Deck 2: The Project Management Life Cycle

ملء الشاشة (f)
exit full mode
سؤال
The PMBOK organizes project management processes into ___________groups.

A)six
B)five
C)three
D)four
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
An organization's information systems needs may result from:

A)requests to deal with problems in current procedures.
B)the realization that information technology could be used to capitalize on an existing opportunity.
C)the desire to perform additional tasks.
D)all of the above.
سؤال
Scope verification is part of which process group?

A)Controlling
B)Executing
C)Initiating
D)Planning
سؤال
Information distribution is part of which process group?

A)Planning
B)Initiating
C)Executing
D)Controlling
سؤال
You should use a network diagram when:

A)tasks can be worked on independently of other tasks.
B)tasks are well- defined and have a clear beginning and endpoint.
C)tasks are ordered.
D)all of the above.
سؤال
Key general management skills essential for successful project management include all EXCEPT:

A)communicating.
B)leading.
C)commanding
D)problem solving.
سؤال
What is NOT characteristic of a network diagram?

A)A network diagram shows which tasks can be done in parallel.
B)A network diagram shows slack time within activity rectangles.
C)A network diagram visually shows the duration of tasks.
D)A network diagram visually shows the sequence dependencies between tasks.
سؤال
The second phase of the systems development life cycle encompasses all EXCEPT:

A)requirements structuring.
B)requirements determination.
C)requirements design.
D)alternative generation.
سؤال
Some systems analysts consider the life cycle to be:

A)a system.
B)a spiral.
C)an ellipse.
D)a pentagram.
سؤال
The final phase of the systems development life cycle is called:

A)systems maintenance.
B)systems modification.
C)systems operation.
D)bug fixing.
سؤال
The amount of time a task can be delayed without delaying the early start of any immediately following task is called:

A)free slack.
B)optional slack.
C)overall slack.
D)total slack.
سؤال
The phase of the systems development life cycle where the need for a new system is identified and the scope is determined is called:

A)systems identification.
B)scope determination.
C)initiation phase.
D)systems planning.
سؤال
Requesting seller responses is part of which process group?

A)Executing
B)Controlling
C)Planning
D)Initiating
سؤال
Projects are divided into smaller parts called:

A)deliverables.
B)phases.
C)stages.
D)parts.
سؤال
The third phase of the systems development life cycle is called:

A)logical design.
B)systems conversion.
C)physical design.
D)systems design.
سؤال
A functional organizational structure is sometimes thought of as resembling a:

A)matrix.
B)pyramid.
C)square.
D)network.
سؤال
Managing the project team is part of which process group?

A)Executing
B)Closing
C)Controlling
D)Planning
سؤال
What is NOT a characteristic of a Gantt chart?

A)A Gantt chart shows the time overlap of tasks.
B)A Gantt chart clearly shows how tasks must be ordered.
C)A Gantt chart visually shows the duration of tasks.
D)A Gantt chart can visually show slack times available.
سؤال
A series of continuous actions that bring about a particular result, end, or condition is called a(n):

A)activity sequence.
B)program.
C)process.
D)continuum.
سؤال
Systems implementation includes all EXCEPT:

A)testing.
B)coding.
C)installation.
D)maintenance.
سؤال
Social, economic, and environmental influences are comprised of:

A)culture.
B)standards and regulations.
C)internationalization.
D)all of the above.
سؤال
Activity definition is part of which process group?

A)Controlling
B)Initiating
C)Executing
D)Planning
سؤال
The second phase of the systems development life cycle is called:

A)systems alternative generation.
B)systems selection.
C)systems requirements determination.
D)systems analysis.
سؤال
All of the following organizational influences can affect a project's success, EXCEPT for the:

A)organization's customers.
B)organization's structure.
C)role of the project management office.
D)organizational culture.
سؤال
What is NOT a common organizational structure?

A)Departmental
B)Matrix
C)Projectized
D)Functional
سؤال
Developing a project charter is part of which process group?

A)Controlling
B)Initiating
C)Executing
D)Planning
سؤال
Most project life cycles share the following characteristics:

A)cost and staffing levels are low at the start, higher at the end, and drop rapidly as the project nears an end.
B)the ability of stakeholders to influence final characteristics of the project's product is highest at the beginning and lowest at the end.
C)the probability of successfully completing the project is lowest at the beginning, so risk and uncertainty are also the highest at that point.
D)all of the above.
سؤال
Persons, groups of people, pieces of equipment, or materials used in accomplishing an activity are called:

A)resources.
B)requirements.
C)supplies.
D)provisions.
سؤال
The five phases of the systems development life cycle include all EXCEPT:

A)maintenance.
B)planning and selection.
C)bug fixing.
D)design.
سؤال
Developing a project team is part of which process group?

A)Executing
B)Controlling
C)Initiating
D)Planning
سؤال
Structured systems design that can be broken down into smaller and smaller units for conversion into instructions written in a programming language is called:

A)logical design.
B)systems conversion.
C)physical design.
D)systems design.
سؤال
Performing quality control is part of which process group?

A)Closing
B)Controlling
C)Executing
D)Planning
سؤال
A document approved by a recognized body, that provides, for common and repeated use, rules, guidelines, or characteristics for products, processes, or services with which compliance is not mandatory is called:

A)standard.
B)guideline.
C)regulation.
D)agreement.
سؤال
The organizational unit created to centralize and coordinate projects within an organization is called:

A)project coordination center.
B)project organization office.
C)project management office.
D)coordination bureau.
سؤال
Risk estimation is part of which process group?

A)Initiating
B)Controlling
C)Planning
D)Executing
سؤال
The phases of managing a project are called:

A)project management life cycle.
B)project management phase model.
C)systems development life cycle.
D)project life cycle.
سؤال
Which aspects of the organizational environment can influence the success of a project?

A)Environmental influences
B)Organizational structure
C)Stakeholders
D)All of the above
سؤال
Contract closure is part of which process group?

A)Executing
B)Closing
C)Controlling
D)Planning
سؤال
Specifications which focus on the origin, flow, and processing of data in a system, but are not tied to any specific hardware and systems software platform are called:

A)systems conversion.
B)systems design.
C)physical design.
D)logical design.
سؤال
The five phases of the systems development (in the correct order)are:

A)planning and selection, analysis, design, implementation, and maintenance.
B)planning and selection, design, analysis, maintenance, and implementation.
C)analysis, planning and selection, design, implementation, and maintenance.
D)planning and selection, analysis, implementation, design, and maintenance.
سؤال
Process groups are ___________by the results they produce.
سؤال
The second phase in the SDLC is called___________ .
سؤال
___________refers to the amount of time a task can be delayed without delaying the early start of any immediately following task.
سؤال
Problem solving consists of:

A)problem analysis and solution selection.
B)problem definition and decision making.
C)problem finding and problem clarification.
D)gathering information and problem finding.
سؤال
The review points at the end of each stage are called everything EXCEPT:

A)phase exits.
B)kill points.
C)terminators.
D)stage gates.
سؤال
A ___________is a series of continuous actions that bring about a particular results, end, or condition.
سؤال
The third phase in the SDLC is called___________.
سؤال
The shortest time in which a project can be completed is shown by the:

A)crucial path
B)critical path.
C)shortest path.
D)longest path.
سؤال
The amount of time an activity can be delayed without delaying the project is called:

A)delay time.
B)lag time.
C)slack time.
D)free time.
سؤال
The process group concerned with authorizing a project to begin is called ___________ .
سؤال
The amount if time a task can be delayed without delaying the completion of the project is called:

A)overall slack.
B)free slack.
C)optional slack.
D)total slack.
سؤال
The technique that uses optimistic, pessimistic, and realistic time to calculate the expected time for a particular task is known as___________ .
سؤال
The five process groups identified by the PMBOK are initiating, planning, executing, monitoring and controlling, and ___________ .
سؤال
Projects are divided into smaller parts called ___________.
سؤال
The process group involving coordinating people and resources to carry out the plan is called ___________.
سؤال
A document, which lays down product, process, or service characteristics, including the applicable administrative provisions, with which compliance is mandatory, is called:

A)guideline.
B)agreement.
C)regulation.
D)standard.
سؤال
Specifications that focus on the origin, flow, and processing of data in a system, but are not tied to any specific hardware and systems software platform are called___________ .
سؤال
The technique that uses optimistic, pessimistic, and realistic time to calculate the expected time for a particular task is called:

A)PERT.
B)OPR technique.
C)PORT.
D)expected time technique.
سؤال
Defining a problem correctly means distinguishing between___________ .
سؤال
The fourth phase of the systems development life cycle is called:

A)systems installation.
B)systems implementation.
C)coding.
D)systems conversion.
سؤال
A type of organizational structure where people from different backgrounds work with each other throughout the lifetime of a project is called ___________ organization structure.
سؤال
The process group concerned with measuring progress during execution of a project is called ___________.
سؤال
Compliance with regulations is___________ .
سؤال
Standards may over time become___________ regulations, driven by market pressures or habit.
سؤال
The process group concerned with formal acceptance of a project is called ___________.
سؤال
An organization's ___________reflects what those who work there hold to be most important.
سؤال
Activities with a slack time of zero are on the ___________.
سؤال
The___________ expected completion time refers to the time in which an activity can be completed without delaying the project.
سؤال
The process group involving defining goals and selecting the best way to achieve them is called___________ .
سؤال
Problem solving has two aspects: ___________and decision making.
سؤال
The first phase in the SDLC, where the need for a new or enhanced systems is identified and the proposed system's scope is determined is called___________ .
سؤال
A type of organizational structure that typically crosses functional design with some other design characteristic is called___________organization structure.
سؤال
The fifth phase in the SDLC is called___________ .
سؤال
A ___________is a popular graph for displaying the duration of tasks.
سؤال
Due to limitations in terms of time and human processing, decision making often results in___________
.
سؤال
Problem solving has two aspects: problem definition and___________.
سؤال
The fourth phase in the SDLC is called___________
سؤال
Nodes not on the critical path contain___________ .
سؤال
Compliance with a standard is ___________ .
سؤال
The sequence of activities whose order and durations directly affect the completion date of a project is called___________ .
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/119
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 2: The Project Management Life Cycle
1
The PMBOK organizes project management processes into ___________groups.

A)six
B)five
C)three
D)four
five
2
An organization's information systems needs may result from:

A)requests to deal with problems in current procedures.
B)the realization that information technology could be used to capitalize on an existing opportunity.
C)the desire to perform additional tasks.
D)all of the above.
D
3
Scope verification is part of which process group?

A)Controlling
B)Executing
C)Initiating
D)Planning
A
4
Information distribution is part of which process group?

A)Planning
B)Initiating
C)Executing
D)Controlling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
5
You should use a network diagram when:

A)tasks can be worked on independently of other tasks.
B)tasks are well- defined and have a clear beginning and endpoint.
C)tasks are ordered.
D)all of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
6
Key general management skills essential for successful project management include all EXCEPT:

A)communicating.
B)leading.
C)commanding
D)problem solving.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
7
What is NOT characteristic of a network diagram?

A)A network diagram shows which tasks can be done in parallel.
B)A network diagram shows slack time within activity rectangles.
C)A network diagram visually shows the duration of tasks.
D)A network diagram visually shows the sequence dependencies between tasks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
8
The second phase of the systems development life cycle encompasses all EXCEPT:

A)requirements structuring.
B)requirements determination.
C)requirements design.
D)alternative generation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
9
Some systems analysts consider the life cycle to be:

A)a system.
B)a spiral.
C)an ellipse.
D)a pentagram.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
10
The final phase of the systems development life cycle is called:

A)systems maintenance.
B)systems modification.
C)systems operation.
D)bug fixing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
11
The amount of time a task can be delayed without delaying the early start of any immediately following task is called:

A)free slack.
B)optional slack.
C)overall slack.
D)total slack.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
12
The phase of the systems development life cycle where the need for a new system is identified and the scope is determined is called:

A)systems identification.
B)scope determination.
C)initiation phase.
D)systems planning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
13
Requesting seller responses is part of which process group?

A)Executing
B)Controlling
C)Planning
D)Initiating
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
14
Projects are divided into smaller parts called:

A)deliverables.
B)phases.
C)stages.
D)parts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
15
The third phase of the systems development life cycle is called:

A)logical design.
B)systems conversion.
C)physical design.
D)systems design.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
16
A functional organizational structure is sometimes thought of as resembling a:

A)matrix.
B)pyramid.
C)square.
D)network.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
17
Managing the project team is part of which process group?

A)Executing
B)Closing
C)Controlling
D)Planning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
18
What is NOT a characteristic of a Gantt chart?

A)A Gantt chart shows the time overlap of tasks.
B)A Gantt chart clearly shows how tasks must be ordered.
C)A Gantt chart visually shows the duration of tasks.
D)A Gantt chart can visually show slack times available.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
19
A series of continuous actions that bring about a particular result, end, or condition is called a(n):

A)activity sequence.
B)program.
C)process.
D)continuum.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
20
Systems implementation includes all EXCEPT:

A)testing.
B)coding.
C)installation.
D)maintenance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
21
Social, economic, and environmental influences are comprised of:

A)culture.
B)standards and regulations.
C)internationalization.
D)all of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
22
Activity definition is part of which process group?

A)Controlling
B)Initiating
C)Executing
D)Planning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
23
The second phase of the systems development life cycle is called:

A)systems alternative generation.
B)systems selection.
C)systems requirements determination.
D)systems analysis.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
24
All of the following organizational influences can affect a project's success, EXCEPT for the:

A)organization's customers.
B)organization's structure.
C)role of the project management office.
D)organizational culture.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
25
What is NOT a common organizational structure?

A)Departmental
B)Matrix
C)Projectized
D)Functional
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
26
Developing a project charter is part of which process group?

A)Controlling
B)Initiating
C)Executing
D)Planning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
27
Most project life cycles share the following characteristics:

A)cost and staffing levels are low at the start, higher at the end, and drop rapidly as the project nears an end.
B)the ability of stakeholders to influence final characteristics of the project's product is highest at the beginning and lowest at the end.
C)the probability of successfully completing the project is lowest at the beginning, so risk and uncertainty are also the highest at that point.
D)all of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
28
Persons, groups of people, pieces of equipment, or materials used in accomplishing an activity are called:

A)resources.
B)requirements.
C)supplies.
D)provisions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
29
The five phases of the systems development life cycle include all EXCEPT:

A)maintenance.
B)planning and selection.
C)bug fixing.
D)design.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
30
Developing a project team is part of which process group?

A)Executing
B)Controlling
C)Initiating
D)Planning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
31
Structured systems design that can be broken down into smaller and smaller units for conversion into instructions written in a programming language is called:

A)logical design.
B)systems conversion.
C)physical design.
D)systems design.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
32
Performing quality control is part of which process group?

A)Closing
B)Controlling
C)Executing
D)Planning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
33
A document approved by a recognized body, that provides, for common and repeated use, rules, guidelines, or characteristics for products, processes, or services with which compliance is not mandatory is called:

A)standard.
B)guideline.
C)regulation.
D)agreement.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
34
The organizational unit created to centralize and coordinate projects within an organization is called:

A)project coordination center.
B)project organization office.
C)project management office.
D)coordination bureau.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
35
Risk estimation is part of which process group?

A)Initiating
B)Controlling
C)Planning
D)Executing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
36
The phases of managing a project are called:

A)project management life cycle.
B)project management phase model.
C)systems development life cycle.
D)project life cycle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
37
Which aspects of the organizational environment can influence the success of a project?

A)Environmental influences
B)Organizational structure
C)Stakeholders
D)All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
38
Contract closure is part of which process group?

A)Executing
B)Closing
C)Controlling
D)Planning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
39
Specifications which focus on the origin, flow, and processing of data in a system, but are not tied to any specific hardware and systems software platform are called:

A)systems conversion.
B)systems design.
C)physical design.
D)logical design.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
40
The five phases of the systems development (in the correct order)are:

A)planning and selection, analysis, design, implementation, and maintenance.
B)planning and selection, design, analysis, maintenance, and implementation.
C)analysis, planning and selection, design, implementation, and maintenance.
D)planning and selection, analysis, implementation, design, and maintenance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
41
Process groups are ___________by the results they produce.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
42
The second phase in the SDLC is called___________ .
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
43
___________refers to the amount of time a task can be delayed without delaying the early start of any immediately following task.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
44
Problem solving consists of:

A)problem analysis and solution selection.
B)problem definition and decision making.
C)problem finding and problem clarification.
D)gathering information and problem finding.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
45
The review points at the end of each stage are called everything EXCEPT:

A)phase exits.
B)kill points.
C)terminators.
D)stage gates.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
46
A ___________is a series of continuous actions that bring about a particular results, end, or condition.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
47
The third phase in the SDLC is called___________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
48
The shortest time in which a project can be completed is shown by the:

A)crucial path
B)critical path.
C)shortest path.
D)longest path.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
49
The amount of time an activity can be delayed without delaying the project is called:

A)delay time.
B)lag time.
C)slack time.
D)free time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
50
The process group concerned with authorizing a project to begin is called ___________ .
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
51
The amount if time a task can be delayed without delaying the completion of the project is called:

A)overall slack.
B)free slack.
C)optional slack.
D)total slack.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
52
The technique that uses optimistic, pessimistic, and realistic time to calculate the expected time for a particular task is known as___________ .
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
53
The five process groups identified by the PMBOK are initiating, planning, executing, monitoring and controlling, and ___________ .
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
54
Projects are divided into smaller parts called ___________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
55
The process group involving coordinating people and resources to carry out the plan is called ___________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
56
A document, which lays down product, process, or service characteristics, including the applicable administrative provisions, with which compliance is mandatory, is called:

A)guideline.
B)agreement.
C)regulation.
D)standard.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
57
Specifications that focus on the origin, flow, and processing of data in a system, but are not tied to any specific hardware and systems software platform are called___________ .
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
58
The technique that uses optimistic, pessimistic, and realistic time to calculate the expected time for a particular task is called:

A)PERT.
B)OPR technique.
C)PORT.
D)expected time technique.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
59
Defining a problem correctly means distinguishing between___________ .
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
60
The fourth phase of the systems development life cycle is called:

A)systems installation.
B)systems implementation.
C)coding.
D)systems conversion.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
61
A type of organizational structure where people from different backgrounds work with each other throughout the lifetime of a project is called ___________ organization structure.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
62
The process group concerned with measuring progress during execution of a project is called ___________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
63
Compliance with regulations is___________ .
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
64
Standards may over time become___________ regulations, driven by market pressures or habit.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
65
The process group concerned with formal acceptance of a project is called ___________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
66
An organization's ___________reflects what those who work there hold to be most important.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
67
Activities with a slack time of zero are on the ___________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
68
The___________ expected completion time refers to the time in which an activity can be completed without delaying the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
69
The process group involving defining goals and selecting the best way to achieve them is called___________ .
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
70
Problem solving has two aspects: ___________and decision making.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
71
The first phase in the SDLC, where the need for a new or enhanced systems is identified and the proposed system's scope is determined is called___________ .
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
72
A type of organizational structure that typically crosses functional design with some other design characteristic is called___________organization structure.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
73
The fifth phase in the SDLC is called___________ .
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
74
A ___________is a popular graph for displaying the duration of tasks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
75
Due to limitations in terms of time and human processing, decision making often results in___________
.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
76
Problem solving has two aspects: problem definition and___________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
77
The fourth phase in the SDLC is called___________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
78
Nodes not on the critical path contain___________ .
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
79
Compliance with a standard is ___________ .
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
80
The sequence of activities whose order and durations directly affect the completion date of a project is called___________ .
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 119 في هذه المجموعة.