Deck 15: Operation and Information System Management

ملء الشاشة (f)
exit full mode
سؤال
The Widget Company may base its decision of where to locate its facilities on

A) the availability of labor.
B) the cost of energy.
C) how close to customers they need to be.
D) all of the above
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The process of analyzing the design to determine the materials and parts that it requires in the production process is known as

A) MRP.
B) facilities layout design.
C) make-buy analysis.
D) JIT.
سؤال
The firm's ability to produce the product during a given period is referred to as

A) capacity.
B) input.
C) conversion.
D) MRP.
سؤال
A particularly complex project's conversion activities might best be monitored with a

A) PDCA cycle.
B) PERT network.
C) Gantt chart.
D) load chart.
سؤال
The assembly line at the BMW factory in Regensburg, Germany, that can accommodate several different models of the car simultaneously is an example of

A) a fixed-position layout.
B) flexible manufacturing.
C) statistical process control.
D) MRP.
سؤال
The foundation of operations management is

A) acquiring inputs.
B) delivering the output.
C) planning.
D) determining the customer.
سؤال
Given the size of the product, an aircraft manufacturer would be most likely to use a ________ layout.

A) product
B) process
C) fixed-position
D) facilities
سؤال
When the operations manager determines a minimum level of inventory then reorders inputs when this level is reached, she is using

A) fixed-interval reordering.
B) a conversion process.
C) MRP.
D) fixed-point reordering.
سؤال
Strategic planning can help the firm determine

A) the need for the product.
B) the market the firm wishes to target.
C) if the firm wants to make or buy their product.
D) all of the above
سؤال
Materials, energy, information, management, technology, and labor that are needed to create a product are known as

A) facilities layout design.
B) process.
C) inputs.
D) outputs.
سؤال
An effective conversion process

A) converts the inputs into the final product.
B) lowers the cost of creating the product.
C) creates a better product for the same cost.
D) all of the above
سؤال
________ systems are used to keep inventory levels more or less constant.

A) Conversion
B) Reordering
C) Inventory
D) Statistical process
سؤال
Which of the following is not an appropriate tool for determining an efficient sequence and monitoring for activities in the conversion process?

A) PERT network
B) Gantt chart
C) Deming wheel
D) Load chart
سؤال
Which of the following is not a stage of operations management?

A) Acquiring inputs
B) Controlling the conversion processes
C) Planning the strategy of the organization
D) Delivering the output
سؤال
Which tool for monitoring the conversion process is a visual sequence of the process steps?

A) Gantt chart
B) PDCA cycle
C) Deming wheel
D) PERT chart
سؤال
The three stages of operations management are

A) highly interrelated.
B) separate.
C) somewhat influenced by each other.
D) are not related to the organization's strategic planning process.
سؤال
The employee and equipment stay in one workstation as the product moves through the system in a ________ layout.

A) product
B) process
C) fixed-position
D) facilities
سؤال
When self-managed teams are used in flexible manufacturing

A) team members learn all the tasks in the production process.
B) team members schedule work and hire new staff.
C) productivity and efficiency typically increase.
D) all of the above
سؤال
In the ________, the firm begins with an assessment of whether they will lose or gain a competitive advantage by outsourcing the product or some aspect of its production.

A) strategic planning process
B) make-buy analysis
C) conversion process
D) output process
سؤال
Which tool for monitoring the conversion process would list the people involved in each step and the time frame for their involvement?

A) PDCA cycle
B) PERT chart
C) Deming wheel
D) Load chart
سؤال
The International Organization for Standardization

A) develops technical standards that guide production and distribution.
B) is a network of national standards from five major countries.
C) is meant to make international trade more difficult to keep jobs at home.
D) all of the above
سؤال
________ is considered the father of quality management.

A) Imai
B) Pareto
C) Deming
D) Kanban
سؤال
The ultimate goal of six sigma is where defects occur at the rate of 1 per

A) 1,300.
B) 300,000.
C) 1 million.
D) 3.4 million.
سؤال
Which of the following is not a component of the Deming wheel?

A) Plan
B) Do
C) Convert
D) Act
سؤال
The Japanese process of continuous improvement in the organization's production system from numerous small, incremental improvements in production processes is known as

A) just-in-time.
B) kaizen.
C) kanban.
D) ISO.
سؤال
Customer fulfillment begins when

A) an order is received.
B) when the firm's product will be delivered.
C) when the inputs are ready to produce the product.
D) when capacity is evaluated.
سؤال
Which of the following is not a statistical process control tool?

A) Pareto analysis
B) Check sheets
C) Gantt charts
D) Cause-and-effect diagrams
سؤال
The source of standards for defining quality today is the

A) customer.
B) operations department.
C) strategic planning team.
D) internal standards set.
سؤال
The difference between what customers want and what they actually get from the company is known as

A) the learning/doing gap.
B) the quality gap.
C) kaizen.
D) process reengineering.
سؤال
________ ultimately decide what constitutes quality through ________.

A) Customers; purchasing decisions
B) Managers; operations decisions
C) Employees; quality circles
D) Managers; company and employee goals
سؤال
Which of the following is a recommendation for implementing kaizen?

A) Wait until the solutions have been perfected to implement.
B) Do not discard conventional ideas in devising solutions.
C) Focus wisdom on the kaizen process, not money.
D) The knowledge of one person is more valuable than the wisdom of ten people.
سؤال
The basis of ________ is the understanding that all employees and organizational units should be working harmoniously to satisfy the customer.

A) quality circles
B) TQM
C) MRP
D) ORR
سؤال
Releasing orders so that the work is evenly distributed is referred to as

A) partial productivity.
B) ORR.
C) load leveling.
D) customer fulfillment.
سؤال
Quality management techniques

A) are limited to operations management.
B) seldom cut across departmental boundaries.
C) can be used in team performance.
D) all of the above
سؤال
Quality today

A) has become less visible.
B) is often "baked in" to the management process.
C) continues to be critically important to the survival and competitiveness of business.
D) all of the above
سؤال
Common causes of ongoing variances that operations management should correct include which of the following?

A) Scheduling errors
B) Inaccurate documentation
C) Weak designs
D) all of the above
سؤال
The measurement of how well an organization utilizes all of its resources to produce its outputs is known as

A) ORR activity.
B) total factor productivity.
C) partial productivity.
D) TQM.
سؤال
A quality management approach emphasizes

A) the empowerment of workers and their responsibility for the quality of the outcomes of work processes.
B) employee motivation.
C) employee ability levels.
D) a separate quality inspector.
سؤال
Which of the following is not a method of managing quality?

A) Process reengineering
B) Kaizen
C) Just-in-time
D) MRP
سؤال
According to the kaizen principle of continuous improvement, the status quo of the process is the ________ step.

A) innovation
B) maintenance
C) kaizen
D) kanban
سؤال
Facilities layout affects the efficiency of the production system.
سؤال
The kanban system is driven by

A) inventory levels.
B) quality.
C) customer demand.
D) management goals.
سؤال
In fixed-interval reordering systems, the operations manager determines a minimum level of inventory and once this level is reached, inputs are reordered.
سؤال
The value of JIT inventory systems is

A) saving on warehouse space and labor.
B) ensuring financial resources are not tied up in inputs waiting to be used.
C) identifying defects in input rather quickly.
D) all of the above
سؤال
An information technology form of quality management is

A) MRP
B) JIT
C) ERP
D) TQM
سؤال
A form of JIT system that originated in Japan and uses cards to generate inventory is known as

A) ISO
B) kanban
C) kaizen
D) MRP
سؤال
When a plant manager monitors production and randomly checks the quality of the products as they are being produced, he is using

A) feedforward control.
B) concurrent control.
C) feedback control.
D) Deming's wheel.
سؤال
In process reengineering, the firm is viewed as

A) a complete process.
B) an individual area supplying materials to other areas.
C) small increments of ongoing change.
D) separate and distinct processes.
سؤال
The goal of a JIT system is

A) creating the firm's product in the least amount of time.
B) improving the firm's profitability.
C) creating an appropriate strategic plan.
D) developing best practices for quality improvement.
سؤال
One of the main principles of kaizen is

A) finding an appropriate facilities layout.
B) creating a website of best practices.
C) sharing ideas.
D) reducing waste in materials, inventory, production steps, and activities that don't add value.
سؤال
Feedforward control is used to ensure

A) control takes place as the work is being carried out.
B) corrections are made after the process has been completed.
C) problems are prevented before they occur.
D) quality standards are met.
سؤال
Creating capacity that exceeds the amount of products that can be sold is inefficient because unused capacity wastes the firm's resources.
سؤال
A problem experienced with JIT is

A) that having just enough inventory leaves the firm without a buffer.
B) keeping the labor supply stable.
C) maintaining production equipment when demand is higher than expected.
D) all of the above
سؤال
In a JIT system, the firm's inventory of inputs are

A) kept at the lowest level possible.
B) purchased from a single supplier.
C) kept at the highest level possible.
D) kept in nearby warehouses.
سؤال
The bureaucratic control process includes which of the following steps?

A) Establishing standards
B) Identifying shortcomings
C) Taking corrective action
D) all of the above
سؤال
A Y-shaped layout is less amenable to flexible manufacturing then a straight-line layout.
سؤال
The problem of lost cards experienced with the kanban system is addressed with

A) JIT.
B) an electronic kanban system that uses a scanner to read in a code on a container.
C) process reengineering.
D) all of the above
سؤال
A waste-reduction technique that enables the organization to control inputs is

A) using a limited number of suppliers.
B) maximizing facilities layout.
C) creating a best practices website.
D) all of the above
سؤال
Which of the following is true concerning the measurement of performance?

A) Qualitative standards are easier to measure than quantitative standards.
B) Quantitative standards and data can be measured objectively.
C) Qualitative standards are not open to human interpretation.
D) Only quantitative data should be measured for a company to improve its performance.
سؤال
Many of the steps to improve quality and efficiency cut across departmental boundaries.
سؤال
What is flexible manufacturing?
سؤال
In a JIT system, inputs arrive at the organization just before they are needed.
سؤال
What is the advantage of an electronic kanban system over the physical card system?
سؤال
What are the steps that make up the quality approach according to Deming?
سؤال
The kaizen principle of continuous improvement is incorporated into the ISO 9000 standards and is a part of most quality improvement efforts.
سؤال
The least useful type of control is concurrent control.
سؤال
In bureaucratic control, managers seldom use written guidelines to establish internal performance expectations.
سؤال
What is operations management and what are the three stages of operation?
سؤال
What is the role of a firm's suppliers in quality?
سؤال
Discuss the traditional, Western management approach to quality as compared to the quality management philosophy.
سؤال
What are the three basic control types that a manager can exercise?
سؤال
What is a JIT system?
سؤال
Which type of control would have been most helpful to BP in averting the oil spill in the Gulf of Mexico? Why?
سؤال
Explain the three steps in kaizen and the circular nature of the process.
سؤال
Contrast a product, process, and fixed-position layout.
سؤال
Discuss three tools to analyze the steps to determine an efficient sequence and to monitor the process.
سؤال
What are the four steps in the control process?
سؤال
Recently, TQM has become less visible in the organization because it is less important overall.
سؤال
How does total factor productivity differ from partial productivity?
سؤال
What is MRP?
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/80
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 15: Operation and Information System Management
1
The Widget Company may base its decision of where to locate its facilities on

A) the availability of labor.
B) the cost of energy.
C) how close to customers they need to be.
D) all of the above
D
2
The process of analyzing the design to determine the materials and parts that it requires in the production process is known as

A) MRP.
B) facilities layout design.
C) make-buy analysis.
D) JIT.
A
3
The firm's ability to produce the product during a given period is referred to as

A) capacity.
B) input.
C) conversion.
D) MRP.
A
4
A particularly complex project's conversion activities might best be monitored with a

A) PDCA cycle.
B) PERT network.
C) Gantt chart.
D) load chart.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
5
The assembly line at the BMW factory in Regensburg, Germany, that can accommodate several different models of the car simultaneously is an example of

A) a fixed-position layout.
B) flexible manufacturing.
C) statistical process control.
D) MRP.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
6
The foundation of operations management is

A) acquiring inputs.
B) delivering the output.
C) planning.
D) determining the customer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
7
Given the size of the product, an aircraft manufacturer would be most likely to use a ________ layout.

A) product
B) process
C) fixed-position
D) facilities
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
8
When the operations manager determines a minimum level of inventory then reorders inputs when this level is reached, she is using

A) fixed-interval reordering.
B) a conversion process.
C) MRP.
D) fixed-point reordering.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
9
Strategic planning can help the firm determine

A) the need for the product.
B) the market the firm wishes to target.
C) if the firm wants to make or buy their product.
D) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
10
Materials, energy, information, management, technology, and labor that are needed to create a product are known as

A) facilities layout design.
B) process.
C) inputs.
D) outputs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
11
An effective conversion process

A) converts the inputs into the final product.
B) lowers the cost of creating the product.
C) creates a better product for the same cost.
D) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
12
________ systems are used to keep inventory levels more or less constant.

A) Conversion
B) Reordering
C) Inventory
D) Statistical process
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
13
Which of the following is not an appropriate tool for determining an efficient sequence and monitoring for activities in the conversion process?

A) PERT network
B) Gantt chart
C) Deming wheel
D) Load chart
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
14
Which of the following is not a stage of operations management?

A) Acquiring inputs
B) Controlling the conversion processes
C) Planning the strategy of the organization
D) Delivering the output
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
15
Which tool for monitoring the conversion process is a visual sequence of the process steps?

A) Gantt chart
B) PDCA cycle
C) Deming wheel
D) PERT chart
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
16
The three stages of operations management are

A) highly interrelated.
B) separate.
C) somewhat influenced by each other.
D) are not related to the organization's strategic planning process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
17
The employee and equipment stay in one workstation as the product moves through the system in a ________ layout.

A) product
B) process
C) fixed-position
D) facilities
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
18
When self-managed teams are used in flexible manufacturing

A) team members learn all the tasks in the production process.
B) team members schedule work and hire new staff.
C) productivity and efficiency typically increase.
D) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
19
In the ________, the firm begins with an assessment of whether they will lose or gain a competitive advantage by outsourcing the product or some aspect of its production.

A) strategic planning process
B) make-buy analysis
C) conversion process
D) output process
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
20
Which tool for monitoring the conversion process would list the people involved in each step and the time frame for their involvement?

A) PDCA cycle
B) PERT chart
C) Deming wheel
D) Load chart
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
21
The International Organization for Standardization

A) develops technical standards that guide production and distribution.
B) is a network of national standards from five major countries.
C) is meant to make international trade more difficult to keep jobs at home.
D) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
22
________ is considered the father of quality management.

A) Imai
B) Pareto
C) Deming
D) Kanban
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
23
The ultimate goal of six sigma is where defects occur at the rate of 1 per

A) 1,300.
B) 300,000.
C) 1 million.
D) 3.4 million.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
24
Which of the following is not a component of the Deming wheel?

A) Plan
B) Do
C) Convert
D) Act
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
25
The Japanese process of continuous improvement in the organization's production system from numerous small, incremental improvements in production processes is known as

A) just-in-time.
B) kaizen.
C) kanban.
D) ISO.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
26
Customer fulfillment begins when

A) an order is received.
B) when the firm's product will be delivered.
C) when the inputs are ready to produce the product.
D) when capacity is evaluated.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
27
Which of the following is not a statistical process control tool?

A) Pareto analysis
B) Check sheets
C) Gantt charts
D) Cause-and-effect diagrams
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
28
The source of standards for defining quality today is the

A) customer.
B) operations department.
C) strategic planning team.
D) internal standards set.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
29
The difference between what customers want and what they actually get from the company is known as

A) the learning/doing gap.
B) the quality gap.
C) kaizen.
D) process reengineering.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
30
________ ultimately decide what constitutes quality through ________.

A) Customers; purchasing decisions
B) Managers; operations decisions
C) Employees; quality circles
D) Managers; company and employee goals
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
31
Which of the following is a recommendation for implementing kaizen?

A) Wait until the solutions have been perfected to implement.
B) Do not discard conventional ideas in devising solutions.
C) Focus wisdom on the kaizen process, not money.
D) The knowledge of one person is more valuable than the wisdom of ten people.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
32
The basis of ________ is the understanding that all employees and organizational units should be working harmoniously to satisfy the customer.

A) quality circles
B) TQM
C) MRP
D) ORR
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
33
Releasing orders so that the work is evenly distributed is referred to as

A) partial productivity.
B) ORR.
C) load leveling.
D) customer fulfillment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
34
Quality management techniques

A) are limited to operations management.
B) seldom cut across departmental boundaries.
C) can be used in team performance.
D) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
35
Quality today

A) has become less visible.
B) is often "baked in" to the management process.
C) continues to be critically important to the survival and competitiveness of business.
D) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
36
Common causes of ongoing variances that operations management should correct include which of the following?

A) Scheduling errors
B) Inaccurate documentation
C) Weak designs
D) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
37
The measurement of how well an organization utilizes all of its resources to produce its outputs is known as

A) ORR activity.
B) total factor productivity.
C) partial productivity.
D) TQM.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
38
A quality management approach emphasizes

A) the empowerment of workers and their responsibility for the quality of the outcomes of work processes.
B) employee motivation.
C) employee ability levels.
D) a separate quality inspector.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
39
Which of the following is not a method of managing quality?

A) Process reengineering
B) Kaizen
C) Just-in-time
D) MRP
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
40
According to the kaizen principle of continuous improvement, the status quo of the process is the ________ step.

A) innovation
B) maintenance
C) kaizen
D) kanban
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
41
Facilities layout affects the efficiency of the production system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
42
The kanban system is driven by

A) inventory levels.
B) quality.
C) customer demand.
D) management goals.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
43
In fixed-interval reordering systems, the operations manager determines a minimum level of inventory and once this level is reached, inputs are reordered.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
44
The value of JIT inventory systems is

A) saving on warehouse space and labor.
B) ensuring financial resources are not tied up in inputs waiting to be used.
C) identifying defects in input rather quickly.
D) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
45
An information technology form of quality management is

A) MRP
B) JIT
C) ERP
D) TQM
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
46
A form of JIT system that originated in Japan and uses cards to generate inventory is known as

A) ISO
B) kanban
C) kaizen
D) MRP
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
47
When a plant manager monitors production and randomly checks the quality of the products as they are being produced, he is using

A) feedforward control.
B) concurrent control.
C) feedback control.
D) Deming's wheel.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
48
In process reengineering, the firm is viewed as

A) a complete process.
B) an individual area supplying materials to other areas.
C) small increments of ongoing change.
D) separate and distinct processes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
49
The goal of a JIT system is

A) creating the firm's product in the least amount of time.
B) improving the firm's profitability.
C) creating an appropriate strategic plan.
D) developing best practices for quality improvement.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
50
One of the main principles of kaizen is

A) finding an appropriate facilities layout.
B) creating a website of best practices.
C) sharing ideas.
D) reducing waste in materials, inventory, production steps, and activities that don't add value.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
51
Feedforward control is used to ensure

A) control takes place as the work is being carried out.
B) corrections are made after the process has been completed.
C) problems are prevented before they occur.
D) quality standards are met.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
52
Creating capacity that exceeds the amount of products that can be sold is inefficient because unused capacity wastes the firm's resources.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
53
A problem experienced with JIT is

A) that having just enough inventory leaves the firm without a buffer.
B) keeping the labor supply stable.
C) maintaining production equipment when demand is higher than expected.
D) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
54
In a JIT system, the firm's inventory of inputs are

A) kept at the lowest level possible.
B) purchased from a single supplier.
C) kept at the highest level possible.
D) kept in nearby warehouses.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
55
The bureaucratic control process includes which of the following steps?

A) Establishing standards
B) Identifying shortcomings
C) Taking corrective action
D) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
56
A Y-shaped layout is less amenable to flexible manufacturing then a straight-line layout.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
57
The problem of lost cards experienced with the kanban system is addressed with

A) JIT.
B) an electronic kanban system that uses a scanner to read in a code on a container.
C) process reengineering.
D) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
58
A waste-reduction technique that enables the organization to control inputs is

A) using a limited number of suppliers.
B) maximizing facilities layout.
C) creating a best practices website.
D) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
59
Which of the following is true concerning the measurement of performance?

A) Qualitative standards are easier to measure than quantitative standards.
B) Quantitative standards and data can be measured objectively.
C) Qualitative standards are not open to human interpretation.
D) Only quantitative data should be measured for a company to improve its performance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
60
Many of the steps to improve quality and efficiency cut across departmental boundaries.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
61
What is flexible manufacturing?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
62
In a JIT system, inputs arrive at the organization just before they are needed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
63
What is the advantage of an electronic kanban system over the physical card system?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
64
What are the steps that make up the quality approach according to Deming?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
65
The kaizen principle of continuous improvement is incorporated into the ISO 9000 standards and is a part of most quality improvement efforts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
66
The least useful type of control is concurrent control.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
67
In bureaucratic control, managers seldom use written guidelines to establish internal performance expectations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
68
What is operations management and what are the three stages of operation?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
69
What is the role of a firm's suppliers in quality?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
70
Discuss the traditional, Western management approach to quality as compared to the quality management philosophy.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
71
What are the three basic control types that a manager can exercise?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
72
What is a JIT system?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
73
Which type of control would have been most helpful to BP in averting the oil spill in the Gulf of Mexico? Why?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
74
Explain the three steps in kaizen and the circular nature of the process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
75
Contrast a product, process, and fixed-position layout.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
76
Discuss three tools to analyze the steps to determine an efficient sequence and to monitor the process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
77
What are the four steps in the control process?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
78
Recently, TQM has become less visible in the organization because it is less important overall.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
79
How does total factor productivity differ from partial productivity?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
80
What is MRP?