Deck 15: Operations Scheduling and Sequencing

ملء الشاشة (f)
exit full mode
سؤال
In the context of operations management,_____ refers to the assignment of start and completion times to particular jobs,people,or equipment.

A) scheduling
B) appointing
C) statistical forecasting
D) demand planning
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Two examples of process-focused performance measures for sequencing rules are tardiness and lateness.
سؤال
The Clarke-Wright Heuristic Method is used to solve the common scheduling problem in logistics that involves determining routes from a central depot or warehouse to many customers.
سؤال
In the context of sequencing,_____ is the difference between the completion time and the due date of a job.

A) flow time
B) makespan
C) lateness
D) tardiness
سؤال
In priority dispatching rules,the acronym FNO stands for feasible number of operations remaining.
سؤال
A requirement of two-resource sequencing rule is that:

A) all jobs must begin at the same time.
B) each job must be processed first on the first resource and then on the second.
C) a maximum of two jobs can be processed at a time on each resource.
D) total processing time must be minimized.
سؤال
Gantt charts are used to:

A) develop a factory layout.
B) track inventory levels over time.
C) monitor planned schedules.
D) forecast personnel requirements.
سؤال
In the context of sequencing,the earliest due date (EDD)rule:

A) minimizes the maximum jobs past due.
B) maximizes average flow time of jobs past due.
C) maximizes resource utilization of jobs past due.
D) minimizes the average processing time of jobs past due.
سؤال
Different industries use different software packages for scheduling because every industry has different problem structures.
سؤال
In the context of sequencing,_____ is the time needed to process a given set of jobs.

A) flow time
B) makespan
C) lateness
D) tardiness
سؤال
In the context of sequencing,the _____ minimizes the average lateness of a set of jobs.

A) shortest processing time rule
B) earliest due date rule
C) first come,first serve rule
D) fewest number of operations remaining rule
سؤال
In the context of sequencing,the shortest processing time (SPT)rule tends to:

A) maximize the number of jobs in the system.
B) maximize average flow time.
C) minimize resource utilization.
D) minimize work-in-process inventory.
سؤال
In the context of sequencing,_____ is the amount of time by which the completion time exceeds the due date of a job.

A) flow time
B) makespan
C) lateness
D) tardiness
سؤال
In a two-resource sequencing problem,_____.

A) the processing time for each job on each resource is unknown
B) flow time is maximized
C) the goal is to minimize makespan
D) a job can be processed by either of its resources in any sequence
سؤال
In the context of operations management,triage nurses deciding on the order in which emergency patients are to be treated is an example of _____.

A) appointing
B) sequencing
C) statistical forecasting
D) demand planning
سؤال
Customized scheduling spreadsheets use readily available software such as Microsoft Excel,but may be rather expensive to develop.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/16
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 15: Operations Scheduling and Sequencing
1
In the context of operations management,_____ refers to the assignment of start and completion times to particular jobs,people,or equipment.

A) scheduling
B) appointing
C) statistical forecasting
D) demand planning
scheduling
2
Two examples of process-focused performance measures for sequencing rules are tardiness and lateness.
False
3
The Clarke-Wright Heuristic Method is used to solve the common scheduling problem in logistics that involves determining routes from a central depot or warehouse to many customers.
True
4
In the context of sequencing,_____ is the difference between the completion time and the due date of a job.

A) flow time
B) makespan
C) lateness
D) tardiness
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 16 في هذه المجموعة.
فتح الحزمة
k this deck
5
In priority dispatching rules,the acronym FNO stands for feasible number of operations remaining.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 16 في هذه المجموعة.
فتح الحزمة
k this deck
6
A requirement of two-resource sequencing rule is that:

A) all jobs must begin at the same time.
B) each job must be processed first on the first resource and then on the second.
C) a maximum of two jobs can be processed at a time on each resource.
D) total processing time must be minimized.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 16 في هذه المجموعة.
فتح الحزمة
k this deck
7
Gantt charts are used to:

A) develop a factory layout.
B) track inventory levels over time.
C) monitor planned schedules.
D) forecast personnel requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 16 في هذه المجموعة.
فتح الحزمة
k this deck
8
In the context of sequencing,the earliest due date (EDD)rule:

A) minimizes the maximum jobs past due.
B) maximizes average flow time of jobs past due.
C) maximizes resource utilization of jobs past due.
D) minimizes the average processing time of jobs past due.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 16 في هذه المجموعة.
فتح الحزمة
k this deck
9
Different industries use different software packages for scheduling because every industry has different problem structures.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 16 في هذه المجموعة.
فتح الحزمة
k this deck
10
In the context of sequencing,_____ is the time needed to process a given set of jobs.

A) flow time
B) makespan
C) lateness
D) tardiness
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 16 في هذه المجموعة.
فتح الحزمة
k this deck
11
In the context of sequencing,the _____ minimizes the average lateness of a set of jobs.

A) shortest processing time rule
B) earliest due date rule
C) first come,first serve rule
D) fewest number of operations remaining rule
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 16 في هذه المجموعة.
فتح الحزمة
k this deck
12
In the context of sequencing,the shortest processing time (SPT)rule tends to:

A) maximize the number of jobs in the system.
B) maximize average flow time.
C) minimize resource utilization.
D) minimize work-in-process inventory.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 16 في هذه المجموعة.
فتح الحزمة
k this deck
13
In the context of sequencing,_____ is the amount of time by which the completion time exceeds the due date of a job.

A) flow time
B) makespan
C) lateness
D) tardiness
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 16 في هذه المجموعة.
فتح الحزمة
k this deck
14
In a two-resource sequencing problem,_____.

A) the processing time for each job on each resource is unknown
B) flow time is maximized
C) the goal is to minimize makespan
D) a job can be processed by either of its resources in any sequence
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 16 في هذه المجموعة.
فتح الحزمة
k this deck
15
In the context of operations management,triage nurses deciding on the order in which emergency patients are to be treated is an example of _____.

A) appointing
B) sequencing
C) statistical forecasting
D) demand planning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 16 في هذه المجموعة.
فتح الحزمة
k this deck
16
Customized scheduling spreadsheets use readily available software such as Microsoft Excel,but may be rather expensive to develop.