Deck 8: Managing Project Quality

ملء الشاشة (f)
exit full mode
سؤال
A quality threshold refers to:

A)a product not being purchased because the cost of quality is too high.
B)a baseline.
C)a product not being purchased, regardless of quality, if there is no need to be filled.
D)a product not being purchased because of low quality.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
All of the following are ISO 9000 principles EXCEPT for:

A)continual improvement.
B)involvement of people
C)involvement of stakeholders
D)customer focus
سؤال
Costs of training staff in design methodologies is an example of:

A)external failure costs.
B)prevention costs.
C)internal failure costs.
D)appraisal costs.
سؤال
One type of quality cost is:

A)appraisal costs.
B)external failure costs.
C)prevention costs.
D)all of the above.
سؤال
Which quality management pioneer is best known for the fishbone diagram?

A)W. Edwards Deming
B)Kaoru Ishikawa
C)Paul Pareto
D)Joseph Juran
سؤال
Graphical, time- based charts used to display process results are called:

A)Pareto charts.
B)cause- and- effect diagrams.
C)project problem charts.
D)control charts.
سؤال
Capability maturity models have ________levels.

A)three
B)six
C)five
D)four
سؤال
The process of selecting a random sample from a population in order to infer characteristics about that population is called:

A)statistical sampling.
B)spot- checks.
C)random inspection.
D)mathematical modeling.
سؤال
Who of the following is not known as a quality management pioneer?

A)Henry Gantt
B)Philip B. Crosby
C)W. Edwards Deming
D)Joseph Juran
سؤال
Costs of rework in programming is an example of:

A)prevention costs.
B)external failure costs.
C)appraisal costs.
D)internal failure costs.
سؤال
The degree to which a set of inherent characteristics fulfill________.

A)a company's needs
B)requirements
C)a project's needs
D)a customer's needs
سؤال
The balanced scorecard suggests viewing organizational activities from the following perspectives EXCEPT:

A)the business process perspective.
B)the stakeholder perspective.
C)the financial perspective.
D)the customer perspective.
سؤال
Six Sigma was first conceived of at:

A)Motorola.
B)DEC.
C)Toyota.
D)IBM.
سؤال
Operational definitions of specific processes, events, or products, as well as an explanation of how they will be measured in terms of quality are called:

A)quality definitions.
B)quality specifications.
C)quality measures.
D)quality metrics.
سؤال
Histograms (or bar charts)where the values being plotted are arranged in descending order are called:

A)project problem charts.
B)cause- and- effect diagrams.
C)control charts.
D)Pareto charts.
سؤال
Which of the following is NOT part of the Six Sigma methodology?

A)Measuring the core business processes
B)Improving the target processes
C)Analyzing the data collected
D)Controlling the core business processes
سؤال
Which generic management systems standard is among the most popular in the world?

A)Six Sigma
B)Total Quality Management
C)ISO 9000
D)Malcolm Baldridge National Quality Program
سؤال
The balanced scorecard approach is:

A)a measurement system.
B)a management system.
C)a mandatory report.
D)a reporting system.
سؤال
The process of monitoring results to determine if the quality standards of the project are being met is called:

A)quality execution.
B)quality control.
C)quality assurance.
D)quality improvement.
سؤال
The ISO 9000 standards are primarily concerned with the processes the organization does to:

A)satisfy regulatory requirements.
B)enhance customer satisfaction.
C)satisfy customer quality requirements.
D)all of the above.
سؤال
Which quality management pioneer is best known for the 80/20 rule?

A)W. Edwards Deming
B)Joseph Juran
C)Paul Pareto
D)Kaoru Ishikawa
سؤال
The Baldridge National Quality Program recognizes outstanding achievements in ________areas.

A)seven
B)six
C)five
D)eight
سؤال
A plan specifying how to identify wasteful and non- value added activities is called:

A)quality baseline.
B)activity improvement plan.
C)quality management plan.
D)process improvement plan.
سؤال
Ishikawa's cause- and- effect diagram is also known as:

A)fishbone diagram.
B)quality diagram.
C)skeleton diagram.
D)bone diagram.
سؤال
Deming's model is known as:

A)plan- check- do- act model.
B)plan- do- act- check model.
C)plan- check- act- do model.
D)plan- do- check- act model.
سؤال
A process improvement plan analyzes:

A)process metrics.
B)process boundaries.
C)process configuration.
D)all of the above.
سؤال
Design of experiments uses ________to test the efficiency of certain project management approaches by testing factors that may influence a specific variable.

A)evaluative techniques
B)statistical techniques
C)sophisticated tests
D)a trial- and- error approach
سؤال
Diagrams used to identify potential and real causes of problems that organize problems into categories are called:

A)Pareto charts.
B)cause- and- effect diagrams.
C)project problem charts.
D)control charts.
سؤال
The study of a competitor's products or business practices for the purpose of improving a company's performance is called:

A)benchmarking.
B)industrial espionage.
C)competitor analysis.
D)comparison.
سؤال
All of the following are part of Ishikawa's actionable items EXCEPT:

A)check the effects of education and training.
B)take appropriate action.
C)determine goals and targets.
D)engage in education and training.
سؤال
The process of identifying relevant quality standards and developing a plan to ensure the project meets those standards is called:

A)quality identification.
B)quality assurance.
C)quality improvement.
D)quality planning.
سؤال
Robert Kaplan and David Norton came up with a system called:

A)balanced reporting.
B)balanced scorecard.
C)balanced report card.
D)balanced scoring system.
سؤال
Costs of support and maintenance is an example of:

A)external failure costs.
B)appraisal costs.
C)prevention costs.
D)internal failure costs.
سؤال
The set of overall intentions and direction of an organization with regard to quality, as formally expressed by top management is called:

A)quality management plan.
B)quality policy.
C)quality rules.
D)quality guidelines.
سؤال
Costs of code inspection and testing is an example of:

A)internal failure costs.
B)appraisal costs.
C)external failure costs.
D)prevention costs.
سؤال
An evaluation of the costs and benefits of alternative approaches to a proposed activity to determine the best alternative is called:

A)tradeoff evaluation.
B)quality planning.
C)cost/benefit analysis.
D)alternative evaluation.
سؤال
Which quality management process is not focus of the Juran Trilogy?

A)Quality improvement
B)Quality planning
C)Quality assurance
D)Quality control
سؤال
Which quality management pioneer is best known for his 14 points of quality?

A)Joseph Juran
B)Philip B. Crosby
C)Kaoru Ishikawa
D)W. Edwards Deming
سؤال
The national quality program was named after U.S. Secretary of Commerce:

A)Donald Louis Evans.
B)William Daley.
C)Carlos Gutierrez
D)Malcolm Baldridge.
سؤال
A company can assess its capabilities with respect to best practices within a given industry using:

A)CPR.
B)CMM.
C)CRT.
D)CNN.
سؤال
What is the highest level of Six Sigma certification?

A)Champion
B)Grandmaster
C)Master
D)Master black belt
سؤال
Quality audits can be:

A)scheduled.
B)performed by third- party auditors.
C)random.
D)all of the above.
سؤال
________is defined as the degree to which a set of inherent characteristics fulfill requirements.
سؤال
Appraisal costs are a type of costs of________ .
سؤال
The purpose of Six Sigma is to:

A)reduce competitive threats.
B)reduce variation.
C)reduce problems.
D)none of the above.
سؤال
External failure costs are a type of costs of________ .
سؤال
The process of ensuring that the project meets the standards outlined during the quality planning phase is called:

A)quality planning.
B)quality execution.
C)quality improvement.
D)quality assurance.
سؤال
The basis for which project quality is measured and reported is called:

A)quality metric.
B)quality checklist.
C)quality baseline.
D)quality plan.
سؤال
A systematic approach to managing quality that originated in the 1950s is:

A)CSMA.
B)TDMA.
C)TQC.
D)TQM.
سؤال
Quality planning is usually performed:

A)before other project planning issues are addressed.
B)after other project planning issues are addressed.
C)at the same time that other project planning issues are addressed.
D)at the very beginning of a project.
سؤال
________are tools used to ensure that a specific set of actions has been correctly performed.

A)Quality checklists
B)Quality baselines
C)Quality plans
D)Quality metrics
سؤال
The 80/20 rule is also known as the ________ Principle.
سؤال
A plan specifying how quality measures will be implemented during a project is called:

A)quality baseline.
B)quality implementation plan.
C)quality management plan.
D)quality improvement plan.
سؤال
Which quality management pioneer is best known for the book Quality Is Free?

A)Joseph Juran
B)Paul Pareto
C)Philip B. Crosby
D)Kaoru Ishikawa
سؤال
Cost of quality includes:

A)the costs to improve or ensure quality measures.
B)the costs associated with a lack of quality.
C)the costs to sell a product.
D)both A and B.
سؤال
The costs of rework in programming are an example of ________costs.
سؤال
In the early 1990's Robert Kaplan and David Norton created a system called________ .
سؤال
Cost/benefit analyses are:

A)utterly useless.
B)very accurate.
C)sometimes criticized for being too simplistic.
D)critical to project success.
سؤال
What is another name for the 80/20 rule?

A)Cost of Quality
B)Law of diminishing returns
C)Golden rule
D)Pareto principle
سؤال
Which of the following is NOT a software maturity level?

A)Improving
B)Repeatable
C)Initial
D)Defined
سؤال
____________requires management and employees to become involved in the continuous improvement of the goods and services a firm produces.
سؤال
____________is the process of identifying relevant standards and developing a plan to ensure the project meets those standards.
سؤال
Control charts are graphical, ____________charts used to display process results.
سؤال
Quality metrics are ________of specific processes, events, or products as well as explanations of how they will be measured in terms of quality.
سؤال
The cost of quality may run from ____________ % of total cost for most businesses.
سؤال
Quality assurance is the process of ensuring that the project meets the ________outlined during the quality planning phase.
سؤال
____________examines not what is done, but how it was done.
سؤال
A ____________ is the basis for which project quality is reported.
سؤال
ISO 9000 is a ________of standards, rather than a single standard.
سؤال
The costs of code inspection and testing are an example of ____________ costs.
سؤال
Prevention costs are a type of costs of ________ .
سؤال
A ________specifies how quality measures will be implemented during a project.
سؤال
The balanced scorecard is seen as a management system, rather than a ____________ system.
سؤال
________is a summary of the status of project deliverables, any performance measures that have been collected, and any implemented changes from the original project management plan.
سؤال
Cost of quality is the cost to improve or ensure quality measures, as well as the cost associated with________ .
سؤال
The highest level of Six Sigma proficiency is ____________ .
سؤال
The ____________ standards are primarily concerned with quality management.
سؤال
____________is the use of measurement and testing procedures to determine whether results conform to the particular project standards.
سؤال
Statistical sampling is the process of selecting a ____________from a population in order to infer characteristics about that population.
سؤال
Kaoru Ishikawa's fishbone diagram is a type of ________diagram.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/127
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 8: Managing Project Quality
1
A quality threshold refers to:

A)a product not being purchased because the cost of quality is too high.
B)a baseline.
C)a product not being purchased, regardless of quality, if there is no need to be filled.
D)a product not being purchased because of low quality.
C
2
All of the following are ISO 9000 principles EXCEPT for:

A)continual improvement.
B)involvement of people
C)involvement of stakeholders
D)customer focus
C
3
Costs of training staff in design methodologies is an example of:

A)external failure costs.
B)prevention costs.
C)internal failure costs.
D)appraisal costs.
B
4
One type of quality cost is:

A)appraisal costs.
B)external failure costs.
C)prevention costs.
D)all of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
5
Which quality management pioneer is best known for the fishbone diagram?

A)W. Edwards Deming
B)Kaoru Ishikawa
C)Paul Pareto
D)Joseph Juran
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
6
Graphical, time- based charts used to display process results are called:

A)Pareto charts.
B)cause- and- effect diagrams.
C)project problem charts.
D)control charts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
7
Capability maturity models have ________levels.

A)three
B)six
C)five
D)four
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
8
The process of selecting a random sample from a population in order to infer characteristics about that population is called:

A)statistical sampling.
B)spot- checks.
C)random inspection.
D)mathematical modeling.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
9
Who of the following is not known as a quality management pioneer?

A)Henry Gantt
B)Philip B. Crosby
C)W. Edwards Deming
D)Joseph Juran
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
10
Costs of rework in programming is an example of:

A)prevention costs.
B)external failure costs.
C)appraisal costs.
D)internal failure costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
11
The degree to which a set of inherent characteristics fulfill________.

A)a company's needs
B)requirements
C)a project's needs
D)a customer's needs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
12
The balanced scorecard suggests viewing organizational activities from the following perspectives EXCEPT:

A)the business process perspective.
B)the stakeholder perspective.
C)the financial perspective.
D)the customer perspective.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
13
Six Sigma was first conceived of at:

A)Motorola.
B)DEC.
C)Toyota.
D)IBM.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
14
Operational definitions of specific processes, events, or products, as well as an explanation of how they will be measured in terms of quality are called:

A)quality definitions.
B)quality specifications.
C)quality measures.
D)quality metrics.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
15
Histograms (or bar charts)where the values being plotted are arranged in descending order are called:

A)project problem charts.
B)cause- and- effect diagrams.
C)control charts.
D)Pareto charts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
16
Which of the following is NOT part of the Six Sigma methodology?

A)Measuring the core business processes
B)Improving the target processes
C)Analyzing the data collected
D)Controlling the core business processes
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
17
Which generic management systems standard is among the most popular in the world?

A)Six Sigma
B)Total Quality Management
C)ISO 9000
D)Malcolm Baldridge National Quality Program
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
18
The balanced scorecard approach is:

A)a measurement system.
B)a management system.
C)a mandatory report.
D)a reporting system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
19
The process of monitoring results to determine if the quality standards of the project are being met is called:

A)quality execution.
B)quality control.
C)quality assurance.
D)quality improvement.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
20
The ISO 9000 standards are primarily concerned with the processes the organization does to:

A)satisfy regulatory requirements.
B)enhance customer satisfaction.
C)satisfy customer quality requirements.
D)all of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
21
Which quality management pioneer is best known for the 80/20 rule?

A)W. Edwards Deming
B)Joseph Juran
C)Paul Pareto
D)Kaoru Ishikawa
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
22
The Baldridge National Quality Program recognizes outstanding achievements in ________areas.

A)seven
B)six
C)five
D)eight
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
23
A plan specifying how to identify wasteful and non- value added activities is called:

A)quality baseline.
B)activity improvement plan.
C)quality management plan.
D)process improvement plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
24
Ishikawa's cause- and- effect diagram is also known as:

A)fishbone diagram.
B)quality diagram.
C)skeleton diagram.
D)bone diagram.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
25
Deming's model is known as:

A)plan- check- do- act model.
B)plan- do- act- check model.
C)plan- check- act- do model.
D)plan- do- check- act model.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
26
A process improvement plan analyzes:

A)process metrics.
B)process boundaries.
C)process configuration.
D)all of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
27
Design of experiments uses ________to test the efficiency of certain project management approaches by testing factors that may influence a specific variable.

A)evaluative techniques
B)statistical techniques
C)sophisticated tests
D)a trial- and- error approach
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
28
Diagrams used to identify potential and real causes of problems that organize problems into categories are called:

A)Pareto charts.
B)cause- and- effect diagrams.
C)project problem charts.
D)control charts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
29
The study of a competitor's products or business practices for the purpose of improving a company's performance is called:

A)benchmarking.
B)industrial espionage.
C)competitor analysis.
D)comparison.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
30
All of the following are part of Ishikawa's actionable items EXCEPT:

A)check the effects of education and training.
B)take appropriate action.
C)determine goals and targets.
D)engage in education and training.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
31
The process of identifying relevant quality standards and developing a plan to ensure the project meets those standards is called:

A)quality identification.
B)quality assurance.
C)quality improvement.
D)quality planning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
32
Robert Kaplan and David Norton came up with a system called:

A)balanced reporting.
B)balanced scorecard.
C)balanced report card.
D)balanced scoring system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
33
Costs of support and maintenance is an example of:

A)external failure costs.
B)appraisal costs.
C)prevention costs.
D)internal failure costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
34
The set of overall intentions and direction of an organization with regard to quality, as formally expressed by top management is called:

A)quality management plan.
B)quality policy.
C)quality rules.
D)quality guidelines.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
35
Costs of code inspection and testing is an example of:

A)internal failure costs.
B)appraisal costs.
C)external failure costs.
D)prevention costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
36
An evaluation of the costs and benefits of alternative approaches to a proposed activity to determine the best alternative is called:

A)tradeoff evaluation.
B)quality planning.
C)cost/benefit analysis.
D)alternative evaluation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
37
Which quality management process is not focus of the Juran Trilogy?

A)Quality improvement
B)Quality planning
C)Quality assurance
D)Quality control
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
38
Which quality management pioneer is best known for his 14 points of quality?

A)Joseph Juran
B)Philip B. Crosby
C)Kaoru Ishikawa
D)W. Edwards Deming
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
39
The national quality program was named after U.S. Secretary of Commerce:

A)Donald Louis Evans.
B)William Daley.
C)Carlos Gutierrez
D)Malcolm Baldridge.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
40
A company can assess its capabilities with respect to best practices within a given industry using:

A)CPR.
B)CMM.
C)CRT.
D)CNN.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
41
What is the highest level of Six Sigma certification?

A)Champion
B)Grandmaster
C)Master
D)Master black belt
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
42
Quality audits can be:

A)scheduled.
B)performed by third- party auditors.
C)random.
D)all of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
43
________is defined as the degree to which a set of inherent characteristics fulfill requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
44
Appraisal costs are a type of costs of________ .
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
45
The purpose of Six Sigma is to:

A)reduce competitive threats.
B)reduce variation.
C)reduce problems.
D)none of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
46
External failure costs are a type of costs of________ .
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
47
The process of ensuring that the project meets the standards outlined during the quality planning phase is called:

A)quality planning.
B)quality execution.
C)quality improvement.
D)quality assurance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
48
The basis for which project quality is measured and reported is called:

A)quality metric.
B)quality checklist.
C)quality baseline.
D)quality plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
49
A systematic approach to managing quality that originated in the 1950s is:

A)CSMA.
B)TDMA.
C)TQC.
D)TQM.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
50
Quality planning is usually performed:

A)before other project planning issues are addressed.
B)after other project planning issues are addressed.
C)at the same time that other project planning issues are addressed.
D)at the very beginning of a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
51
________are tools used to ensure that a specific set of actions has been correctly performed.

A)Quality checklists
B)Quality baselines
C)Quality plans
D)Quality metrics
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
52
The 80/20 rule is also known as the ________ Principle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
53
A plan specifying how quality measures will be implemented during a project is called:

A)quality baseline.
B)quality implementation plan.
C)quality management plan.
D)quality improvement plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
54
Which quality management pioneer is best known for the book Quality Is Free?

A)Joseph Juran
B)Paul Pareto
C)Philip B. Crosby
D)Kaoru Ishikawa
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
55
Cost of quality includes:

A)the costs to improve or ensure quality measures.
B)the costs associated with a lack of quality.
C)the costs to sell a product.
D)both A and B.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
56
The costs of rework in programming are an example of ________costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
57
In the early 1990's Robert Kaplan and David Norton created a system called________ .
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
58
Cost/benefit analyses are:

A)utterly useless.
B)very accurate.
C)sometimes criticized for being too simplistic.
D)critical to project success.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
59
What is another name for the 80/20 rule?

A)Cost of Quality
B)Law of diminishing returns
C)Golden rule
D)Pareto principle
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
60
Which of the following is NOT a software maturity level?

A)Improving
B)Repeatable
C)Initial
D)Defined
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
61
____________requires management and employees to become involved in the continuous improvement of the goods and services a firm produces.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
62
____________is the process of identifying relevant standards and developing a plan to ensure the project meets those standards.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
63
Control charts are graphical, ____________charts used to display process results.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
64
Quality metrics are ________of specific processes, events, or products as well as explanations of how they will be measured in terms of quality.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
65
The cost of quality may run from ____________ % of total cost for most businesses.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
66
Quality assurance is the process of ensuring that the project meets the ________outlined during the quality planning phase.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
67
____________examines not what is done, but how it was done.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
68
A ____________ is the basis for which project quality is reported.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
69
ISO 9000 is a ________of standards, rather than a single standard.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
70
The costs of code inspection and testing are an example of ____________ costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
71
Prevention costs are a type of costs of ________ .
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
72
A ________specifies how quality measures will be implemented during a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
73
The balanced scorecard is seen as a management system, rather than a ____________ system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
74
________is a summary of the status of project deliverables, any performance measures that have been collected, and any implemented changes from the original project management plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
75
Cost of quality is the cost to improve or ensure quality measures, as well as the cost associated with________ .
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
76
The highest level of Six Sigma proficiency is ____________ .
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
77
The ____________ standards are primarily concerned with quality management.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
78
____________is the use of measurement and testing procedures to determine whether results conform to the particular project standards.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
79
Statistical sampling is the process of selecting a ____________from a population in order to infer characteristics about that population.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
80
Kaoru Ishikawa's fishbone diagram is a type of ________diagram.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 127 في هذه المجموعة.