Deck 11: Lodging Planning and Design
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/8
العب
ملء الشاشة (f)
Deck 11: Lodging Planning and Design
1
The largest back-of-the-house area in most hotels and the one requiring the most design attention is:
A)administrative office group.
B)the maintenance department.
C)the kitchen and food production area.
D)receiving and storage.
A)administrative office group.
B)the maintenance department.
C)the kitchen and food production area.
D)receiving and storage.
C
2
The process for developing a new hotel typically takes approximately:
A)six to twelve months.
B)one to two years.
C)three to four years.
D)five to seven years.
A)six to twelve months.
B)one to two years.
C)three to four years.
D)five to seven years.
C
3
The first design phase of a hotel construction project is called:
A)schematic design.
B)feasibility assessment.
C)engineering design.
D)conceptual design.
A)schematic design.
B)feasibility assessment.
C)engineering design.
D)conceptual design.
A
4
The most prominent hotel public space is the:
A)ballroom.
B)lounge.
C)restaurant.
D)lobby.
A)ballroom.
B)lounge.
C)restaurant.
D)lobby.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 8 في هذه المجموعة.
فتح الحزمة
k this deck
5
A hotel's front office should always be located:
A)adjacent to the front desk.
B)near the sales office.
C)on the ground floor.
D)on the penthouse floor.
A)adjacent to the front desk.
B)near the sales office.
C)on the ground floor.
D)on the penthouse floor.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 8 في هذه المجموعة.
فتح الحزمة
k this deck
6
What is a porte cochère?
A)It is the technical name for a main hotel entrance that meets ADA's accessibility requirements.
B)It is the French name for the back or employee entrance to a hotel.
C)It is a hotel patio or courtyard typically constructed with paving stones.
D)It is a canopy designed to protect guests from inclement weather and provide visual emphasis to a hotel's main entrance.
A)It is the technical name for a main hotel entrance that meets ADA's accessibility requirements.
B)It is the French name for the back or employee entrance to a hotel.
C)It is a hotel patio or courtyard typically constructed with paving stones.
D)It is a canopy designed to protect guests from inclement weather and provide visual emphasis to a hotel's main entrance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 8 في هذه المجموعة.
فتح الحزمة
k this deck
7
The most efficient guestroom floor configuration in terms of saleable gross floor area is:
A)tower.
B)double-loaded slab.
C)single-loaded slab.
D)atrium.
A)tower.
B)double-loaded slab.
C)single-loaded slab.
D)atrium.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 8 في هذه المجموعة.
فتح الحزمة
k this deck
8
The double-loaded slab guestroom floor configuration features:
A)rooms on both sides of a central corridor.
B)rooms grouped around a central vertical core.
C)rooms off a corridor encircling a multi-story lobby space.
D)rooms off one side of a corridor.
A)rooms on both sides of a central corridor.
B)rooms grouped around a central vertical core.
C)rooms off a corridor encircling a multi-story lobby space.
D)rooms off one side of a corridor.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 8 في هذه المجموعة.
فتح الحزمة
k this deck

