Deck 12: Project Management

ملء الشاشة (f)
exit full mode
سؤال
In preparing a project ________ plan,team members break down the key components to include all the tasks that have to be performed,the timing and sequence of the tasks,and a confirmation that resources are available to complete the project.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The initial plan for the project can be thought of as its strategic plan.
سؤال
Match each term with its definition
a.project scope
b.deliverables
c.risk
d.project
e.cross-functional team
f.critical path
Mapping the tasks that impact the completion date of a project
سؤال
Microsoft OneNote software is an example of a ________ that may be used to manage small projects.
سؤال
To assess the ________ of a project,the best question to ask is what can go wrong with each aspect of it.
سؤال
At the conclusion of an external project,these are presented to the client for final approval.

A) action minutes
B) deliverables
C) oral presentation
D) written report
سؤال
After assessing the risks of a project,the second step is to ________ each risk,or to think about whether the adverse impact will be major or minor.
سؤال
For some projects,technical expertise and cognitive ability may be critical ________ factors that are required.
سؤال
Which of these is not true of the final report for a project?

A) Input is required from all team members.
B) All project members should read and approve the final document.
C) It documents that all aspects of the project were completed and met all quality and quantity specifications.
D) If results are presented orally,the team leader will choose one person to prepare and deliver the presentation..
سؤال
A general rule of thumb is that a large team working on a collaborative project is more challenging to manage than a small team working on the same project.
سؤال
Which of these does not represent an industry in which workers spend most of their time working on projects?

A) architecture
B) construction
C) engineering
D) retail
Enter the appropriate word(s)to complete the statement.
سؤال
Which of these is not true of the project monitoring phase?

A) Only the team leader is involved in project monitoring.
B) Careful monitoring gives the team an opportunity to detect needed changes and make those changes in a timely manner.
C) The entire team can brainstorm and try to develop ways to work around obstacles that arise.
D) When changes are necessary,written change agreements are used to ensure that both parties agree to the changes,and then they are added to the original agreement.
سؤال
The team ________ is generally appointed and must possess strong leadership and communication skills as well as the technical expertise required for the project.
سؤال
Match each term with its definition
a.project scope
b.deliverables
c.risk
d.project
e.cross-functional team
f.critical path
A defined set of tasks with specific outcomes that form a unit of work to be completed in a specified timeframe with specified resources
سؤال
A project designed to improve work processes within a department would be appropriate for a cross-functional team.
سؤال
Regularly scheduled team meetings (face-to-face or virtual,if necessary)are the best way to involve team members in a project.
سؤال
For internal projects,normally a formal or written document defining the scope of the project and the deliverables is prepared,agreed upon,and signed by top management.
سؤال
Meeting and exceeding expectations is important for both internal and external projects.
سؤال
Which of the following is not a project resource?

A) budget or financial resources
B) location for meetings
C) people
D) technology or equipment
سؤال
What is the project scope sometimes called?

A) deliverables
B) project specifications
C) contingency plan
D) critical path
سؤال
Match each term with its definition
a.project scope
b.deliverables
c.risk
d.project
e.cross-functional team
f.critical path
A team that represents different departments of the organization
سؤال
What is the tool frequently used to show graphically the order in which tasks need to be scheduled and the progress made toward completing a task?
سؤال
What document is typically prepared at the end of a project?
سؤال
Match each term with its definition
a.project scope
b.deliverables
c.risk
d.project
e.cross-functional team
f.critical path
The possibility of loss,damage,or adverse results
سؤال
What is the popular concept of unknown origin that assumes that if anything can go wrong,it will,and at the most inopportune time?
سؤال
Match each term with its definition
a.project scope
b.deliverables
c.risk
d.project
e.cross-functional team
f.critical path
Defined,measurable results or tangible things that the customer,client,or your company expects to have at the completion of the project
سؤال
Whose performance are evaluation and rewards at the conclusion of either an internal or external project based on?
سؤال
For an external project,what does meet and or exceeding expectations frequently generate?
سؤال
Name the two ways in which authority for a project typically comes about.
سؤال
Match each term with its definition
a.project scope
b.deliverables
c.risk
d.project
e.cross-functional team
f.critical path
The objectives,everything that is included,everything that is specifically excluded,and the outcomes that must be produced
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/30
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 12: Project Management
1
In preparing a project ________ plan,team members break down the key components to include all the tasks that have to be performed,the timing and sequence of the tasks,and a confirmation that resources are available to complete the project.
operational
2
The initial plan for the project can be thought of as its strategic plan.
True
3
Match each term with its definition
a.project scope
b.deliverables
c.risk
d.project
e.cross-functional team
f.critical path
Mapping the tasks that impact the completion date of a project
f
4
Microsoft OneNote software is an example of a ________ that may be used to manage small projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
5
To assess the ________ of a project,the best question to ask is what can go wrong with each aspect of it.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
6
At the conclusion of an external project,these are presented to the client for final approval.

A) action minutes
B) deliverables
C) oral presentation
D) written report
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
7
After assessing the risks of a project,the second step is to ________ each risk,or to think about whether the adverse impact will be major or minor.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
8
For some projects,technical expertise and cognitive ability may be critical ________ factors that are required.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
9
Which of these is not true of the final report for a project?

A) Input is required from all team members.
B) All project members should read and approve the final document.
C) It documents that all aspects of the project were completed and met all quality and quantity specifications.
D) If results are presented orally,the team leader will choose one person to prepare and deliver the presentation..
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
10
A general rule of thumb is that a large team working on a collaborative project is more challenging to manage than a small team working on the same project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
11
Which of these does not represent an industry in which workers spend most of their time working on projects?

A) architecture
B) construction
C) engineering
D) retail
Enter the appropriate word(s)to complete the statement.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
12
Which of these is not true of the project monitoring phase?

A) Only the team leader is involved in project monitoring.
B) Careful monitoring gives the team an opportunity to detect needed changes and make those changes in a timely manner.
C) The entire team can brainstorm and try to develop ways to work around obstacles that arise.
D) When changes are necessary,written change agreements are used to ensure that both parties agree to the changes,and then they are added to the original agreement.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
13
The team ________ is generally appointed and must possess strong leadership and communication skills as well as the technical expertise required for the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
14
Match each term with its definition
a.project scope
b.deliverables
c.risk
d.project
e.cross-functional team
f.critical path
A defined set of tasks with specific outcomes that form a unit of work to be completed in a specified timeframe with specified resources
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
15
A project designed to improve work processes within a department would be appropriate for a cross-functional team.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
16
Regularly scheduled team meetings (face-to-face or virtual,if necessary)are the best way to involve team members in a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
17
For internal projects,normally a formal or written document defining the scope of the project and the deliverables is prepared,agreed upon,and signed by top management.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
18
Meeting and exceeding expectations is important for both internal and external projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
19
Which of the following is not a project resource?

A) budget or financial resources
B) location for meetings
C) people
D) technology or equipment
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
20
What is the project scope sometimes called?

A) deliverables
B) project specifications
C) contingency plan
D) critical path
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
21
Match each term with its definition
a.project scope
b.deliverables
c.risk
d.project
e.cross-functional team
f.critical path
A team that represents different departments of the organization
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
22
What is the tool frequently used to show graphically the order in which tasks need to be scheduled and the progress made toward completing a task?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
23
What document is typically prepared at the end of a project?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
24
Match each term with its definition
a.project scope
b.deliverables
c.risk
d.project
e.cross-functional team
f.critical path
The possibility of loss,damage,or adverse results
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
25
What is the popular concept of unknown origin that assumes that if anything can go wrong,it will,and at the most inopportune time?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
26
Match each term with its definition
a.project scope
b.deliverables
c.risk
d.project
e.cross-functional team
f.critical path
Defined,measurable results or tangible things that the customer,client,or your company expects to have at the completion of the project
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
27
Whose performance are evaluation and rewards at the conclusion of either an internal or external project based on?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
28
For an external project,what does meet and or exceeding expectations frequently generate?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
29
Name the two ways in which authority for a project typically comes about.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
30
Match each term with its definition
a.project scope
b.deliverables
c.risk
d.project
e.cross-functional team
f.critical path
The objectives,everything that is included,everything that is specifically excluded,and the outcomes that must be produced