related.
سؤال
The period of highest risk impact for a project risk exists primarily in the:

A)development stage of the project life cycle.
B)concept stage of the project life cycle.
C)implementation stage of the project life cycle.
D)termination stage of the project life cycle.
سؤال
A serious risk factor probably has:

A)a high consequence and a medium likelihood.
B)a high consequence and a low likelihood.
C)a medium consequence and a low likelihood.
D)a low consequence and a medium likelihood.
سؤال
A method for conducting risk factor identification that consolidates the judgments of isolated anonymous respondents is:

A)a brainstorming meeting.
B)the Delphi method.
C)past history.
D)multiple assessments.
سؤال
The probability that funds allocated to the project will be insufficient to complete it is:

A)technical risk.
B)cost estimate risk.
C)financing risk.
D)operating risk.
سؤال
A method for conducting risk factor identification that generates ideas but doesn't focus on decision making is:

A)a brainstorming meeting.
B)the Delphi method.
C)past history.
D)multiple assessments.
سؤال
The probability that project revenues will not be sufficient to repay the debts is:

A)financial risk
B)cost estimate risk.
C)market risk.
D)promotion risk.
سؤال
The construction foreman posted a large sign requiring all work site visitors to don a hard hat and safety glasses.He also purchased copious quantities of both items and made them readily available at the entrance.The foreman is engaged in:

A)risk identification.
B)risk mitigation.
C)analysis of probability and consequences.
D)control and documentation.
سؤال
The probability that investments made to fund the front-end activities will be lost due to project abandonment is:

A)promotion risk.
B)political risk.
C)organizational risk.
D)financial risk.
سؤال
The residents of Enumclaw,Washington,live in the shadow of majestic Mount Rainier and its 26 glaciers.The Cascades form a ring of fire around the Pacific Northwest and erupt with surprising regularity,although Mount Rainier hasn't erupted on a major scale since about a thousand years ago.When it does erupt,the pyroclastic flow (a massive cloud of superheated ash and rock up to 1500 degrees Fahrenheit that can travel at speeds up to 300 miles per hour)will make Enumclaw a less pleasant place to live.City leaders have completed the:

A)control and documentation phase of risk management.
B)risk identification phase of risk management.
C)analysis of probability and consequences phase of risk management.
D)risk mitigation strategies phase of risk management.
سؤال
One source of information on future risks and the leading indicators that accompany risks is:

A)a brainstorming meeting.
B)the Delphi method.
C)past history.
D)multiple assessments.
سؤال
The mouse executive board meeting was drawing to a conclusion;the only way they would be able to detect the presence of the cat was to tie a bell around its tail.Under their risk management identification scheme,this would fall under:

A)commercial risk.
B)execution risk.
C)financial risk.
D)technical risk.
سؤال
While thrilling,there is a chance that you would have an accident if you elected to drive on the Autobahn while blindfolded,an outcome that could be described as:

A)high in consequence and high in probability.
B)low in consequence and low in probability.
C)low in probability and high in consequence.
D)high in probability and low in consequence.
سؤال
The marketing team would develop the advertising campaign to promote the newest product but the engineers wanted to keep all product details a secret during development.The service and operations branches of the company were also in the dark,so product rollout was going to be their initiation also.This project has a very high:

A)political risk.
B)operating risk.
C)organizational risk.
D)integration risk.
سؤال
The terpsichorean was familiar with the risks associated with various moves,the accountant knew financial risks forwards and backwards,while the civil engineer could quantify the risks associated with distributed loads on the temporary stage.Their input was used as part of:

A)a brainstorming meeting approach to risk factor identification.
B)the Delphi method approach to risk factor identification.
C)a past history approach to risk factor identification.
D)a multiple assessments approach to risk factor identification.
سؤال
The house had almost been framed when an F-5 tornado ripped across the plains and turned the house back into a lumber pile,not stacked as neatly as it was originally.The homeowner's fears of:

A)technical risks had come true.
B)operating risks had come true.
C)acts of God had come true.
D)environmental risks had come true.
سؤال
Based on the projected selling price of $20 per unit,the manufacturer invested a substantial portion of its available cash in a machine that could produce twenty-thousand gumballs in an hour.If consumers weren't willing to pay this much for gum,then the manufacturer faced significant:

A)financial risk.
B)promotion risk.
C)cost estimate risk.
D)market risk.
سؤال
The probability that a project to establish infrastructure in a third-world country teetering on the brink of civil war is fraught with:

A)political risk.
B)operating risk.
C)organizational risk.
D)integration risk.
سؤال
There is always a chance that the music loving public cannot be convinced of the need to return to the 8-track format for new releases.The probability that we don't sell one million units before the holiday season is:

A)promotion risk.
B)market risk.
C)organizational risk.
D)financial risk.
سؤال
Risk management is a:

A)three-stage process.
B)four-stage process.
C)five-stage process.
D)six-stage process.
سؤال
The probability that legal and managerial structures put together to develop and operate the project will not perform well is:

A)operating risk.
B)political risk.
C)organizational risk.
D)integration risk.
سؤال
The probability that a project will overrun its allocated duration is:

A)volume market risk.
B)price market risk.
C)integration risk.
D)schedule risk.
سؤال
You have agreed to paint your neighbor's house a lovely shade of chartreuse for $1500 and discover much to your dismay that the house has a second floor.Now you're faced with the prospect of buying a ladder or scaffolding or a really long handled brush,not to mention the 15 more gallons of paint that will be needed to cover.You won't get another penny for what will surely be increased efforts since your neighbor transferred risk with a(n):

A)cost-plus contract.
B)contingency reserve.
C)fixed price contract.
D)inflation clause.
سؤال
A project team assesses their primary risk factor's probability of failure with a maturity risk of 0.2,a complexity risk of 0.6,and a dependency risk of 0.9.The probability of failure is:

A)less than or equal to 0.3.
B)greater than 0.3 but less than or equal to 0.6.
C)greater than 0.6 but less than or equal to 0.9.
D)greater than 0.9.
سؤال
A project team assigns probabilities of 0.1,0.3,and 0.6 respectively to the maturity,complexity,and dependency categories.The probability of failure can be calculated as:

A)0.02.
B)0.45.
C)0.33.
D)0.57.
سؤال
A project has identical probability of failure and consequence of failure values.What must these values be if the overall risk factor is at the low end of the high risk category?

A).234
B).387
C).452
D).591
سؤال
Fred Knievel took out a substantial life insurance policy before he began his trek across North America in his Volvo.Doing so enabled him to:

A)accept risk.
B)minimize risk.
C)transfer risk.
D)share risk.
سؤال
Project penalty clauses that initiate at mutually agreed-on points in the project's development and implementation are:

A)liquidated damages.
B)milestone adjustments.
C)contingency clauses.
D)penalty points.
سؤال
If the risk of a negative outcome is slight,the best course of action might be to:

A)minimize it.
B)share it.
C)transfer it.
D)accept it.
سؤال
With a cost factor of 0.1,a schedule rating of 0.3,a reliability rating of 0.5,and a performance rating of 0.3,the overall consequence of failure was:

A)0.2 for the squidproofing project.
B)0.3 for the squidproofing project.
C)0.4 for the squidproofing project.
D)0.5 for the squidproofing project.
سؤال
The Farm Fresh Egg project was too great for one person to pull off.The construction costs for the coop and chicken run were enormous and the sinister threat of avian flu hung over the area like a black cloud.It was only through the combined efforts of Matsushita Chickenworks and the City of Edmond that the project would be undertaken,since they would be able to:

A)accept the risk.
B)minimize the risk.
C)transfer the risk.
D)share the risk.
سؤال
With the failure probability and consequence scores shown in the table,compute the overall risk factor for the project. <strong>With the failure probability and consequence scores shown in the table,compute the overall risk factor for the project.  </strong> A)less than or equal to 0.3 B)greater than 0.3 but less than or equal to 0.4 C)greater than 0.4 but less than or equal to 0.5 D)greater than 0.5 <div style=padding-top: 35px>

A)less than or equal to 0.3
B)greater than 0.3 but less than or equal to 0.4
C)greater than 0.4 but less than or equal to 0.5
D)greater than 0.5
سؤال
The professor wore both a belt and suspenders during lecture each day because he chose to:

A)accept risk.
B)minimize risk.
C)share risk.
D)transfer risk.
سؤال
The expected cost of an item that is estimated at $5,000 with a task contingency multiplier of 1.2 is:

A)$4,167.
B)$5,000.
C)$5,200.
D)$6,000.
سؤال
Use the failure probability and consequence scores shown in the table to determine the consequence of failure for the project. <strong>Use the failure probability and consequence scores shown in the table to determine the consequence of failure for the project.  </strong> A)greater than 0.6 B)less than or equal to 0.6 but greater than 0.4 C)less than or equal to 0.4 but greater than 0.2 D)less than 0.2 <div style=padding-top: 35px>

A)greater than 0.6
B)less than or equal to 0.6 but greater than 0.4
C)less than or equal to 0.4 but greater than 0.2
D)less than 0.2
سؤال
The firm set aside a little extra money just in case an unforeseen element of cost pushed the project beyond what they had budgeted.This extra money is called:

A)a rainy day fund.
B)a contingency reserve.
C)an escalation clause.
D)a sinking fund.
سؤال
With a maturity risk of 0.3,a complexity risk of 0.2,and a dependency risk of 0.2,the probability of failure is:

A)about 0.23.
B)about 0.7.
C)about 0.012.
D)about 0.45.
سؤال
The project team toiled long into the night to develop consequence of failure scores and probability of failure scores as indicated below.What is the overall risk factor for the project? <strong>The project team toiled long into the night to develop consequence of failure scores and probability of failure scores as indicated below.What is the overall risk factor for the project?  </strong> A)less than or equal to 0.6 B)greater than 0.6 but less than or equal to 0.7 C)greater than 0.7 but less than or equal to 0.8 D)greater than 0.8 <div style=padding-top: 35px>

A)less than or equal to 0.6
B)greater than 0.6 but less than or equal to 0.7
C)greater than 0.7 but less than or equal to 0.8
D)greater than 0.8
سؤال
It was well known that the cost of failure category for cost was a 0.7,and for schedule was a 0.8.The project team settled on the cost of failure for reliability of 0.6,and for performance of 0.4.What is the overall consequence of failure?

A)less than or equal to 0.5
B)greater than 0.5 but less than or equal to 0.6
C)greater than 0.6 but less than or equal to 0.7
D)greater than 0.7
سؤال
Use the failure probability and consequence scores shown in the table to determine the overall risk factor for the project.Based on your analysis,the overall project has a(n): <strong>Use the failure probability and consequence scores shown in the table to determine the overall risk factor for the project.Based on your analysis,the overall project has a(n):  </strong> A)low risk. B)medium risk. C)high risk. D)unacceptable risk. <div style=padding-top: 35px>

A)low risk.
B)medium risk.
C)high risk.
D)unacceptable risk.
سؤال
The consequences of failure categories of cost,schedule,reliability,and performance were believed to be 0.2,0.6,0.5,and 0.7.What is the overall consequence of failure?

A)0.2
B)0.3
C)0.4
D)0.5
سؤال
Twenty-thousand dollars was budgeted for the office renovation that had a task contingency multiplier of 1.3.The estimated cost of the task must be:

A)about $15,400.
B)about $26,000.
C)about $22,800.
D)about $18,600.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/114
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 7: Risk Management
1
The PRAM model for risk management proposes that risk management follow a life cycle much as projects follow a life cycle.
False
2
The PRAM model for risk management proposes different risk management strategies be deployed at various points in the project life cycle.
True
3
As risk decreases in the project life cycle,opportunity increases.
False
4
Contingency reserves require a construction company to hold back some funds in an account just in case something happens that increases the overall project cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
5
The PRAM model for risk management proposes a "pick and choose" approach to risk management.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
6
The peak of the combined risk impact curve is during the ________ and ________ phases of the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
7
Technical risk is the probability that the project will not perform to the required standards or produce substandard products or have excessive operating cost consumption.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
8
Risk cannot be transferred because ultimately your own project will suffer the consequences if the event occurs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
9
Opportunity emerges from favorable project circumstances and risk from unfavorable events.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
10
Early in the life cycle of a project,both risk and opportunity are ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
11
The probability that the investments made to fund the front-end activities will be lost due to project abandonment is financing risk.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
12
Opportunity and risk are at their peak during the ________ phase of the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
13
One approach to risk mitigation is simply to accept it.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
14
PRAM (project risk analysis and management)should be conducted as a "one-shot" activity during the project planning phase.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
15
Risk is a function of the probability of an adverse event occurring and its ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
16
Every one of the nine phases of the PRAM methodology has a deliverable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
17
The risk is highest in the earliest phase of the project life cycle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
18
Risks can be quantified by multiplying the likelihood a failure will occur by the severity of the failure.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
19
The highest dollar value of reserves is typically task contingency.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
20
________ is defined as the art and science of identifying,analyzing,and responding to risk factors throughout the life of a project and in the best interests of its objectives.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
21
To protect his poultry from meteorites,the gentleman farmer made hard hats for each bird and installed a meteor detection system that opened umbrellas throughout the yard if a meteor were detected.The safety of his flock thus assured,the farmer was surprised when he read his latest issue of Risk Management Magazine and discovered that this event was:

A)high in consequence and high in probability.
B)low in consequence and low in probability.
C)low in probability and high in consequence.
D)high in probability and low in consequence.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
22
The first step in the risk management process is ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
23
A risk impact matrix displays an event's ________ and ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
24
A rule of thumb for project risk score calculations is that a risk score of ________ is considered high risk.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
25
The first step of the Project Risk Analysis and Management program,define,requires that planners make sure the ________ is well-defined.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
26
The amount a company has at stake in a project rises above the dollar value of opportunity in the:

A)implementation phase.
B)development phase.
C)concept phase.
D)termination phase.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
27
Project risk is lowest during the:

A)concept stage of the project life cycle.
B)implementation stage of the project life cycle.
C)termination stage of the project life cycle.
D)development stage of the project life cycle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
28
A(n)________ process as part of risk mitigation strategies requires a useful documentation system that all partners in the project can access.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
29
A common method of transferring the risk of a cost overrun is to establish a(n)________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
30
Risk and opportunity:

A)both increase throughout the project life cycle.
B)vary inversely throughout the project life cycle.
C)both decrease throughout the project life cycle.
D)do not vary throughout the project life cycle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
31
Jim knew instinctively that his professor wouldn't appreciate it if he brought his single scoop of vanilla ice cream into the lecture hall with him.He could almost hear the inevitable question,"Did you bring enough for everyone?" To avert such an embarrassment,he practically inhaled his frozen confection as he raced down the hall.He had eaten ice cream in this fashion before and knew he would soon have an ice cream headache,which could be described as:

A)high in consequence and high in probability.
B)low in consequence and low in probability.
C)low in probability and high in consequence.
D)high in probability and low in consequence.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
32
Leave it to the Europeans to develop a fabulous,integrated program of risk management to address the project's entire life cycle.This program is known as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
33
An agreement between two firms that has provisions for fixed costs or liquidated damages contains an element of ________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
34
There is always a chance that different entities that should work together to complete a project won't be able to do so.This likelihood is called ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
35
One technique that can be used to identify risk factors associated with a project is ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
36
The greatest project opportunity occurs when:

A)the project is in the concept phase.
B)the project is in the development phase.
C)the project is in the implementation phase.
D)the project is in the termination phase.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
37
The greatest project risk occurs when:

A)the probability of the event is high and the consequences of the event are high.
B)the probability of the event is high and the consequences of the event are low.
C)the probability of the event is low and the consequences of the event are high.
D)the probability of the event is low and the consequences of the event are low.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
38
Project risk is highest during the:

A)termination stage of the project life cycle.
B)concept stage of the project life cycle.
C)implementation stage of the project life cycle.
D)development stage of the project life cycle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
39
The difference between projects that fail and those that are ultimately successful has to do with:

A)the plans that have been made to deal with problems as they arise.
B)the fact that a successful project doesn't encounter problems.
C)whether the project is for an internal or external customer.
D)whether the problem is time- or budget-related.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
40
The period of highest risk impact for a project risk exists primarily in the:

A)development stage of the project life cycle.
B)concept stage of the project life cycle.
C)implementation stage of the project life cycle.
D)termination stage of the project life cycle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
41
A serious risk factor probably has:

A)a high consequence and a medium likelihood.
B)a high consequence and a low likelihood.
C)a medium consequence and a low likelihood.
D)a low consequence and a medium likelihood.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
42
A method for conducting risk factor identification that consolidates the judgments of isolated anonymous respondents is:

A)a brainstorming meeting.
B)the Delphi method.
C)past history.
D)multiple assessments.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
43
The probability that funds allocated to the project will be insufficient to complete it is:

A)technical risk.
B)cost estimate risk.
C)financing risk.
D)operating risk.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
44
A method for conducting risk factor identification that generates ideas but doesn't focus on decision making is:

A)a brainstorming meeting.
B)the Delphi method.
C)past history.
D)multiple assessments.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
45
The probability that project revenues will not be sufficient to repay the debts is:

A)financial risk
B)cost estimate risk.
C)market risk.
D)promotion risk.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
46
The construction foreman posted a large sign requiring all work site visitors to don a hard hat and safety glasses.He also purchased copious quantities of both items and made them readily available at the entrance.The foreman is engaged in:

A)risk identification.
B)risk mitigation.
C)analysis of probability and consequences.
D)control and documentation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
47
The probability that investments made to fund the front-end activities will be lost due to project abandonment is:

A)promotion risk.
B)political risk.
C)organizational risk.
D)financial risk.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
48
The residents of Enumclaw,Washington,live in the shadow of majestic Mount Rainier and its 26 glaciers.The Cascades form a ring of fire around the Pacific Northwest and erupt with surprising regularity,although Mount Rainier hasn't erupted on a major scale since about a thousand years ago.When it does erupt,the pyroclastic flow (a massive cloud of superheated ash and rock up to 1500 degrees Fahrenheit that can travel at speeds up to 300 miles per hour)will make Enumclaw a less pleasant place to live.City leaders have completed the:

A)control and documentation phase of risk management.
B)risk identification phase of risk management.
C)analysis of probability and consequences phase of risk management.
D)risk mitigation strategies phase of risk management.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
49
One source of information on future risks and the leading indicators that accompany risks is:

A)a brainstorming meeting.
B)the Delphi method.
C)past history.
D)multiple assessments.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
50
The mouse executive board meeting was drawing to a conclusion;the only way they would be able to detect the presence of the cat was to tie a bell around its tail.Under their risk management identification scheme,this would fall under:

A)commercial risk.
B)execution risk.
C)financial risk.
D)technical risk.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
51
While thrilling,there is a chance that you would have an accident if you elected to drive on the Autobahn while blindfolded,an outcome that could be described as:

A)high in consequence and high in probability.
B)low in consequence and low in probability.
C)low in probability and high in consequence.
D)high in probability and low in consequence.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
52
The marketing team would develop the advertising campaign to promote the newest product but the engineers wanted to keep all product details a secret during development.The service and operations branches of the company were also in the dark,so product rollout was going to be their initiation also.This project has a very high:

A)political risk.
B)operating risk.
C)organizational risk.
D)integration risk.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
53
The terpsichorean was familiar with the risks associated with various moves,the accountant knew financial risks forwards and backwards,while the civil engineer could quantify the risks associated with distributed loads on the temporary stage.Their input was used as part of:

A)a brainstorming meeting approach to risk factor identification.
B)the Delphi method approach to risk factor identification.
C)a past history approach to risk factor identification.
D)a multiple assessments approach to risk factor identification.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
54
The house had almost been framed when an F-5 tornado ripped across the plains and turned the house back into a lumber pile,not stacked as neatly as it was originally.The homeowner's fears of:

A)technical risks had come true.
B)operating risks had come true.
C)acts of God had come true.
D)environmental risks had come true.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
55
Based on the projected selling price of $20 per unit,the manufacturer invested a substantial portion of its available cash in a machine that could produce twenty-thousand gumballs in an hour.If consumers weren't willing to pay this much for gum,then the manufacturer faced significant:

A)financial risk.
B)promotion risk.
C)cost estimate risk.
D)market risk.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
56
The probability that a project to establish infrastructure in a third-world country teetering on the brink of civil war is fraught with:

A)political risk.
B)operating risk.
C)organizational risk.
D)integration risk.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
57
There is always a chance that the music loving public cannot be convinced of the need to return to the 8-track format for new releases.The probability that we don't sell one million units before the holiday season is:

A)promotion risk.
B)market risk.
C)organizational risk.
D)financial risk.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
58
Risk management is a:

A)three-stage process.
B)four-stage process.
C)five-stage process.
D)six-stage process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
59
The probability that legal and managerial structures put together to develop and operate the project will not perform well is:

A)operating risk.
B)political risk.
C)organizational risk.
D)integration risk.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
60
The probability that a project will overrun its allocated duration is:

A)volume market risk.
B)price market risk.
C)integration risk.
D)schedule risk.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
61
You have agreed to paint your neighbor's house a lovely shade of chartreuse for $1500 and discover much to your dismay that the house has a second floor.Now you're faced with the prospect of buying a ladder or scaffolding or a really long handled brush,not to mention the 15 more gallons of paint that will be needed to cover.You won't get another penny for what will surely be increased efforts since your neighbor transferred risk with a(n):

A)cost-plus contract.
B)contingency reserve.
C)fixed price contract.
D)inflation clause.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
62
A project team assesses their primary risk factor's probability of failure with a maturity risk of 0.2,a complexity risk of 0.6,and a dependency risk of 0.9.The probability of failure is:

A)less than or equal to 0.3.
B)greater than 0.3 but less than or equal to 0.6.
C)greater than 0.6 but less than or equal to 0.9.
D)greater than 0.9.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
63
A project team assigns probabilities of 0.1,0.3,and 0.6 respectively to the maturity,complexity,and dependency categories.The probability of failure can be calculated as:

A)0.02.
B)0.45.
C)0.33.
D)0.57.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
64
A project has identical probability of failure and consequence of failure values.What must these values be if the overall risk factor is at the low end of the high risk category?

A).234
B).387
C).452
D).591
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
65
Fred Knievel took out a substantial life insurance policy before he began his trek across North America in his Volvo.Doing so enabled him to:

A)accept risk.
B)minimize risk.
C)transfer risk.
D)share risk.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
66
Project penalty clauses that initiate at mutually agreed-on points in the project's development and implementation are:

A)liquidated damages.
B)milestone adjustments.
C)contingency clauses.
D)penalty points.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
67
If the risk of a negative outcome is slight,the best course of action might be to:

A)minimize it.
B)share it.
C)transfer it.
D)accept it.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
68
With a cost factor of 0.1,a schedule rating of 0.3,a reliability rating of 0.5,and a performance rating of 0.3,the overall consequence of failure was:

A)0.2 for the squidproofing project.
B)0.3 for the squidproofing project.
C)0.4 for the squidproofing project.
D)0.5 for the squidproofing project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
69
The Farm Fresh Egg project was too great for one person to pull off.The construction costs for the coop and chicken run were enormous and the sinister threat of avian flu hung over the area like a black cloud.It was only through the combined efforts of Matsushita Chickenworks and the City of Edmond that the project would be undertaken,since they would be able to:

A)accept the risk.
B)minimize the risk.
C)transfer the risk.
D)share the risk.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
70
With the failure probability and consequence scores shown in the table,compute the overall risk factor for the project. <strong>With the failure probability and consequence scores shown in the table,compute the overall risk factor for the project.  </strong> A)less than or equal to 0.3 B)greater than 0.3 but less than or equal to 0.4 C)greater than 0.4 but less than or equal to 0.5 D)greater than 0.5

A)less than or equal to 0.3
B)greater than 0.3 but less than or equal to 0.4
C)greater than 0.4 but less than or equal to 0.5
D)greater than 0.5
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
71
The professor wore both a belt and suspenders during lecture each day because he chose to:

A)accept risk.
B)minimize risk.
C)share risk.
D)transfer risk.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
72
The expected cost of an item that is estimated at $5,000 with a task contingency multiplier of 1.2 is:

A)$4,167.
B)$5,000.
C)$5,200.
D)$6,000.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
73
Use the failure probability and consequence scores shown in the table to determine the consequence of failure for the project. <strong>Use the failure probability and consequence scores shown in the table to determine the consequence of failure for the project.  </strong> A)greater than 0.6 B)less than or equal to 0.6 but greater than 0.4 C)less than or equal to 0.4 but greater than 0.2 D)less than 0.2

A)greater than 0.6
B)less than or equal to 0.6 but greater than 0.4
C)less than or equal to 0.4 but greater than 0.2
D)less than 0.2
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
74
The firm set aside a little extra money just in case an unforeseen element of cost pushed the project beyond what they had budgeted.This extra money is called:

A)a rainy day fund.
B)a contingency reserve.
C)an escalation clause.
D)a sinking fund.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
75
With a maturity risk of 0.3,a complexity risk of 0.2,and a dependency risk of 0.2,the probability of failure is:

A)about 0.23.
B)about 0.7.
C)about 0.012.
D)about 0.45.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
76
The project team toiled long into the night to develop consequence of failure scores and probability of failure scores as indicated below.What is the overall risk factor for the project? <strong>The project team toiled long into the night to develop consequence of failure scores and probability of failure scores as indicated below.What is the overall risk factor for the project?  </strong> A)less than or equal to 0.6 B)greater than 0.6 but less than or equal to 0.7 C)greater than 0.7 but less than or equal to 0.8 D)greater than 0.8

A)less than or equal to 0.6
B)greater than 0.6 but less than or equal to 0.7
C)greater than 0.7 but less than or equal to 0.8
D)greater than 0.8
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
77
It was well known that the cost of failure category for cost was a 0.7,and for schedule was a 0.8.The project team settled on the cost of failure for reliability of 0.6,and for performance of 0.4.What is the overall consequence of failure?

A)less than or equal to 0.5
B)greater than 0.5 but less than or equal to 0.6
C)greater than 0.6 but less than or equal to 0.7
D)greater than 0.7
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
78
Use the failure probability and consequence scores shown in the table to determine the overall risk factor for the project.Based on your analysis,the overall project has a(n): <strong>Use the failure probability and consequence scores shown in the table to determine the overall risk factor for the project.Based on your analysis,the overall project has a(n):  </strong> A)low risk. B)medium risk. C)high risk. D)unacceptable risk.

A)low risk.
B)medium risk.
C)high risk.
D)unacceptable risk.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
79
The consequences of failure categories of cost,schedule,reliability,and performance were believed to be 0.2,0.6,0.5,and 0.7.What is the overall consequence of failure?

A)0.2
B)0.3
C)0.4
D)0.5
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 114 في هذه المجموعة.
فتح الحزمة
k this deck
80
Twenty-thousand dollars was budgeted for the office renovation that had a task contingency multiplier of 1.3.The estimated cost of the task must be:

A)about $15,400.
B)about $26,000.
C)about $22,800.
D)about $18,600.