Deck 4: Leadership and the Project Manager

ملء الشاشة (f)
exit full mode
سؤال
An entrepreneur type of project champion is the source of the idea and also the main sponsor.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The number one flaw that makes a project manager a poor leader is setting a bad example.
سؤال
The organizational factor that is most vital in preventing a project manager from being recognized as a leader is lack of resources.
سؤال
A project manager may also be the project champion.
سؤال
The new leader must make a conscious effort to distance himself from the people being led.
سؤال
Providing the needed motivation for the project team is a nontraditional duty of a project champion.
سؤال
Emotional intelligence is a more important measure of leadership effectiveness than technical skill,analytical ability,and intelligence.
سؤال
Project leader duties include present-oriented and future-oriented tasks,but do not include past-oriented tasks.
سؤال
One reason projects are initially underfunded is because their requirements are sometimes deliberately understated.
سؤال
A project manager must be able to shift temporal orientation from past,to present,to future.
سؤال
One way an organization can develop a core of project management professionals is to administer personality tests and match people attuned to project work to projects.
سؤال
One way to distinguish the two roles is to realize that leaders aim for efficiency while managers aim for effectiveness.
سؤال
Leadership may be part of a manager's job but other managerial roles are not necessarily part of a leader's job.
سؤال
The most important characteristic of a project leader is ability to inspire.
سؤال
Summarizing and consensus testing are two group maintenance behaviors that a project manager uses to show support for project team members.
سؤال
The majority of a champion's time is spent performing the traditional project management duties of leadership,administration,obtaining resources,and coordination and control.
سؤال
In a survey of thousands of managers within U.S.corporations,a significant majority felt that the most important characteristic of superior leaders is honesty.
سؤال
One of the most important contributions of a project manager is to continually remind the team what is most important.
سؤال
Someone with a polychronic preference functions in two different temporal orientations,such as past and present.
سؤال
Leadership is an innate characteristic that some people have and some don't.
سؤال
The idea that all members of a project team have the ability to offer a contrary position in order to achieve true partnership between the project manager and the team is called:

A)exchange of purpose.
B)a right to say no.
C)joint accountability.
D)absolute honesty.
سؤال
The ________ is a project champion that is a senior-level manager who does everything possible to promote the project,including obtaining resources,coaching the team,and protecting the project when necessary.
سؤال
________ is the element of emotional intelligence that describes a person's ability to keep themselves under control.
سؤال
________ refers to a leader's ability to recognize that effective leadership is part of the relational transaction between subordinates and themselves.
سؤال
________ is a group maintenance behavior that serves to increase and equalize participation.
سؤال
________ behavior seeks to get the job done.
سؤال
The facet of partnership that describes the requirement that every worker be responsible for defining the project's vision and goals is called:

A)exchange of purpose.
B)a right to say no.
C)joint accountability.
D)absolute honesty.
سؤال
The temporal context or space to which an individual is naturally drawn is known as ________.
سؤال
The ________ is usually a scientist,engineer,or similar person who is the source of and driving force behind the idea.
سؤال
Outgoing,people-oriented individuals have a better likelihood of performing well on project work than quieter,more introverted people.
سؤال
The ability to cognitively bring the past and future closer together is ________.
سؤال
A(n)________ is in individual who identifies with a new development,using all weapons at his command,against the funded resistance of the organization.
سؤال
A survey of managers in U.S.corporations revealed that ________ is the most important characteristic of a leader.
سؤال
A(n)________ is interested in efficiency of operations,but a(n)________ is interested in effectiveness of outcomes.
سؤال
The new project management professionalism calls for the creation of ________ so that gifted project managers can move from project to project and advance in the organization just as their functional counterparts do.
سؤال
________ is the element of emotional intelligence that describes a person's ability to manage relationships with others.
سؤال
________ is the element of emotional intelligence that implies having a deep understanding of one's own strengths and weaknesses,ego needs,drives,and motives.
سؤال
An effective project manager must have ________ so that she is not adversely affected by complex or uncertain situations.
سؤال
Some ________ duties of project champions include leadership,coordination,and technical understanding.
سؤال
For the project manager,leadership is:

A)the process by which she influences the project team.
B)the process of assembling a group of individuals.
C)the process of building skills among all team members.
D)the process of maintaining control of the budget.
سؤال
In a partnership,each member of the project team is responsible for the project's outcomes and the current situation,whether it is positive or shows evidence of project problems.The term that best describes this responsibility is:

A)exchange of purpose.
B)a right to say no.
C)joint accountability.
D)absolute honesty.
سؤال
A more apt title for a project manager is:

A)controller.
B)comptroller.
C)project director.
D)project leader.
سؤال
Projects are often underfunded in the concept stage because:

A)the project requirements were deliberately understated.
B)there is complete trust in project managers by top management so more resources can be asked for at any time.
C)the project's goals are too clearly defined.
D)the project's top management sponsor is too influential.
سؤال
A project champion is:

A)a project manager that always completes projects within the allotted time frame.
B)a sponsor in top management that is keenly interested in the project's success.
C)a project manager that always completes projects within the allotted budget.
D)a project manager that always completes projects within the allotted time frame and under budget.
سؤال
Which of these is more characteristic of a leader?

A)strive for control
B)do things right
C)demand respect
D)inspire trust
سؤال
Project meetings do not generally serve this purpose for the project team:

A)help all stakeholders increase their commitment to the project.
B)provide a forum for airing grievances with stakeholders and team members.
C)provide visibility for the project manager's role in managing the project.
D)define the project and all the major team players.
سؤال
The group maintenance behavior of gatekeeping helps to:

A)increase and equalize participation.
B)reduce tension and hostility.
C)regulate behavior.
D)increase comprehension.
سؤال
Which statement regarding the duties of leaders and managers is best?

A)Leaders embrace the status quo while managers support change.
B)A manager's title is bestowed by the organization.
C)Leaders aim for efficiency.
D)Managers aim for effectiveness.
سؤال
Which of these is more characteristic of a manager?

A)develop new processes
B)originate
C)state their position
D)focus on people
سؤال
Project team motivation comes primarily from:

A)the project manager.
B)the project champion.
C)within each team member.
D)the project client's acceptance.
سؤال
The project management pearl of wisdom that declares,"If they know nothing of what you are doing,they assume you are doing nothing," means that:

A)stakeholders must be communicated with on a continual basis throughout the project's development.
B)the duration of most projects is sufficiently long as to contain many days when no actual progress is being made.
C)the more complex a project is,the more likely that the client who will ultimately receive the project has no idea how it is being executed.
D)a project manager that holds lengthy progress meetings with his team will generally complete projects more successfully.
سؤال
Group maintenance behavior would be exhibited by a project manager who:

A)provides the necessary support and technical assistance.
B)plans and schedules activities and resources appropriately.
C)contributes to the completion of project assignments.
D)works with subordinates to understand their problems.
سؤال
Which of these behaviors is task-oriented?

A)Every Friday is ice-cream day at the job site;everyone gets a double dip of their favorite flavor.
B)The employee of the month plaque is updated monthly and placed in a prominent position near the checkout stand.
C)The dean reached into his pocket,extracted his money clip and peeled off $3,000,saying,"Why don't you pick out some window treatments for the office? Something nice."
D)When my computer broke,the project manager had it replaced immediately.
سؤال
A project manager's function should be:

A)to control the "soft" people issues.
B)to manage the hard technical details.
C)to holistically manage the entire project.
D)to apply a laissez faire approach and let the work progress unimpeded.
سؤال
Which of these duties is more reflective of a leader's tasks?

A)efficiency of operations
B)delegation and maintaining
C)motivation and inspiration
D)marshalling resources
سؤال
Task-oriented leadership behavior is characterized by:

A)showing trust in project team members.
B)acting friendly and supportive towards project team members.
C)contributing to the completion of project assignments.
D)recognizing the accomplishments of team members.
سؤال
Which of these lists of duties is more reflective of managerial tasks?

A)creating vision and strategies
B)problem solving
C)long-term risk taking
D)communication by word and deed
سؤال
Which statement regarding the duties of leaders and managers is best?

A)Leaders embrace change while managers support the status quo.
B)Management is more about interpersonal relationships than leadership is.
C)Leaders aim for efficiency.
D)Managers aim for effectiveness.
سؤال
It is most important that a project manager:

A)focuses on meeting daily challenges head on.
B)focuses on meetings.
C)remembers the overall picture,or goals,that define the project.
D)operates on the boundary between strategy and tactics.
سؤال
The authentic atmosphere that is vital for project manager and team to function in can be described as:

A)exchange of purpose.
B)a right to say no.
C)joint accountability.
D)absolute honesty.
سؤال
A survey of 58 firms on their project management practices and skills identified which of the following as an essential skill?

A)complex simplicity
B)enthusiastic apathy
C)productive creativity
D)honest duplicity
سؤال
The task-oriented behavior of summarizing accomplishes which specific outcome?

A)Check on understanding and assess progress.
B)Guide and sequence discussion.
C)Check on agreement.
D)Increase comprehension.
سؤال
Which of these is the more meaningful measure of leadership effectiveness?

A)subject matter knowledge
B)emotional intelligence
C)technical skill
D)analytical ability
سؤال
George believes that time is cyclical while Brad has a linear view.This is a significant difference in their:

A)timeline orientation.
B)future time perspective.
C)time conception.
D)polychronic preference.
سؤال
Project management is first and foremost:

A)a people management challenge.
B)a customer service challenge.
C)a perception management challenge.
D)a budget management challenge.
سؤال
Which of these is NOT an element of emotional intelligence?

A)intelligence
B)self-awareness
C)motivation
D)empathy
سؤال
Based on a study of successful American project managers as perceived by project team members,the most important characteristic of a project manager is:

A)visionary.
B)good communicator.
C)good motivator.
D)leadership by example.
سؤال
Friendliness with a purpose describes:

A)empathy.
B)self-regulation.
C)obsequiousness.
D)social skill.
سؤال
A large sample survey was used to ask a total of 2,615 managers within U.S.corporations what they considered to be the most important characteristic of effective leaders.The item that ranked #1 was:

A)inspiring.
B)honest.
C)imaginative.
D)dependable.
سؤال
The emotional intelligence element that implies having a deep understanding of one's own strengths and weaknesses,ego needs,drives,and motives is called:

A)motivation.
B)self-regulation.
C)self-awareness.
D)social skill.
سؤال
If all the project management studies discussed in the text are synthesized,it quickly becomes apparent that the key to understanding leadership behavior is to focus on:

A)where in the organizational hierarchy the project leaders are located.
B)where in the organizational hierarchy the project team members are located.
C)who the leaders are.
D)what the leaders do.
سؤال
Pettersen's study of project managers found that most do not have the capacity to exercise power that derives from formal positional authority and therefore they must develop:

A)project champions.
B)cadres of trained professionals.
C)effective influencing skills.
D)efficient communications networks.
سؤال
Geoff sits at his desk and daydreams about what life will be like in 2030 when he retires.He can clearly picture events throughout the almost two decades that must elapse between now and then and what elements must come together to fulfill his lifelong dream of traveling the country in his RV.The temporal skill that Geoff is blessed (some would say cursed)with is:

A)future time perspective.
B)time span.
C)time conception.
D)timeline orientation.
سؤال
The temporal context or space to which an individual is oriented is their:

A)time orientation.
B)chronometer.
C)chronological clock.
D)biological clock.
سؤال
Which of these behaviors is task-oriented?

A)harmonizing
B)consensus testing
C)standard setting
D)process analyzing
سؤال
Among the essential abilities for effective project managers identified by a survey of 58 firms on their project management practices and skills was:

A)obfuscation.
B)humor.
C)speed.
D)experience.
سؤال
Which of these behaviors is indicative of group maintenance?

A)stimulating communication
B)clarifying communication
C)process analyzing
D)process structuring
سؤال
The ability to cognitively bring the past and future closer together is:

A)creating future vision.
B)time warping.
C)time compressing.
D)tesseracting.
سؤال
Uncle Rico spends every waking hour selling Tupperware and reminiscing about his glory years in high school,mostly the latter.The past is his:

A)timeline orientation.
B)time span.
C)time conception.
D)temporal preference.
سؤال
Bill runs his life like he runs Windows,always working on six or seven things at once.He exhibits:

A)multitasking skills.
B)simultaneity.
C)co-processing ability.
D)polychronic preference.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/130
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 4: Leadership and the Project Manager
1
An entrepreneur type of project champion is the source of the idea and also the main sponsor.
False
2
The number one flaw that makes a project manager a poor leader is setting a bad example.
True
3
The organizational factor that is most vital in preventing a project manager from being recognized as a leader is lack of resources.
False
4
A project manager may also be the project champion.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
5
The new leader must make a conscious effort to distance himself from the people being led.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
6
Providing the needed motivation for the project team is a nontraditional duty of a project champion.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
7
Emotional intelligence is a more important measure of leadership effectiveness than technical skill,analytical ability,and intelligence.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
8
Project leader duties include present-oriented and future-oriented tasks,but do not include past-oriented tasks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
9
One reason projects are initially underfunded is because their requirements are sometimes deliberately understated.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
10
A project manager must be able to shift temporal orientation from past,to present,to future.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
11
One way an organization can develop a core of project management professionals is to administer personality tests and match people attuned to project work to projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
12
One way to distinguish the two roles is to realize that leaders aim for efficiency while managers aim for effectiveness.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
13
Leadership may be part of a manager's job but other managerial roles are not necessarily part of a leader's job.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
14
The most important characteristic of a project leader is ability to inspire.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
15
Summarizing and consensus testing are two group maintenance behaviors that a project manager uses to show support for project team members.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
16
The majority of a champion's time is spent performing the traditional project management duties of leadership,administration,obtaining resources,and coordination and control.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
17
In a survey of thousands of managers within U.S.corporations,a significant majority felt that the most important characteristic of superior leaders is honesty.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
18
One of the most important contributions of a project manager is to continually remind the team what is most important.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
19
Someone with a polychronic preference functions in two different temporal orientations,such as past and present.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
20
Leadership is an innate characteristic that some people have and some don't.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
21
The idea that all members of a project team have the ability to offer a contrary position in order to achieve true partnership between the project manager and the team is called:

A)exchange of purpose.
B)a right to say no.
C)joint accountability.
D)absolute honesty.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
22
The ________ is a project champion that is a senior-level manager who does everything possible to promote the project,including obtaining resources,coaching the team,and protecting the project when necessary.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
23
________ is the element of emotional intelligence that describes a person's ability to keep themselves under control.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
24
________ refers to a leader's ability to recognize that effective leadership is part of the relational transaction between subordinates and themselves.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
25
________ is a group maintenance behavior that serves to increase and equalize participation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
26
________ behavior seeks to get the job done.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
27
The facet of partnership that describes the requirement that every worker be responsible for defining the project's vision and goals is called:

A)exchange of purpose.
B)a right to say no.
C)joint accountability.
D)absolute honesty.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
28
The temporal context or space to which an individual is naturally drawn is known as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
29
The ________ is usually a scientist,engineer,or similar person who is the source of and driving force behind the idea.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
30
Outgoing,people-oriented individuals have a better likelihood of performing well on project work than quieter,more introverted people.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
31
The ability to cognitively bring the past and future closer together is ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
32
A(n)________ is in individual who identifies with a new development,using all weapons at his command,against the funded resistance of the organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
33
A survey of managers in U.S.corporations revealed that ________ is the most important characteristic of a leader.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
34
A(n)________ is interested in efficiency of operations,but a(n)________ is interested in effectiveness of outcomes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
35
The new project management professionalism calls for the creation of ________ so that gifted project managers can move from project to project and advance in the organization just as their functional counterparts do.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
36
________ is the element of emotional intelligence that describes a person's ability to manage relationships with others.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
37
________ is the element of emotional intelligence that implies having a deep understanding of one's own strengths and weaknesses,ego needs,drives,and motives.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
38
An effective project manager must have ________ so that she is not adversely affected by complex or uncertain situations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
39
Some ________ duties of project champions include leadership,coordination,and technical understanding.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
40
For the project manager,leadership is:

A)the process by which she influences the project team.
B)the process of assembling a group of individuals.
C)the process of building skills among all team members.
D)the process of maintaining control of the budget.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
41
In a partnership,each member of the project team is responsible for the project's outcomes and the current situation,whether it is positive or shows evidence of project problems.The term that best describes this responsibility is:

A)exchange of purpose.
B)a right to say no.
C)joint accountability.
D)absolute honesty.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
42
A more apt title for a project manager is:

A)controller.
B)comptroller.
C)project director.
D)project leader.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
43
Projects are often underfunded in the concept stage because:

A)the project requirements were deliberately understated.
B)there is complete trust in project managers by top management so more resources can be asked for at any time.
C)the project's goals are too clearly defined.
D)the project's top management sponsor is too influential.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
44
A project champion is:

A)a project manager that always completes projects within the allotted time frame.
B)a sponsor in top management that is keenly interested in the project's success.
C)a project manager that always completes projects within the allotted budget.
D)a project manager that always completes projects within the allotted time frame and under budget.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
45
Which of these is more characteristic of a leader?

A)strive for control
B)do things right
C)demand respect
D)inspire trust
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
46
Project meetings do not generally serve this purpose for the project team:

A)help all stakeholders increase their commitment to the project.
B)provide a forum for airing grievances with stakeholders and team members.
C)provide visibility for the project manager's role in managing the project.
D)define the project and all the major team players.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
47
The group maintenance behavior of gatekeeping helps to:

A)increase and equalize participation.
B)reduce tension and hostility.
C)regulate behavior.
D)increase comprehension.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
48
Which statement regarding the duties of leaders and managers is best?

A)Leaders embrace the status quo while managers support change.
B)A manager's title is bestowed by the organization.
C)Leaders aim for efficiency.
D)Managers aim for effectiveness.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
49
Which of these is more characteristic of a manager?

A)develop new processes
B)originate
C)state their position
D)focus on people
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
50
Project team motivation comes primarily from:

A)the project manager.
B)the project champion.
C)within each team member.
D)the project client's acceptance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
51
The project management pearl of wisdom that declares,"If they know nothing of what you are doing,they assume you are doing nothing," means that:

A)stakeholders must be communicated with on a continual basis throughout the project's development.
B)the duration of most projects is sufficiently long as to contain many days when no actual progress is being made.
C)the more complex a project is,the more likely that the client who will ultimately receive the project has no idea how it is being executed.
D)a project manager that holds lengthy progress meetings with his team will generally complete projects more successfully.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
52
Group maintenance behavior would be exhibited by a project manager who:

A)provides the necessary support and technical assistance.
B)plans and schedules activities and resources appropriately.
C)contributes to the completion of project assignments.
D)works with subordinates to understand their problems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
53
Which of these behaviors is task-oriented?

A)Every Friday is ice-cream day at the job site;everyone gets a double dip of their favorite flavor.
B)The employee of the month plaque is updated monthly and placed in a prominent position near the checkout stand.
C)The dean reached into his pocket,extracted his money clip and peeled off $3,000,saying,"Why don't you pick out some window treatments for the office? Something nice."
D)When my computer broke,the project manager had it replaced immediately.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
54
A project manager's function should be:

A)to control the "soft" people issues.
B)to manage the hard technical details.
C)to holistically manage the entire project.
D)to apply a laissez faire approach and let the work progress unimpeded.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
55
Which of these duties is more reflective of a leader's tasks?

A)efficiency of operations
B)delegation and maintaining
C)motivation and inspiration
D)marshalling resources
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
56
Task-oriented leadership behavior is characterized by:

A)showing trust in project team members.
B)acting friendly and supportive towards project team members.
C)contributing to the completion of project assignments.
D)recognizing the accomplishments of team members.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
57
Which of these lists of duties is more reflective of managerial tasks?

A)creating vision and strategies
B)problem solving
C)long-term risk taking
D)communication by word and deed
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
58
Which statement regarding the duties of leaders and managers is best?

A)Leaders embrace change while managers support the status quo.
B)Management is more about interpersonal relationships than leadership is.
C)Leaders aim for efficiency.
D)Managers aim for effectiveness.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
59
It is most important that a project manager:

A)focuses on meeting daily challenges head on.
B)focuses on meetings.
C)remembers the overall picture,or goals,that define the project.
D)operates on the boundary between strategy and tactics.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
60
The authentic atmosphere that is vital for project manager and team to function in can be described as:

A)exchange of purpose.
B)a right to say no.
C)joint accountability.
D)absolute honesty.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
61
A survey of 58 firms on their project management practices and skills identified which of the following as an essential skill?

A)complex simplicity
B)enthusiastic apathy
C)productive creativity
D)honest duplicity
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
62
The task-oriented behavior of summarizing accomplishes which specific outcome?

A)Check on understanding and assess progress.
B)Guide and sequence discussion.
C)Check on agreement.
D)Increase comprehension.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
63
Which of these is the more meaningful measure of leadership effectiveness?

A)subject matter knowledge
B)emotional intelligence
C)technical skill
D)analytical ability
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
64
George believes that time is cyclical while Brad has a linear view.This is a significant difference in their:

A)timeline orientation.
B)future time perspective.
C)time conception.
D)polychronic preference.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
65
Project management is first and foremost:

A)a people management challenge.
B)a customer service challenge.
C)a perception management challenge.
D)a budget management challenge.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
66
Which of these is NOT an element of emotional intelligence?

A)intelligence
B)self-awareness
C)motivation
D)empathy
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
67
Based on a study of successful American project managers as perceived by project team members,the most important characteristic of a project manager is:

A)visionary.
B)good communicator.
C)good motivator.
D)leadership by example.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
68
Friendliness with a purpose describes:

A)empathy.
B)self-regulation.
C)obsequiousness.
D)social skill.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
69
A large sample survey was used to ask a total of 2,615 managers within U.S.corporations what they considered to be the most important characteristic of effective leaders.The item that ranked #1 was:

A)inspiring.
B)honest.
C)imaginative.
D)dependable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
70
The emotional intelligence element that implies having a deep understanding of one's own strengths and weaknesses,ego needs,drives,and motives is called:

A)motivation.
B)self-regulation.
C)self-awareness.
D)social skill.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
71
If all the project management studies discussed in the text are synthesized,it quickly becomes apparent that the key to understanding leadership behavior is to focus on:

A)where in the organizational hierarchy the project leaders are located.
B)where in the organizational hierarchy the project team members are located.
C)who the leaders are.
D)what the leaders do.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
72
Pettersen's study of project managers found that most do not have the capacity to exercise power that derives from formal positional authority and therefore they must develop:

A)project champions.
B)cadres of trained professionals.
C)effective influencing skills.
D)efficient communications networks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
73
Geoff sits at his desk and daydreams about what life will be like in 2030 when he retires.He can clearly picture events throughout the almost two decades that must elapse between now and then and what elements must come together to fulfill his lifelong dream of traveling the country in his RV.The temporal skill that Geoff is blessed (some would say cursed)with is:

A)future time perspective.
B)time span.
C)time conception.
D)timeline orientation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
74
The temporal context or space to which an individual is oriented is their:

A)time orientation.
B)chronometer.
C)chronological clock.
D)biological clock.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
75
Which of these behaviors is task-oriented?

A)harmonizing
B)consensus testing
C)standard setting
D)process analyzing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
76
Among the essential abilities for effective project managers identified by a survey of 58 firms on their project management practices and skills was:

A)obfuscation.
B)humor.
C)speed.
D)experience.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
77
Which of these behaviors is indicative of group maintenance?

A)stimulating communication
B)clarifying communication
C)process analyzing
D)process structuring
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
78
The ability to cognitively bring the past and future closer together is:

A)creating future vision.
B)time warping.
C)time compressing.
D)tesseracting.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
79
Uncle Rico spends every waking hour selling Tupperware and reminiscing about his glory years in high school,mostly the latter.The past is his:

A)timeline orientation.
B)time span.
C)time conception.
D)temporal preference.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
80
Bill runs his life like he runs Windows,always working on six or seven things at once.He exhibits:

A)multitasking skills.
B)simultaneity.
C)co-processing ability.
D)polychronic preference.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 130 في هذه المجموعة.