Deck 10: Fundamentals of Cost Management

ملء الشاشة (f)
exit full mode
سؤال
Managerial decisions based on activity-based costing (ABC) information affect only volume-related, batch-related, and product-related costs.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
A cost of quality system is based on the trade-off between incurring costs to meet product (or service) specifications and the costs of failing to meet those specifications.
سؤال
Internal failure costs include materials wasted in the production process and correcting products before they are sold.
سؤال
Activity-based cost management (ABCM) can be used for managerial decision-making in service, merchandising, and manufacturing companies.
سؤال
Quality can be defined as the degree to which a product or service performs as it was designed to do.
سؤال
Unused capacity costs incurred for the benefit of a company's customers (e.g., meet seasonal demands) should be assigned to the customers that require (use) the excess capacity.
سؤال
Storing materials, work-in-process items, and finished goods in inventory are essential, value-added activities in most companies.
سؤال
Activity-based cost management (ABCM) uses the information provided by activity-based costing (ABC) to identify ways to improve operations.
سؤال
In activity-based costing, the cost driver rate is computed by dividing the total cost per activity by the estimated number of units produced.
سؤال
Tangible customer expectations include how the product's salespeople treat customers and the time required to deliver the product to the customer.
سؤال
The basic concepts involved in activity-based costing (ABC) can be used to determine customer profitability as well as product costs.
سؤال
The difference between the resources used and the resources supplied is called unused resource capacity in a typical activity-based cost management (ABCM) system.
سؤال
In general, managerial decisions affecting capacity-related costs and activities also affect volume-level, batch-level, and product-level cost and activities.
سؤال
Unused resource capacity plus the amount of the resources used is equal to the amount of resources supplied.
سؤال
In general, the unit-level (or volume-related) costs in an activity-based costing (ABC) system are variable costs.
سؤال
Activity-based costing (ABC) techniques used to evaluate customer profitability can also be applied to evaluating suppliers.
سؤال
Theoretical capacity is the long-run expected volume based on reasonably attainable working conditions.
سؤال
In general, decreasing (or eliminating) the resources committed to nonvalue-added activities will decrease customer response time.
سؤال
Theoretical capacity is the amount of production possible assuming expected downtime for scheduled maintenance, normal breaks, and vacations.
سؤال
In general, the capacity-related costs in an activity-based costing (ABC) system are variable costs.
سؤال
Fence Industries is preparing its annual profit plan. As part of its analysis of the profitability of its customers, management estimates that the $12,000 for sales support should be assigned to the individual customers from the information given as follows:
 Customer A  Customer B  Units purchased 100,000200,000 Purchase orders (annual) 520\begin{array} { | l | r | r | } \hline & { \text { Customer A } } & { \text { Customer B } } \\\hline \text { Units purchased } & 100,000 & 200,000 \\\hline \text { Purchase orders (annual) } & 5 & 20 \\\hline\end{array}

-
What is the amount of the sales support costs that should be allocated to Customer B, assuming Fence uses purchases orders to compute activity-based costs?

A) $2,400.
B) $4,000.
C) $8,000.
D) $9,600.
سؤال
In an activity-based costing (ABC) system, cost reduction is accomplished by identifying and eliminating: (CPA adapted)
 All Cost Drivers  Non value-added Activities \begin{array} {cc} { \text { All Cost Drivers } } & \text { Non value-added Activities } \\\end{array}
A.  No  No \begin{array} {cc} & & \text { No } &&&&&&&&& \text { No } \\\end{array}
B.  Yes  Yes \begin{array} {cc} && \text { Yes } &&&&&&&&& \text { Yes } \\\end{array}
C.  No  Yes \begin{array} {cc} && \text { No } &&&&&&&&& \text { Yes } \\\end{array}
D.  Yes  No \begin{array} {cc} && \text { Yes } &&&&&&&&& \text { No } \\\end{array}

A) Option A.
B) Option B.
C) Option C.
D) Option D.
سؤال
Which of the following is a value-added activity?

A) Storing items.
B) Moving items.
C) Waiting for work.
D) Assembling items.
سؤال
Which of the following is not true of process reengineering?

A) It is the changing of operational processes to improve performance.
B) It often takes place after examining ABC data to determine opportunities for improvement.
C) It involves identifying what the customer wants or expects from the firm's products or services.
D) It is the sixth, and final, step of ABCM activity analysis.
سؤال
Which of the following items would be classified as a batch-related cost in an activity-based cost management (ABCM) system?

A) Indirect labor.
B) Production supervisor's salary.
C) Depreciation on factory building.
D) Machinery set-up costs.
سؤال
Activity-based cost management (ABCM) can best be defined as:

A) a cost system using multiple departmental overhead rates.
B) the use of cost information gathered using activity-based costing (ABC).
C) a quality-control system focusing on eliminating errors and mistakes.
D) an incentive system for a company's key decision-makers.
سؤال
Barter Company's cost management and product costing procedures follow activity-based costing (ABC) principles. Activities have been identified and classified as being either value-added or nonvalue-added for each product. Which of the following activities, used in Barter's production process, is nonvalue-added? (CPA adapted)

A) Drill press activity.
B) Heat treatment activity.
C) Design engineering activity.
D) Raw materials storage activity.
سؤال
Activity analysis is one of the first stages in implementing activity-based cost management (ABCM). Which of the following steps in activity analysis is usually performed first?

A) Classify all activities as value-added or nonvalue-added.
B) Chart, from start to finish, the activities used to complete the product or service.
C) Identify the process objectives that are defined by what the customer wants or expects from the process.
D) Continuously improve the efficiency of all value-added activities and develop plans to eliminate or reduce nonvalue-added ones.
سؤال
McArthur Company has gathered the following data related to its production process of two of its products for the week ended April 30:
 Model  Item #B200  Item #C440  Quantity produced 60100 Unit-related material costs $42,000$100,000 Variable conversion costs 72,000300,000 Total direct costs $114,000$400,000 Indirect costs:  Indirect manufacturing costs 163,200272,000 Indirect operating costs 255,000425,000 Total indirect costs 418,200697,000 Total cost$532,200$1,097,000\begin{array}{lrrrr}\text { Model } & \text { Item \#B200 } & \text { Item \#C440 }\\\text { Quantity produced } & 60 & 100 \\\text { Unit-related material costs } & \$ 42,000 & \$ 100,000 \\\text { Variable conversion costs } & 72,000 & 300,000\\\text { Total direct costs } & \$ 114,000 & \$ 400,000 \\\text { Indirect costs: } & & & \\\text { Indirect manufacturing costs } & 163,200 & 272,000 \\\text { Indirect operating costs } & 255,000 & 425,000\\\text { Total indirect costs } & 418,200 & 697,000 \\\text { Total cost}& \$ 532,200 & \$ 1,097,000\end{array}
The costs above that appear to be allocated rather than traced are:

A) Unit-related material costs.
B) Variable conversion costs.
C) Indirect manufacturing costs only.
D) All indirect costs.
سؤال
Which of the following activities is most likely to be classified as value-added for a merchandise company?

A) Purchasing.
B) Waiting.
C) Receiving.
D) Setting up.
سؤال
Which of the following statements about activity-based costing (ABC) is not true? (CIA adapted)

A) In ABC, cost drivers are used to link costs to products.
B) ABC is useful for assigning marketing and distribution costs.
C) ABC differs from traditional costing systems in that products are not cross-subsidized.
D) ABC is more likely to result in major differences from traditional costing systems if the firm manufactures only one product rather than multiple products.
سؤال
Which of the following items would not be used as the cost driver for a volume-related cost in an activity-based cost management (ABCM) system?

A) Direct labor hours.
B) Machine hours.
C) Units produced.
D) Square footage.
سؤال
Which of the following activities is most likely to be classified as value-added for a manufacturing company?

A) Storing.
B) Ordering.
C) Inspecting.
D) Assembling.
سؤال
Activity analysis is an important approach to operations control and the successful implementation of activity-based cost management (ABCM). Which of the following procedures is not part of activity analysis?

A) Chart, from start to finish, the activities used to complete the product or service.
B) Classify all activities as either value-added or nonvalue-added activities.
C) Identify the process objectives as defined by what the customer desires from the process.
D) Compute the predetermined rate per activity by dividing the total cost pool by the total cost drivers.
سؤال
Fence Industries is preparing its annual profit plan. As part of its analysis of the profitability of its customers, management estimates that the $12,000 for sales support should be assigned to the individual customers from the information given as follows:
 Customer A  Customer B  Units purchased 100,000200,000 Purchase orders (annual) 520\begin{array} { | l | r | r | } \hline & { \text { Customer A } } & { \text { Customer B } } \\\hline \text { Units purchased } & 100,000 & 200,000 \\\hline \text { Purchase orders (annual) } & 5 & 20 \\\hline\end{array}

-
What is the amount of the sales support costs that should be allocated to Customer A, assuming Fence uses purchases orders to compute activity-based costs?

A) $2,400.
B) $4,000.
C) $8,000.
D) $9,600.
سؤال
In an activity-based cost management (ABCM) system, facility-related costs are those that are incurred to:

A) sustain the company's marketing program.
B) maintain the plant's production capacity.
C) support the research and development process.
D) cause a change in the engineering plans for a product.
سؤال
Fence Industries is preparing its annual profit plan. As part of its analysis of the profitability of its customers, management estimates that the $12,000 for sales support should be assigned to the individual customers from the information given as follows:
 Customer A  Customer B  Units purchased 100,000200,000 Purchase orders (annual) 520\begin{array} { | l | r | r | } \hline & { \text { Customer A } } & { \text { Customer B } } \\\hline \text { Units purchased } & 100,000 & 200,000 \\\hline \text { Purchase orders (annual) } & 5 & 20 \\\hline\end{array}

-
What is the amount of the sales support costs that should be allocated to Customer B, assuming Fence uses units purchased to compute activity-based costs?

A) $2,400.
B) $4,000.
C) $8,000.
D) $9,600.
سؤال
Which of the following items would be classified as a volume-related cost in an activity-based cost management (ABCM) system?

A) Indirect materials.
B) Production supervisor's salary.
C) Depreciation on factory building.
D) Research and development.
سؤال
Which of the following items would be classified as a product-related cost in an activity-based cost management (ABCM) system?

A) Change order to meet a new customer's specification.
B) Movement of materials for products in production.
C) Long-term lease payments for factory equipment.
D) Insurance and property taxes on factory building.
سؤال
Fence Industries is preparing its annual profit plan. As part of its analysis of the profitability of its customers, management estimates that the $12,000 for sales support should be assigned to the individual customers from the information given as follows:
 Customer A  Customer B  Units purchased 100,000200,000 Purchase orders (annual) 520\begin{array} { | l | r | r | } \hline & { \text { Customer A } } & { \text { Customer B } } \\\hline \text { Units purchased } & 100,000 & 200,000 \\\hline \text { Purchase orders (annual) } & 5 & 20 \\\hline\end{array}

-
What is the amount of the sales support costs that should be allocated to Customer A assuming Fence uses units purchased to compute activity-based costs?

A) $2,400.
B) $4,000.
C) $8,000.
D) $9,600.
سؤال
Express Travel decides to price delivery service according to the results of a recent activity-based costing (ABC) study. The study indicates Express Travel should charge $16 per order, 1% of annual order value for general delivery costs, $2.50 per item, and $45 for delivery.
A year later, Express Travel collected the following information for three of its customers:
 Cost driver  Customer A  Customer B  Customer C  Number of orders 18812 Number of deliveries 101024 Total number of items 2,0004,00012,000 Annual order value $120,000$80,000$100,000\begin{array} { l r r r } { \text { Cost driver } } & \text { Customer A } & \text { Customer B } & \text { Customer C } \\\text { Number of orders } & 18 & 8 & 12 \\\text { Number of deliveries } & 10 & 10 & 24 \\\text { Total number of items } & 2,000 & 4,000 & 12,000 \\\text { Annual order value } & \$ 120,000 & \$ 80,000 & \$ 100,000\end{array}

-
What are the total delivery costs charged to Customer C during the year?

A) $16,863.
B) $20,000.
C) $31,272.
D) $32,272.
سؤال
Crafter Lumber Supply noticed a recent decline in the amount of purchases from a key customer. Worried that other customers might also reduce their purchases, Crafter's management decided to evaluate the cost of its delivery service. Which of the following cost drivers is more appropriate for general administrative costs of the Delivery Department?

A) Number of different items ordered.
B) Value of each order.
C) Total number of items in each order.
D) Number of deliveries made.
سؤال
Benton Company is preparing its annual profit plan. As part of its analysis of the cost of its purchasing activity, management estimates that the $48,000 for purchasing support should be assigned to the individual vendors from the information given as follows:
 Vendor A  Vendor B  Units purchased 100,000200,000 Purchase orders (annual) 624 Number of shipments received 1252\begin{array} { | l | r | r | } \hline & { \text { Vendor A } } &{ \text { Vendor B } } \\\hline \text { Units purchased } & 100,000 & 200,000 \\\hline \text { Purchase orders (annual) } & 6 & 24 \\\hline \text { Number of shipments received } & 12 & 52 \\\hline\end{array}

-
What is the amount of the purchasing costs that should be allocated to Vendor B, assuming Benton uses purchases orders to compute activity-based costs?

A) $9,600.
B) $16,000.
C) $32,000.
D) $38,400.
سؤال
Benton Company is preparing its annual profit plan. As part of its analysis of the cost of its purchasing activity, management estimates that the $48,000 for purchasing support should be assigned to the individual vendors from the information given as follows:
 Vendor A  Vendor B  Units purchased 100,000200,000 Purchase orders (annual) 624 Number of shipments received 1252\begin{array} { | l | r | r | } \hline & { \text { Vendor A } } & { \text { Vendor B } } \\\hline \text { Units purchased } & 100,000 & 200,000 \\\hline \text { Purchase orders (annual) } & 6 & 24 \\\hline \text { Number of shipments received } & 12 & 52 \\\hline\end{array}

-
What is the amount of the purchasing costs that should be allocated to Vendor A, assuming Benton uses purchases orders to compute activity-based costs?

A) $9,600.
B) $16,000.
C) $32,000.
D) $38,400.
سؤال
Express Travel decides to price delivery services according to the results of a recent activity-based costing (ABC) study. The study indicates Express Travel should charge $16 per order, 1% of annual order value for general delivery costs, $2.50 per item, and $45 for delivery.
A year later, Express Travel collected the following information for three of its customers:
 Cost driver  Customer A  Customer B  Customer C  Number of orders 18812 Number of deliveries 101024 Total number of items 2,0004,00012,000 Annual order value $120,000$80,000$100,000\begin{array} { l r r r } \text { Cost driver } & \text { Customer A } & \text { Customer B } & \text { Customer C } \\\text { Number of orders } & 18 & 8 & 12 \\\text { Number of deliveries } & 10 & 10 & 24 \\\text { Total number of items } & 2,000 & 4,000 & 12,000 \\\text { Annual order value } & \$ 120,000 & \$ 80,000 & \$ 100,000\end{array}

-
What are the total delivery costs charged to Customer B during the year?

A) $13,490.
B) $11,378.
C) $10,800.
D) $10,578.
سؤال
South Beach Industries reports the following information about resources. At the beginning of the year, South Beach estimated it would spend $180,000 for materials, $42,000 for purchasing, $35,000 for setups, and $36,000 for repairs.
<strong>South Beach Industries reports the following information about resources. At the beginning of the year, South Beach estimated it would spend $180,000 for materials, $42,000 for purchasing, $35,000 for setups, and $36,000 for repairs.    - The unused resource capacity for materials for South Beach is:</strong> A) $12,700. B) $3,500. C) $19,270. D) $9,200. <div style=padding-top: 35px>

-
The unused resource capacity for materials for South Beach is:

A) $12,700.
B) $3,500.
C) $19,270.
D) $9,200.
سؤال
Benton Company is preparing its annual profit plan. As part of its analysis of the cost of its purchasing activity, management estimates that the $48,000 for purchasing support should be assigned to the individual vendors from the information given as follows:
 Vendor A  Vendor B  Units purchased 100,000200,000 Purchase orders (annual) 624 Number of shipments received 1252\begin{array} { | l | r | r | } \hline & { \text { Vendor A } } &{ \text { Vendor B } } \\\hline \text { Units purchased } & 100,000 & 200,000 \\\hline \text { Purchase orders (annual) } & 6 & 24 \\\hline \text { Number of shipments received } & 12 & 52 \\\hline\end{array}

-
What is the amount of the purchasing costs that should be allocated to Vendor B, assuming Benton uses units purchased to compute activity-based costs?

A) $9,600.
B) $16,000.
C) $32,000.
D) $38,400.
سؤال
Benton Company is preparing its annual profit plan. As part of its analysis of the cost of its purchasing activity, management estimates that the $48,000 for purchasing support should be assigned to the individual vendors from the information given as follows:
 Vendor A  Vendor B  Units purchased 100,000200,000 Purchase orders (annual) 624 Number of shipments received 1252\begin{array} { | l | r | r | } \hline & { \text { Vendor A } } & { \text { Vendor B } } \\\hline \text { Units purchased } & 100,000 & 200,000 \\\hline \text { Purchase orders (annual) } & 6 & 24 \\\hline \text { Number of shipments received } & 12 & 52 \\\hline\end{array}

-
What is the amount of the purchasing costs that should be allocated to Vendor B, assuming Benton uses number of shipments received to compute activity-based costs?

A) $9,000.
B) $16,000.
C) $32,000.
D) $39,000.
سؤال
The amount of resources used in an activity-based costing (ABC) system for a specific activity is computed by multiplying the:

A) cost driver rate by the actual cost driver volume.
B) cost driver rate by the planned cost driver volume.
C) overhead rate by the actual cost driver volume.
D) overhead rate by the planned cost driver volume.
سؤال
Express Travel decides to price delivery services according to the results of a recent activity-based costing (ABC) study. The study indicates Express Travel should charge $16 per order, 1% of annual order value for general delivery costs, $2.50 per item, and $45 for delivery.
A year later, Express Travel collected the following information for three of its customers:
 Cost driver  Customer A  Customer B  Customer C  Number of orders 18812 Number of deliveries 101024 Total number of items 2,0004,00012,000 Annual order value $120,000$80,000$100,000\begin{array} { l r r r } \text { Cost driver } & \text { Customer A } & \text { Customer B } & \text { Customer C } \\\text { Number of orders } & 18 & 8 & 12 \\\text { Number of deliveries } & 10 & 10 & 24 \\\text { Total number of items } & 2,000 & 4,000 & 12,000 \\\text { Annual order value } & \$ 120,000 & \$ 80,000 & \$ 100,000\end{array}

-
What are the total delivery costs charged to Customer A during the year?

A) $5,738.
B) $6,650.
C) $6,938.
D) $20,235.
سؤال
South Beach Industries reports the following information about resources. At the beginning of the year, South Beach estimated it would spend $180,000 for materials, $42,000 for purchasing, $35,000 for setups, and $36,000 for repairs.
<strong>South Beach Industries reports the following information about resources. At the beginning of the year, South Beach estimated it would spend $180,000 for materials, $42,000 for purchasing, $35,000 for setups, and $36,000 for repairs.    - The unused resource capacity for purchasing for South Beach is:</strong> A) $5,538. B) $2,000. C) $4,300. D) $2,300. <div style=padding-top: 35px>

-
The unused resource capacity for purchasing for South Beach is:

A) $5,538.
B) $2,000.
C) $4,300.
D) $2,300.
سؤال
Benton Company is preparing its annual profit plan. As part of its analysis of the cost of its purchasing activity, management estimates that the $48,000 for purchasing support should be assigned to the individual vendors from the information given as follows:
 Vendor A  Vendor B  Units purchased 100,000200,000 Purchase orders (annual) 624 Number of shiprnents received 1252\begin{array} { | l | r | r | } \hline & { \text { Vendor A } } &{ \text { Vendor B } } \\\hline \text { Units purchased } & 100,000 & 200,000 \\\hline \text { Purchase orders (annual) } & 6 & 24 \\\hline \text { Number of shiprnents received } & 12 & 52 \\\hline\end{array}
What is the amount of the purchasing costs that should be allocated to Vendor A, assuming Benton uses units purchased to compute activity-based costs?

A) $9,600.
B) $16,000.
C) $32,000.
D) $38,400.
سؤال
Republic Industries decides to price delivery services according to the results of a recent activity-based costing (ABC) study. The study indicates Republic should charge $8 per order, 2% of annual order value for general delivery costs, $1.25 per item, and $30 for delivery.
A year later, Republic collected the following information for two of its best customers:
 Cost driver  Customer C  Customer D  Number of orders 188 Number of deliveries 1010 Total number of items 2,0004,000 Annual order value $120,00080,000\begin{array} { l r r } \text { Cost driver } & \text { Customer C } & \text { Customer D } \\\text { Number of orders } & 18 & 8 \\\text { Number of deliveries } & 10 & 10 \\\text { Total number of items } & 2,000 & 4,000 \\\text { Annual order value } & \$ 120,000 &8 0 , 0 0 0\end{array}

-
What are the total delivery costs charged to Customer C during the year?

A) $5,344.
B) $5,364.
C) $6,900.
D) $6,964.
سؤال
Macon Publishing reports the following information about resources. At the beginning of the year, Macon estimated it would spend $42,000 for setups and $21,000 for clerical.
<strong>Macon Publishing reports the following information about resources. At the beginning of the year, Macon estimated it would spend $42,000 for setups and $21,000 for clerical.    - The unused resource capacity for setups for Macon Publishing is:</strong> A) $1,250. B) $3,000. C) $1,750. D) $5,000. <div style=padding-top: 35px>

-
The unused resource capacity for setups for Macon Publishing is:

A) $1,250.
B) $3,000.
C) $1,750.
D) $5,000.
سؤال
South Beach Industries reports the following information about resources. At the beginning of the year, South Beach estimated it would spend $180,000 for materials, $42,000 for purchasing, $35,000 for setups, and $36,000 for repairs.
<strong>South Beach Industries reports the following information about resources. At the beginning of the year, South Beach estimated it would spend $180,000 for materials, $42,000 for purchasing, $35,000 for setups, and $36,000 for repairs.    - The unused resource capacity for setups for South Beach is:</strong> A) $2,500. B) $1,080. C) $1,500. D) $1,000. <div style=padding-top: 35px>

-
The unused resource capacity for setups for South Beach is:

A) $2,500.
B) $1,080.
C) $1,500.
D) $1,000.
سؤال
Republic Industries decides to price delivery services according to the results of a recent activity-based costing (ABC) study. The study indicates Republic should charge $8 per order, 2% of annual order value for general delivery costs, $1.25 per item, and $30 for delivery.
A year later, Republic collected the following information for two of its best customers:
 Cost driver  Customer C  Customer D  Number of orders 188 Number of deliveries 1010 Total number of items 2,0004,000 Annual order value $120,000$80,000\begin{array} { l r r } \text { Cost driver } & \text { Customer C } & \text { Customer D } \\\text { Number of orders } & 18 & 8 \\\text { Number of deliveries } & 10 & 10 \\\text { Total number of items } & 2,000 & 4,000 \\\text { Annual order value } & \$ 120,000 & \$ 8 0 , 0 0 0\end{array}

-
What are the total delivery costs charged to Customer D during the year?

A) $5,344.
B) $5,364.
C) $6,900.
D) $6,964.
سؤال
Activity-based costing (ABC) information cannot be used by managerial decision-makers to evaluate the:

A) profitability of a customer.
B) market potential of a product.
C) cost of using a particular supplier.
D) whether to continue providing a service.
سؤال
South Beach Industries reports the following information about resources. At the beginning of the year, South Beach estimated it would spend $180,000 for materials, $42,000 for purchasing, $35,000 for setups, and $36,000 for repairs.
<strong>South Beach Industries reports the following information about resources. At the beginning of the year, South Beach estimated it would spend $180,000 for materials, $42,000 for purchasing, $35,000 for setups, and $36,000 for repairs.    - The unused resource capacity for repairs for South Beach is:</strong> A) $4,800. B) $10,800. C) $6,000. D) $3,600. <div style=padding-top: 35px>

-
The unused resource capacity for repairs for South Beach is:

A) $4,800.
B) $10,800.
C) $6,000.
D) $3,600.
سؤال
The unused resource capacity is the difference between the resources supplied and the resources:

A) purchased.
B) wasted.
C) used.
D) on hand.
سؤال
Benton Company is preparing its annual profit plan. As part of its analysis of the cost of its purchasing activity, management estimates that the $48,000 for purchasing support should be assigned to the individual vendors from the information given as follows:
 Vendor A  Vendor B  Units purchased 100,000200,000 Purchase orders (annual) 624 Number of shipments received 1252\begin{array} { | l | r | r | } \hline & { \text { Vendor A } } &{ \text { Vendor B } } \\\hline \text { Units purchased } & 100,000 & 200,000 \\\hline \text { Purchase orders (annual) } & 6 & 24 \\\hline \text { Number of shipments received } & 12 & 52 \\\hline\end{array}

-
What is the amount of the purchasing costs that should be allocated to Vendor A, assuming Benton uses number of shipments received to compute activity-based costs?

A) $9,000.
B) $16,000.
C) $32,000.
D) $39,000.
سؤال
Water Industries' quality control report for August contains the following items:
 Gathering, analysis, and reporting quality data$1,000 Inspecting raw materials received from vendors2,000 Testing and inspecting finished products 3,000 Visiting customer sites to test product4,000 Designing product to reduce production problems 5,000 Repairing and/or replacing products under warranty 6,000 Maintaining the equipment used to gather quality data 7,000 Cost (net) of materials wasted during production 8,000\begin{array}{ll}\text { Gathering, analysis, and reporting quality data}&\$1,000\\\text { Inspecting raw materials received from vendors}&2,000\\\text { Testing and inspecting finished products }&3,000\\\text { Visiting customer sites to test product}&4,000\\\text { Designing product to reduce production problems } & 5,000 \\\text { Repairing and/or replacing products under warranty } & 6,000 \\\text { Maintaining the equipment used to gather quality data } & 7,000 \\\text { Cost (net) of materials wasted during production } & 8,000\end{array}


-
What would be the total of the appraisal costs on the August quality control report for Water Industries?

A) $7,000.
B) $11,000.
C) $12,000.
D) $15,000.
سؤال
Which of the following is not an explanation of why a company would operate at less than theoretical capacity?

A) Scheduled maintenance of equipment.
B) Breakdowns in equipment.
C) Customer demand is less than anticipated.
D) Customer demand is more than anticipated.
سؤال
Water Industries' quality control report for August contains the following items:
 Gathering, analysis, and reporting quality data$1,000 Inspecting raw materials received from vendors2,000 Testing and inspecting finished products 3,000 Visiting customer sites to test product4,000 Designing product to reduce production problems 5,000 Repairing and/or replacing products under warranty 6,000 Maintaining the equipment used to gather quality data 7,000 Cost (net) of materials wasted during production 8,000\begin{array}{ll}\text { Gathering, analysis, and reporting quality data}&\$1,000\\\text { Inspecting raw materials received from vendors}&2,000\\\text { Testing and inspecting finished products }&3,000\\\text { Visiting customer sites to test product}&4,000\\\text { Designing product to reduce production problems } & 5,000 \\\text { Repairing and/or replacing products under warranty } & 6,000 \\\text { Maintaining the equipment used to gather quality data } & 7,000 \\\text { Cost (net) of materials wasted during production } & 8,000\end{array}

-
What would be the total of the prevention costs on the August quality control report for Water Industries?

A) $5,000.
B) $7,000.
C) $11,000.
D) $15,000.
سؤال
Denim Products reports the following information about resources. At the beginning of the year, Denim estimated it would spend $84,000 for setups and $41,000 for quality testing.
<strong>Denim Products reports the following information about resources. At the beginning of the year, Denim estimated it would spend $84,000 for setups and $41,000 for quality testing.    - The unused resource capacity for setups for Denim Products is:</strong> A) $6,000. B) $2,500. C) $1,000. D) $3,500. <div style=padding-top: 35px>

-
The unused resource capacity for setups for Denim Products is:

A) $6,000.
B) $2,500.
C) $1,000.
D) $3,500.
سؤال
Which of the following is not an example of an external failure cost?

A) Accepting company liability resulting from product failure.
B) Experiencing decreasing sales as a result of poor-quality products.
C) Repairing or replacing defective products after they've been sold.
D) Testing products in use at the customer's site.
سؤال
Which of the following statements regarding quality costs is(are) false?
(A) In a cost of quality system, internal and external failure costs are called conformance costs.
(B) Prevention costs are costs incurred to detect individual units of product that do not conform to its specifications.

A) Only A is false.
B) Only B is false.
C) Both of these are false.
D) Neither of these is false.
سؤال
The degree to which a good or service meets specifications is called:

A) conformance to specifications.
B) customer quality demands.
C) a conformance cost.
D) a compliance cost.
سؤال
Which of the following statement is(are) true?
(A) Unused capacity costs incurred for the benefit of a company's customers (e.g., meet seasonal demands) should be assigned to the customers that require (use) the excess capacity.
(B) In general, managerial decisions affecting capacity-related costs and activities also affect volume-related, batch-related, and product-related cost and activities.

A) Only A is true.
B) Only B is true.
C) Both of these are true.
D) Neither of these is true.
سؤال
A company has high winter demand and low summer demand for its services. The cost of the unused summer capacity should be allocated:

A) to an account called Idle Capacity.
B) evenly to all customers.
C) only to the winter customers.
D) only to the summer customers.
سؤال
Which of the following statements is(are) true?
(A) Theoretical capacity is the long-run expected volume based on reasonably attainable working conditions.
(B) The cost of excess capacity is allocated to individual cost objects using the cost driver rate.

A) Only A is true.
B) Only B is true.
C) Both of these are true.
D) Neither of these is true.
سؤال
Which of the following is an example of a prevention cost?

A) Machine inspection.
B) Warranty repairs.
C) Field testing.
D) Marketing costs.
سؤال
Which of the following is an example of an internal failure cost?

A) Training employees to improve quality.
B) Designing products to reduce production problems.
C) Correcting product defects before they are sold.
D) Inspecting the production process as it occurs.
سؤال
Which of the following items is included in almost all quality control systems?

A) Quality-related waiting time.
B) Quality planning and analysis.
C) Excess or obsolete inventory.
D) Quality-related overtime.
سؤال
Macon Publishing reports the following information about resources. At the beginning of the year, Macon estimated it would spend $42,000 for setups and $21,000 for clerical.
<strong>Macon Publishing reports the following information about resources. At the beginning of the year, Macon estimated it would spend $42,000 for setups and $21,000 for clerical.    - The unused resource capacity for clerical for Macon Publishing is:</strong> A) $5,000. B) $1,000. C) $6,000. D) $1,260. <div style=padding-top: 35px>

-
The unused resource capacity for clerical for Macon Publishing is:

A) $5,000.
B) $1,000.
C) $6,000.
D) $1,260.
سؤال
Which of the following is not an example of a prevention cost?

A) Training employees to improve quality.
B) Designing products to reduce production problems.
C) Correcting product defects before they are sold.
D) Inspecting the production process as it occurs.
سؤال
Scallon Products reports the following information about resources. At the beginning of the year, Scallon estimated it would spend $8,000 for energy and $12,000 for repairs.
<strong>Scallon Products reports the following information about resources. At the beginning of the year, Scallon estimated it would spend $8,000 for energy and $12,000 for repairs.    - The unused resource capacity for energy for Scallon Products is:</strong> A) $8,000. B) $1,080. C) $1,420. D) $2,500. <div style=padding-top: 35px>

-
The unused resource capacity for energy for Scallon Products is:

A) $8,000.
B) $1,080.
C) $1,420.
D) $2,500.
سؤال
Scallon Products reports the following information about resources. At the beginning of the year, Scallon estimated it would spend $8,000 for energy and $12,000 for repairs.
<strong>Scallon Products reports the following information about resources. At the beginning of the year, Scallon estimated it would spend $8,000 for energy and $12,000 for repairs.    - The unused resource capacity for repairs for Scallon Products is:</strong> A) $2,400. B) $12,000. C) $6,000. D) $3,600. <div style=padding-top: 35px>

-
The unused resource capacity for repairs for Scallon Products is:

A) $2,400.
B) $12,000.
C) $6,000.
D) $3,600.
سؤال
Which of the following statements regarding the trade-off between conformance and nonconformance costs is(are) false?
(A) The optimal level for a company's quality control program occurs when its conformance costs equal its nonconformance costs.
(B) There is an inverse relationship between the costs spent on nonconformance costs and the level of quality achieved.

A) Only A is false.
B) Only B is false.
C) Both of these are false.
D) Neither of these is false.
سؤال
The amount of production possible under normal working conditions, including planned downtime and scheduled vacations, is called:

A) actual capacity.
B) normal capacity.
C) practical capacity.
D) theoretical capacity.
سؤال
Denim Products reports the following information about resources. At the beginning of the year, Denim estimated it would spend $84,000 for setups and $41,000 for quality testing.
<strong>Denim Products reports the following information about resources. At the beginning of the year, Denim estimated it would spend $84,000 for setups and $41,000 for quality testing.    - The unused resource capacity for quality testing for Denim Products is:</strong> A) $4,000. B) $2,000. C) $1,000. D) $5,000. <div style=padding-top: 35px>

-
The unused resource capacity for quality testing for Denim Products is:

A) $4,000.
B) $2,000.
C) $1,000.
D) $5,000.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/144
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 10: Fundamentals of Cost Management
1
Managerial decisions based on activity-based costing (ABC) information affect only volume-related, batch-related, and product-related costs.
False
2
A cost of quality system is based on the trade-off between incurring costs to meet product (or service) specifications and the costs of failing to meet those specifications.
True
3
Internal failure costs include materials wasted in the production process and correcting products before they are sold.
True
4
Activity-based cost management (ABCM) can be used for managerial decision-making in service, merchandising, and manufacturing companies.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
5
Quality can be defined as the degree to which a product or service performs as it was designed to do.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
6
Unused capacity costs incurred for the benefit of a company's customers (e.g., meet seasonal demands) should be assigned to the customers that require (use) the excess capacity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
7
Storing materials, work-in-process items, and finished goods in inventory are essential, value-added activities in most companies.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
8
Activity-based cost management (ABCM) uses the information provided by activity-based costing (ABC) to identify ways to improve operations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
9
In activity-based costing, the cost driver rate is computed by dividing the total cost per activity by the estimated number of units produced.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
10
Tangible customer expectations include how the product's salespeople treat customers and the time required to deliver the product to the customer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
11
The basic concepts involved in activity-based costing (ABC) can be used to determine customer profitability as well as product costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
12
The difference between the resources used and the resources supplied is called unused resource capacity in a typical activity-based cost management (ABCM) system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
13
In general, managerial decisions affecting capacity-related costs and activities also affect volume-level, batch-level, and product-level cost and activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
14
Unused resource capacity plus the amount of the resources used is equal to the amount of resources supplied.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
15
In general, the unit-level (or volume-related) costs in an activity-based costing (ABC) system are variable costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
16
Activity-based costing (ABC) techniques used to evaluate customer profitability can also be applied to evaluating suppliers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
17
Theoretical capacity is the long-run expected volume based on reasonably attainable working conditions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
18
In general, decreasing (or eliminating) the resources committed to nonvalue-added activities will decrease customer response time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
19
Theoretical capacity is the amount of production possible assuming expected downtime for scheduled maintenance, normal breaks, and vacations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
20
In general, the capacity-related costs in an activity-based costing (ABC) system are variable costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
21
Fence Industries is preparing its annual profit plan. As part of its analysis of the profitability of its customers, management estimates that the $12,000 for sales support should be assigned to the individual customers from the information given as follows:
 Customer A  Customer B  Units purchased 100,000200,000 Purchase orders (annual) 520\begin{array} { | l | r | r | } \hline & { \text { Customer A } } & { \text { Customer B } } \\\hline \text { Units purchased } & 100,000 & 200,000 \\\hline \text { Purchase orders (annual) } & 5 & 20 \\\hline\end{array}

-
What is the amount of the sales support costs that should be allocated to Customer B, assuming Fence uses purchases orders to compute activity-based costs?

A) $2,400.
B) $4,000.
C) $8,000.
D) $9,600.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
22
In an activity-based costing (ABC) system, cost reduction is accomplished by identifying and eliminating: (CPA adapted)
 All Cost Drivers  Non value-added Activities \begin{array} {cc} { \text { All Cost Drivers } } & \text { Non value-added Activities } \\\end{array}
A.  No  No \begin{array} {cc} & & \text { No } &&&&&&&&& \text { No } \\\end{array}
B.  Yes  Yes \begin{array} {cc} && \text { Yes } &&&&&&&&& \text { Yes } \\\end{array}
C.  No  Yes \begin{array} {cc} && \text { No } &&&&&&&&& \text { Yes } \\\end{array}
D.  Yes  No \begin{array} {cc} && \text { Yes } &&&&&&&&& \text { No } \\\end{array}

A) Option A.
B) Option B.
C) Option C.
D) Option D.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
23
Which of the following is a value-added activity?

A) Storing items.
B) Moving items.
C) Waiting for work.
D) Assembling items.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
24
Which of the following is not true of process reengineering?

A) It is the changing of operational processes to improve performance.
B) It often takes place after examining ABC data to determine opportunities for improvement.
C) It involves identifying what the customer wants or expects from the firm's products or services.
D) It is the sixth, and final, step of ABCM activity analysis.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
25
Which of the following items would be classified as a batch-related cost in an activity-based cost management (ABCM) system?

A) Indirect labor.
B) Production supervisor's salary.
C) Depreciation on factory building.
D) Machinery set-up costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
26
Activity-based cost management (ABCM) can best be defined as:

A) a cost system using multiple departmental overhead rates.
B) the use of cost information gathered using activity-based costing (ABC).
C) a quality-control system focusing on eliminating errors and mistakes.
D) an incentive system for a company's key decision-makers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
27
Barter Company's cost management and product costing procedures follow activity-based costing (ABC) principles. Activities have been identified and classified as being either value-added or nonvalue-added for each product. Which of the following activities, used in Barter's production process, is nonvalue-added? (CPA adapted)

A) Drill press activity.
B) Heat treatment activity.
C) Design engineering activity.
D) Raw materials storage activity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
28
Activity analysis is one of the first stages in implementing activity-based cost management (ABCM). Which of the following steps in activity analysis is usually performed first?

A) Classify all activities as value-added or nonvalue-added.
B) Chart, from start to finish, the activities used to complete the product or service.
C) Identify the process objectives that are defined by what the customer wants or expects from the process.
D) Continuously improve the efficiency of all value-added activities and develop plans to eliminate or reduce nonvalue-added ones.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
29
McArthur Company has gathered the following data related to its production process of two of its products for the week ended April 30:
 Model  Item #B200  Item #C440  Quantity produced 60100 Unit-related material costs $42,000$100,000 Variable conversion costs 72,000300,000 Total direct costs $114,000$400,000 Indirect costs:  Indirect manufacturing costs 163,200272,000 Indirect operating costs 255,000425,000 Total indirect costs 418,200697,000 Total cost$532,200$1,097,000\begin{array}{lrrrr}\text { Model } & \text { Item \#B200 } & \text { Item \#C440 }\\\text { Quantity produced } & 60 & 100 \\\text { Unit-related material costs } & \$ 42,000 & \$ 100,000 \\\text { Variable conversion costs } & 72,000 & 300,000\\\text { Total direct costs } & \$ 114,000 & \$ 400,000 \\\text { Indirect costs: } & & & \\\text { Indirect manufacturing costs } & 163,200 & 272,000 \\\text { Indirect operating costs } & 255,000 & 425,000\\\text { Total indirect costs } & 418,200 & 697,000 \\\text { Total cost}& \$ 532,200 & \$ 1,097,000\end{array}
The costs above that appear to be allocated rather than traced are:

A) Unit-related material costs.
B) Variable conversion costs.
C) Indirect manufacturing costs only.
D) All indirect costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
30
Which of the following activities is most likely to be classified as value-added for a merchandise company?

A) Purchasing.
B) Waiting.
C) Receiving.
D) Setting up.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
31
Which of the following statements about activity-based costing (ABC) is not true? (CIA adapted)

A) In ABC, cost drivers are used to link costs to products.
B) ABC is useful for assigning marketing and distribution costs.
C) ABC differs from traditional costing systems in that products are not cross-subsidized.
D) ABC is more likely to result in major differences from traditional costing systems if the firm manufactures only one product rather than multiple products.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
32
Which of the following items would not be used as the cost driver for a volume-related cost in an activity-based cost management (ABCM) system?

A) Direct labor hours.
B) Machine hours.
C) Units produced.
D) Square footage.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
33
Which of the following activities is most likely to be classified as value-added for a manufacturing company?

A) Storing.
B) Ordering.
C) Inspecting.
D) Assembling.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
34
Activity analysis is an important approach to operations control and the successful implementation of activity-based cost management (ABCM). Which of the following procedures is not part of activity analysis?

A) Chart, from start to finish, the activities used to complete the product or service.
B) Classify all activities as either value-added or nonvalue-added activities.
C) Identify the process objectives as defined by what the customer desires from the process.
D) Compute the predetermined rate per activity by dividing the total cost pool by the total cost drivers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
35
Fence Industries is preparing its annual profit plan. As part of its analysis of the profitability of its customers, management estimates that the $12,000 for sales support should be assigned to the individual customers from the information given as follows:
 Customer A  Customer B  Units purchased 100,000200,000 Purchase orders (annual) 520\begin{array} { | l | r | r | } \hline & { \text { Customer A } } & { \text { Customer B } } \\\hline \text { Units purchased } & 100,000 & 200,000 \\\hline \text { Purchase orders (annual) } & 5 & 20 \\\hline\end{array}

-
What is the amount of the sales support costs that should be allocated to Customer A, assuming Fence uses purchases orders to compute activity-based costs?

A) $2,400.
B) $4,000.
C) $8,000.
D) $9,600.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
36
In an activity-based cost management (ABCM) system, facility-related costs are those that are incurred to:

A) sustain the company's marketing program.
B) maintain the plant's production capacity.
C) support the research and development process.
D) cause a change in the engineering plans for a product.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
37
Fence Industries is preparing its annual profit plan. As part of its analysis of the profitability of its customers, management estimates that the $12,000 for sales support should be assigned to the individual customers from the information given as follows:
 Customer A  Customer B  Units purchased 100,000200,000 Purchase orders (annual) 520\begin{array} { | l | r | r | } \hline & { \text { Customer A } } & { \text { Customer B } } \\\hline \text { Units purchased } & 100,000 & 200,000 \\\hline \text { Purchase orders (annual) } & 5 & 20 \\\hline\end{array}

-
What is the amount of the sales support costs that should be allocated to Customer B, assuming Fence uses units purchased to compute activity-based costs?

A) $2,400.
B) $4,000.
C) $8,000.
D) $9,600.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
38
Which of the following items would be classified as a volume-related cost in an activity-based cost management (ABCM) system?

A) Indirect materials.
B) Production supervisor's salary.
C) Depreciation on factory building.
D) Research and development.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
39
Which of the following items would be classified as a product-related cost in an activity-based cost management (ABCM) system?

A) Change order to meet a new customer's specification.
B) Movement of materials for products in production.
C) Long-term lease payments for factory equipment.
D) Insurance and property taxes on factory building.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
40
Fence Industries is preparing its annual profit plan. As part of its analysis of the profitability of its customers, management estimates that the $12,000 for sales support should be assigned to the individual customers from the information given as follows:
 Customer A  Customer B  Units purchased 100,000200,000 Purchase orders (annual) 520\begin{array} { | l | r | r | } \hline & { \text { Customer A } } & { \text { Customer B } } \\\hline \text { Units purchased } & 100,000 & 200,000 \\\hline \text { Purchase orders (annual) } & 5 & 20 \\\hline\end{array}

-
What is the amount of the sales support costs that should be allocated to Customer A assuming Fence uses units purchased to compute activity-based costs?

A) $2,400.
B) $4,000.
C) $8,000.
D) $9,600.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
41
Express Travel decides to price delivery service according to the results of a recent activity-based costing (ABC) study. The study indicates Express Travel should charge $16 per order, 1% of annual order value for general delivery costs, $2.50 per item, and $45 for delivery.
A year later, Express Travel collected the following information for three of its customers:
 Cost driver  Customer A  Customer B  Customer C  Number of orders 18812 Number of deliveries 101024 Total number of items 2,0004,00012,000 Annual order value $120,000$80,000$100,000\begin{array} { l r r r } { \text { Cost driver } } & \text { Customer A } & \text { Customer B } & \text { Customer C } \\\text { Number of orders } & 18 & 8 & 12 \\\text { Number of deliveries } & 10 & 10 & 24 \\\text { Total number of items } & 2,000 & 4,000 & 12,000 \\\text { Annual order value } & \$ 120,000 & \$ 80,000 & \$ 100,000\end{array}

-
What are the total delivery costs charged to Customer C during the year?

A) $16,863.
B) $20,000.
C) $31,272.
D) $32,272.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
42
Crafter Lumber Supply noticed a recent decline in the amount of purchases from a key customer. Worried that other customers might also reduce their purchases, Crafter's management decided to evaluate the cost of its delivery service. Which of the following cost drivers is more appropriate for general administrative costs of the Delivery Department?

A) Number of different items ordered.
B) Value of each order.
C) Total number of items in each order.
D) Number of deliveries made.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
43
Benton Company is preparing its annual profit plan. As part of its analysis of the cost of its purchasing activity, management estimates that the $48,000 for purchasing support should be assigned to the individual vendors from the information given as follows:
 Vendor A  Vendor B  Units purchased 100,000200,000 Purchase orders (annual) 624 Number of shipments received 1252\begin{array} { | l | r | r | } \hline & { \text { Vendor A } } &{ \text { Vendor B } } \\\hline \text { Units purchased } & 100,000 & 200,000 \\\hline \text { Purchase orders (annual) } & 6 & 24 \\\hline \text { Number of shipments received } & 12 & 52 \\\hline\end{array}

-
What is the amount of the purchasing costs that should be allocated to Vendor B, assuming Benton uses purchases orders to compute activity-based costs?

A) $9,600.
B) $16,000.
C) $32,000.
D) $38,400.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
44
Benton Company is preparing its annual profit plan. As part of its analysis of the cost of its purchasing activity, management estimates that the $48,000 for purchasing support should be assigned to the individual vendors from the information given as follows:
 Vendor A  Vendor B  Units purchased 100,000200,000 Purchase orders (annual) 624 Number of shipments received 1252\begin{array} { | l | r | r | } \hline & { \text { Vendor A } } & { \text { Vendor B } } \\\hline \text { Units purchased } & 100,000 & 200,000 \\\hline \text { Purchase orders (annual) } & 6 & 24 \\\hline \text { Number of shipments received } & 12 & 52 \\\hline\end{array}

-
What is the amount of the purchasing costs that should be allocated to Vendor A, assuming Benton uses purchases orders to compute activity-based costs?

A) $9,600.
B) $16,000.
C) $32,000.
D) $38,400.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
45
Express Travel decides to price delivery services according to the results of a recent activity-based costing (ABC) study. The study indicates Express Travel should charge $16 per order, 1% of annual order value for general delivery costs, $2.50 per item, and $45 for delivery.
A year later, Express Travel collected the following information for three of its customers:
 Cost driver  Customer A  Customer B  Customer C  Number of orders 18812 Number of deliveries 101024 Total number of items 2,0004,00012,000 Annual order value $120,000$80,000$100,000\begin{array} { l r r r } \text { Cost driver } & \text { Customer A } & \text { Customer B } & \text { Customer C } \\\text { Number of orders } & 18 & 8 & 12 \\\text { Number of deliveries } & 10 & 10 & 24 \\\text { Total number of items } & 2,000 & 4,000 & 12,000 \\\text { Annual order value } & \$ 120,000 & \$ 80,000 & \$ 100,000\end{array}

-
What are the total delivery costs charged to Customer B during the year?

A) $13,490.
B) $11,378.
C) $10,800.
D) $10,578.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
46
South Beach Industries reports the following information about resources. At the beginning of the year, South Beach estimated it would spend $180,000 for materials, $42,000 for purchasing, $35,000 for setups, and $36,000 for repairs.
<strong>South Beach Industries reports the following information about resources. At the beginning of the year, South Beach estimated it would spend $180,000 for materials, $42,000 for purchasing, $35,000 for setups, and $36,000 for repairs.    - The unused resource capacity for materials for South Beach is:</strong> A) $12,700. B) $3,500. C) $19,270. D) $9,200.

-
The unused resource capacity for materials for South Beach is:

A) $12,700.
B) $3,500.
C) $19,270.
D) $9,200.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
47
Benton Company is preparing its annual profit plan. As part of its analysis of the cost of its purchasing activity, management estimates that the $48,000 for purchasing support should be assigned to the individual vendors from the information given as follows:
 Vendor A  Vendor B  Units purchased 100,000200,000 Purchase orders (annual) 624 Number of shipments received 1252\begin{array} { | l | r | r | } \hline & { \text { Vendor A } } &{ \text { Vendor B } } \\\hline \text { Units purchased } & 100,000 & 200,000 \\\hline \text { Purchase orders (annual) } & 6 & 24 \\\hline \text { Number of shipments received } & 12 & 52 \\\hline\end{array}

-
What is the amount of the purchasing costs that should be allocated to Vendor B, assuming Benton uses units purchased to compute activity-based costs?

A) $9,600.
B) $16,000.
C) $32,000.
D) $38,400.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
48
Benton Company is preparing its annual profit plan. As part of its analysis of the cost of its purchasing activity, management estimates that the $48,000 for purchasing support should be assigned to the individual vendors from the information given as follows:
 Vendor A  Vendor B  Units purchased 100,000200,000 Purchase orders (annual) 624 Number of shipments received 1252\begin{array} { | l | r | r | } \hline & { \text { Vendor A } } & { \text { Vendor B } } \\\hline \text { Units purchased } & 100,000 & 200,000 \\\hline \text { Purchase orders (annual) } & 6 & 24 \\\hline \text { Number of shipments received } & 12 & 52 \\\hline\end{array}

-
What is the amount of the purchasing costs that should be allocated to Vendor B, assuming Benton uses number of shipments received to compute activity-based costs?

A) $9,000.
B) $16,000.
C) $32,000.
D) $39,000.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
49
The amount of resources used in an activity-based costing (ABC) system for a specific activity is computed by multiplying the:

A) cost driver rate by the actual cost driver volume.
B) cost driver rate by the planned cost driver volume.
C) overhead rate by the actual cost driver volume.
D) overhead rate by the planned cost driver volume.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
50
Express Travel decides to price delivery services according to the results of a recent activity-based costing (ABC) study. The study indicates Express Travel should charge $16 per order, 1% of annual order value for general delivery costs, $2.50 per item, and $45 for delivery.
A year later, Express Travel collected the following information for three of its customers:
 Cost driver  Customer A  Customer B  Customer C  Number of orders 18812 Number of deliveries 101024 Total number of items 2,0004,00012,000 Annual order value $120,000$80,000$100,000\begin{array} { l r r r } \text { Cost driver } & \text { Customer A } & \text { Customer B } & \text { Customer C } \\\text { Number of orders } & 18 & 8 & 12 \\\text { Number of deliveries } & 10 & 10 & 24 \\\text { Total number of items } & 2,000 & 4,000 & 12,000 \\\text { Annual order value } & \$ 120,000 & \$ 80,000 & \$ 100,000\end{array}

-
What are the total delivery costs charged to Customer A during the year?

A) $5,738.
B) $6,650.
C) $6,938.
D) $20,235.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
51
South Beach Industries reports the following information about resources. At the beginning of the year, South Beach estimated it would spend $180,000 for materials, $42,000 for purchasing, $35,000 for setups, and $36,000 for repairs.
<strong>South Beach Industries reports the following information about resources. At the beginning of the year, South Beach estimated it would spend $180,000 for materials, $42,000 for purchasing, $35,000 for setups, and $36,000 for repairs.    - The unused resource capacity for purchasing for South Beach is:</strong> A) $5,538. B) $2,000. C) $4,300. D) $2,300.

-
The unused resource capacity for purchasing for South Beach is:

A) $5,538.
B) $2,000.
C) $4,300.
D) $2,300.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
52
Benton Company is preparing its annual profit plan. As part of its analysis of the cost of its purchasing activity, management estimates that the $48,000 for purchasing support should be assigned to the individual vendors from the information given as follows:
 Vendor A  Vendor B  Units purchased 100,000200,000 Purchase orders (annual) 624 Number of shiprnents received 1252\begin{array} { | l | r | r | } \hline & { \text { Vendor A } } &{ \text { Vendor B } } \\\hline \text { Units purchased } & 100,000 & 200,000 \\\hline \text { Purchase orders (annual) } & 6 & 24 \\\hline \text { Number of shiprnents received } & 12 & 52 \\\hline\end{array}
What is the amount of the purchasing costs that should be allocated to Vendor A, assuming Benton uses units purchased to compute activity-based costs?

A) $9,600.
B) $16,000.
C) $32,000.
D) $38,400.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
53
Republic Industries decides to price delivery services according to the results of a recent activity-based costing (ABC) study. The study indicates Republic should charge $8 per order, 2% of annual order value for general delivery costs, $1.25 per item, and $30 for delivery.
A year later, Republic collected the following information for two of its best customers:
 Cost driver  Customer C  Customer D  Number of orders 188 Number of deliveries 1010 Total number of items 2,0004,000 Annual order value $120,00080,000\begin{array} { l r r } \text { Cost driver } & \text { Customer C } & \text { Customer D } \\\text { Number of orders } & 18 & 8 \\\text { Number of deliveries } & 10 & 10 \\\text { Total number of items } & 2,000 & 4,000 \\\text { Annual order value } & \$ 120,000 &8 0 , 0 0 0\end{array}

-
What are the total delivery costs charged to Customer C during the year?

A) $5,344.
B) $5,364.
C) $6,900.
D) $6,964.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
54
Macon Publishing reports the following information about resources. At the beginning of the year, Macon estimated it would spend $42,000 for setups and $21,000 for clerical.
<strong>Macon Publishing reports the following information about resources. At the beginning of the year, Macon estimated it would spend $42,000 for setups and $21,000 for clerical.    - The unused resource capacity for setups for Macon Publishing is:</strong> A) $1,250. B) $3,000. C) $1,750. D) $5,000.

-
The unused resource capacity for setups for Macon Publishing is:

A) $1,250.
B) $3,000.
C) $1,750.
D) $5,000.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
55
South Beach Industries reports the following information about resources. At the beginning of the year, South Beach estimated it would spend $180,000 for materials, $42,000 for purchasing, $35,000 for setups, and $36,000 for repairs.
<strong>South Beach Industries reports the following information about resources. At the beginning of the year, South Beach estimated it would spend $180,000 for materials, $42,000 for purchasing, $35,000 for setups, and $36,000 for repairs.    - The unused resource capacity for setups for South Beach is:</strong> A) $2,500. B) $1,080. C) $1,500. D) $1,000.

-
The unused resource capacity for setups for South Beach is:

A) $2,500.
B) $1,080.
C) $1,500.
D) $1,000.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
56
Republic Industries decides to price delivery services according to the results of a recent activity-based costing (ABC) study. The study indicates Republic should charge $8 per order, 2% of annual order value for general delivery costs, $1.25 per item, and $30 for delivery.
A year later, Republic collected the following information for two of its best customers:
 Cost driver  Customer C  Customer D  Number of orders 188 Number of deliveries 1010 Total number of items 2,0004,000 Annual order value $120,000$80,000\begin{array} { l r r } \text { Cost driver } & \text { Customer C } & \text { Customer D } \\\text { Number of orders } & 18 & 8 \\\text { Number of deliveries } & 10 & 10 \\\text { Total number of items } & 2,000 & 4,000 \\\text { Annual order value } & \$ 120,000 & \$ 8 0 , 0 0 0\end{array}

-
What are the total delivery costs charged to Customer D during the year?

A) $5,344.
B) $5,364.
C) $6,900.
D) $6,964.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
57
Activity-based costing (ABC) information cannot be used by managerial decision-makers to evaluate the:

A) profitability of a customer.
B) market potential of a product.
C) cost of using a particular supplier.
D) whether to continue providing a service.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
58
South Beach Industries reports the following information about resources. At the beginning of the year, South Beach estimated it would spend $180,000 for materials, $42,000 for purchasing, $35,000 for setups, and $36,000 for repairs.
<strong>South Beach Industries reports the following information about resources. At the beginning of the year, South Beach estimated it would spend $180,000 for materials, $42,000 for purchasing, $35,000 for setups, and $36,000 for repairs.    - The unused resource capacity for repairs for South Beach is:</strong> A) $4,800. B) $10,800. C) $6,000. D) $3,600.

-
The unused resource capacity for repairs for South Beach is:

A) $4,800.
B) $10,800.
C) $6,000.
D) $3,600.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
59
The unused resource capacity is the difference between the resources supplied and the resources:

A) purchased.
B) wasted.
C) used.
D) on hand.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
60
Benton Company is preparing its annual profit plan. As part of its analysis of the cost of its purchasing activity, management estimates that the $48,000 for purchasing support should be assigned to the individual vendors from the information given as follows:
 Vendor A  Vendor B  Units purchased 100,000200,000 Purchase orders (annual) 624 Number of shipments received 1252\begin{array} { | l | r | r | } \hline & { \text { Vendor A } } &{ \text { Vendor B } } \\\hline \text { Units purchased } & 100,000 & 200,000 \\\hline \text { Purchase orders (annual) } & 6 & 24 \\\hline \text { Number of shipments received } & 12 & 52 \\\hline\end{array}

-
What is the amount of the purchasing costs that should be allocated to Vendor A, assuming Benton uses number of shipments received to compute activity-based costs?

A) $9,000.
B) $16,000.
C) $32,000.
D) $39,000.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
61
Water Industries' quality control report for August contains the following items:
 Gathering, analysis, and reporting quality data$1,000 Inspecting raw materials received from vendors2,000 Testing and inspecting finished products 3,000 Visiting customer sites to test product4,000 Designing product to reduce production problems 5,000 Repairing and/or replacing products under warranty 6,000 Maintaining the equipment used to gather quality data 7,000 Cost (net) of materials wasted during production 8,000\begin{array}{ll}\text { Gathering, analysis, and reporting quality data}&\$1,000\\\text { Inspecting raw materials received from vendors}&2,000\\\text { Testing and inspecting finished products }&3,000\\\text { Visiting customer sites to test product}&4,000\\\text { Designing product to reduce production problems } & 5,000 \\\text { Repairing and/or replacing products under warranty } & 6,000 \\\text { Maintaining the equipment used to gather quality data } & 7,000 \\\text { Cost (net) of materials wasted during production } & 8,000\end{array}


-
What would be the total of the appraisal costs on the August quality control report for Water Industries?

A) $7,000.
B) $11,000.
C) $12,000.
D) $15,000.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
62
Which of the following is not an explanation of why a company would operate at less than theoretical capacity?

A) Scheduled maintenance of equipment.
B) Breakdowns in equipment.
C) Customer demand is less than anticipated.
D) Customer demand is more than anticipated.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
63
Water Industries' quality control report for August contains the following items:
 Gathering, analysis, and reporting quality data$1,000 Inspecting raw materials received from vendors2,000 Testing and inspecting finished products 3,000 Visiting customer sites to test product4,000 Designing product to reduce production problems 5,000 Repairing and/or replacing products under warranty 6,000 Maintaining the equipment used to gather quality data 7,000 Cost (net) of materials wasted during production 8,000\begin{array}{ll}\text { Gathering, analysis, and reporting quality data}&\$1,000\\\text { Inspecting raw materials received from vendors}&2,000\\\text { Testing and inspecting finished products }&3,000\\\text { Visiting customer sites to test product}&4,000\\\text { Designing product to reduce production problems } & 5,000 \\\text { Repairing and/or replacing products under warranty } & 6,000 \\\text { Maintaining the equipment used to gather quality data } & 7,000 \\\text { Cost (net) of materials wasted during production } & 8,000\end{array}

-
What would be the total of the prevention costs on the August quality control report for Water Industries?

A) $5,000.
B) $7,000.
C) $11,000.
D) $15,000.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
64
Denim Products reports the following information about resources. At the beginning of the year, Denim estimated it would spend $84,000 for setups and $41,000 for quality testing.
<strong>Denim Products reports the following information about resources. At the beginning of the year, Denim estimated it would spend $84,000 for setups and $41,000 for quality testing.    - The unused resource capacity for setups for Denim Products is:</strong> A) $6,000. B) $2,500. C) $1,000. D) $3,500.

-
The unused resource capacity for setups for Denim Products is:

A) $6,000.
B) $2,500.
C) $1,000.
D) $3,500.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
65
Which of the following is not an example of an external failure cost?

A) Accepting company liability resulting from product failure.
B) Experiencing decreasing sales as a result of poor-quality products.
C) Repairing or replacing defective products after they've been sold.
D) Testing products in use at the customer's site.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
66
Which of the following statements regarding quality costs is(are) false?
(A) In a cost of quality system, internal and external failure costs are called conformance costs.
(B) Prevention costs are costs incurred to detect individual units of product that do not conform to its specifications.

A) Only A is false.
B) Only B is false.
C) Both of these are false.
D) Neither of these is false.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
67
The degree to which a good or service meets specifications is called:

A) conformance to specifications.
B) customer quality demands.
C) a conformance cost.
D) a compliance cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
68
Which of the following statement is(are) true?
(A) Unused capacity costs incurred for the benefit of a company's customers (e.g., meet seasonal demands) should be assigned to the customers that require (use) the excess capacity.
(B) In general, managerial decisions affecting capacity-related costs and activities also affect volume-related, batch-related, and product-related cost and activities.

A) Only A is true.
B) Only B is true.
C) Both of these are true.
D) Neither of these is true.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
69
A company has high winter demand and low summer demand for its services. The cost of the unused summer capacity should be allocated:

A) to an account called Idle Capacity.
B) evenly to all customers.
C) only to the winter customers.
D) only to the summer customers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
70
Which of the following statements is(are) true?
(A) Theoretical capacity is the long-run expected volume based on reasonably attainable working conditions.
(B) The cost of excess capacity is allocated to individual cost objects using the cost driver rate.

A) Only A is true.
B) Only B is true.
C) Both of these are true.
D) Neither of these is true.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
71
Which of the following is an example of a prevention cost?

A) Machine inspection.
B) Warranty repairs.
C) Field testing.
D) Marketing costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
72
Which of the following is an example of an internal failure cost?

A) Training employees to improve quality.
B) Designing products to reduce production problems.
C) Correcting product defects before they are sold.
D) Inspecting the production process as it occurs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
73
Which of the following items is included in almost all quality control systems?

A) Quality-related waiting time.
B) Quality planning and analysis.
C) Excess or obsolete inventory.
D) Quality-related overtime.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
74
Macon Publishing reports the following information about resources. At the beginning of the year, Macon estimated it would spend $42,000 for setups and $21,000 for clerical.
<strong>Macon Publishing reports the following information about resources. At the beginning of the year, Macon estimated it would spend $42,000 for setups and $21,000 for clerical.    - The unused resource capacity for clerical for Macon Publishing is:</strong> A) $5,000. B) $1,000. C) $6,000. D) $1,260.

-
The unused resource capacity for clerical for Macon Publishing is:

A) $5,000.
B) $1,000.
C) $6,000.
D) $1,260.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
75
Which of the following is not an example of a prevention cost?

A) Training employees to improve quality.
B) Designing products to reduce production problems.
C) Correcting product defects before they are sold.
D) Inspecting the production process as it occurs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
76
Scallon Products reports the following information about resources. At the beginning of the year, Scallon estimated it would spend $8,000 for energy and $12,000 for repairs.
<strong>Scallon Products reports the following information about resources. At the beginning of the year, Scallon estimated it would spend $8,000 for energy and $12,000 for repairs.    - The unused resource capacity for energy for Scallon Products is:</strong> A) $8,000. B) $1,080. C) $1,420. D) $2,500.

-
The unused resource capacity for energy for Scallon Products is:

A) $8,000.
B) $1,080.
C) $1,420.
D) $2,500.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
77
Scallon Products reports the following information about resources. At the beginning of the year, Scallon estimated it would spend $8,000 for energy and $12,000 for repairs.
<strong>Scallon Products reports the following information about resources. At the beginning of the year, Scallon estimated it would spend $8,000 for energy and $12,000 for repairs.    - The unused resource capacity for repairs for Scallon Products is:</strong> A) $2,400. B) $12,000. C) $6,000. D) $3,600.

-
The unused resource capacity for repairs for Scallon Products is:

A) $2,400.
B) $12,000.
C) $6,000.
D) $3,600.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
78
Which of the following statements regarding the trade-off between conformance and nonconformance costs is(are) false?
(A) The optimal level for a company's quality control program occurs when its conformance costs equal its nonconformance costs.
(B) There is an inverse relationship between the costs spent on nonconformance costs and the level of quality achieved.

A) Only A is false.
B) Only B is false.
C) Both of these are false.
D) Neither of these is false.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
79
The amount of production possible under normal working conditions, including planned downtime and scheduled vacations, is called:

A) actual capacity.
B) normal capacity.
C) practical capacity.
D) theoretical capacity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 144 في هذه المجموعة.
فتح الحزمة
k this deck
80
Denim Products reports the following information about resources. At the beginning of the year, Denim estimated it would spend $84,000 for setups and $41,000 for quality testing.
<strong>Denim Products reports the following information about resources. At the beginning of the year, Denim estimated it would spend $84,000 for setups and $41,000 for quality testing.    - The unused resource capacity for quality testing for Denim Products is:</strong> A) $4,000. B) $2,000. C) $1,000. D) $5,000.

-
The unused resource capacity for quality testing for Denim Products is:

A) $4,000.
B) $2,000.
C) $1,000.
D) $5,000.