Deck 7: Quality and Process Improvement

ملء الشاشة (f)
exit full mode
سؤال
Companies have adopted various slogans to describe initiatives to develop lean systems. Which one of the following slogans would not be consistent with the philosophy of lean systems?

A) hidden inventory
B) material as needed
C) synchronous manufacturing
D) stockless production
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Which one of the following competitive priorities is most often emphasized in JIT production?

A) low cost
B) high- performance design
C) product flexibility
D) volume flexibility
سؤال
Companies utilizing JIT systems generally have

A) suppliers who are low- cost producers.
B) suppliers that are located nearby to decrease delivery lead time.
C) suppliers that are willing to accept short- term contracts.
D) many suppliers to assure that material shortages never occur.
سؤال
Which of the following is not an element of JIT practices?

A) specialized workers
B) pull method
C) uniform production rates
D) quick setups
سؤال
Which of the following would not be present, for a family dining restaurant, implementing JIT and lean production?

A) small food inventories
B) close relationship with restaurant's suppliers
C) food preparation in large batches
D) kitchen arranged to minimize wasteful movements
سؤال
There are many requirements for the successful implementation of the JIT system of production. Which one of the following is not such a requirement of the JIT system?

A) short setup time
B) uniform assembly schedule
C) low machine failure and low defects
D) substantial natural resources
سؤال
When implementing a JIT system,

A) it is critical to develop a master production schedule that changes frequently as forecasts change.
B) management should base the reward system on production volume.
C) the plant layout is the only environmental characteristic that need not be analyzed.
D) managers can mitigate some of the effects of worker stress by judiciously using safety stocks and emphasizing material flows rather than worker pace.
سؤال
JIT systems maintain inventory in small lot sizes because small lot sizes

A) increase the quality level of the product.
B) increase pipeline inventory, allowing the organization to buffer against demand uncertainties.
C) enable schedules to utilize machine capacities more efficiently.
D) increase manufacturing lead time because of the increase in waiting time.
سؤال
Which one of the following statements is TRUE?

A) Two operating rules for the kanban system are (1) the container size should be equal to at least seven days of supply and (2) each container must have a kanban card.
B) The kanban system is more effective when the assembly schedule calls for small lots and does not fluctuate much from day to day.
C) Supplier performance is much more important in U.S. environments than such factors as lot sizes, scrap losses, and worker flexibility.
D) The number of kanban cards should be equal to the desired safety stock times alpha.
سؤال
A kanban system is an important mechanism for JIT management. Which one of the following statements regarding the operation of a kanban system is TRUE?

A) A kanban and a container move as a pair once production begins at the fabrication process.
B) An empty container can be exchanged for a full container at the storage location even though no kanban is on the full container.
C) A typical kanban used in the JIT system includes various information such as item number, unit price, competitor's product name, and its price.
D) A kanban can be used to set the order quantity, but not the inventory level.
سؤال
<strong>  Use the information in Table 8.3. How many kanban containers would be required if a 5 % efficiency factor is used?</strong> A) 10 or less B) 11 or 12 C) 13 or 14 D) 15 or more <div style=padding-top: 35px>
Use the information in Table 8.3. How many kanban containers would be required if a 5 % efficiency factor is used?

A) 10 or less
B) 11 or 12
C) 13 or 14
D) 15 or more
سؤال
A supplier to a company using JIT II

A) will incur increased invoicing and payment costs but will get higher prices.
B) enjoys a savings in personnel costs because the in- plant representative is employed by the customer.
C) will be able to sell directly to the engineering department of the customer.
D) must be very flexible to incur the dramatic swings in requirements from the customer.
سؤال
When a push system is replaced by a pull system, with smaller lot sizes, many benefits can be realized. Which one of the following statements correctly represents one of these benefits?

A) Only simple planning systems are required.
B) More space is required to keep the increased amount of WIP inventory.
C) The inventory level is increased to protect the system from the uncertainty in demand.
D) Cycle time will be increased, resulting in higher machine utilization.
سؤال
Of the following statements, which one is most characteristic of a JIT system of production?

A) high dependence on customized components, as in high variability in components
B) large lot sizes to achieve uniform operating system workloads
C) high conformance to product or service quality specifications
D) high variability in the daily loads for individual workstations
سؤال
When mixed model scheduling is used on an assembly- line

A) JIT is not possible.
B) nonuniform workload will result in the feeding of work centres.
C) a uniform workload will result in the feeding of work centres.
D) large lot sizes are the result.
سؤال
The just- in- time (JIT) philosophy is about

A) a comprehensive approach to eliminate waste.
B) improving quality by selecting certified suppliers.
C) reducing cost by reducing the number of suppliers.
D) improving delivery performance by doing all operations ahead of time.
سؤال
Which of the following statements about using JIT systems for services is FALSE?

A) Preventive maintenance can be important for a service.
B) Unlike manufacturing, there is little need for analyzing work methods because services are typically customized.
C) The need to develop a flexible workforce is a function of the degree of customization of the services provided.
D) Reservation systems can be used to provide uniform facility loads.
سؤال
The customer in a company that uses JIT is considered what?

A) the customer
B) defined as the end user
C) the next person or machine to use or further the current process
D) seldom needed to evaluate the quality of the finished product
سؤال
When a push system is replaced by a pull system using small lot sizes, which one of the following is expected to happen?

A) More units will be reworked to fix a quality problem.
B) WIP will increase.
C) More space will be required for inventory.
D) Cycle time will decrease.
سؤال
Which one of the following is not one of the characteristics of JIT systems?

A) close supplier ties
B) large batch sizes to provide a cushion of inventory
C) consistently high conformance quality
D) pull method of material flows
سؤال
Which of the following is not an example of the pull method of material flows?

A) a flooring contractor that only stocks samples of products, ordering supplies from manufacturers once customers place orders
B) replenishing inventory in a retail outlet based on forecast demand
C) Dell Computers make- to- order system for fulfilling orders placed through its on- line retailing site
D) selecting the toppings for a pizza based on specific customer orders
سؤال
Which of the following would not be a benefit of small production lots?

A) smaller work- in- process inventory
B) workstations can be closer together
C) shorter manufacturing cycle time
D) fewer setups
سؤال
The JIT concept will not work without the proper environment. Which one of the following characteristics is most common to firms that have successfully implemented a JIT system?

A) specialized workforce
B) longer setup times
C) uniform assembly schedules
D) high rates of machine failures
سؤال
<strong>  Use the information in Table 8.1. How many kanban containers would be required if a 10 % efficiency factor is used?</strong> A) 3 or less B) 4 or 5 C) 5 or 6 D) 7 or more <div style=padding-top: 35px>
Use the information in Table 8.1. How many kanban containers would be required if a 10 % efficiency factor is used?

A) 3 or less
B) 4 or 5
C) 5 or 6
D) 7 or more
سؤال
The advantages of JIT systems include all but which one of the following?

A) reduction in machine utilization
B) increase in productivity
C) reduction in space requirements
D) reduction in inventory
سؤال
The just- in- time (JIT) system is a(n)

A) management system of people and procedures to fulfill all delivery deadlines.
B) integrated system of managing resources, information, and decision processes to eliminate waste.
C) materials management system for removing all inventories.
D) production system of small- lot manufacturing to reduce work- in- process inventory.
سؤال
All of the following wastes but one often occur in the firms.

A) Overproduction
B) Defects
C) Motion
D) Overutilization of employees
سؤال
The final assembly schedule in a JIT system

A) allow daily changes in demand levels, regardless of size, to be incorporated immediately into the work center schedules.
B) should be developed for each product independent of the process requirements for the other products.
C) strives to create a uniform flow at the work centers in the plant.
D) avoids the use of small lot sizes because they create many production orders and cause confusion.
سؤال
Implementing a JIT system

A) requires an examination of the reward system to make sure it is consistent with the JIT philosophy.
B) has the advantage that workers have less stress because of the routine, repetitive work they perform.
C) involves the reorganization of material flows to that of a flexible flow.
D) typically relieves the workers and first- line supervisors from activities such as scheduling, expediting, and productivity improvements.
سؤال
<strong>  Use the information in Table 8.1. Using an efficiency factor of 5 %, calculate the number of kanban containers needed for the fastener.</strong> A) 3 or less B) 4 or 5 C) 5 or 6 D) the next person or machine to use or further the current process 7 or more <div style=padding-top: 35px>
Use the information in Table 8.1. Using an efficiency factor of 5 %, calculate the number of kanban containers needed for the fastener.

A) 3 or less
B) 4 or 5
C) 5 or 6
D) the next person or machine to use or further the current process 7 or more
سؤال
<strong>  Use the information in Table 8.2. How many kanban containers would be required if a 10 % efficiency factor is used?</strong> A) 3 or less B) 4 or 5 C) 5 or 6 D) 7 or more <div style=padding-top: 35px>
Use the information in Table 8.2. How many kanban containers would be required if a 10 % efficiency factor is used?

A) 3 or less
B) 4 or 5
C) 5 or 6
D) 7 or more
سؤال
<strong>  Use the information in Table 8.3. How many kanban containers would be required if a 15 % efficiency factor is used?</strong> A) 10 or less B) 11 or 12 C) 13 or 14 D) 15 or more <div style=padding-top: 35px>
Use the information in Table 8.3. How many kanban containers would be required if a 15 % efficiency factor is used?

A) 10 or less
B) 11 or 12
C) 13 or 14
D) 15 or more
سؤال
In a JIT II system the

A) sales effort of the supplier increases but the cost of materials to the customer decreases.
B) customer need not have close interaction with the supplier.
C) customer is brought into the plant as an active member of the purchasing department of the supplier.
D) in- plant representative replaces the buyer, salesperson, and sometimes the materials planner.
سؤال
In JIT systems, if a defective product is found, which of the following is generally NOT done?

A) The defective unit is returned to the worker responsible for creating the defect.
B) The production line is made aware of the problem without stopping the line.
C) The defective unit is passed on to the next workstation.
D) The production line is stopped.
سؤال
Suppliers often cite which of the following as a major concern?

A) long- term contracts
B) minimization of inventory
C) large lot sizes
D) zero defect production
سؤال
According to JIT, an approach to reduce product variation is

A) make fewer setups.
B) continually improve the process.
C) hire and train quality inspectors.
D) by many competing sources.
سؤال
Which of the following are not a characteristic of just- in- time / lean systems?

A) large order sizes to earn quantity discounts
B) inbound transport scheduling
C) few suppliers
D) long- term contracts
سؤال
Early shipments to a company utilizing a JIT system result in

A) decreased production costs for the company.
B) stockouts for the company.
C) back orders for the company.
D) extra inventory for the company.
سؤال
Which one of the following is not a characteristic of JIT systems?

A) empowerment of employees
B) on time quality deliveries
C) strong job specialization
D) training
سؤال
<strong>  Use the information in Table 8.2. How many kanban containers would be required if a 5 % efficiency factor is used?</strong> A) 3 or less B) 4 or 5 C) 5 or 6 D) 7 or more <div style=padding-top: 35px>
Use the information in Table 8.2. How many kanban containers would be required if a 5 % efficiency factor is used?

A) 3 or less
B) 4 or 5
C) 5 or 6
D) 7 or more
سؤال
Which of the following statements regarding a pull system is true?

A) Work is pulled to the downstream stations before it is actually needed.
B) Manufacturing cycle time is increased.
C) Problems become more obvious.
D) Large lots are pulled from upstream stations.
سؤال
JIT systems utilize the standardization of components because standardization

A) decreases the demand for each component.
B) allows for small lot sizes more easily.
C) decreases repeatability.
D) increases worker productivity.
سؤال
Use the information in Table 8.3. How many kanban containers would be required if a 10 % efficiency factor is used?

A) 10 or less
B) 11 or 12
C) 13 or 14
D) 15 or more
سؤال
Continuous improvement with JIT systems

A) entails systematically stressing the system and focusing on problem areas.
B) requires periodically increasing lot sizes or workforce levels to uncover problems.
C) involves navigating a ship over treacherous rocks.
D) focuses exclusively on internal operations because relationships with customers and suppliers are addressed by the logistics department.
سؤال
________ refers to the goal of having a setup time of less than 10 minutes.
سؤال
Which of the following will result if the goals of JIT partnerships are met?

A) Inventory in transit is replaced by on- site inventory.
B) As suppliers are located closer to facilities, in- transit inventory decreases
C) Receiving activity and inspection are outsourced for incoming goods.
D) The number of suppliers increases.
سؤال
Mixed model production requires

A) computer scheduling.
B) special- purpose equipment.
C) unfocused factories.
D) multiskilled workers.
سؤال
Which one of the following is not a benefit of the implementation of JIT?

A) quality improvement
B) reduction in work in process
C) variability increase
D) cost reduction
سؤال
A(n) ________ is a JIT concept that results in material being produced only when requested and moved to where it is needed just and only as it is needed.
سؤال
The just- in- time production system is a total system concept that takes cultural environment, managerial practice, and support of the workforce into account. Which one of the following statements regarding the basic philosophy of JIT systems is TRUE?

A) For managers, a high level of inventory is regarded as the main resource that they can utilize for flawless operation of the manufacturing system.
B) One of the few disadvantages of a JIT system is the large storage area requirement for inventory.
C) The JIT system eliminates buildup of inventories by coordinating the flow of materials between processes.
D) Sufficient amounts of natural resources are the main element for the successful implementation of JIT systems.
سؤال
Which of the following is generally not accepted as a JIT action, when a manufacturer took the following actions to reduce inventory?

A) inventory in transit has been reduced
B) a pull system was introduced to move inventory
C) production of smaller lots was introduced
D) the lowest priced, based on quantity discounts, supplier is chosen
سؤال
Any deviation from the optimum process that delivers perfect product on time, every time, is ________ .
سؤال
With respect to quantities, which characteristic of JIT partnerships would be included of the following?

A) suppliers ship based on their own production schedules
B) short- term contracts to ensure flexibility
C) a variable output rate
D) supplier is packaging in standard quantities
سؤال
The ________ is the minimum inventory necessary to keep a perfect system running?
سؤال
With respect to JIT systems, what is the advantage of standardized components?
سؤال
Although small lot sizes are beneficial to operations, they have the disadvantage of increasing the frequency of ________ .
سؤال
What is a kanban?

A) used in a push system
B) a card
C) authorization of equipment maintenance
D) designed for a job shop
سؤال
Which one of the following is an advantage of just- in- time (JIT) systems?

A) JIT systems reduce equipment needs by using larger lot sizes.
B) JIT systems result in a decrease in safety stock and work- in- process inventory.
C) JIT systems can be implemented in any production environment.
D) JIT systems result in an increase in manufacturing lead times.
سؤال
For firms along the supply chain, two aspects of lean systems that are important to manage include ________ and ________ .
سؤال
The main focus of lean systems in implementing JIT is the reduction of investment in inventory and requires _________ .
سؤال
The Japanese word for card that has come to mean "signal" is ________ _.
سؤال
Daily production schedules in high volume, make- to- stock environments must be ________
for extended periods.
سؤال
What are the advantages of producing in small lots?
سؤال
The standardization of components, called part commonality or ________ , increases repeatability which supports lean production.
سؤال
Explain how a line flow strategy can be used to reduce or eliminate setups.
سؤال
In lean systems, workers and first- line supervisors must take on ________ formally assigned to middle managers and support staff.
سؤال
________ is the philosophy that waste can be eliminated by cutting unnecessary inventory and removing non- value- adding activities in operations.
سؤال
What are the organizational issues companies must address before implementing a JIT system?
سؤال
The ________ method produces the item when activated by customer demand.
سؤال
Suppliers accept responsibility for helping to meet customer's needs due to ________ .
سؤال
The ________ method produces the item in advance of customer need.
سؤال
A(n) ________ assembly line produces a mix of models in smaller lots.
سؤال
When suppliers are encouraged to locate near manufacturing plants, the goal of the JIT partnership is to reduce ________ inventory.
سؤال
The 5S term referring to organization of the work area so that it easy to find what is needed, would be ________ .
سؤال
A(n) ________ is a card used to control the flow of production through a factory.
سؤال
JIT suppliers have concerns that the JIT firm's demands for small lot sizes are simply a way of transferring holding cost from manufacturer firm to the supplier firm.
سؤال
What is the "pull method" of material flow?
سؤال
In lean systems, small lot sizes are required, resulting in a large number of setups, which means companies must significantly reduce _________ .
سؤال
________ are operating systems that are designed to create efficient processes by taking a total systems perspective.
سؤال
________ is a system where the supplier is brought into the plant to be an active member of the purchasing office of the customer.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/153
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 7: Quality and Process Improvement
1
Companies have adopted various slogans to describe initiatives to develop lean systems. Which one of the following slogans would not be consistent with the philosophy of lean systems?

A) hidden inventory
B) material as needed
C) synchronous manufacturing
D) stockless production
hidden inventory
2
Which one of the following competitive priorities is most often emphasized in JIT production?

A) low cost
B) high- performance design
C) product flexibility
D) volume flexibility
low cost
3
Companies utilizing JIT systems generally have

A) suppliers who are low- cost producers.
B) suppliers that are located nearby to decrease delivery lead time.
C) suppliers that are willing to accept short- term contracts.
D) many suppliers to assure that material shortages never occur.
suppliers that are located nearby to decrease delivery lead time.
4
Which of the following is not an element of JIT practices?

A) specialized workers
B) pull method
C) uniform production rates
D) quick setups
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
5
Which of the following would not be present, for a family dining restaurant, implementing JIT and lean production?

A) small food inventories
B) close relationship with restaurant's suppliers
C) food preparation in large batches
D) kitchen arranged to minimize wasteful movements
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
6
There are many requirements for the successful implementation of the JIT system of production. Which one of the following is not such a requirement of the JIT system?

A) short setup time
B) uniform assembly schedule
C) low machine failure and low defects
D) substantial natural resources
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
7
When implementing a JIT system,

A) it is critical to develop a master production schedule that changes frequently as forecasts change.
B) management should base the reward system on production volume.
C) the plant layout is the only environmental characteristic that need not be analyzed.
D) managers can mitigate some of the effects of worker stress by judiciously using safety stocks and emphasizing material flows rather than worker pace.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
8
JIT systems maintain inventory in small lot sizes because small lot sizes

A) increase the quality level of the product.
B) increase pipeline inventory, allowing the organization to buffer against demand uncertainties.
C) enable schedules to utilize machine capacities more efficiently.
D) increase manufacturing lead time because of the increase in waiting time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
9
Which one of the following statements is TRUE?

A) Two operating rules for the kanban system are (1) the container size should be equal to at least seven days of supply and (2) each container must have a kanban card.
B) The kanban system is more effective when the assembly schedule calls for small lots and does not fluctuate much from day to day.
C) Supplier performance is much more important in U.S. environments than such factors as lot sizes, scrap losses, and worker flexibility.
D) The number of kanban cards should be equal to the desired safety stock times alpha.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
10
A kanban system is an important mechanism for JIT management. Which one of the following statements regarding the operation of a kanban system is TRUE?

A) A kanban and a container move as a pair once production begins at the fabrication process.
B) An empty container can be exchanged for a full container at the storage location even though no kanban is on the full container.
C) A typical kanban used in the JIT system includes various information such as item number, unit price, competitor's product name, and its price.
D) A kanban can be used to set the order quantity, but not the inventory level.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
11
<strong>  Use the information in Table 8.3. How many kanban containers would be required if a 5 % efficiency factor is used?</strong> A) 10 or less B) 11 or 12 C) 13 or 14 D) 15 or more
Use the information in Table 8.3. How many kanban containers would be required if a 5 % efficiency factor is used?

A) 10 or less
B) 11 or 12
C) 13 or 14
D) 15 or more
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
12
A supplier to a company using JIT II

A) will incur increased invoicing and payment costs but will get higher prices.
B) enjoys a savings in personnel costs because the in- plant representative is employed by the customer.
C) will be able to sell directly to the engineering department of the customer.
D) must be very flexible to incur the dramatic swings in requirements from the customer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
13
When a push system is replaced by a pull system, with smaller lot sizes, many benefits can be realized. Which one of the following statements correctly represents one of these benefits?

A) Only simple planning systems are required.
B) More space is required to keep the increased amount of WIP inventory.
C) The inventory level is increased to protect the system from the uncertainty in demand.
D) Cycle time will be increased, resulting in higher machine utilization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
14
Of the following statements, which one is most characteristic of a JIT system of production?

A) high dependence on customized components, as in high variability in components
B) large lot sizes to achieve uniform operating system workloads
C) high conformance to product or service quality specifications
D) high variability in the daily loads for individual workstations
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
15
When mixed model scheduling is used on an assembly- line

A) JIT is not possible.
B) nonuniform workload will result in the feeding of work centres.
C) a uniform workload will result in the feeding of work centres.
D) large lot sizes are the result.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
16
The just- in- time (JIT) philosophy is about

A) a comprehensive approach to eliminate waste.
B) improving quality by selecting certified suppliers.
C) reducing cost by reducing the number of suppliers.
D) improving delivery performance by doing all operations ahead of time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
17
Which of the following statements about using JIT systems for services is FALSE?

A) Preventive maintenance can be important for a service.
B) Unlike manufacturing, there is little need for analyzing work methods because services are typically customized.
C) The need to develop a flexible workforce is a function of the degree of customization of the services provided.
D) Reservation systems can be used to provide uniform facility loads.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
18
The customer in a company that uses JIT is considered what?

A) the customer
B) defined as the end user
C) the next person or machine to use or further the current process
D) seldom needed to evaluate the quality of the finished product
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
19
When a push system is replaced by a pull system using small lot sizes, which one of the following is expected to happen?

A) More units will be reworked to fix a quality problem.
B) WIP will increase.
C) More space will be required for inventory.
D) Cycle time will decrease.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
20
Which one of the following is not one of the characteristics of JIT systems?

A) close supplier ties
B) large batch sizes to provide a cushion of inventory
C) consistently high conformance quality
D) pull method of material flows
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
21
Which of the following is not an example of the pull method of material flows?

A) a flooring contractor that only stocks samples of products, ordering supplies from manufacturers once customers place orders
B) replenishing inventory in a retail outlet based on forecast demand
C) Dell Computers make- to- order system for fulfilling orders placed through its on- line retailing site
D) selecting the toppings for a pizza based on specific customer orders
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
22
Which of the following would not be a benefit of small production lots?

A) smaller work- in- process inventory
B) workstations can be closer together
C) shorter manufacturing cycle time
D) fewer setups
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
23
The JIT concept will not work without the proper environment. Which one of the following characteristics is most common to firms that have successfully implemented a JIT system?

A) specialized workforce
B) longer setup times
C) uniform assembly schedules
D) high rates of machine failures
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
24
<strong>  Use the information in Table 8.1. How many kanban containers would be required if a 10 % efficiency factor is used?</strong> A) 3 or less B) 4 or 5 C) 5 or 6 D) 7 or more
Use the information in Table 8.1. How many kanban containers would be required if a 10 % efficiency factor is used?

A) 3 or less
B) 4 or 5
C) 5 or 6
D) 7 or more
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
25
The advantages of JIT systems include all but which one of the following?

A) reduction in machine utilization
B) increase in productivity
C) reduction in space requirements
D) reduction in inventory
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
26
The just- in- time (JIT) system is a(n)

A) management system of people and procedures to fulfill all delivery deadlines.
B) integrated system of managing resources, information, and decision processes to eliminate waste.
C) materials management system for removing all inventories.
D) production system of small- lot manufacturing to reduce work- in- process inventory.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
27
All of the following wastes but one often occur in the firms.

A) Overproduction
B) Defects
C) Motion
D) Overutilization of employees
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
28
The final assembly schedule in a JIT system

A) allow daily changes in demand levels, regardless of size, to be incorporated immediately into the work center schedules.
B) should be developed for each product independent of the process requirements for the other products.
C) strives to create a uniform flow at the work centers in the plant.
D) avoids the use of small lot sizes because they create many production orders and cause confusion.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
29
Implementing a JIT system

A) requires an examination of the reward system to make sure it is consistent with the JIT philosophy.
B) has the advantage that workers have less stress because of the routine, repetitive work they perform.
C) involves the reorganization of material flows to that of a flexible flow.
D) typically relieves the workers and first- line supervisors from activities such as scheduling, expediting, and productivity improvements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
30
<strong>  Use the information in Table 8.1. Using an efficiency factor of 5 %, calculate the number of kanban containers needed for the fastener.</strong> A) 3 or less B) 4 or 5 C) 5 or 6 D) the next person or machine to use or further the current process 7 or more
Use the information in Table 8.1. Using an efficiency factor of 5 %, calculate the number of kanban containers needed for the fastener.

A) 3 or less
B) 4 or 5
C) 5 or 6
D) the next person or machine to use or further the current process 7 or more
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
31
<strong>  Use the information in Table 8.2. How many kanban containers would be required if a 10 % efficiency factor is used?</strong> A) 3 or less B) 4 or 5 C) 5 or 6 D) 7 or more
Use the information in Table 8.2. How many kanban containers would be required if a 10 % efficiency factor is used?

A) 3 or less
B) 4 or 5
C) 5 or 6
D) 7 or more
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
32
<strong>  Use the information in Table 8.3. How many kanban containers would be required if a 15 % efficiency factor is used?</strong> A) 10 or less B) 11 or 12 C) 13 or 14 D) 15 or more
Use the information in Table 8.3. How many kanban containers would be required if a 15 % efficiency factor is used?

A) 10 or less
B) 11 or 12
C) 13 or 14
D) 15 or more
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
33
In a JIT II system the

A) sales effort of the supplier increases but the cost of materials to the customer decreases.
B) customer need not have close interaction with the supplier.
C) customer is brought into the plant as an active member of the purchasing department of the supplier.
D) in- plant representative replaces the buyer, salesperson, and sometimes the materials planner.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
34
In JIT systems, if a defective product is found, which of the following is generally NOT done?

A) The defective unit is returned to the worker responsible for creating the defect.
B) The production line is made aware of the problem without stopping the line.
C) The defective unit is passed on to the next workstation.
D) The production line is stopped.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
35
Suppliers often cite which of the following as a major concern?

A) long- term contracts
B) minimization of inventory
C) large lot sizes
D) zero defect production
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
36
According to JIT, an approach to reduce product variation is

A) make fewer setups.
B) continually improve the process.
C) hire and train quality inspectors.
D) by many competing sources.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
37
Which of the following are not a characteristic of just- in- time / lean systems?

A) large order sizes to earn quantity discounts
B) inbound transport scheduling
C) few suppliers
D) long- term contracts
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
38
Early shipments to a company utilizing a JIT system result in

A) decreased production costs for the company.
B) stockouts for the company.
C) back orders for the company.
D) extra inventory for the company.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
39
Which one of the following is not a characteristic of JIT systems?

A) empowerment of employees
B) on time quality deliveries
C) strong job specialization
D) training
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
40
<strong>  Use the information in Table 8.2. How many kanban containers would be required if a 5 % efficiency factor is used?</strong> A) 3 or less B) 4 or 5 C) 5 or 6 D) 7 or more
Use the information in Table 8.2. How many kanban containers would be required if a 5 % efficiency factor is used?

A) 3 or less
B) 4 or 5
C) 5 or 6
D) 7 or more
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
41
Which of the following statements regarding a pull system is true?

A) Work is pulled to the downstream stations before it is actually needed.
B) Manufacturing cycle time is increased.
C) Problems become more obvious.
D) Large lots are pulled from upstream stations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
42
JIT systems utilize the standardization of components because standardization

A) decreases the demand for each component.
B) allows for small lot sizes more easily.
C) decreases repeatability.
D) increases worker productivity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
43
Use the information in Table 8.3. How many kanban containers would be required if a 10 % efficiency factor is used?

A) 10 or less
B) 11 or 12
C) 13 or 14
D) 15 or more
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
44
Continuous improvement with JIT systems

A) entails systematically stressing the system and focusing on problem areas.
B) requires periodically increasing lot sizes or workforce levels to uncover problems.
C) involves navigating a ship over treacherous rocks.
D) focuses exclusively on internal operations because relationships with customers and suppliers are addressed by the logistics department.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
45
________ refers to the goal of having a setup time of less than 10 minutes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
46
Which of the following will result if the goals of JIT partnerships are met?

A) Inventory in transit is replaced by on- site inventory.
B) As suppliers are located closer to facilities, in- transit inventory decreases
C) Receiving activity and inspection are outsourced for incoming goods.
D) The number of suppliers increases.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
47
Mixed model production requires

A) computer scheduling.
B) special- purpose equipment.
C) unfocused factories.
D) multiskilled workers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
48
Which one of the following is not a benefit of the implementation of JIT?

A) quality improvement
B) reduction in work in process
C) variability increase
D) cost reduction
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
49
A(n) ________ is a JIT concept that results in material being produced only when requested and moved to where it is needed just and only as it is needed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
50
The just- in- time production system is a total system concept that takes cultural environment, managerial practice, and support of the workforce into account. Which one of the following statements regarding the basic philosophy of JIT systems is TRUE?

A) For managers, a high level of inventory is regarded as the main resource that they can utilize for flawless operation of the manufacturing system.
B) One of the few disadvantages of a JIT system is the large storage area requirement for inventory.
C) The JIT system eliminates buildup of inventories by coordinating the flow of materials between processes.
D) Sufficient amounts of natural resources are the main element for the successful implementation of JIT systems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
51
Which of the following is generally not accepted as a JIT action, when a manufacturer took the following actions to reduce inventory?

A) inventory in transit has been reduced
B) a pull system was introduced to move inventory
C) production of smaller lots was introduced
D) the lowest priced, based on quantity discounts, supplier is chosen
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
52
Any deviation from the optimum process that delivers perfect product on time, every time, is ________ .
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
53
With respect to quantities, which characteristic of JIT partnerships would be included of the following?

A) suppliers ship based on their own production schedules
B) short- term contracts to ensure flexibility
C) a variable output rate
D) supplier is packaging in standard quantities
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
54
The ________ is the minimum inventory necessary to keep a perfect system running?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
55
With respect to JIT systems, what is the advantage of standardized components?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
56
Although small lot sizes are beneficial to operations, they have the disadvantage of increasing the frequency of ________ .
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
57
What is a kanban?

A) used in a push system
B) a card
C) authorization of equipment maintenance
D) designed for a job shop
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
58
Which one of the following is an advantage of just- in- time (JIT) systems?

A) JIT systems reduce equipment needs by using larger lot sizes.
B) JIT systems result in a decrease in safety stock and work- in- process inventory.
C) JIT systems can be implemented in any production environment.
D) JIT systems result in an increase in manufacturing lead times.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
59
For firms along the supply chain, two aspects of lean systems that are important to manage include ________ and ________ .
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
60
The main focus of lean systems in implementing JIT is the reduction of investment in inventory and requires _________ .
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
61
The Japanese word for card that has come to mean "signal" is ________ _.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
62
Daily production schedules in high volume, make- to- stock environments must be ________
for extended periods.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
63
What are the advantages of producing in small lots?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
64
The standardization of components, called part commonality or ________ , increases repeatability which supports lean production.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
65
Explain how a line flow strategy can be used to reduce or eliminate setups.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
66
In lean systems, workers and first- line supervisors must take on ________ formally assigned to middle managers and support staff.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
67
________ is the philosophy that waste can be eliminated by cutting unnecessary inventory and removing non- value- adding activities in operations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
68
What are the organizational issues companies must address before implementing a JIT system?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
69
The ________ method produces the item when activated by customer demand.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
70
Suppliers accept responsibility for helping to meet customer's needs due to ________ .
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
71
The ________ method produces the item in advance of customer need.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
72
A(n) ________ assembly line produces a mix of models in smaller lots.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
73
When suppliers are encouraged to locate near manufacturing plants, the goal of the JIT partnership is to reduce ________ inventory.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
74
The 5S term referring to organization of the work area so that it easy to find what is needed, would be ________ .
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
75
A(n) ________ is a card used to control the flow of production through a factory.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
76
JIT suppliers have concerns that the JIT firm's demands for small lot sizes are simply a way of transferring holding cost from manufacturer firm to the supplier firm.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
77
What is the "pull method" of material flow?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
78
In lean systems, small lot sizes are required, resulting in a large number of setups, which means companies must significantly reduce _________ .
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
79
________ are operating systems that are designed to create efficient processes by taking a total systems perspective.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
80
________ is a system where the supplier is brought into the plant to be an active member of the purchasing office of the customer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 153 في هذه المجموعة.