Deck 2: The Unit Substation

ملء الشاشة (f)
exit full mode
سؤال
Rate reductions are made by the power company when the metering measurements are taken on the side of the transformer.

A) high-voltage
B) variable-voltage
C) low-voltage
D) secondary bus
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The decimal impedance in a transformer is found by determining the ratio of the source voltage as compared to the rated voltage of the winding.

A) high-voltage
B) variable-voltage
C) low-voltage
D) short circuit
سؤال
is the process of selecting protective devices so that there is a minimum of power interruption in case of a fault or overload.

A) Transformation
B) Masking
C) Coordination
D) Correlation
سؤال
The rates charged by the power company for the energy used are based on the readings of the meter registers and the indicators.

A) maximum demand
B) short circuit
C) terminal
D) ampere
سؤال
High-voltage fuses are available with either an N or a(n) rating.

A) B
B) C
C) D
D) E
سؤال
If the primary current is less than two amperes for a transformer rated at 600 volts or less, the short-circuit protective device can be set at not more than percent of this value.

A) 100
B) 200
C) 300
D) 400
سؤال
Connections between the current and potential transformers in the high-voltage section of the unit substation and the autotransformer and meter sockets in the cabinet are made with size 12 wire.

A) Music Wire Gauge
B) US Steel Wire Gauge
C) W&M Wire Gauge
D) American Wire Gauge
سؤال
How do you select a fuse with the correct continuous current rating to provide transformer protection?
سؤال
After the incoming voltage is reduced to the desired value, it is taken by into the low-voltage section.

A) busbars
B) grounding buses
C) terminals
D) secondary buses
سؤال
The of a transformer is the winding that is connected to a voltage source.

A) ammeter
B) secondary
C) primary
D) short circuit
سؤال
What should you be wary of when coordinating high-voltage fusings?
سؤال
An alternative to grounding the secondary is to let it ; that is, the secondary remains ungrounded.

A) sink
B) float
C) surface
D) exit
سؤال
A device called a provides a reliable method of terminating a high-voltage cable.

A) lighting arrester
B) pothead
C) grounding bus
D) secondary bus
سؤال
The step-down transformers, metering, and switching equipment necessary to supply the low voltage loads to the customer are housed in a .

A) unit substation
B) grounding bus
C) terminal
D) secondary bus
سؤال
What is the procedure for terminating an incoming high-voltage cable?
سؤال
A 600-volt to 200-volt transformer would become a 600-volt to -volt transformer if the connections were reversed.

A) 100
B) 300
C) 1200
D) 1800
سؤال
The autotransformer is designed to provide voltage components to the potential coils of the reactive meter. These voltage components are degrees out of phase with the line voltage.

A) 45
B) 90
C) 180
D) 270
سؤال
Discuss the role and location of the grounding bus.
سؤال
Lightning arresters are designed to provide a(n) path to ground for any surge currents such as those resulting from a lightning strike.

A) high impedance
B) low-impedance
C) indirect
D) intermittent
سؤال
What role do taps play?
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/20
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 2: The Unit Substation
1
Rate reductions are made by the power company when the metering measurements are taken on the side of the transformer.

A) high-voltage
B) variable-voltage
C) low-voltage
D) secondary bus
A
2
The decimal impedance in a transformer is found by determining the ratio of the source voltage as compared to the rated voltage of the winding.

A) high-voltage
B) variable-voltage
C) low-voltage
D) short circuit
A
3
is the process of selecting protective devices so that there is a minimum of power interruption in case of a fault or overload.

A) Transformation
B) Masking
C) Coordination
D) Correlation
C
4
The rates charged by the power company for the energy used are based on the readings of the meter registers and the indicators.

A) maximum demand
B) short circuit
C) terminal
D) ampere
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
5
High-voltage fuses are available with either an N or a(n) rating.

A) B
B) C
C) D
D) E
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
6
If the primary current is less than two amperes for a transformer rated at 600 volts or less, the short-circuit protective device can be set at not more than percent of this value.

A) 100
B) 200
C) 300
D) 400
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
7
Connections between the current and potential transformers in the high-voltage section of the unit substation and the autotransformer and meter sockets in the cabinet are made with size 12 wire.

A) Music Wire Gauge
B) US Steel Wire Gauge
C) W&M Wire Gauge
D) American Wire Gauge
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
8
How do you select a fuse with the correct continuous current rating to provide transformer protection?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
9
After the incoming voltage is reduced to the desired value, it is taken by into the low-voltage section.

A) busbars
B) grounding buses
C) terminals
D) secondary buses
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
10
The of a transformer is the winding that is connected to a voltage source.

A) ammeter
B) secondary
C) primary
D) short circuit
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
11
What should you be wary of when coordinating high-voltage fusings?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
12
An alternative to grounding the secondary is to let it ; that is, the secondary remains ungrounded.

A) sink
B) float
C) surface
D) exit
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
13
A device called a provides a reliable method of terminating a high-voltage cable.

A) lighting arrester
B) pothead
C) grounding bus
D) secondary bus
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
14
The step-down transformers, metering, and switching equipment necessary to supply the low voltage loads to the customer are housed in a .

A) unit substation
B) grounding bus
C) terminal
D) secondary bus
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
15
What is the procedure for terminating an incoming high-voltage cable?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
16
A 600-volt to 200-volt transformer would become a 600-volt to -volt transformer if the connections were reversed.

A) 100
B) 300
C) 1200
D) 1800
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
17
The autotransformer is designed to provide voltage components to the potential coils of the reactive meter. These voltage components are degrees out of phase with the line voltage.

A) 45
B) 90
C) 180
D) 270
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
18
Discuss the role and location of the grounding bus.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
19
Lightning arresters are designed to provide a(n) path to ground for any surge currents such as those resulting from a lightning strike.

A) high impedance
B) low-impedance
C) indirect
D) intermittent
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
20
What role do taps play?