Deck 9: Closing the Project

ملء الشاشة (f)
exit full mode
سؤال
Lessons learned could be helpful in bidding, planning, and/or performing future projects.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The process of closing the project involves various actions, including

A) identifying which resources to use for the project.
B) collecting and making final payments.
C) adding in extra work if the project hasn't spent all the funds.
D) replenishing office supplies that may not have been used on the project.
سؤال
Lessons learned may be lost from a project if they are not captured at the moment the lesson is learned.
سؤال
Have lessons learned as an agenda topic on a new project and include in project management training.
سؤال
Projects also can be terminated by the sponsor or customer.
سؤال
Documentation of lessons learned should be done on an ongoing basis throughout the planning and performing phases of the project.
سؤال
The project manager should schedule the meeting immediately following the delivery of the final report rather than waiting for a time when the customer is in a position to really determine whether the project met expectations and achieved the anticipated benefits.
سؤال
There may be circumstances that require a project to be terminated before it is completed.
سؤال
The project team should wait until the end of the project to capture and document lessons learned.
سؤال
As part of, or in addition to, the documents in the archive, it can be valuable to create a database of common data elements from past projects in order to analyze and determine if there are trends or correlations that could be helpful in bidding, planning, and/or performing future projects.
سؤال
The post-project evaluation meeting with the project sponsor should contain an opportunity to ask closed-ended questions about possible additional projects and obtain permission to use the customer as a reference with potential customers.
سؤال
The open-ended question post-project evaluation meeting should contain an opportunity to talk about possible additional projects and assume permission to use the customer as a reference with potential customers.
سؤال
Projects also can be terminated by the sponsor or customer for financial situations.
سؤال
The fourth and final phase of the project life cycle is

A) evaluating the project.
B) controlling the project.
C) performing the project.
D) closing the project.
سؤال
The system should organize information so that it has complex commands to retrieve information by category or subject of lesson learned or by key words.
سؤال
Projects also can be terminated by the sponsor or customer due to satisfaction with the project progress.
سؤال
Projects also can be terminated by the sponsor or customer because the project needs have changed.
سؤال
The process of closing the project involves various actions, including

A) assigning Staff to activities..
B) examining and estimating costs associated with Staff.
C) recognizing and evaluating Staff.
D) having Staff get to know each other.
سؤال
Just as important as having the internal post-project meetings within the project organization is having a post-project evaluation meeting with the customer or sponsor.
سؤال
Projects also can be terminated by the sponsor or customer due to a project return on investment increase.
سؤال
Hold_________ meetings at the end of the project with team members to have feedback from each team member about their performance and how to improve future projects.

A) individual
B) group
C) activity specific
D) project progress
سؤال
The project organization should establish a __________ that includes an easily accessible repository that encourages project managers and teams to retrieve lessons learned and information from previous projects.

A) document storage routine
B) file structure
C) knowledge base system
D) revision process
سؤال
The purpose of identifying and documenting lessons learned is to capitalize on the knowledge and experience gained on the project in order to

A) improve performance on future projects.
B) create a large database of information.
C) establish a procedure of identification and documentation.
D) keep project team members busy.
سؤال
Verifying that all payments have been made to any subcontractors, consultants, vendors, or suppliers for any purchased materials or services is completed during the

A) evaluating the project phase.
B) controlling the project phase.
C) performing the project phase.
D) closing the project phase.
سؤال
A financial related activity that must be performed during the closing phase is assuring that

A) total budgeted costs are calculated.
B) the quarterly payments are invoiced.
C) the personnel responsible for financial work is identified.
D) all payments have been collected from the customer.
سؤال
As part of, or in addition to, the documents in the archive, it can be valuable to create a database of common data elements from past projects in order to analyze and determine if there are trends or correlations that

A) show a strong project team member that should be given additional compensation.
B) should be shared with the project sponsors of all the projects.
C) could be helpful in bidding, planning, and/or performing future projects.
D) should be shown on the annual reports for the organization.
سؤال
During project closing, the project team or contractor should ensure that copies of appropriate project documentation are properly organized, filed, and archived so that

A) they can be stored easily.
B) they can be readily retrieved for future use.
C) the files are ready for audit.
D) the project sponsor could review them.
سؤال
Participants of _______ should include the project manager, key project team members, and key representatives of the customer's organization who were involved with the project.

A) a post-project evaluation meeting with the customer or sponsor
B) a project progress meeting with project stakeholders
C) an analysis session with the project team
D) a pre-RFP meeting with the customer
سؤال
The process of closing the project involves various actions, including

A) organizing and archiving project documents.
B) recording revision numbers in the names of documents.
C) using techniques such as track changes to record document edits.
D) creating a file structure to save and organize project documents.
سؤال
The purposes of __________ should be to determine whether the project provided the customer with the expected benefits, assess the level of customer satisfaction, and obtain any feedback that would be helpful in future business relationships with this customer or with other customers.

A) a post-project evaluation meeting with the customer or sponsor
B) a project progress meeting with project stakeholders
C) an analysis session with the project team
D) a pre-RFP meeting with the customer
سؤال
During the______, review and evaluate performance of the project and identify what can be done to improve performance on future projects.

A) evaluating the project phase
B) controlling the project phase
C) performing the project phase
D) closing the project phase
سؤال
The project manager should schedule the post-project evaluation meeting with the customer or sponsor for a time when the customer is in a position to

A) pay all the expenses of the project to the contractor.
B) really determine whether the project met expectations and achieved the anticipated benefits.
C) solicit proposals for a new RFP.
D) begin planning for future projects or opportunities for the contractor.
سؤال
The process of closing the project involves various actions, including

A) using lessons learned from prior projects.
B) documenting lessons learned.
C) researching lessons learned in the knowledge base.
D) identifying the similarities of this project to other projects for planning.
سؤال
At the _______ meeting with the project team at the end of the project, the project manager should lead a discussion of what happened during performance of the project and solicit specific recommendations for improvement.

A) individual
B) group
C) activity specific
D) project progress
سؤال
Successful projects should end with some type of

A) recognition and celebration.
B) criticism review.
C) list of all the problems in the project.
D) letter to all the stakeholders about what went wrong.
سؤال
Once all payments have been received and made, the project "books," or accounting records, can be closed, and a financial analysis of the project can be made in which final actual costs are compared to

A) the FCAC calculations made.
B) the project baseline budget.
C) the actual value of the project.
D) amounts paid to suppliers.
سؤال
The ________ should prepare a written report of project performance including lessons learned and recommendations.

A) stakeholders
B) customer
C) project manager
D) CEO of the contractor's organization
سؤال
The project manager should prepare a written performance evaluation of each member of the project team that mentions how each has

A) made mistakes in the problem and how much that mistake cost the organization.
B) expanded her or his knowledge as a result of the project assignment and identifies areas she or he needs to develop further.
C) interacted with other team members, especially where conflict has caused problems for reaching the final goals of the project.
D) contributed to the project with a list of activities and the time on each and an analysis of what was done incorrectly on each activity.
سؤال
During the _____, the project team or contractor should ensure that copies of appropriate project documentation are properly organized, filed, and archived so that they can be readily retrieved for future use.

A) evaluating the project phase.
B) controlling the project phase.
C) performing the project phase.
D) closing the project phase.
سؤال
The process of closing the project involves various actions, including

A) conducting a post-project evaluation.
B) listening to the customer to make sure of what is needed in the project.
C) evaluating and estimating the resources for the project.
D) performing the final work on tasks.
سؤال
Why should the project organization establish a knowledge base system for the organization?
سؤال
What type of knowledge base system should be established by the project organization?
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/42
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 9: Closing the Project
1
Lessons learned could be helpful in bidding, planning, and/or performing future projects.
True
2
The process of closing the project involves various actions, including

A) identifying which resources to use for the project.
B) collecting and making final payments.
C) adding in extra work if the project hasn't spent all the funds.
D) replenishing office supplies that may not have been used on the project.
B
3
Lessons learned may be lost from a project if they are not captured at the moment the lesson is learned.
True
4
Have lessons learned as an agenda topic on a new project and include in project management training.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
5
Projects also can be terminated by the sponsor or customer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
6
Documentation of lessons learned should be done on an ongoing basis throughout the planning and performing phases of the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
7
The project manager should schedule the meeting immediately following the delivery of the final report rather than waiting for a time when the customer is in a position to really determine whether the project met expectations and achieved the anticipated benefits.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
8
There may be circumstances that require a project to be terminated before it is completed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
9
The project team should wait until the end of the project to capture and document lessons learned.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
10
As part of, or in addition to, the documents in the archive, it can be valuable to create a database of common data elements from past projects in order to analyze and determine if there are trends or correlations that could be helpful in bidding, planning, and/or performing future projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
11
The post-project evaluation meeting with the project sponsor should contain an opportunity to ask closed-ended questions about possible additional projects and obtain permission to use the customer as a reference with potential customers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
12
The open-ended question post-project evaluation meeting should contain an opportunity to talk about possible additional projects and assume permission to use the customer as a reference with potential customers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
13
Projects also can be terminated by the sponsor or customer for financial situations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
14
The fourth and final phase of the project life cycle is

A) evaluating the project.
B) controlling the project.
C) performing the project.
D) closing the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
15
The system should organize information so that it has complex commands to retrieve information by category or subject of lesson learned or by key words.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
16
Projects also can be terminated by the sponsor or customer due to satisfaction with the project progress.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
17
Projects also can be terminated by the sponsor or customer because the project needs have changed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
18
The process of closing the project involves various actions, including

A) assigning Staff to activities..
B) examining and estimating costs associated with Staff.
C) recognizing and evaluating Staff.
D) having Staff get to know each other.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
19
Just as important as having the internal post-project meetings within the project organization is having a post-project evaluation meeting with the customer or sponsor.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
20
Projects also can be terminated by the sponsor or customer due to a project return on investment increase.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
21
Hold_________ meetings at the end of the project with team members to have feedback from each team member about their performance and how to improve future projects.

A) individual
B) group
C) activity specific
D) project progress
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
22
The project organization should establish a __________ that includes an easily accessible repository that encourages project managers and teams to retrieve lessons learned and information from previous projects.

A) document storage routine
B) file structure
C) knowledge base system
D) revision process
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
23
The purpose of identifying and documenting lessons learned is to capitalize on the knowledge and experience gained on the project in order to

A) improve performance on future projects.
B) create a large database of information.
C) establish a procedure of identification and documentation.
D) keep project team members busy.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
24
Verifying that all payments have been made to any subcontractors, consultants, vendors, or suppliers for any purchased materials or services is completed during the

A) evaluating the project phase.
B) controlling the project phase.
C) performing the project phase.
D) closing the project phase.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
25
A financial related activity that must be performed during the closing phase is assuring that

A) total budgeted costs are calculated.
B) the quarterly payments are invoiced.
C) the personnel responsible for financial work is identified.
D) all payments have been collected from the customer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
26
As part of, or in addition to, the documents in the archive, it can be valuable to create a database of common data elements from past projects in order to analyze and determine if there are trends or correlations that

A) show a strong project team member that should be given additional compensation.
B) should be shared with the project sponsors of all the projects.
C) could be helpful in bidding, planning, and/or performing future projects.
D) should be shown on the annual reports for the organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
27
During project closing, the project team or contractor should ensure that copies of appropriate project documentation are properly organized, filed, and archived so that

A) they can be stored easily.
B) they can be readily retrieved for future use.
C) the files are ready for audit.
D) the project sponsor could review them.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
28
Participants of _______ should include the project manager, key project team members, and key representatives of the customer's organization who were involved with the project.

A) a post-project evaluation meeting with the customer or sponsor
B) a project progress meeting with project stakeholders
C) an analysis session with the project team
D) a pre-RFP meeting with the customer
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
29
The process of closing the project involves various actions, including

A) organizing and archiving project documents.
B) recording revision numbers in the names of documents.
C) using techniques such as track changes to record document edits.
D) creating a file structure to save and organize project documents.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
30
The purposes of __________ should be to determine whether the project provided the customer with the expected benefits, assess the level of customer satisfaction, and obtain any feedback that would be helpful in future business relationships with this customer or with other customers.

A) a post-project evaluation meeting with the customer or sponsor
B) a project progress meeting with project stakeholders
C) an analysis session with the project team
D) a pre-RFP meeting with the customer
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
31
During the______, review and evaluate performance of the project and identify what can be done to improve performance on future projects.

A) evaluating the project phase
B) controlling the project phase
C) performing the project phase
D) closing the project phase
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
32
The project manager should schedule the post-project evaluation meeting with the customer or sponsor for a time when the customer is in a position to

A) pay all the expenses of the project to the contractor.
B) really determine whether the project met expectations and achieved the anticipated benefits.
C) solicit proposals for a new RFP.
D) begin planning for future projects or opportunities for the contractor.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
33
The process of closing the project involves various actions, including

A) using lessons learned from prior projects.
B) documenting lessons learned.
C) researching lessons learned in the knowledge base.
D) identifying the similarities of this project to other projects for planning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
34
At the _______ meeting with the project team at the end of the project, the project manager should lead a discussion of what happened during performance of the project and solicit specific recommendations for improvement.

A) individual
B) group
C) activity specific
D) project progress
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
35
Successful projects should end with some type of

A) recognition and celebration.
B) criticism review.
C) list of all the problems in the project.
D) letter to all the stakeholders about what went wrong.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
36
Once all payments have been received and made, the project "books," or accounting records, can be closed, and a financial analysis of the project can be made in which final actual costs are compared to

A) the FCAC calculations made.
B) the project baseline budget.
C) the actual value of the project.
D) amounts paid to suppliers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
37
The ________ should prepare a written report of project performance including lessons learned and recommendations.

A) stakeholders
B) customer
C) project manager
D) CEO of the contractor's organization
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
38
The project manager should prepare a written performance evaluation of each member of the project team that mentions how each has

A) made mistakes in the problem and how much that mistake cost the organization.
B) expanded her or his knowledge as a result of the project assignment and identifies areas she or he needs to develop further.
C) interacted with other team members, especially where conflict has caused problems for reaching the final goals of the project.
D) contributed to the project with a list of activities and the time on each and an analysis of what was done incorrectly on each activity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
39
During the _____, the project team or contractor should ensure that copies of appropriate project documentation are properly organized, filed, and archived so that they can be readily retrieved for future use.

A) evaluating the project phase.
B) controlling the project phase.
C) performing the project phase.
D) closing the project phase.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
40
The process of closing the project involves various actions, including

A) conducting a post-project evaluation.
B) listening to the customer to make sure of what is needed in the project.
C) evaluating and estimating the resources for the project.
D) performing the final work on tasks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
41
Why should the project organization establish a knowledge base system for the organization?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
42
What type of knowledge base system should be established by the project organization?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.