Deck 10: Production and Cost Estimation

ملء الشاشة (f)
exit full mode
سؤال
A short-run production function was estimated as Q=0.002L3+0.16L2Q = - 0.002 L ^ { 3 } + 0.16 L ^ { 2 } At 20 units of labor,what is average product?

A)6.0
B)1.9
C)6.3
D)4.0
E)2.4
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
A short-run production function was estimated as Q=0.002L3+0.16L2Q = - 0.002 L ^ { 3 } + 0.16 L ^ { 2 } At 60 units of labor,what is marginal product?

A)4.1
B)1.2
C)6.3
D)2.4
E)-2.4
سؤال
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form AVC=a+bQ+cQ2A V C = a + b Q + c Q ^ { 2 } and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.  <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form  A V C = a + b Q + c Q ^ { 2 }  and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.   At what level of output is average variable cost (AVC)at its minimum point for Straker Industries?</strong> A)0.14 B)4.7 C)7 D)14 E)28 <div style=padding-top: 35px>  At what level of output is average variable cost (AVC)at its minimum point for Straker Industries?

A)0.14
B)4.7
C)7
D)14
E)28
سؤال
Which of the following specifications could NOT be employed for estimating a short run production function?

A)Q = aK + bL
B) Q=aK3L3+bK2L2Q = a K ^ { 3 } L ^ { 3 } + b K ^ {2 } L ^ { 2 }
C)Q = AL3 + BL2
D)both a and b
E)all of the above
سؤال
A short-run production function was estimated as Q=0.002L3+0.16L2Q = - 0.002 L ^ { 3 } + 0.16 L ^ { 2 } At 20 units of labor,what is marginal product?

A)6.0
B)1.9
C)6.3
D)4.0
E)2.4
سؤال
An average variable cost function is estimated as AVC=962Q+0.05Q2A V C = 96 - 2 Q + 0.05 Q ^ { 2 } Which of the following cost functions is associated with this estimate?

A)SMC = 96 - 4Q + 0.1Q2
B)TVC = 96Q - 2Q2 + 0.05Q3
C)TVC = 96Q + 4Q2 + 0.15Q3
D)SMC = 96 - 4Q + 0.15Q2
E)both b and d
سؤال
A short-run production function was estimated as Q=0.002L3+0.16L2Q = - 0.002 L ^ { 3 } + 0.16 L ^ { 2 } At what level of labor usage does the maximum average product occur?

A)20
B)30
C)40
D)50
E)60
سؤال
With a cubic production function of the form Q=aK3L3+bK2L2Q = a K ^ { 3 } L ^ { 3 } + b K ^ { - 2 } L ^ { 2 } ,in order for the average and marginal product functions to have their usual theoretical properties,it must be the case that

A)a < 0,b > 0
B)a > 0,b < 0
C)a < 0,b < 0
D)a > 0,b > 0
سؤال
A short-run production function was estimated as Q=0.002L3+0.16L2Q = - 0.002 L ^ { 3 } + 0.16 L ^ { 2 } At 60 units of labor,what is average product?

A)9.4
B)8.6
C)3.7
D)2.4
E)6.4
سؤال
An estimated short-run cost function

A)can be used to make price and output decisions.
B)holds the capital stock constant.
C)can be estimated using time-series data.
D)both a and c
E)all of the above
سؤال
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form AVC=a+bQ+cQ2A V C = a + b Q + c Q ^ { 2 } and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.  <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form  A V C = a + b Q + c Q ^ { 2 }  and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.   The estimated short-run marginal cost function (SMC)at Straker Industries is:</strong> A)  S M C = 43.4 Q - 1.4 Q ^ { 2 } + 0.07 Q ^ { 3 }  B)  S M C = 43.4 - 1.4 Q + 0.07 Q ^ { 2 }  C)  S M C = 43.4 Q - 5.6 Q ^ { 2 } + 0.6 Q ^ { 3 }  D)  S M C = 43.4 - 5.6 Q + 0.6 Q ^ { 2 }  <div style=padding-top: 35px>  The estimated short-run marginal cost function (SMC)at Straker Industries is:

A) SMC=43.4Q1.4Q2+0.07Q3S M C = 43.4 Q - 1.4 Q ^ { 2 } + 0.07 Q ^ { 3 }
B) SMC=43.41.4Q+0.07Q2S M C = 43.4 - 1.4 Q + 0.07 Q ^ { 2 }
C) SMC=43.4Q5.6Q2+0.6Q3S M C = 43.4 Q - 5.6 Q ^ { 2 } + 0.6 Q ^ { 3 }
D) SMC=43.45.6Q+0.6Q2S M C = 43.4 - 5.6 Q + 0.6 Q ^ { 2 }
سؤال
When estimating a short-run average variable cost function,

A)the intercept must be forced to equal zero.
B)the cost data must be inflation-adjusted.
C)at least one input must have been constant during the period in which the data were collected.
D)both b and c
E)all of the above
سؤال
A short-run production function was estimated as Q=0.002L3+0.16L2Q = - 0.002 L ^ { 3 } + 0.16 L ^ { 2 } What is average product when it is at its maximum level?

A)3.20
B)8.75
C)6.92
D)6.00
E)9.40
سؤال
Which of the following is an estimable form of a production function?

A)Q = f(L,K)
B)Q = f(L, Kˉ\bar { K } )
C) Q=aK3L3+bK2L2Q = a K ^ { 3 } L ^ { 3 } + b K ^ { - 2 } L ^ { 2 }
D)all of the above
سؤال
A short-run production function was estimated as Q=0.002L3+0.16L2Q = - 0.002 L ^ { 3 } + 0.16 L ^ { 2 } What is total product when average product is at its maximum level?

A)94
B)86
C)100
D)128
E)150
سؤال
A short-run production function was estimated as Q=0.002L3+0.16L2Q = - 0.002 L ^ { 3 } + 0.16 L ^ { 2 } At 20 units of labor,what is total product?

A)48
B)96
C)20
D)62
E)41
سؤال
The opportunity cost of capital owned by the firm should reflect

A)acquisition cost.
B)the return foregone by using the capital rather than renting it to another firm.
C)wage rate differences.
D)both a and b
سؤال
A theoretical restriction on the short-run cubic cost equation,TVC = aQ + bQ + cQ2,is

A)a > 0,b > 0,c > 0
B)a > 0,b < 0,c > 0
C)a > 0,b > 0,c < 0
D)a > 0,b < 0,c < 0
سؤال
When estimating a short-run production function of the form Q=AL3+BL2Q = A L ^ { 3 } + B L ^ { 2 } ,it is necessary to specify in the computer routine that

A)A < 0.
B)B > 0.
C)the intercept term is forced to equal zero.
D)a and b
E)all of the above
سؤال
Which of the following represents a short-run cubic production function?

A) Q=aK3L3+bK2L2Q = a K ^ { 3 } L ^ { 3 } + b K ^ { - 2 } L ^ { 2 }
B) Q=3AL2+2BL( where A=aKˉ3,B=bKˉ2)Q = 3 A L ^ { 2 } + 2 B L \left( \text { where } A = a \bar { K } ^ { 3 } , B = b \bar { K } ^ { 2 } \right)
C) Q=AL3+BL2( where A=aKˉ3,B=bKˉ2)Q = A L ^ { 3 } + B L ^ { 2 } \left( \text { where } A = a \bar { K } ^ { 3 } , B = b \bar { K } ^ { 2 } \right)
D) Q=AL2+BL( where A=aK3,B=bKˉ2)Q = A L ^ { 2 } + B L \left( \text { where } A = a \overline { K ^ { - 3 } } , B = b \bar { K } ^ { 2 } \right)
سؤال
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form AVC=a+bQ+cQ2A V C = a + b Q + c Q ^ { 2 } and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.  <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form  A V C = a + b Q + c Q ^ { 2 }  and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.   If Straker Industries produces 12 units of output,what is estimated average total cost (ATC)?</strong> A)$121.93 B)$171.40 C)$463.20 D)$1,348 <div style=padding-top: 35px>  If Straker Industries produces 12 units of output,what is estimated average total cost (ATC)?

A)$121.93
B)$171.40
C)$463.20
D)$1,348
سؤال
A firm estimates its long-run production function to be Q=0.0075K3L3+12K2L2Q = - 0.0075 K ^ { 3 } L ^ { 3 } + 12 K ^ { 2 } L ^ { 2 } Suppose the firm employs 12 units of capital.Marginal product when 10 units of labor are employed is

A)12,248
B)13,142
C)14,287
D)15,984
E)30,672
سؤال
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form AVC=a+bQ+cQ2A V C = a + b Q + c Q ^ { 2 } and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.  <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form  A V C = a + b Q + c Q ^ { 2 }  and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.   If Straker Industries produces 20 units of output,what is estimated average total cost (ATC)?</strong> A)$19.40 B)$67.40 C)$117.40 D)$1,348 <div style=padding-top: 35px>  If Straker Industries produces 20 units of output,what is estimated average total cost (ATC)?

A)$19.40
B)$67.40
C)$117.40
D)$1,348
سؤال
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form AVC=a+bQ+cQ2A V C = a + b Q + c Q ^ { 2 } and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.  <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form  A V C = a + b Q + c Q ^ { 2 }  and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.   If Straker Industries produces 12 units of output,what is estimated short-run marginal cost (SMC)?</strong> A)$28.04 B)$32.40 C)$33.33 D)$62.60 <div style=padding-top: 35px>  If Straker Industries produces 12 units of output,what is estimated short-run marginal cost (SMC)?

A)$28.04
B)$32.40
C)$33.33
D)$62.60
سؤال
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form AVC=a+bQ+cQ2A V C = a + b Q + c Q ^ { 2 } and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.  <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form  A V C = a + b Q + c Q ^ { 2 }  and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.   If Straker Industries produces 20 units of output,what is estimated average variable cost (AVC)?</strong> A)$19.40 B)$67.40 C)$171.40 D)$179.40 <div style=padding-top: 35px>  If Straker Industries produces 20 units of output,what is estimated average variable cost (AVC)?

A)$19.40
B)$67.40
C)$171.40
D)$179.40
سؤال
The empirical specification Q=AL3+BL2Q = A L ^ { 3 } + B L ^ { 2 } can be used to estimate

A)a short-run cubic production function.
B)short-run cubic cost function.
C)a family of U-shaped product curves.
D)both a and c
E)none of the above
سؤال
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form AVC=a+bQ+cQ2A V C = a + b Q + c Q ^ { 2 } and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.  <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form  A V C = a + b Q + c Q ^ { 2 }  and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.   If Straker Industries produces 20 units of output,what is estimated total cost (TC)?</strong> A)$1,348 B)$1,498 C)$2,348 D)$4,428 <div style=padding-top: 35px>  If Straker Industries produces 20 units of output,what is estimated total cost (TC)?

A)$1,348
B)$1,498
C)$2,348
D)$4,428
سؤال
A firm estimates its long-run production function to be Q=0.0075K3L3+12K2L2Q = - 0.0075 K ^ { 3 } L ^ { 3 } + 12 K ^ {2 } L ^ { 2 } Suppose the firm employs 12 units of capital.At ________ units of labor,average product of labor begins to diminish.

A)32.21
B)44.44
C)66.67
D)76.66
E)82.27
سؤال
For the short-run cost function AVC = a + bQ + cQ2,

A)the AVC curve is UU -shaped when a < 0,b > 0,and c < 0.
B)the AVC curve is UU -shaped when a > 0,b < 0,and c > 0.
C)the corresponding SMC function is SMC=aQ+2bQ2+3cQ3S M C = a Q + 2 b Q ^ { 2 } + 3 c Q ^ { 3 } .
D)both a and c
E)all of the above
سؤال
The empirical specification TVC=aQ+bQ2+cQ3T V C = a Q + b Q ^ { 2 } + c Q ^ { 3 } can be used to estimate

A)a short-run cubic production function.
B)short-run cubic cost function.
C)a  U \text { U } -shaped TVC curve.
D)both b and c
E)none of the above
سؤال
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form AVC=a+bQ+cQ2A V C = a + b Q + c Q ^ { 2 } and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.  <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form  A V C = a + b Q + c Q ^ { 2 }  and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.   If Straker Industries produces 12 units of output,what is estimated average variable cost (AVC)?</strong> A)$28.04 B)$32.40 C)$33.33 D)$38.60 <div style=padding-top: 35px>  If Straker Industries produces 12 units of output,what is estimated average variable cost (AVC)?

A)$28.04
B)$32.40
C)$33.33
D)$38.60
سؤال
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form AVC=a+bQ+cQ2A V C = a + b Q + c Q ^ { 2 } and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.  <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form  A V C = a + b Q + c Q ^ { 2 }  and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.   At Straker Industries,average variable cost (AVC)reaches its minimum value at $________.</strong> A)$24.50 B)$33.60 C)$72.80 D)$121.80 <div style=padding-top: 35px>  At Straker Industries,average variable cost (AVC)reaches its minimum value at $________.

A)$24.50
B)$33.60
C)$72.80
D)$121.80
سؤال
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form AVC=a+bQ+cQ2A V C = a + b Q + c Q ^ { 2 } and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.  <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form  A V C = a + b Q + c Q ^ { 2 }  and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.   If Straker Industries produces 20 units of output,what is estimated total variable cost (TVC)?</strong> A)$1,348 B)$1,498 C)$2,348 D)$4,428 <div style=padding-top: 35px>  If Straker Industries produces 20 units of output,what is estimated total variable cost (TVC)?

A)$1,348
B)$1,498
C)$2,348
D)$4,428
سؤال
A cubic specification for a short-run production function is appropriate when the scatter diagram indicates

A)an S-shaped total product curve.
B)marginal product of labor falls throughout the range of labor usage.
C)total product is decreasing throughout the range of labor usage.
D)an S-shaped marginal product of labor curve.
E)a  U \text { U } -shaped marginal product of labor curve (MP first falls and then rises as labor usage increases.
سؤال
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form AVC=a+bQ+cQ2A V C = a + b Q + c Q ^ { 2 } and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.  <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form  A V C = a + b Q + c Q ^ { 2 }  and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.   If Straker Industries produces 12 units of output,what is estimated total cost (TC)?</strong> A)$1,000 B)$1,463 C)$2,348 D)$4,428 <div style=padding-top: 35px>  If Straker Industries produces 12 units of output,what is estimated total cost (TC)?

A)$1,000
B)$1,463
C)$2,348
D)$4,428
سؤال
A firm estimates its long-run production function to be Q=0.0075K3L3+12K2L2Q = - 0.0075 K ^ { 3 } L ^ { 3 } + 12 K ^ { 2 } L ^ { 2 } Suppose the firm employs 12 units of capital.The product curve(s)in the short-run are

A)TP = -12.96 L3 + 1,728L2.
B)AP = -12.96 L3 + 1,728L2.
C)MP = -38.88 L2 + 3,456L.
D)both a and b
E)both a and c
سؤال
A firm estimates its long-run production function to be Q=0.0075K3L3+12K2L2Q = - 0.0075 K ^ { 3 } L ^ { 3 } + 12 K ^ { 2 } L ^ { 2 } Suppose the firm employs 12 units of capital.At _______ units of labor,marginal product of labor begins to diminish.

A)32.21
B)44.44
C)66.67
D)76.66
E)82.27
سؤال
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form AVC=a+bQ+cQ2A V C = a + b Q + c Q ^ { 2 } and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.  <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form  A V C = a + b Q + c Q ^ { 2 }  and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.   If Straker Industries produces 20 units of output,what is estimated short-run marginal cost (SMC)?</strong> A)$171.40 B)$463.20 C)$1,348 D)$2,348 <div style=padding-top: 35px>  If Straker Industries produces 20 units of output,what is estimated short-run marginal cost (SMC)?

A)$171.40
B)$463.20
C)$1,348
D)$2,348
سؤال
When estimating a cubic short-run production function Q=AL3+BL2Q = A L ^ { 3 } + B L ^ { 2 } using linear regression analysis,you must

A)transform the equation into linear form by defining L3 and L2 as L3 and L2,respectively.
B)suppress the intercept term (regress through the origin).
C)convert the right-hand-side variables to logarithms.
D)both a and b
E)both b and c
سؤال
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form AVC=a+bQ+cQ2A V C = a + b Q + c Q ^ { 2 } and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.  <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form  A V C = a + b Q + c Q ^ { 2 }  and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.   If Straker Industries produces 12 units of output,what is estimated total variable cost (TVC)?</strong> A)$171.40 B)$463.20 C)$1,348 D)$2,348 <div style=padding-top: 35px>  If Straker Industries produces 12 units of output,what is estimated total variable cost (TVC)?

A)$171.40
B)$463.20
C)$1,348
D)$2,348
سؤال
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost (AVC)function to be AVC=880.026Q+0.000003Q2A V C = 88 - 0.026 Q + 0.000003 Q ^ { 2 } Greene Enterprises faces total fixed costs (TFC)of $300,000.When Greene's output is 2,000 units,what is short-run marginal cost (SMC)?

A)$20
B)$42
C)$72
D)$90
E)$100
سؤال
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost (AVC)function to be AVC=880.026Q+0.000003Q2A V C = 88 - 0.026 Q + 0.000003 Q ^ { 2 } Greene Enterprises faces total fixed costs (TFC)of $300,000.What is total variable cost (TVC)at Greene Enterprises when average variable cost (AVC)is at its minimum?

A)$48,000
B)$101,101
C)$137,222
D)$190,476
E)$437,212
سؤال
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost (AVC)function to be AVC=880.026Q+0.000003Q2A V C = 88 - 0.026 Q + 0.000003 Q ^ { 2 } Greene Enterprises faces total fixed costs (TFC)of $300,000.If Greene Enterprises produces 6,000 units of output,what is estimated average total cost (ATC)?

A)$40
B)$75.25
C)$80
D)$90
E)$168.42
سؤال
A firm estimates its long-run production function to be Q=0.0075K3L3+12K2L2Q = - 0.0075 K ^ { 3 } L ^ { 3 } + 12 K ^ { 2 } L ^ { 2 } Suppose the firm employs 12 units of capital.Average product when 10 units of labor are employed is

A)12,248
B)13,142
C)14,287
D)15,984
E)30,672
سؤال
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost (AVC)function to be AVC=880.026Q+0.000003Q2A V C = 88 - 0.026 Q + 0.000003 Q ^ { 2 } Greene Enterprises faces total fixed costs (TFC)of $300,000.At what level of output does average variable cost (AVC)reach its minimum value for Greene Enterprises?

A)800
B)3,144
C)3,800
D)4,333
E)51,672
سؤال
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost (AVC)function to be AVC=880.026Q+0.000003Q2A V C = 88 - 0.026 Q + 0.000003 Q ^ { 2 } Greene Enterprises faces total fixed costs (TFC)of $300,000.When Greene's output is 2,000 units,average variable cost (AVC)is

A)rising
B)falling
C)greater than short-run marginal cost
D)less than short-run marginal cost
E)both b and c
سؤال
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost (AVC)function to be AVC=880.026Q+0.000003Q2A V C = 88 - 0.026 Q + 0.000003 Q ^ { 2 } Greene Enterprises faces total fixed costs (TFC)of $300,000.If Greene Enterprises produces 6,000 units of output,what is estimated short-run marginal cost (SMC)?

A)$45.60
B)$62.40
C)$83
D)$92
E)$100
سؤال
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost (AVC)function to be AVC=880.026Q+0.000003Q2A V C = 88 - 0.026 Q + 0.000003 Q ^ { 2 } Greene Enterprises faces total fixed costs (TFC)of $300,000.When Greene's output is 2,000 units,what is total cost (TC)?

A)$144,000
B)$396,000
C)$444,000
D)$642,000
E)$846,000
سؤال
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost (AVC)function to be AVC=880.026Q+0.000003Q2A V C = 88 - 0.026 Q + 0.000003 Q ^ { 2 } Greene Enterprises faces total fixed costs (TFC)of $300,000.When Greene's output is 2,000 units,what is average variable cost (AVC)?

A)$20
B)$48
C)$62
D)$72
E)$85
سؤال
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost (AVC)function to be AVC=880.026Q+0.000003Q2A V C = 88 - 0.026 Q + 0.000003 Q ^ { 2 } Greene Enterprises faces total fixed costs (TFC)of $300,000.When Greene Enterprises produces 6,000 units,average variable cost (AVC)is $_________.

A)$40
B)$49.62
C)$55
D)$60
E)$72.46
سؤال
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost (AVC)function to be AVC=880.026Q+0.000003Q2A V C = 88 - 0.026 Q + 0.000003 Q ^ { 2 } Greene Enterprises faces total fixed costs (TFC)of $300,000.At Greene Enterprises,average variable cost (AVC)reaches its minimum value at $________.

A)$28.00
B)$31.67
C)$39.64
D)$43.33
E)$82.00
سؤال
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost (AVC)function to be AVC=880.026Q+0.000003Q2A V C = 88 - 0.026 Q + 0.000003 Q ^ { 2 } Greene Enterprises faces total fixed costs (TFC)of $300,000.When Greene's output is 6,000 units,average variable cost (AVC)is

A)rising
B)falling
C)greater than short-run marginal cost
D)less than short-run marginal cost
E)both a and d
سؤال
A short-run marginal cost function is estimated as SMC=964Q+0.15Q2S M C = 96 - 4 Q + 0.15 Q ^ { 2 } .Which of the following cost functions is associated with this estimated SMC equation?

A)TVC = 96Q - 2Q2 + 0.05Q3
B)SMC = 96 - 4Q + 0.1Q2
C)TVC = 96Q + 4Q2 + 0.15Q3
D)AVC = 96 - 2Q + 0.05Q2
E)a and d
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/53
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 10: Production and Cost Estimation
1
A short-run production function was estimated as Q=0.002L3+0.16L2Q = - 0.002 L ^ { 3 } + 0.16 L ^ { 2 } At 20 units of labor,what is average product?

A)6.0
B)1.9
C)6.3
D)4.0
E)2.4
2.4
2
A short-run production function was estimated as Q=0.002L3+0.16L2Q = - 0.002 L ^ { 3 } + 0.16 L ^ { 2 } At 60 units of labor,what is marginal product?

A)4.1
B)1.2
C)6.3
D)2.4
E)-2.4
-2.4
3
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form AVC=a+bQ+cQ2A V C = a + b Q + c Q ^ { 2 } and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.  <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form  A V C = a + b Q + c Q ^ { 2 }  and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.   At what level of output is average variable cost (AVC)at its minimum point for Straker Industries?</strong> A)0.14 B)4.7 C)7 D)14 E)28  At what level of output is average variable cost (AVC)at its minimum point for Straker Industries?

A)0.14
B)4.7
C)7
D)14
E)28
7
4
Which of the following specifications could NOT be employed for estimating a short run production function?

A)Q = aK + bL
B) Q=aK3L3+bK2L2Q = a K ^ { 3 } L ^ { 3 } + b K ^ {2 } L ^ { 2 }
C)Q = AL3 + BL2
D)both a and b
E)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
5
A short-run production function was estimated as Q=0.002L3+0.16L2Q = - 0.002 L ^ { 3 } + 0.16 L ^ { 2 } At 20 units of labor,what is marginal product?

A)6.0
B)1.9
C)6.3
D)4.0
E)2.4
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
6
An average variable cost function is estimated as AVC=962Q+0.05Q2A V C = 96 - 2 Q + 0.05 Q ^ { 2 } Which of the following cost functions is associated with this estimate?

A)SMC = 96 - 4Q + 0.1Q2
B)TVC = 96Q - 2Q2 + 0.05Q3
C)TVC = 96Q + 4Q2 + 0.15Q3
D)SMC = 96 - 4Q + 0.15Q2
E)both b and d
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
7
A short-run production function was estimated as Q=0.002L3+0.16L2Q = - 0.002 L ^ { 3 } + 0.16 L ^ { 2 } At what level of labor usage does the maximum average product occur?

A)20
B)30
C)40
D)50
E)60
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
8
With a cubic production function of the form Q=aK3L3+bK2L2Q = a K ^ { 3 } L ^ { 3 } + b K ^ { - 2 } L ^ { 2 } ,in order for the average and marginal product functions to have their usual theoretical properties,it must be the case that

A)a < 0,b > 0
B)a > 0,b < 0
C)a < 0,b < 0
D)a > 0,b > 0
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
9
A short-run production function was estimated as Q=0.002L3+0.16L2Q = - 0.002 L ^ { 3 } + 0.16 L ^ { 2 } At 60 units of labor,what is average product?

A)9.4
B)8.6
C)3.7
D)2.4
E)6.4
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
10
An estimated short-run cost function

A)can be used to make price and output decisions.
B)holds the capital stock constant.
C)can be estimated using time-series data.
D)both a and c
E)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
11
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form AVC=a+bQ+cQ2A V C = a + b Q + c Q ^ { 2 } and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.  <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form  A V C = a + b Q + c Q ^ { 2 }  and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.   The estimated short-run marginal cost function (SMC)at Straker Industries is:</strong> A)  S M C = 43.4 Q - 1.4 Q ^ { 2 } + 0.07 Q ^ { 3 }  B)  S M C = 43.4 - 1.4 Q + 0.07 Q ^ { 2 }  C)  S M C = 43.4 Q - 5.6 Q ^ { 2 } + 0.6 Q ^ { 3 }  D)  S M C = 43.4 - 5.6 Q + 0.6 Q ^ { 2 }   The estimated short-run marginal cost function (SMC)at Straker Industries is:

A) SMC=43.4Q1.4Q2+0.07Q3S M C = 43.4 Q - 1.4 Q ^ { 2 } + 0.07 Q ^ { 3 }
B) SMC=43.41.4Q+0.07Q2S M C = 43.4 - 1.4 Q + 0.07 Q ^ { 2 }
C) SMC=43.4Q5.6Q2+0.6Q3S M C = 43.4 Q - 5.6 Q ^ { 2 } + 0.6 Q ^ { 3 }
D) SMC=43.45.6Q+0.6Q2S M C = 43.4 - 5.6 Q + 0.6 Q ^ { 2 }
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
12
When estimating a short-run average variable cost function,

A)the intercept must be forced to equal zero.
B)the cost data must be inflation-adjusted.
C)at least one input must have been constant during the period in which the data were collected.
D)both b and c
E)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
13
A short-run production function was estimated as Q=0.002L3+0.16L2Q = - 0.002 L ^ { 3 } + 0.16 L ^ { 2 } What is average product when it is at its maximum level?

A)3.20
B)8.75
C)6.92
D)6.00
E)9.40
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
14
Which of the following is an estimable form of a production function?

A)Q = f(L,K)
B)Q = f(L, Kˉ\bar { K } )
C) Q=aK3L3+bK2L2Q = a K ^ { 3 } L ^ { 3 } + b K ^ { - 2 } L ^ { 2 }
D)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
15
A short-run production function was estimated as Q=0.002L3+0.16L2Q = - 0.002 L ^ { 3 } + 0.16 L ^ { 2 } What is total product when average product is at its maximum level?

A)94
B)86
C)100
D)128
E)150
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
16
A short-run production function was estimated as Q=0.002L3+0.16L2Q = - 0.002 L ^ { 3 } + 0.16 L ^ { 2 } At 20 units of labor,what is total product?

A)48
B)96
C)20
D)62
E)41
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
17
The opportunity cost of capital owned by the firm should reflect

A)acquisition cost.
B)the return foregone by using the capital rather than renting it to another firm.
C)wage rate differences.
D)both a and b
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
18
A theoretical restriction on the short-run cubic cost equation,TVC = aQ + bQ + cQ2,is

A)a > 0,b > 0,c > 0
B)a > 0,b < 0,c > 0
C)a > 0,b > 0,c < 0
D)a > 0,b < 0,c < 0
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
19
When estimating a short-run production function of the form Q=AL3+BL2Q = A L ^ { 3 } + B L ^ { 2 } ,it is necessary to specify in the computer routine that

A)A < 0.
B)B > 0.
C)the intercept term is forced to equal zero.
D)a and b
E)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
20
Which of the following represents a short-run cubic production function?

A) Q=aK3L3+bK2L2Q = a K ^ { 3 } L ^ { 3 } + b K ^ { - 2 } L ^ { 2 }
B) Q=3AL2+2BL( where A=aKˉ3,B=bKˉ2)Q = 3 A L ^ { 2 } + 2 B L \left( \text { where } A = a \bar { K } ^ { 3 } , B = b \bar { K } ^ { 2 } \right)
C) Q=AL3+BL2( where A=aKˉ3,B=bKˉ2)Q = A L ^ { 3 } + B L ^ { 2 } \left( \text { where } A = a \bar { K } ^ { 3 } , B = b \bar { K } ^ { 2 } \right)
D) Q=AL2+BL( where A=aK3,B=bKˉ2)Q = A L ^ { 2 } + B L \left( \text { where } A = a \overline { K ^ { - 3 } } , B = b \bar { K } ^ { 2 } \right)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
21
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form AVC=a+bQ+cQ2A V C = a + b Q + c Q ^ { 2 } and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.  <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form  A V C = a + b Q + c Q ^ { 2 }  and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.   If Straker Industries produces 12 units of output,what is estimated average total cost (ATC)?</strong> A)$121.93 B)$171.40 C)$463.20 D)$1,348  If Straker Industries produces 12 units of output,what is estimated average total cost (ATC)?

A)$121.93
B)$171.40
C)$463.20
D)$1,348
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
22
A firm estimates its long-run production function to be Q=0.0075K3L3+12K2L2Q = - 0.0075 K ^ { 3 } L ^ { 3 } + 12 K ^ { 2 } L ^ { 2 } Suppose the firm employs 12 units of capital.Marginal product when 10 units of labor are employed is

A)12,248
B)13,142
C)14,287
D)15,984
E)30,672
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
23
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form AVC=a+bQ+cQ2A V C = a + b Q + c Q ^ { 2 } and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.  <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form  A V C = a + b Q + c Q ^ { 2 }  and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.   If Straker Industries produces 20 units of output,what is estimated average total cost (ATC)?</strong> A)$19.40 B)$67.40 C)$117.40 D)$1,348  If Straker Industries produces 20 units of output,what is estimated average total cost (ATC)?

A)$19.40
B)$67.40
C)$117.40
D)$1,348
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
24
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form AVC=a+bQ+cQ2A V C = a + b Q + c Q ^ { 2 } and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.  <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form  A V C = a + b Q + c Q ^ { 2 }  and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.   If Straker Industries produces 12 units of output,what is estimated short-run marginal cost (SMC)?</strong> A)$28.04 B)$32.40 C)$33.33 D)$62.60  If Straker Industries produces 12 units of output,what is estimated short-run marginal cost (SMC)?

A)$28.04
B)$32.40
C)$33.33
D)$62.60
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
25
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form AVC=a+bQ+cQ2A V C = a + b Q + c Q ^ { 2 } and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.  <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form  A V C = a + b Q + c Q ^ { 2 }  and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.   If Straker Industries produces 20 units of output,what is estimated average variable cost (AVC)?</strong> A)$19.40 B)$67.40 C)$171.40 D)$179.40  If Straker Industries produces 20 units of output,what is estimated average variable cost (AVC)?

A)$19.40
B)$67.40
C)$171.40
D)$179.40
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
26
The empirical specification Q=AL3+BL2Q = A L ^ { 3 } + B L ^ { 2 } can be used to estimate

A)a short-run cubic production function.
B)short-run cubic cost function.
C)a family of U-shaped product curves.
D)both a and c
E)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
27
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form AVC=a+bQ+cQ2A V C = a + b Q + c Q ^ { 2 } and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.  <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form  A V C = a + b Q + c Q ^ { 2 }  and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.   If Straker Industries produces 20 units of output,what is estimated total cost (TC)?</strong> A)$1,348 B)$1,498 C)$2,348 D)$4,428  If Straker Industries produces 20 units of output,what is estimated total cost (TC)?

A)$1,348
B)$1,498
C)$2,348
D)$4,428
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
28
A firm estimates its long-run production function to be Q=0.0075K3L3+12K2L2Q = - 0.0075 K ^ { 3 } L ^ { 3 } + 12 K ^ {2 } L ^ { 2 } Suppose the firm employs 12 units of capital.At ________ units of labor,average product of labor begins to diminish.

A)32.21
B)44.44
C)66.67
D)76.66
E)82.27
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
29
For the short-run cost function AVC = a + bQ + cQ2,

A)the AVC curve is UU -shaped when a < 0,b > 0,and c < 0.
B)the AVC curve is UU -shaped when a > 0,b < 0,and c > 0.
C)the corresponding SMC function is SMC=aQ+2bQ2+3cQ3S M C = a Q + 2 b Q ^ { 2 } + 3 c Q ^ { 3 } .
D)both a and c
E)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
30
The empirical specification TVC=aQ+bQ2+cQ3T V C = a Q + b Q ^ { 2 } + c Q ^ { 3 } can be used to estimate

A)a short-run cubic production function.
B)short-run cubic cost function.
C)a  U \text { U } -shaped TVC curve.
D)both b and c
E)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
31
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form AVC=a+bQ+cQ2A V C = a + b Q + c Q ^ { 2 } and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.  <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form  A V C = a + b Q + c Q ^ { 2 }  and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.   If Straker Industries produces 12 units of output,what is estimated average variable cost (AVC)?</strong> A)$28.04 B)$32.40 C)$33.33 D)$38.60  If Straker Industries produces 12 units of output,what is estimated average variable cost (AVC)?

A)$28.04
B)$32.40
C)$33.33
D)$38.60
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
32
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form AVC=a+bQ+cQ2A V C = a + b Q + c Q ^ { 2 } and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.  <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form  A V C = a + b Q + c Q ^ { 2 }  and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.   At Straker Industries,average variable cost (AVC)reaches its minimum value at $________.</strong> A)$24.50 B)$33.60 C)$72.80 D)$121.80  At Straker Industries,average variable cost (AVC)reaches its minimum value at $________.

A)$24.50
B)$33.60
C)$72.80
D)$121.80
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
33
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form AVC=a+bQ+cQ2A V C = a + b Q + c Q ^ { 2 } and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.  <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form  A V C = a + b Q + c Q ^ { 2 }  and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.   If Straker Industries produces 20 units of output,what is estimated total variable cost (TVC)?</strong> A)$1,348 B)$1,498 C)$2,348 D)$4,428  If Straker Industries produces 20 units of output,what is estimated total variable cost (TVC)?

A)$1,348
B)$1,498
C)$2,348
D)$4,428
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
34
A cubic specification for a short-run production function is appropriate when the scatter diagram indicates

A)an S-shaped total product curve.
B)marginal product of labor falls throughout the range of labor usage.
C)total product is decreasing throughout the range of labor usage.
D)an S-shaped marginal product of labor curve.
E)a  U \text { U } -shaped marginal product of labor curve (MP first falls and then rises as labor usage increases.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
35
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form AVC=a+bQ+cQ2A V C = a + b Q + c Q ^ { 2 } and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.  <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form  A V C = a + b Q + c Q ^ { 2 }  and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.   If Straker Industries produces 12 units of output,what is estimated total cost (TC)?</strong> A)$1,000 B)$1,463 C)$2,348 D)$4,428  If Straker Industries produces 12 units of output,what is estimated total cost (TC)?

A)$1,000
B)$1,463
C)$2,348
D)$4,428
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
36
A firm estimates its long-run production function to be Q=0.0075K3L3+12K2L2Q = - 0.0075 K ^ { 3 } L ^ { 3 } + 12 K ^ { 2 } L ^ { 2 } Suppose the firm employs 12 units of capital.The product curve(s)in the short-run are

A)TP = -12.96 L3 + 1,728L2.
B)AP = -12.96 L3 + 1,728L2.
C)MP = -38.88 L2 + 3,456L.
D)both a and b
E)both a and c
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
37
A firm estimates its long-run production function to be Q=0.0075K3L3+12K2L2Q = - 0.0075 K ^ { 3 } L ^ { 3 } + 12 K ^ { 2 } L ^ { 2 } Suppose the firm employs 12 units of capital.At _______ units of labor,marginal product of labor begins to diminish.

A)32.21
B)44.44
C)66.67
D)76.66
E)82.27
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
38
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form AVC=a+bQ+cQ2A V C = a + b Q + c Q ^ { 2 } and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.  <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form  A V C = a + b Q + c Q ^ { 2 }  and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.   If Straker Industries produces 20 units of output,what is estimated short-run marginal cost (SMC)?</strong> A)$171.40 B)$463.20 C)$1,348 D)$2,348  If Straker Industries produces 20 units of output,what is estimated short-run marginal cost (SMC)?

A)$171.40
B)$463.20
C)$1,348
D)$2,348
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
39
When estimating a cubic short-run production function Q=AL3+BL2Q = A L ^ { 3 } + B L ^ { 2 } using linear regression analysis,you must

A)transform the equation into linear form by defining L3 and L2 as L3 and L2,respectively.
B)suppress the intercept term (regress through the origin).
C)convert the right-hand-side variables to logarithms.
D)both a and b
E)both b and c
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
40
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form AVC=a+bQ+cQ2A V C = a + b Q + c Q ^ { 2 } and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.  <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form  A V C = a + b Q + c Q ^ { 2 }  and obtained the following results.Total fixed cost (TFC)at Straker Industries is $1,000.   If Straker Industries produces 12 units of output,what is estimated total variable cost (TVC)?</strong> A)$171.40 B)$463.20 C)$1,348 D)$2,348  If Straker Industries produces 12 units of output,what is estimated total variable cost (TVC)?

A)$171.40
B)$463.20
C)$1,348
D)$2,348
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
41
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost (AVC)function to be AVC=880.026Q+0.000003Q2A V C = 88 - 0.026 Q + 0.000003 Q ^ { 2 } Greene Enterprises faces total fixed costs (TFC)of $300,000.When Greene's output is 2,000 units,what is short-run marginal cost (SMC)?

A)$20
B)$42
C)$72
D)$90
E)$100
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
42
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost (AVC)function to be AVC=880.026Q+0.000003Q2A V C = 88 - 0.026 Q + 0.000003 Q ^ { 2 } Greene Enterprises faces total fixed costs (TFC)of $300,000.What is total variable cost (TVC)at Greene Enterprises when average variable cost (AVC)is at its minimum?

A)$48,000
B)$101,101
C)$137,222
D)$190,476
E)$437,212
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
43
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost (AVC)function to be AVC=880.026Q+0.000003Q2A V C = 88 - 0.026 Q + 0.000003 Q ^ { 2 } Greene Enterprises faces total fixed costs (TFC)of $300,000.If Greene Enterprises produces 6,000 units of output,what is estimated average total cost (ATC)?

A)$40
B)$75.25
C)$80
D)$90
E)$168.42
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
44
A firm estimates its long-run production function to be Q=0.0075K3L3+12K2L2Q = - 0.0075 K ^ { 3 } L ^ { 3 } + 12 K ^ { 2 } L ^ { 2 } Suppose the firm employs 12 units of capital.Average product when 10 units of labor are employed is

A)12,248
B)13,142
C)14,287
D)15,984
E)30,672
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
45
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost (AVC)function to be AVC=880.026Q+0.000003Q2A V C = 88 - 0.026 Q + 0.000003 Q ^ { 2 } Greene Enterprises faces total fixed costs (TFC)of $300,000.At what level of output does average variable cost (AVC)reach its minimum value for Greene Enterprises?

A)800
B)3,144
C)3,800
D)4,333
E)51,672
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
46
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost (AVC)function to be AVC=880.026Q+0.000003Q2A V C = 88 - 0.026 Q + 0.000003 Q ^ { 2 } Greene Enterprises faces total fixed costs (TFC)of $300,000.When Greene's output is 2,000 units,average variable cost (AVC)is

A)rising
B)falling
C)greater than short-run marginal cost
D)less than short-run marginal cost
E)both b and c
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
47
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost (AVC)function to be AVC=880.026Q+0.000003Q2A V C = 88 - 0.026 Q + 0.000003 Q ^ { 2 } Greene Enterprises faces total fixed costs (TFC)of $300,000.If Greene Enterprises produces 6,000 units of output,what is estimated short-run marginal cost (SMC)?

A)$45.60
B)$62.40
C)$83
D)$92
E)$100
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
48
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost (AVC)function to be AVC=880.026Q+0.000003Q2A V C = 88 - 0.026 Q + 0.000003 Q ^ { 2 } Greene Enterprises faces total fixed costs (TFC)of $300,000.When Greene's output is 2,000 units,what is total cost (TC)?

A)$144,000
B)$396,000
C)$444,000
D)$642,000
E)$846,000
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
49
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost (AVC)function to be AVC=880.026Q+0.000003Q2A V C = 88 - 0.026 Q + 0.000003 Q ^ { 2 } Greene Enterprises faces total fixed costs (TFC)of $300,000.When Greene's output is 2,000 units,what is average variable cost (AVC)?

A)$20
B)$48
C)$62
D)$72
E)$85
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
50
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost (AVC)function to be AVC=880.026Q+0.000003Q2A V C = 88 - 0.026 Q + 0.000003 Q ^ { 2 } Greene Enterprises faces total fixed costs (TFC)of $300,000.When Greene Enterprises produces 6,000 units,average variable cost (AVC)is $_________.

A)$40
B)$49.62
C)$55
D)$60
E)$72.46
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
51
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost (AVC)function to be AVC=880.026Q+0.000003Q2A V C = 88 - 0.026 Q + 0.000003 Q ^ { 2 } Greene Enterprises faces total fixed costs (TFC)of $300,000.At Greene Enterprises,average variable cost (AVC)reaches its minimum value at $________.

A)$28.00
B)$31.67
C)$39.64
D)$43.33
E)$82.00
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
52
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost (AVC)function to be AVC=880.026Q+0.000003Q2A V C = 88 - 0.026 Q + 0.000003 Q ^ { 2 } Greene Enterprises faces total fixed costs (TFC)of $300,000.When Greene's output is 6,000 units,average variable cost (AVC)is

A)rising
B)falling
C)greater than short-run marginal cost
D)less than short-run marginal cost
E)both a and d
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
53
A short-run marginal cost function is estimated as SMC=964Q+0.15Q2S M C = 96 - 4 Q + 0.15 Q ^ { 2 } .Which of the following cost functions is associated with this estimated SMC equation?

A)TVC = 96Q - 2Q2 + 0.05Q3
B)SMC = 96 - 4Q + 0.1Q2
C)TVC = 96Q + 4Q2 + 0.15Q3
D)AVC = 96 - 2Q + 0.05Q2
E)a and d
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.