Deck 25: Quality Management

ملء الشاشة (f)
exit full mode
سؤال
As part of postemployment departmental training, a medical technologist was given 10 known blood samples to analyze for ABO specificity. This is referred to as:

A) recertification.
B) a competence assessment.
C) education.
D) a proficiency test.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Employee training takes place:

A) before procedures are validated.
B) after competence assessments.
C) before flowcharting the process.
D) after hiring and after implementing new procedures.
سؤال
A standard operating procedure (SOP) is:

A) a statement of intent or course of action.
B) a description of resources and activities that transform inputs into outputs.
C) a set of directions for how to perform a particular task.
D) a form on which to record results.
سؤال
What is a function of the quality committee or quality council?

A) To provide solutions to recurring clerical errors
B) To provide counseling for departmental downsizing
C) To set priorities for quality improvements
D) To focus on computer upgrades and software implementation
سؤال
A physician complains that she has not received a test report from the blood bank. The remedial action is to:

A) complete the occurrence report form.
B) prepare a copy of the report for the physician.
C) locate the original report.
D) determine why the report was not delivered.
سؤال
Which of the following is an example of an external customer?

A) A night-shift medical technologist
B) A blood donor
C) An intravenous nurse
D) Housekeeping employee
سؤال
Why might a laboratory adopt an individualized quality control plan (IQCP)?

A) To customize its QC program to its specific needs
B) To demonstrate where costs can be saved
C) To eliminate the need to perform daily quality control
D) To do all of these
سؤال
Which of the following might lead to unacceptable quality control results?

A) A technician who has not worked in the area for several months
B) A deteriorated "anti-A"
C) An uncalibrated serofuge
D) All of the above
سؤال
What phase is synonymous with "quality management?"

A) Good manufacturing practice
B) Organization-wide quality assurance
C) Process improvement team
D) Quality control
سؤال
Process improvement teams address all of the following issues except:

A) becoming "team players."
B) quality and reliability of service.
C) filing a grievance.
D) interdepartmental communication.
سؤال
Which of the following is not regarded as an instrument?

A) Automated analyzer
B) Pipette
C) Washer
D) Cuvette
سؤال
Blood collected in a red-top tube and a lavender tube was sent through a tube system to the STAT laboratory. The blood specimens were not labeled with any type of patient identification. The medical technologist called the emergency room (ER) to notify them of the problem. The ER nurse stated she wanted the tubes sent back to the ER and that she would label them. The stat laboratory technologist related the laboratory's policy on unlabeled specimens, saying that they would be discarded. At that point the disgruntled nurse said she would write up a(n) for the laboratory's refusal to analyze blood on an emergency patient.

A) employee evaluation
B) incident report
C) patient report
D) flow chart
سؤال
Which continuous improvement cycle component ensures the finished product has met required specifications?

A) Improve
B) Assess
C) Implement
D) Plan
سؤال
How do internal assessments differ from compliance inspections?

A) Compliance inspections assess performance on quality indicators.
B) Internal assessments focus on meeting regulations.
C) Internal assessments are more frequent than compliance inspections.
D) Compliance inspections seek underlying causes of problems.
سؤال
Calibrating equipment prior to use is considered which function of quality?

A) Quality assurance
B) Quality control
C) Quality improvement
D) Quality management
سؤال
Which of the following statements concerning equipment is true?

A) Requires software to function
B) Quality control is not needed for critical steps.
C) Frequency of testing is determined by manufacturer recommendations.
D) All equipment must be purchased from the manufacturer.
سؤال
All of the following are transfusion service quality assurance indicators used to monitor patient care except:

A) labeling errors on specimens sent to the blood bank.
B) reason for return of blood products.
C) number of therapeutic units drawn.
D) turnaround time on antibody identification.
سؤال
What is the main purpose of linking Current Good Manufacturing Practices (CGMPs) to process control?

A) To comply with the regulations
B) To build quality into the manufacturing process from the beginning to the end
C) To review and approve training programs and employee position descriptions
D) To approve raw test materials and in-house reagents
سؤال
When a new shipment of reagents is received, what measure is taken to determine equivalency?

A) Lot-to-lot testing of new and old lot numbers of reagent
B) Work-flow reorientation
C) Daily quality control
D) Calibration
سؤال
Which statement concerning compliance programs is false?

A) Programs are designed to evaluate effectiveness of blood bank laboratories.
B) Programs provide an occasional opportunity to expose new and different problems.
C) Compliance is synonymous with organization-wide quality assurance.
D) Compliance inspections are conducted every 1 to 2 years.
سؤال
Which of these should be evaluated during a risk assessment?

A) Airflow/ventilation
B) Competency of testing personnel
C) Equipment functioning
D) All of these
سؤال
Which of these is part of process control?

A) Performing routine QC of test methods and reagents
B) Performing proficiency testing and personnel competency checks
C) Using a manual or automated action to prevent the occurrence of errors
D) All of these.
سؤال
Which of these does NOT describe a flowchart?

A) Can be created on paper or with commercially available software programs
B) Displays actions required in a process using graphic symbols for ease of understanding
C) Is useless in obtaining better control of a process.
D) Shows where decision points are located within a process
سؤال
Copies of regulations and accreditation requirements are examples of:

A) documents.
B) forms.
C) results.
D) none of these.
سؤال
Which of these records may be reviewed during competency assessment for blood bank personnel?

A) Quality control records
B) Proficiency testing results
C) Maintenance records
D) All of these
سؤال
An outcomes of performing procedures and testing is called a:

A) document.
B) form.
C) result.
D) none of these.
سؤال
The use of different colored sera for blood bank reagents is an example of:

A) process control.
B) quality control.
C) standard operating procedures.
D) validation studies.
سؤال
Competency assessment for blood bank personnel includes all of these EXCEPT:

A) direct observation of patient test performance.
B) cross-training into other areas of the laboratory.
C) monitoring the recording and reporting of test results.
D) review of test results or worksheets.
سؤال
Daily testing the reactivity of blood typing reagents is considered which function of quality?

A) Quality assurance
B) Quality control
C) Quality improvement
D) Quality management
سؤال
Which of the following relationships is NOT considered a quality essential of an organization?

A) Blood bank personnel links to their families
B) Blood bank's link to the laboratory
C) Blood bank's link to the hospital.
D) Blood bank links to the hospital's quality function
سؤال
Which of the following is NOT an internal customer for the transfusion service?

A) Nurse administering blood products
B) Patient receiving blood products
C) Nursing assistant transporting blood products
D) Physician ordering blood products
سؤال
Laboratory safety training must include which of these for blood bank personnel?

A) Chemical hygiene
B) Emergency preparedness
C) Radiation safety
D) All of these
سؤال
Which of the following provides a framework for applying quality principles and practices in the blood bank?

A) Quality assurance program
B) Quality control and correction
C) Quality improvement process
D) Quality management system
سؤال
Testing all activities in a new process to ensure that the process will work in the live environment is a function of:

A) quality control.
B) standard operating procedures.
C) validation studies.
D) none of these.
سؤال
Which of these need NOT be evaluated during a risk assessment?

A) Patient opinion survey
B) Reagent storage conditions
C) Specimen labeling
D) Transmission of data to LIS
سؤال
What is a flowchart?

A) A tool that displays all the elements involved in a process
B) A tool that allows for greater understanding of specific steps in a process
C) A tool that explains the sequence of activities in a process in paragraph for
D) All of these.
سؤال
A quality framework in the blood bank ensures all of the following EXCEPT:

A) Application of quality principles and practices.
B) Blood bank operations are customized to individual staff preferences.
C) Compliance with regulatory body requirements
D) Review of each step from donor selection through transfusion outcomes.
سؤال
What is the purpose of a flowchart?

A) Facilitates understanding of resources when planning a new process
B) Reveals problems (i.e., missing actions) in a current process
C) Shows how process inputs are converted into outputs
D) All of these
سؤال
Which of the following is not part of an individualized quality control plan (IQCP)?

A) New instrument validation
B) Quality control plan
C) Quality assessment
D) Risk assessment
سؤال
Quality assessment monitors include reviews of all of these EXCEPT:

A) Corrected report communications.
B) Personnel competency records.
C) Turnaround time reports.
D) Vendor selection process.
سؤال
The cost incurred for proficiency testing and periodic licensure or accreditation inspections is what type of cost?

A) Internal evaluation costs
B) External evaluation costs
C) Internal failure costs
D) External failure costs
سؤال
The cost incurred with customer product recalls is an example of what type of cost?

A) Internal evaluation costs
B) External evaluation costs
C) Internal failure costs
D) External failure costs
سؤال
Examples of documents include:

A) written policies, procedures and instructions.
B) process flowcharts and forms.
C) manufacturers' package inserts and operator manuals.
D) all of these.
سؤال
The cost incurred when discarding donated blood units is an example of what type of cost?

A) Internal evaluation costs
B) External evaluation costs
C) Internal failure costs
D) External failure costs
سؤال
52, Using the DOE tool occurs at what stage of the DMAIC process?

A) Analyze
B) Control
C) Define
D) Improve
سؤال
An action taken to reduce or eliminate the potential for a nonconformance is what type of action?

A) Corrective
B) Disciplinary
C) Preventive
D) Remedial
سؤال
Which of the following statements is true?

A) Remedial action occurs over time.
B) Remedial action does not uncover the real cause of the nonconformance.
C) Remedial action does not require further investigation.
D) All of these are true.
سؤال
The cost of good quality (COGQ) does NOT include which of these?

A) Appraisal costs
B) Conformance costs
C) Nonconformance costs
D) Prevention costs
سؤال
The process of define, measure, analyze, improve, and control (DMAIC) is known as which process?

A) IOS System
B) FQM System
C) LEAN
D) Six Sigma
سؤال
Conformance costs may include:

A) preventive maintenance.
B) quality management activities.
C) validation activities.
D) all of these.
سؤال
Ensuring that the implemented changes are sustained occurs at what stage of the DMAIC process?

A) Analyze
B) Control
C) Define
D) Improve
سؤال
Understanding the cause and effect relationships occurs at what stage of the DMAIC process?

A) Analyze
B) Control
C) Define
D) Improve
سؤال
A Pareto chart is used at what stage of the DMAIC process?

A) Analyze
B) Control
C) Define
D) Measure
سؤال
An action taken to identify and eliminate the cause of a nonconformance is what type of action?

A) Corrective
B) Disciplinary
C) Preventive
D) Remedial
سؤال
Using a SIPOC diagram occurs at what stage of the DMAIC process?

A) Analyze
B) Control
C) Define
D) Measure
سؤال
Which of these costs is a cost of poor quality (COPQ)?

A) Appraisal costs
B) Conformance costs
C) Nonconformance costs
D) Prevention costs
سؤال
Examples of forms include:

A) instrument printouts.
B) manual or electronic worksheets.
C) tags, stickers, or labels.
D) all of these.
سؤال
A good document control process does all of these EXCEPT:

A) eliminates the need to document all changes or corrections to procedures.
B) ensures that only the latest approved copies of documents are available for use.
C) links a facility's policies, processes, and procedures to each other.
D) notifies appropriate parties of the change and document the notification.
سؤال
The cost incurred for calibration materials and reagents is an example of what type of cost?

A) Internal evaluation costs
B) External evaluation costs
C) Internal failure costs
D) External failure costs
سؤال
An error has occurred during a test procedure, which was found to be caused by the technologist using a copy of the procedure that was being used at the time of her training. What should be put in place to ensure this type of mistake is not made again.

A) Corrective disciplinary action
B) Document control process
C) Instrument validation
D) Quality control checks
سؤال
Both the blood bank and the entire medical laboratory use which of the following?

A) Quality management systems
B) Continuous improvement systems
C) Essentials quality indicators
D) All of these
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/61
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 25: Quality Management
1
As part of postemployment departmental training, a medical technologist was given 10 known blood samples to analyze for ABO specificity. This is referred to as:

A) recertification.
B) a competence assessment.
C) education.
D) a proficiency test.
B
2
Employee training takes place:

A) before procedures are validated.
B) after competence assessments.
C) before flowcharting the process.
D) after hiring and after implementing new procedures.
D
3
A standard operating procedure (SOP) is:

A) a statement of intent or course of action.
B) a description of resources and activities that transform inputs into outputs.
C) a set of directions for how to perform a particular task.
D) a form on which to record results.
C
4
What is a function of the quality committee or quality council?

A) To provide solutions to recurring clerical errors
B) To provide counseling for departmental downsizing
C) To set priorities for quality improvements
D) To focus on computer upgrades and software implementation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
5
A physician complains that she has not received a test report from the blood bank. The remedial action is to:

A) complete the occurrence report form.
B) prepare a copy of the report for the physician.
C) locate the original report.
D) determine why the report was not delivered.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
6
Which of the following is an example of an external customer?

A) A night-shift medical technologist
B) A blood donor
C) An intravenous nurse
D) Housekeeping employee
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
7
Why might a laboratory adopt an individualized quality control plan (IQCP)?

A) To customize its QC program to its specific needs
B) To demonstrate where costs can be saved
C) To eliminate the need to perform daily quality control
D) To do all of these
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
8
Which of the following might lead to unacceptable quality control results?

A) A technician who has not worked in the area for several months
B) A deteriorated "anti-A"
C) An uncalibrated serofuge
D) All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
9
What phase is synonymous with "quality management?"

A) Good manufacturing practice
B) Organization-wide quality assurance
C) Process improvement team
D) Quality control
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
10
Process improvement teams address all of the following issues except:

A) becoming "team players."
B) quality and reliability of service.
C) filing a grievance.
D) interdepartmental communication.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
11
Which of the following is not regarded as an instrument?

A) Automated analyzer
B) Pipette
C) Washer
D) Cuvette
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
12
Blood collected in a red-top tube and a lavender tube was sent through a tube system to the STAT laboratory. The blood specimens were not labeled with any type of patient identification. The medical technologist called the emergency room (ER) to notify them of the problem. The ER nurse stated she wanted the tubes sent back to the ER and that she would label them. The stat laboratory technologist related the laboratory's policy on unlabeled specimens, saying that they would be discarded. At that point the disgruntled nurse said she would write up a(n) for the laboratory's refusal to analyze blood on an emergency patient.

A) employee evaluation
B) incident report
C) patient report
D) flow chart
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
13
Which continuous improvement cycle component ensures the finished product has met required specifications?

A) Improve
B) Assess
C) Implement
D) Plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
14
How do internal assessments differ from compliance inspections?

A) Compliance inspections assess performance on quality indicators.
B) Internal assessments focus on meeting regulations.
C) Internal assessments are more frequent than compliance inspections.
D) Compliance inspections seek underlying causes of problems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
15
Calibrating equipment prior to use is considered which function of quality?

A) Quality assurance
B) Quality control
C) Quality improvement
D) Quality management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
16
Which of the following statements concerning equipment is true?

A) Requires software to function
B) Quality control is not needed for critical steps.
C) Frequency of testing is determined by manufacturer recommendations.
D) All equipment must be purchased from the manufacturer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
17
All of the following are transfusion service quality assurance indicators used to monitor patient care except:

A) labeling errors on specimens sent to the blood bank.
B) reason for return of blood products.
C) number of therapeutic units drawn.
D) turnaround time on antibody identification.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
18
What is the main purpose of linking Current Good Manufacturing Practices (CGMPs) to process control?

A) To comply with the regulations
B) To build quality into the manufacturing process from the beginning to the end
C) To review and approve training programs and employee position descriptions
D) To approve raw test materials and in-house reagents
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
19
When a new shipment of reagents is received, what measure is taken to determine equivalency?

A) Lot-to-lot testing of new and old lot numbers of reagent
B) Work-flow reorientation
C) Daily quality control
D) Calibration
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
20
Which statement concerning compliance programs is false?

A) Programs are designed to evaluate effectiveness of blood bank laboratories.
B) Programs provide an occasional opportunity to expose new and different problems.
C) Compliance is synonymous with organization-wide quality assurance.
D) Compliance inspections are conducted every 1 to 2 years.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
21
Which of these should be evaluated during a risk assessment?

A) Airflow/ventilation
B) Competency of testing personnel
C) Equipment functioning
D) All of these
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
22
Which of these is part of process control?

A) Performing routine QC of test methods and reagents
B) Performing proficiency testing and personnel competency checks
C) Using a manual or automated action to prevent the occurrence of errors
D) All of these.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
23
Which of these does NOT describe a flowchart?

A) Can be created on paper or with commercially available software programs
B) Displays actions required in a process using graphic symbols for ease of understanding
C) Is useless in obtaining better control of a process.
D) Shows where decision points are located within a process
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
24
Copies of regulations and accreditation requirements are examples of:

A) documents.
B) forms.
C) results.
D) none of these.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
25
Which of these records may be reviewed during competency assessment for blood bank personnel?

A) Quality control records
B) Proficiency testing results
C) Maintenance records
D) All of these
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
26
An outcomes of performing procedures and testing is called a:

A) document.
B) form.
C) result.
D) none of these.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
27
The use of different colored sera for blood bank reagents is an example of:

A) process control.
B) quality control.
C) standard operating procedures.
D) validation studies.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
28
Competency assessment for blood bank personnel includes all of these EXCEPT:

A) direct observation of patient test performance.
B) cross-training into other areas of the laboratory.
C) monitoring the recording and reporting of test results.
D) review of test results or worksheets.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
29
Daily testing the reactivity of blood typing reagents is considered which function of quality?

A) Quality assurance
B) Quality control
C) Quality improvement
D) Quality management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
30
Which of the following relationships is NOT considered a quality essential of an organization?

A) Blood bank personnel links to their families
B) Blood bank's link to the laboratory
C) Blood bank's link to the hospital.
D) Blood bank links to the hospital's quality function
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
31
Which of the following is NOT an internal customer for the transfusion service?

A) Nurse administering blood products
B) Patient receiving blood products
C) Nursing assistant transporting blood products
D) Physician ordering blood products
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
32
Laboratory safety training must include which of these for blood bank personnel?

A) Chemical hygiene
B) Emergency preparedness
C) Radiation safety
D) All of these
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
33
Which of the following provides a framework for applying quality principles and practices in the blood bank?

A) Quality assurance program
B) Quality control and correction
C) Quality improvement process
D) Quality management system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
34
Testing all activities in a new process to ensure that the process will work in the live environment is a function of:

A) quality control.
B) standard operating procedures.
C) validation studies.
D) none of these.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
35
Which of these need NOT be evaluated during a risk assessment?

A) Patient opinion survey
B) Reagent storage conditions
C) Specimen labeling
D) Transmission of data to LIS
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
36
What is a flowchart?

A) A tool that displays all the elements involved in a process
B) A tool that allows for greater understanding of specific steps in a process
C) A tool that explains the sequence of activities in a process in paragraph for
D) All of these.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
37
A quality framework in the blood bank ensures all of the following EXCEPT:

A) Application of quality principles and practices.
B) Blood bank operations are customized to individual staff preferences.
C) Compliance with regulatory body requirements
D) Review of each step from donor selection through transfusion outcomes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
38
What is the purpose of a flowchart?

A) Facilitates understanding of resources when planning a new process
B) Reveals problems (i.e., missing actions) in a current process
C) Shows how process inputs are converted into outputs
D) All of these
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
39
Which of the following is not part of an individualized quality control plan (IQCP)?

A) New instrument validation
B) Quality control plan
C) Quality assessment
D) Risk assessment
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
40
Quality assessment monitors include reviews of all of these EXCEPT:

A) Corrected report communications.
B) Personnel competency records.
C) Turnaround time reports.
D) Vendor selection process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
41
The cost incurred for proficiency testing and periodic licensure or accreditation inspections is what type of cost?

A) Internal evaluation costs
B) External evaluation costs
C) Internal failure costs
D) External failure costs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
42
The cost incurred with customer product recalls is an example of what type of cost?

A) Internal evaluation costs
B) External evaluation costs
C) Internal failure costs
D) External failure costs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
43
Examples of documents include:

A) written policies, procedures and instructions.
B) process flowcharts and forms.
C) manufacturers' package inserts and operator manuals.
D) all of these.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
44
The cost incurred when discarding donated blood units is an example of what type of cost?

A) Internal evaluation costs
B) External evaluation costs
C) Internal failure costs
D) External failure costs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
45
52, Using the DOE tool occurs at what stage of the DMAIC process?

A) Analyze
B) Control
C) Define
D) Improve
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
46
An action taken to reduce or eliminate the potential for a nonconformance is what type of action?

A) Corrective
B) Disciplinary
C) Preventive
D) Remedial
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
47
Which of the following statements is true?

A) Remedial action occurs over time.
B) Remedial action does not uncover the real cause of the nonconformance.
C) Remedial action does not require further investigation.
D) All of these are true.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
48
The cost of good quality (COGQ) does NOT include which of these?

A) Appraisal costs
B) Conformance costs
C) Nonconformance costs
D) Prevention costs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
49
The process of define, measure, analyze, improve, and control (DMAIC) is known as which process?

A) IOS System
B) FQM System
C) LEAN
D) Six Sigma
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
50
Conformance costs may include:

A) preventive maintenance.
B) quality management activities.
C) validation activities.
D) all of these.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
51
Ensuring that the implemented changes are sustained occurs at what stage of the DMAIC process?

A) Analyze
B) Control
C) Define
D) Improve
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
52
Understanding the cause and effect relationships occurs at what stage of the DMAIC process?

A) Analyze
B) Control
C) Define
D) Improve
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
53
A Pareto chart is used at what stage of the DMAIC process?

A) Analyze
B) Control
C) Define
D) Measure
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
54
An action taken to identify and eliminate the cause of a nonconformance is what type of action?

A) Corrective
B) Disciplinary
C) Preventive
D) Remedial
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
55
Using a SIPOC diagram occurs at what stage of the DMAIC process?

A) Analyze
B) Control
C) Define
D) Measure
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
56
Which of these costs is a cost of poor quality (COPQ)?

A) Appraisal costs
B) Conformance costs
C) Nonconformance costs
D) Prevention costs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
57
Examples of forms include:

A) instrument printouts.
B) manual or electronic worksheets.
C) tags, stickers, or labels.
D) all of these.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
58
A good document control process does all of these EXCEPT:

A) eliminates the need to document all changes or corrections to procedures.
B) ensures that only the latest approved copies of documents are available for use.
C) links a facility's policies, processes, and procedures to each other.
D) notifies appropriate parties of the change and document the notification.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
59
The cost incurred for calibration materials and reagents is an example of what type of cost?

A) Internal evaluation costs
B) External evaluation costs
C) Internal failure costs
D) External failure costs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
60
An error has occurred during a test procedure, which was found to be caused by the technologist using a copy of the procedure that was being used at the time of her training. What should be put in place to ensure this type of mistake is not made again.

A) Corrective disciplinary action
B) Document control process
C) Instrument validation
D) Quality control checks
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
61
Both the blood bank and the entire medical laboratory use which of the following?

A) Quality management systems
B) Continuous improvement systems
C) Essentials quality indicators
D) All of these
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.