Deck 22: Scheduling

ملء الشاشة (f)
exit full mode
سؤال
Job shop scheduling is also known as shop floor control.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Minimizing overtime is one of several objectives that could be considered when constructing a schedule.
سؤال
The shortest processing time (SPT)rule is most useful when the job shop is not congested.
سؤال
Determining the optimal allocation of jobs to machines or workers can be solved using the assignment method of linear programming.
سؤال
Johnson's rule gives an optimal sequence for jobs processed serially through a two step system.
سؤال
The sequence in which jobs should be processed is determined using linear programming.
سؤال
The process of prioritizing jobs that have been assigned to a resource is called sequencing.
سؤال
Sequencing involves determining the order in which jobs are released to the shop floor.
سؤال
The time required for a job to move through the system is referred to as flow time.
سؤال
The first-come,first-served (FCFS)sequencing rule should be only used when operating at high levels of capacity.
سؤال
Scheduling specifies when labour,equipment and facilities are needed to produce a product.
سؤال
The longest processing time (LPT)rule tends to complete larger jobs in-house when subcontracting is anticipated.
سؤال
Managers typically use multiple objectives when constructing a schedule.
سؤال
The process of assigning work to limited resources is known as scheduling.
سؤال
The wide variety of jobs in a job shop makes scheduling difficult.
سؤال
Scheduling is considered the last stage of the planning process.
سؤال
Gantt charts show the planned and yet to be completed activities against total activities.
سؤال
Job-shop scheduling is usually performed by skilled machine operators.
سؤال
All sequencing rules strive to optimize both processing efficiency and due date performance.
سؤال
The scheduling function for mass production and job shop production are basically the same.
سؤال
Finite scheduling will not load a resource beyond its fixed capacity.
سؤال
If the following jobs are sequenced according to the first-come-first-served (FCFS)rule,then the mean completion time in days for all jobs is (assume zero for today's date) <strong>If the following jobs are sequenced according to the first-come-first-served (FCFS)rule,then the mean completion time in days for all jobs is (assume zero for today's date)  </strong> A)33 days. B)22 days. C)6.6 days. D)4.4 days. <div style=padding-top: 35px>

A)33 days.
B)22 days.
C)6.6 days.
D)4.4 days.
سؤال
If the following jobs are sequenced according to the FCFS rule,then the mean tardiness (in days)for all jobs would be (assume zero for today's date) <strong>If the following jobs are sequenced according to the FCFS rule,then the mean tardiness (in days)for all jobs would be (assume zero for today's date)  </strong> A)5 days. B)8.33 days. C)10.6 days. D)25 days <div style=padding-top: 35px>

A)5 days.
B)8.33 days.
C)10.6 days.
D)25 days
سؤال
The sequencing rule that minimizes average tardiness for a set of jobs to be processed on one machine is

A)first-come-first served (FCFS).
B)longest processing time (LPT).
C)shortest process time (SPT).
D)due date (DDATE).
سؤال
In a job shop environment,the process of prioritizing jobs assigned to a productive resource is called sequencing.
سؤال
The assignment method of linear programming can be used for both loading and employee scheduling.
سؤال
The sequencing rule that will minimize average job completion time for a set number of jobs to be processed on one machine is

A)first-come-first served (FCFS).
B)longest processing time (LPT).
C)shortest process time (SPT).
D)due date (DDATE).
سؤال
Tardiness is defined as the difference between a job's flow time and makespan.
سؤال
Increasing the capacity of a work centre that is a bottleneck increases output.
سؤال
The process of prioritizing jobs that have been assigned to a resource is called

A)loading.
B)monitoring.
C)sequencing.
D)input/output analysis.
سؤال
With drum-buffer-rope (DBR),the bottleneck resource is always the buffer.
سؤال
The dispatch list contains the order in which work is assigned to a productive resource.
سؤال
Input/output control provides the information necessary to regulate work flow in a job shop environment.
سؤال
Typically,there are more options available when scheduling employees because labour is a very flexible resource.
سؤال
Scheduling using the theory of constraints (TOC)requires that process batch sizes and transfer batch sizes always match.
سؤال
Which of the following is not typically considered an objective of scheduling?

A)minimizing job lateness
B)maximizing time in the system
C)minimizing overtime
D)maximizing machine utilization
سؤال
The time required to complete a group of jobs is referred to as

A)flow time.
B)makespan.
C)completion time.
D)none of the above.
سؤال
If the following jobs are sequenced according to the FCFS rule,then the maximum job tardiness (in days)is (assume zero for today's date) <strong>If the following jobs are sequenced according to the FCFS rule,then the maximum job tardiness (in days)is (assume zero for today's date)  </strong> A)0 days. B)8 days. C)20 days. D)25 days. <div style=padding-top: 35px>

A)0 days.
B)8 days.
C)20 days.
D)25 days.
سؤال
If a job is ahead of schedule,then its critical ratio (CR)will be

A)less than one.
B)greater than one.
C)equal to one.
D)none of the above.
سؤال
The theory of constraints (TOC)approach to scheduling concentrates on scheduling the bottleneck resources.
سؤال
If the following jobs are sequenced according to the DDATE rule,then the mean completion time (in days)for all jobs is (assume zero for today's date) <strong>If the following jobs are sequenced according to the DDATE rule,then the mean completion time (in days)for all jobs is (assume zero for today's date)  </strong> A)16.4 days. B)22.6 days. C)28.7 days. D)33.0 days <div style=padding-top: 35px>

A)16.4 days.
B)22.6 days.
C)28.7 days.
D)33.0 days
سؤال
If the following jobs are sequenced according to the SLACK rule,then the mean completion time (in days)for all jobs is (assume zero for today's date) <strong>If the following jobs are sequenced according to the SLACK rule,then the mean completion time (in days)for all jobs is (assume zero for today's date)  </strong> A)35 days. B)20.8 days. C)18.4 days. D)7 days. <div style=padding-top: 35px>

A)35 days.
B)20.8 days.
C)18.4 days.
D)7 days.
سؤال
If the following jobs are sequenced according to the SPT rule,then the mean completion time (in days)for all jobs is (assume zero for today's date) <strong>If the following jobs are sequenced according to the SPT rule,then the mean completion time (in days)for all jobs is (assume zero for today's date)  </strong> A)6.6 days. B)16 days. C)22 days. D)33 days. <div style=padding-top: 35px>

A)6.6 days.
B)16 days.
C)22 days.
D)33 days.
سؤال
If the following jobs are sequenced according to the LPT rule,then job D would be completed on day (assume zero for to day's date) <strong>If the following jobs are sequenced according to the LPT rule,then job D would be completed on day (assume zero for to day's date)  </strong> A)5. B)25. C)30. D)33. <div style=padding-top: 35px>

A)5.
B)25.
C)30.
D)33.
سؤال
If the following jobs are sequenced according to the DDATE rule,then the mean tardiness (in days)for all jobs is (assume zero for today's date) <strong>If the following jobs are sequenced according to the DDATE rule,then the mean tardiness (in days)for all jobs is (assume zero for today's date)  </strong> A)9.0 days. B)5.4 days. C)3.2 days. D)2.8 days <div style=padding-top: 35px>

A)9.0 days.
B)5.4 days.
C)3.2 days.
D)2.8 days
سؤال
If the following jobs are sequenced according to the SLACK rule,then job A would be completed on day (assume zero for today's date) <strong>If the following jobs are sequenced according to the SLACK rule,then job A would be completed on day (assume zero for today's date)  </strong> A)8. B)7. C)15. D)12. <div style=padding-top: 35px>

A)8.
B)7.
C)15.
D)12.
سؤال
If the following jobs are sequenced according to the SLACK rule,then the maximum job tardiness (in days)is (assume zero for today's date) <strong>If the following jobs are sequenced according to the SLACK rule,then the maximum job tardiness (in days)is (assume zero for today's date)  </strong> A)20 days. B)12 days. C)10 days. D)7 days. <div style=padding-top: 35px>

A)20 days.
B)12 days.
C)10 days.
D)7 days.
سؤال
If the following jobs are sequenced according to the SPT rule,then job B is completed on day (assume zero for today's date) <strong>If the following jobs are sequenced according to the SPT rule,then job B is completed on day (assume zero for today's date)  </strong> A)6. B)14. C)15. D)22. <div style=padding-top: 35px>

A)6.
B)14.
C)15.
D)22.
سؤال
If the following jobs are sequenced according to the SLACK rule,then the mean tardiness (in days)for all jobs is (assume zero for today's date) <strong>If the following jobs are sequenced according to the SLACK rule,then the mean tardiness (in days)for all jobs is (assume zero for today's date)  </strong> A)11.25 days. B)9 days. C)20 days. D)12.5 days. <div style=padding-top: 35px>

A)11.25 days.
B)9 days.
C)20 days.
D)12.5 days.
سؤال
If the following jobs are sequenced according to the SPT rule,then the total number of jobs that would be late is (assume zero for today's date) <strong>If the following jobs are sequenced according to the SPT rule,then the total number of jobs that would be late is (assume zero for today's date)  </strong> A)0 jobs. B)1 job. C)2 jobs. D)3 jobs. <div style=padding-top: 35px>

A)0 jobs.
B)1 job.
C)2 jobs.
D)3 jobs.
سؤال
If the following jobs are sequenced according to the LPT rule,then the mean completion time (in days)for all jobs is (assume zero for today's date) <strong>If the following jobs are sequenced according to the LPT rule,then the mean completion time (in days)for all jobs is (assume zero for today's date)  </strong> A)118 days. B)6.6 days. C)33 days. D)23.6 days. <div style=padding-top: 35px>

A)118 days.
B)6.6 days.
C)33 days.
D)23.6 days.
سؤال
If the following jobs are sequenced according to the LPT rule,then the total number of jobs that would be late is (assume zero for today's date) <strong>If the following jobs are sequenced according to the LPT rule,then the total number of jobs that would be late is (assume zero for today's date)  </strong> A)5 jobs. B)4 jobs. C)3 jobs. D)2 jobs. <div style=padding-top: 35px>

A)5 jobs.
B)4 jobs.
C)3 jobs.
D)2 jobs.
سؤال
If the following jobs are sequenced according to the LPT rule,then the maximum job tardiness (in days)is (assume zero for today's date) <strong>If the following jobs are sequenced according to the LPT rule,then the maximum job tardiness (in days)is (assume zero for today's date)  </strong> A)7 days. B)10 days. C)20 days. D)25 days. <div style=padding-top: 35px>

A)7 days.
B)10 days.
C)20 days.
D)25 days.
سؤال
If the following jobs are sequenced according to the FCFS rule,then job C is completed on day (assume zero for today's date) <strong>If the following jobs are sequenced according to the FCFS rule,then job C is completed on day (assume zero for today's date)  </strong> A)11. B)17. C)25. D)30. <div style=padding-top: 35px>

A)11.
B)17.
C)25.
D)30.
سؤال
If the following jobs are sequenced according to the DDATE rule,then the maximum job tardiness (in days)is (assume zero for today's date) <strong>If the following jobs are sequenced according to the DDATE rule,then the maximum job tardiness (in days)is (assume zero for today's date)  </strong> A)12 days. B)15 days. C)16 days. D)27 days. <div style=padding-top: 35px>

A)12 days.
B)15 days.
C)16 days.
D)27 days.
سؤال
If the following jobs are sequenced according to the FCFS rule,then the total number of jobs that would be late is (assume zero for today's date) <strong>If the following jobs are sequenced according to the FCFS rule,then the total number of jobs that would be late is (assume zero for today's date)  </strong> A)4. B)3. C)2. D)1. <div style=padding-top: 35px>

A)4.
B)3.
C)2.
D)1.
سؤال
If the following jobs are sequenced according to the SLACK rule,then the total number of jobs that would be late is (assume zero for today's date) <strong>If the following jobs are sequenced according to the SLACK rule,then the total number of jobs that would be late is (assume zero for today's date)  </strong> A)1 jobs. B)2 jobs. C)3 jobs. D)4 jobs. <div style=padding-top: 35px>

A)1 jobs.
B)2 jobs.
C)3 jobs.
D)4 jobs.
سؤال
If the following jobs are sequenced according to the LPT rule,then the mean tardiness (in days)for all jobs is (assume zero for today's date) <strong>If the following jobs are sequenced according to the LPT rule,then the mean tardiness (in days)for all jobs is (assume zero for today's date)  </strong> A)62 days. B)12.4 days. C)15.5 days. D)25 days. <div style=padding-top: 35px>

A)62 days.
B)12.4 days.
C)15.5 days.
D)25 days.
سؤال
If the following jobs are sequenced according to the SPT rule,then the maximum job tardiness (in days)is (assume zero for today's date) <strong>If the following jobs are sequenced according to the SPT rule,then the maximum job tardiness (in days)is (assume zero for today's date)  </strong> A)26 days. B)16 days. C)10 days. D)5.2 days. <div style=padding-top: 35px>

A)26 days.
B)16 days.
C)10 days.
D)5.2 days.
سؤال
If the following jobs are sequenced according to the SPT rule,then the mean tardiness (in days)for all jobs is (assume zero for today's date) <strong>If the following jobs are sequenced according to the SPT rule,then the mean tardiness (in days)for all jobs is (assume zero for today's date)  </strong> A)16 days. B)13 days. C)5.2 days. D)3.2 days. <div style=padding-top: 35px>

A)16 days.
B)13 days.
C)5.2 days.
D)3.2 days.
سؤال
Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below: <strong>Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below:   If management wishes to assign products to machines so that the total time to complete all the products is minimized,then Product 3 is assigned to</strong> A)machine A. B)machine B. C)machine C. D)machine D. <div style=padding-top: 35px> If management wishes to assign products to machines so that the total time to complete all the products is minimized,then Product 3 is assigned to

A)machine A.
B)machine B.
C)machine C.
D)machine D.
سؤال
What makes scheduling so difficult in a job shop?
سؤال
Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below: <strong>Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below:   If management wishes to assign products to machines so that the total time to complete all the products is minimized,then Product 1 is assigned to</strong> A)machine A B)machine B C)machine C D)machine D <div style=padding-top: 35px> If management wishes to assign products to machines so that the total time to complete all the products is minimized,then Product 1 is assigned to

A)machine A
B)machine B
C)machine C
D)machine D
سؤال
Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below: <strong>Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below:   If management assigns products to machines so that the total time to complete all jobs is minimized,then the time to complete Product 1 is</strong> A)10 minutes. B)9 minutes. C)16 minutes. D)12 minutes <div style=padding-top: 35px> If management assigns products to machines so that the total time to complete all jobs is minimized,then the time to complete Product 1 is

A)10 minutes.
B)9 minutes.
C)16 minutes.
D)12 minutes
سؤال
If the following jobs are sequenced according to the DDATE rule,then job A would be completed on day (assume zero for today's date) <strong>If the following jobs are sequenced according to the DDATE rule,then job A would be completed on day (assume zero for today's date)  </strong> A)8. B)12. C)16. D)22. <div style=padding-top: 35px>

A)8.
B)12.
C)16.
D)22.
سؤال
A ___ chart is used to show both planned and completed activities against a time scale.

A)Gantt
B)Dispatch
C)Sequencing
D)None of the above.
سؤال
List some of the objectives in scheduling.
سؤال
What is the difference between infinite scheduling and finite scheduling?
سؤال
Who developed the theory of constraints (TOC)and what is its approach to scheduling?
سؤال
Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below. <strong>Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below.   If management wishes to assign products to machines so that the total time to complete all the products is minimized,then Product 4 is assigned to</strong> A)machine A. B)machine B. C)machine C. D)machine D. <div style=padding-top: 35px> If management wishes to assign products to machines so that the total time to complete all the products is minimized,then Product 4 is assigned to

A)machine A.
B)machine B.
C)machine C.
D)machine D.
سؤال
The following set of jobs must be processed serially through a two-step system.The times at each process are in hours.If Johnson's Rule is used to sequence the jobs then Job C would start processing on operation 2 at <strong>The following set of jobs must be processed serially through a two-step system.The times at each process are in hours.If Johnson's Rule is used to sequence the jobs then Job C would start processing on operation 2 at  </strong> A)hour 13. B)hour 26. C)hour 47. D)hour 53. <div style=padding-top: 35px>

A)hour 13.
B)hour 26.
C)hour 47.
D)hour 53.
سؤال
Why is monitoring an important component of job-shop scheduling?
سؤال
The following set of jobs must be processed serially through a two-step system.The times at each process are in hours.If Johnson's Rule is used to sequence the jobs then the makespan time (in hours)for all jobs is <strong>The following set of jobs must be processed serially through a two-step system.The times at each process are in hours.If Johnson's Rule is used to sequence the jobs then the makespan time (in hours)for all jobs is  </strong> A)42 hours. B)53 hours. C)90 hours. D)95 hours. <div style=padding-top: 35px>

A)42 hours.
B)53 hours.
C)90 hours.
D)95 hours.
سؤال
Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below: <strong>Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below:   The minimum time required to complete all the products is</strong> A)29 minutes. B)27 minutes. C)33 minutes. D)36 minutes. <div style=padding-top: 35px> The minimum time required to complete all the products is

A)29 minutes.
B)27 minutes.
C)33 minutes.
D)36 minutes.
سؤال
If the following jobs are sequenced according to the DDATE rule,then the total number of jobs that would be late is (assume zero for today's date) <strong>If the following jobs are sequenced according to the DDATE rule,then the total number of jobs that would be late is (assume zero for today's date)  </strong> A)5 jobs. B)4 jobs. C)3 jobs. D)2 jobs. <div style=padding-top: 35px>

A)5 jobs.
B)4 jobs.
C)3 jobs.
D)2 jobs.
سؤال
The following set of jobs must be processed serially through a two-step system.If Johnson's Rule is used to sequence the jobs,then the order in which the jobs would be performed is <strong>The following set of jobs must be processed serially through a two-step system.If Johnson's Rule is used to sequence the jobs,then the order in which the jobs would be performed is  </strong> A)A-B-C-D-E B)C-B-E-D-A C)E-B-D-A-C D)D-E-B-A-C <div style=padding-top: 35px>

A)A-B-C-D-E
B)C-B-E-D-A
C)E-B-D-A-C
D)D-E-B-A-C
سؤال
The following set of jobs must be processed serially through a two-step system.The times at each process are in hours.If Johnson's Rule is used to sequence the jobs,then Job A would complete processing on operation 2 at <strong>The following set of jobs must be processed serially through a two-step system.The times at each process are in hours.If Johnson's Rule is used to sequence the jobs,then Job A would complete processing on operation 2 at  </strong> A)hour 21. B)hour 35. C)hour 38. D)hour 47. <div style=padding-top: 35px>

A)hour 21.
B)hour 35.
C)hour 38.
D)hour 47.
سؤال
The scheduling rule that minimizes the makespan time for a set of jobs that must be processed through a two-step system where every job follows the same sequence through the two processes is

A)the shortest processing time (SPT).
B)Johnson's Rule.
C)the assignment method.
D)the minimal slack rule.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/78
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 22: Scheduling
1
Job shop scheduling is also known as shop floor control.
True
2
Minimizing overtime is one of several objectives that could be considered when constructing a schedule.
True
3
The shortest processing time (SPT)rule is most useful when the job shop is not congested.
False
4
Determining the optimal allocation of jobs to machines or workers can be solved using the assignment method of linear programming.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
5
Johnson's rule gives an optimal sequence for jobs processed serially through a two step system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
6
The sequence in which jobs should be processed is determined using linear programming.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
7
The process of prioritizing jobs that have been assigned to a resource is called sequencing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
8
Sequencing involves determining the order in which jobs are released to the shop floor.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
9
The time required for a job to move through the system is referred to as flow time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
10
The first-come,first-served (FCFS)sequencing rule should be only used when operating at high levels of capacity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
11
Scheduling specifies when labour,equipment and facilities are needed to produce a product.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
12
The longest processing time (LPT)rule tends to complete larger jobs in-house when subcontracting is anticipated.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
13
Managers typically use multiple objectives when constructing a schedule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
14
The process of assigning work to limited resources is known as scheduling.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
15
The wide variety of jobs in a job shop makes scheduling difficult.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
16
Scheduling is considered the last stage of the planning process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
17
Gantt charts show the planned and yet to be completed activities against total activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
18
Job-shop scheduling is usually performed by skilled machine operators.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
19
All sequencing rules strive to optimize both processing efficiency and due date performance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
20
The scheduling function for mass production and job shop production are basically the same.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
21
Finite scheduling will not load a resource beyond its fixed capacity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
22
If the following jobs are sequenced according to the first-come-first-served (FCFS)rule,then the mean completion time in days for all jobs is (assume zero for today's date) <strong>If the following jobs are sequenced according to the first-come-first-served (FCFS)rule,then the mean completion time in days for all jobs is (assume zero for today's date)  </strong> A)33 days. B)22 days. C)6.6 days. D)4.4 days.

A)33 days.
B)22 days.
C)6.6 days.
D)4.4 days.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
23
If the following jobs are sequenced according to the FCFS rule,then the mean tardiness (in days)for all jobs would be (assume zero for today's date) <strong>If the following jobs are sequenced according to the FCFS rule,then the mean tardiness (in days)for all jobs would be (assume zero for today's date)  </strong> A)5 days. B)8.33 days. C)10.6 days. D)25 days

A)5 days.
B)8.33 days.
C)10.6 days.
D)25 days
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
24
The sequencing rule that minimizes average tardiness for a set of jobs to be processed on one machine is

A)first-come-first served (FCFS).
B)longest processing time (LPT).
C)shortest process time (SPT).
D)due date (DDATE).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
25
In a job shop environment,the process of prioritizing jobs assigned to a productive resource is called sequencing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
26
The assignment method of linear programming can be used for both loading and employee scheduling.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
27
The sequencing rule that will minimize average job completion time for a set number of jobs to be processed on one machine is

A)first-come-first served (FCFS).
B)longest processing time (LPT).
C)shortest process time (SPT).
D)due date (DDATE).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
28
Tardiness is defined as the difference between a job's flow time and makespan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
29
Increasing the capacity of a work centre that is a bottleneck increases output.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
30
The process of prioritizing jobs that have been assigned to a resource is called

A)loading.
B)monitoring.
C)sequencing.
D)input/output analysis.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
31
With drum-buffer-rope (DBR),the bottleneck resource is always the buffer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
32
The dispatch list contains the order in which work is assigned to a productive resource.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
33
Input/output control provides the information necessary to regulate work flow in a job shop environment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
34
Typically,there are more options available when scheduling employees because labour is a very flexible resource.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
35
Scheduling using the theory of constraints (TOC)requires that process batch sizes and transfer batch sizes always match.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
36
Which of the following is not typically considered an objective of scheduling?

A)minimizing job lateness
B)maximizing time in the system
C)minimizing overtime
D)maximizing machine utilization
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
37
The time required to complete a group of jobs is referred to as

A)flow time.
B)makespan.
C)completion time.
D)none of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
38
If the following jobs are sequenced according to the FCFS rule,then the maximum job tardiness (in days)is (assume zero for today's date) <strong>If the following jobs are sequenced according to the FCFS rule,then the maximum job tardiness (in days)is (assume zero for today's date)  </strong> A)0 days. B)8 days. C)20 days. D)25 days.

A)0 days.
B)8 days.
C)20 days.
D)25 days.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
39
If a job is ahead of schedule,then its critical ratio (CR)will be

A)less than one.
B)greater than one.
C)equal to one.
D)none of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
40
The theory of constraints (TOC)approach to scheduling concentrates on scheduling the bottleneck resources.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
41
If the following jobs are sequenced according to the DDATE rule,then the mean completion time (in days)for all jobs is (assume zero for today's date) <strong>If the following jobs are sequenced according to the DDATE rule,then the mean completion time (in days)for all jobs is (assume zero for today's date)  </strong> A)16.4 days. B)22.6 days. C)28.7 days. D)33.0 days

A)16.4 days.
B)22.6 days.
C)28.7 days.
D)33.0 days
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
42
If the following jobs are sequenced according to the SLACK rule,then the mean completion time (in days)for all jobs is (assume zero for today's date) <strong>If the following jobs are sequenced according to the SLACK rule,then the mean completion time (in days)for all jobs is (assume zero for today's date)  </strong> A)35 days. B)20.8 days. C)18.4 days. D)7 days.

A)35 days.
B)20.8 days.
C)18.4 days.
D)7 days.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
43
If the following jobs are sequenced according to the SPT rule,then the mean completion time (in days)for all jobs is (assume zero for today's date) <strong>If the following jobs are sequenced according to the SPT rule,then the mean completion time (in days)for all jobs is (assume zero for today's date)  </strong> A)6.6 days. B)16 days. C)22 days. D)33 days.

A)6.6 days.
B)16 days.
C)22 days.
D)33 days.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
44
If the following jobs are sequenced according to the LPT rule,then job D would be completed on day (assume zero for to day's date) <strong>If the following jobs are sequenced according to the LPT rule,then job D would be completed on day (assume zero for to day's date)  </strong> A)5. B)25. C)30. D)33.

A)5.
B)25.
C)30.
D)33.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
45
If the following jobs are sequenced according to the DDATE rule,then the mean tardiness (in days)for all jobs is (assume zero for today's date) <strong>If the following jobs are sequenced according to the DDATE rule,then the mean tardiness (in days)for all jobs is (assume zero for today's date)  </strong> A)9.0 days. B)5.4 days. C)3.2 days. D)2.8 days

A)9.0 days.
B)5.4 days.
C)3.2 days.
D)2.8 days
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
46
If the following jobs are sequenced according to the SLACK rule,then job A would be completed on day (assume zero for today's date) <strong>If the following jobs are sequenced according to the SLACK rule,then job A would be completed on day (assume zero for today's date)  </strong> A)8. B)7. C)15. D)12.

A)8.
B)7.
C)15.
D)12.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
47
If the following jobs are sequenced according to the SLACK rule,then the maximum job tardiness (in days)is (assume zero for today's date) <strong>If the following jobs are sequenced according to the SLACK rule,then the maximum job tardiness (in days)is (assume zero for today's date)  </strong> A)20 days. B)12 days. C)10 days. D)7 days.

A)20 days.
B)12 days.
C)10 days.
D)7 days.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
48
If the following jobs are sequenced according to the SPT rule,then job B is completed on day (assume zero for today's date) <strong>If the following jobs are sequenced according to the SPT rule,then job B is completed on day (assume zero for today's date)  </strong> A)6. B)14. C)15. D)22.

A)6.
B)14.
C)15.
D)22.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
49
If the following jobs are sequenced according to the SLACK rule,then the mean tardiness (in days)for all jobs is (assume zero for today's date) <strong>If the following jobs are sequenced according to the SLACK rule,then the mean tardiness (in days)for all jobs is (assume zero for today's date)  </strong> A)11.25 days. B)9 days. C)20 days. D)12.5 days.

A)11.25 days.
B)9 days.
C)20 days.
D)12.5 days.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
50
If the following jobs are sequenced according to the SPT rule,then the total number of jobs that would be late is (assume zero for today's date) <strong>If the following jobs are sequenced according to the SPT rule,then the total number of jobs that would be late is (assume zero for today's date)  </strong> A)0 jobs. B)1 job. C)2 jobs. D)3 jobs.

A)0 jobs.
B)1 job.
C)2 jobs.
D)3 jobs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
51
If the following jobs are sequenced according to the LPT rule,then the mean completion time (in days)for all jobs is (assume zero for today's date) <strong>If the following jobs are sequenced according to the LPT rule,then the mean completion time (in days)for all jobs is (assume zero for today's date)  </strong> A)118 days. B)6.6 days. C)33 days. D)23.6 days.

A)118 days.
B)6.6 days.
C)33 days.
D)23.6 days.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
52
If the following jobs are sequenced according to the LPT rule,then the total number of jobs that would be late is (assume zero for today's date) <strong>If the following jobs are sequenced according to the LPT rule,then the total number of jobs that would be late is (assume zero for today's date)  </strong> A)5 jobs. B)4 jobs. C)3 jobs. D)2 jobs.

A)5 jobs.
B)4 jobs.
C)3 jobs.
D)2 jobs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
53
If the following jobs are sequenced according to the LPT rule,then the maximum job tardiness (in days)is (assume zero for today's date) <strong>If the following jobs are sequenced according to the LPT rule,then the maximum job tardiness (in days)is (assume zero for today's date)  </strong> A)7 days. B)10 days. C)20 days. D)25 days.

A)7 days.
B)10 days.
C)20 days.
D)25 days.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
54
If the following jobs are sequenced according to the FCFS rule,then job C is completed on day (assume zero for today's date) <strong>If the following jobs are sequenced according to the FCFS rule,then job C is completed on day (assume zero for today's date)  </strong> A)11. B)17. C)25. D)30.

A)11.
B)17.
C)25.
D)30.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
55
If the following jobs are sequenced according to the DDATE rule,then the maximum job tardiness (in days)is (assume zero for today's date) <strong>If the following jobs are sequenced according to the DDATE rule,then the maximum job tardiness (in days)is (assume zero for today's date)  </strong> A)12 days. B)15 days. C)16 days. D)27 days.

A)12 days.
B)15 days.
C)16 days.
D)27 days.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
56
If the following jobs are sequenced according to the FCFS rule,then the total number of jobs that would be late is (assume zero for today's date) <strong>If the following jobs are sequenced according to the FCFS rule,then the total number of jobs that would be late is (assume zero for today's date)  </strong> A)4. B)3. C)2. D)1.

A)4.
B)3.
C)2.
D)1.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
57
If the following jobs are sequenced according to the SLACK rule,then the total number of jobs that would be late is (assume zero for today's date) <strong>If the following jobs are sequenced according to the SLACK rule,then the total number of jobs that would be late is (assume zero for today's date)  </strong> A)1 jobs. B)2 jobs. C)3 jobs. D)4 jobs.

A)1 jobs.
B)2 jobs.
C)3 jobs.
D)4 jobs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
58
If the following jobs are sequenced according to the LPT rule,then the mean tardiness (in days)for all jobs is (assume zero for today's date) <strong>If the following jobs are sequenced according to the LPT rule,then the mean tardiness (in days)for all jobs is (assume zero for today's date)  </strong> A)62 days. B)12.4 days. C)15.5 days. D)25 days.

A)62 days.
B)12.4 days.
C)15.5 days.
D)25 days.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
59
If the following jobs are sequenced according to the SPT rule,then the maximum job tardiness (in days)is (assume zero for today's date) <strong>If the following jobs are sequenced according to the SPT rule,then the maximum job tardiness (in days)is (assume zero for today's date)  </strong> A)26 days. B)16 days. C)10 days. D)5.2 days.

A)26 days.
B)16 days.
C)10 days.
D)5.2 days.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
60
If the following jobs are sequenced according to the SPT rule,then the mean tardiness (in days)for all jobs is (assume zero for today's date) <strong>If the following jobs are sequenced according to the SPT rule,then the mean tardiness (in days)for all jobs is (assume zero for today's date)  </strong> A)16 days. B)13 days. C)5.2 days. D)3.2 days.

A)16 days.
B)13 days.
C)5.2 days.
D)3.2 days.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
61
Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below: <strong>Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below:   If management wishes to assign products to machines so that the total time to complete all the products is minimized,then Product 3 is assigned to</strong> A)machine A. B)machine B. C)machine C. D)machine D. If management wishes to assign products to machines so that the total time to complete all the products is minimized,then Product 3 is assigned to

A)machine A.
B)machine B.
C)machine C.
D)machine D.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
62
What makes scheduling so difficult in a job shop?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
63
Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below: <strong>Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below:   If management wishes to assign products to machines so that the total time to complete all the products is minimized,then Product 1 is assigned to</strong> A)machine A B)machine B C)machine C D)machine D If management wishes to assign products to machines so that the total time to complete all the products is minimized,then Product 1 is assigned to

A)machine A
B)machine B
C)machine C
D)machine D
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
64
Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below: <strong>Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below:   If management assigns products to machines so that the total time to complete all jobs is minimized,then the time to complete Product 1 is</strong> A)10 minutes. B)9 minutes. C)16 minutes. D)12 minutes If management assigns products to machines so that the total time to complete all jobs is minimized,then the time to complete Product 1 is

A)10 minutes.
B)9 minutes.
C)16 minutes.
D)12 minutes
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
65
If the following jobs are sequenced according to the DDATE rule,then job A would be completed on day (assume zero for today's date) <strong>If the following jobs are sequenced according to the DDATE rule,then job A would be completed on day (assume zero for today's date)  </strong> A)8. B)12. C)16. D)22.

A)8.
B)12.
C)16.
D)22.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
66
A ___ chart is used to show both planned and completed activities against a time scale.

A)Gantt
B)Dispatch
C)Sequencing
D)None of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
67
List some of the objectives in scheduling.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
68
What is the difference between infinite scheduling and finite scheduling?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
69
Who developed the theory of constraints (TOC)and what is its approach to scheduling?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
70
Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below. <strong>Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below.   If management wishes to assign products to machines so that the total time to complete all the products is minimized,then Product 4 is assigned to</strong> A)machine A. B)machine B. C)machine C. D)machine D. If management wishes to assign products to machines so that the total time to complete all the products is minimized,then Product 4 is assigned to

A)machine A.
B)machine B.
C)machine C.
D)machine D.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
71
The following set of jobs must be processed serially through a two-step system.The times at each process are in hours.If Johnson's Rule is used to sequence the jobs then Job C would start processing on operation 2 at <strong>The following set of jobs must be processed serially through a two-step system.The times at each process are in hours.If Johnson's Rule is used to sequence the jobs then Job C would start processing on operation 2 at  </strong> A)hour 13. B)hour 26. C)hour 47. D)hour 53.

A)hour 13.
B)hour 26.
C)hour 47.
D)hour 53.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
72
Why is monitoring an important component of job-shop scheduling?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
73
The following set of jobs must be processed serially through a two-step system.The times at each process are in hours.If Johnson's Rule is used to sequence the jobs then the makespan time (in hours)for all jobs is <strong>The following set of jobs must be processed serially through a two-step system.The times at each process are in hours.If Johnson's Rule is used to sequence the jobs then the makespan time (in hours)for all jobs is  </strong> A)42 hours. B)53 hours. C)90 hours. D)95 hours.

A)42 hours.
B)53 hours.
C)90 hours.
D)95 hours.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
74
Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below: <strong>Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below:   The minimum time required to complete all the products is</strong> A)29 minutes. B)27 minutes. C)33 minutes. D)36 minutes. The minimum time required to complete all the products is

A)29 minutes.
B)27 minutes.
C)33 minutes.
D)36 minutes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
75
If the following jobs are sequenced according to the DDATE rule,then the total number of jobs that would be late is (assume zero for today's date) <strong>If the following jobs are sequenced according to the DDATE rule,then the total number of jobs that would be late is (assume zero for today's date)  </strong> A)5 jobs. B)4 jobs. C)3 jobs. D)2 jobs.

A)5 jobs.
B)4 jobs.
C)3 jobs.
D)2 jobs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
76
The following set of jobs must be processed serially through a two-step system.If Johnson's Rule is used to sequence the jobs,then the order in which the jobs would be performed is <strong>The following set of jobs must be processed serially through a two-step system.If Johnson's Rule is used to sequence the jobs,then the order in which the jobs would be performed is  </strong> A)A-B-C-D-E B)C-B-E-D-A C)E-B-D-A-C D)D-E-B-A-C

A)A-B-C-D-E
B)C-B-E-D-A
C)E-B-D-A-C
D)D-E-B-A-C
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
77
The following set of jobs must be processed serially through a two-step system.The times at each process are in hours.If Johnson's Rule is used to sequence the jobs,then Job A would complete processing on operation 2 at <strong>The following set of jobs must be processed serially through a two-step system.The times at each process are in hours.If Johnson's Rule is used to sequence the jobs,then Job A would complete processing on operation 2 at  </strong> A)hour 21. B)hour 35. C)hour 38. D)hour 47.

A)hour 21.
B)hour 35.
C)hour 38.
D)hour 47.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
78
The scheduling rule that minimizes the makespan time for a set of jobs that must be processed through a two-step system where every job follows the same sequence through the two processes is

A)the shortest processing time (SPT).
B)Johnson's Rule.
C)the assignment method.
D)the minimal slack rule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.