Deck 12: Managing Project Control and Closure

ملء الشاشة (f)
exit full mode
سؤال
Perhaps the most important aspect of successful project management is:

A)participation.
B)analysis and action.
C)the efficient flow of information.
D)team members' commitment.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Controlling processes are important factors in of the nine project management knowledge areas.

A)four
B)six
C)five
D)seven
سؤال
are documented recommendations that minimize the probability of negative consequences to the project.

A)Recommended corrective actions
B)Project control actions
C)Risk mitigation actions
D)Recommended preventive actions
سؤال
is the process of identifying the cause of variance relative to the project baseline and determining whether any corrective action is needed.

A)Variance analysis
B)Cause and effect diagramming
C)Baseline analysis
D)Progress analysis
سؤال
Team members need to be encouraged to:

A)offer opinions.
B)encourage to participate.
C)take responsibility when problems arise.
D)all of the above.
سؤال
are documented and authorized guidelines that are intended to reduce the probability of negative consequences to the project due to identified risks.

A)Approved defect repair
B)Approved preventive actions
C)Approved corrective actions
D)Approved change requests
سؤال
are documented recommendations that needed to bring future project performance into conformance with the project management plan.

A)Recommended corrective actions
B)Risk mitigation actions
C)Recommended preventive actions
D)Project control actions
سؤال
The actual cost associated with work on an activity during a particular time period is:

A)the product of PV and % completed.
B)the product of EV and % completed.
C)not calculated but drawn from invoices.
D)The product of EV and PV.
سؤال
is the process of monitoring and measuring project progress and influencing the plan to account for any discrepancies between planned progress and actual progress.

A)Project control
B)Project execution
C)Progress monitoring
D)Project monitoring
سؤال
measures project performance over time, and provides a way to forecast future performance based on past performance.

A)Earned value management.
B)Project performance analysis
C)Schedule analysis
D)Variance analysis
سؤال
is the management style the manager employs in following a plan and dealing with problems or changes in the plan.

A)Project control style
B)Philosophy of project control
C)Approach to project control
D)Style of project control
سؤال
is the final implementation and training related to the project, getting acceptance and signoff on the project, and archiving of the project's results.

A)Project implementation
B)Project closure
C)Project signoff
D)Project handover
سؤال
Earned value management is a powerful cost control technique that provides estimates on the likelihood the project will meet requirements.

A)schedule
B)budget
C)project
D)both A and B
سؤال
The is calculated by dividing the BAC by the CPI.

A)estimated cost at completion
B)budget at completion
C)estimated time to complete
D)completion performance index
سؤال
For large, complex projects, the may be most appropriate.

A)dogmatic philosophy
B)pragmatic philosophy
C)laid- back philosophy
D)relaxed philosophy
سؤال
Controlling processes are important factor in all of the following project management knowledge areas EXCEPT management.

A)time
B)procurement
C)cost
D)integration
سؤال
All of the following are philosophies of project control EXCEPT:

A)relaxed philosophy.
B)laid- back philosophy.
C)pragmatic philosophy .
D)dogmatic philosophy.
سؤال
For relatively small projects, the may be most appropriate.

A)dogmatic philosophy
B)relaxed philosophy
C)laid- back philosophy
D)pragmatic philosophy
سؤال
The is a time- phased budget that is used to measure and monitor cost performance.

A)cost baseline
B)budget baseline
C)project budget
D)project resources baseline
سؤال
The is the ratio of EV to AC.

A)schedule performance ratio
B)cost performance index
C)cost performance ratio
D)schedule performance index
سؤال
are documented and authorized changes that are scheduled for implementation by the project team.

A)Approved preventive actions
B)Approved change requests
C)Approved corrective actions
D)Approved defect repair
سؤال
The is the ratio of EV to PV.

A)schedule performance ratio
B)cost performance ratio
C)schedule performance index
D)cost performance index
سؤال
A post- implementation review is conducted:

A)a few weeks after user training has commenced.
B)right after a project was implemented.
C)6- 12 months after implementation.
D)once the client has become familiar with the product.
سؤال
A is a systematic and formal enquiry into a project's expenditures, schedule, and quality of work.

A)project audit
B)project review
C)project assessment
D)project control
سؤال
are approved and authorized actions that are recommended to correct defects in the project deliverables.

A)Approved preventive actions
B)Approved change requests
C)Approved corrective actions
D)Approved defect repair
سؤال
is the difference between the scheduled completion of an activity and the actual completion.

A)SD
B)CV
C)SV
D)CD
سؤال
A cost control method for examining project cost performance over time to determine whether performance is improving or deteriorating is:

A)variance analysis.
B)earned value analysis.
C)cost analysis.
D)trend analysis.
سؤال
The is calculated by dividing the original time estimate by the SPI.

A)estimated time to complete
B)completion time
C)estimated cost at completion
D)schedule performance index
سؤال
Project control is the process of monitoring and __________ project progress and influencing the plan to account for any discrepancies between planned progress and actual progress.
سؤال
is the difference between the earned value and the actual cost.

A)SD
B)CV
C)SV
D)CD
سؤال
are activities and reporting methods instituted during the course of a project to monitor its progress and to provide reports for project managers and stakeholders.

A)Project guidelines
B)Standard project procedures
C)Standard operating procedures
D)Project rules
سؤال
Reluctance to hear bad news communicated from lower levels of the organizational hierarchy is referred to as:

A)deaf effect.
B)fear of reprisal.
C)mum effect.
D)blowing the whistle.
سؤال
A(n)contains a record of the project management techniques employed over the course of the project, surveys, and outstanding items that still need to be resolved.

A)outstanding item report
B)post- implementation report
C)handover report
D)end report
سؤال
The 80/20 rule is another name for_________ .
سؤال
The budgeted amount for the work actually completed on the activity during a given time period is referred to as:

A)PV.
B)EC.
C)PC.
D)EV.
سؤال
Pareto's law states that:

A)80 percent of the causes result in 20 percent problems.
B)the bar in histogram should be arranged in decreasing order.
C)in a histogram, the probabilities of occurrence are cumulative.
D)80 percent of the problems are the result of 20 percent of the causes.
سؤال
Withholding negative information out of fear for negative consequences is known as:

A)deaf effect.
B)blowing the whistle.
C)fear of reprisal.
D)mum effect.
سؤال
A change control system is a documented process that describes the procedures by which:

A)system changes are managed.
B)the project and product scope can be changed.
C)changes are controlled.
D)all of the above.
سؤال
The budgeted cost for the work scheduled to be completed on an activity up to a given point of time is referred to as:

A)PC.
B)PV.
C)EV.
D)EC.
سؤال
are documented and authorized guidelines necessary to bring future project performance in conformance with the project management plan.

A)Approved preventive actions
B)Approved change requests
C)Approved defect repair
D)Approved corrective actions
سؤال
The approved project schedule is also referred to as schedule_________ .
سؤال
A _________system is a formal, documented process that describes the procedures for changing the project scope and product scope.
سؤال
Part of the _________procedure includes training the end users and other organizational members on use of the new product.
سؤال
_________is the process of screening the project results to determine whether they conform to relevant quality standards and identifying means to eliminate causes of unsatisfactory results.
سؤال
A(n)_________contains a record of the project management techniques employed over the course of the project, surveys, and outstanding items that still need to be resolved.
سؤال
A_________ is a scope control technique that ensure that the requested changes to a project and product scope are thoroughly considered before being implemented.
سؤال
_________is the process of identifying the cause of variance relative to the project baseline and determining whether any corrective action is needed.
سؤال
A __________ is a tool for controlling a project that involves recording information such as requested changes by the client, completion dates of deliverables, and so on.
سؤال
_________are items or activities that will still need to be addressed but, because of their nature, may need to be addressed by the clients themselves of assigned to a team member to attend after the official project handover.
سؤال
In many organizations, blowing the whistle is seen as _________behavior.
سؤال
_________are requested changes that were not chosen for implementation.
سؤال
Outsourcing of_________ to a third party from outside the organization can help reduce the political consequences of whistle blowing.
سؤال
Communicating bad news up the hierarchy is also known as _________.
سؤال
_________is the process of identifying, analyzing, and planning for new risks, keeping track of identified risks, reanalyzing existing risks, monitoring trigger conditions for contingency plans, monitoring residual risks, and reviewing the executing of risk responses.
سؤال
The results of the perform quality control process can also lead to new_________ .
سؤال
Indexes _________indicate possible problems with a project's progress.
سؤال
A __________ is a document that is usually completed 6- 12 months after implementation as a check on whether the outcomes of the project were as expected, whether ongoing costs are as expected, and whether implementing the product yields net benefits.
سؤال
The withholding of information for fearing negative consequences is also known as the_________.
سؤال
A __________ is a process that helps the project team monitor and control the work being performed in accordance to the project management plan.
سؤال
For_________ projects, the laid- back philosophy of project control may be most appropriate.
سؤال
_________is the process of identifying, evaluating, and managing changes that occur from project initiation through project closure.
سؤال
An important issue during the closure process if the _________of the project management methods you have used.
سؤال
_________is the process of setting procedures and rules in place for controlling changes to the project schedule.
سؤال
The reluctance to "hear the whistle" by upper management is also known as the _________.
سؤال
In addition to the philosophy of project control employed, the manager also needs to_________.
سؤال
If EV is greater than the PV, then SV is positive and the project is ahead of schedule.
سؤال
Project risk audits are usually only performed during project execution.
سؤال
_________is a formal process for assuring that only agreed- upon changes are made to the project's scope.
سؤال
Recommended corrective actions are documented recommendations needed to bring future project performance into conformance with the project management plan.
سؤال
Earned value management measures project performance over time, and provides a way to forecast future performance base on_________ .
سؤال
_________are estimates or predictions of conditions or events in the project's future.
سؤال
Cost control is the process of monitoring cost performance to ensure that only appropriate changes are included in the modified_________.
سؤال
For _________projects, the dogmatic philosophy of project control may be most appropriate.
سؤال
In Microsoft Project, a_________ can be used to compare planned and actual project information.
سؤال
A negative CV means that it cost more to perform the work than was planned for
سؤال
_________is the process of delivering the project to the client and training the personnel to use it.
سؤال
The _________change system provides the procedures by which changes can be made to the cost baseline.
سؤال
Formal signed- off _________helps prevent a project from going on and on without ever truly being finished.
سؤال
Project closure is the final implementation and training related to the project, getting acceptance and _________on the project, and archiving of the project's results.
سؤال
A _________CV means that it cost more to perform the work than was planned for.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/110
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 12: Managing Project Control and Closure
1
Perhaps the most important aspect of successful project management is:

A)participation.
B)analysis and action.
C)the efficient flow of information.
D)team members' commitment.
C
2
Controlling processes are important factors in of the nine project management knowledge areas.

A)four
B)six
C)five
D)seven
B
3
are documented recommendations that minimize the probability of negative consequences to the project.

A)Recommended corrective actions
B)Project control actions
C)Risk mitigation actions
D)Recommended preventive actions
D
4
is the process of identifying the cause of variance relative to the project baseline and determining whether any corrective action is needed.

A)Variance analysis
B)Cause and effect diagramming
C)Baseline analysis
D)Progress analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
5
Team members need to be encouraged to:

A)offer opinions.
B)encourage to participate.
C)take responsibility when problems arise.
D)all of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
6
are documented and authorized guidelines that are intended to reduce the probability of negative consequences to the project due to identified risks.

A)Approved defect repair
B)Approved preventive actions
C)Approved corrective actions
D)Approved change requests
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
7
are documented recommendations that needed to bring future project performance into conformance with the project management plan.

A)Recommended corrective actions
B)Risk mitigation actions
C)Recommended preventive actions
D)Project control actions
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
8
The actual cost associated with work on an activity during a particular time period is:

A)the product of PV and % completed.
B)the product of EV and % completed.
C)not calculated but drawn from invoices.
D)The product of EV and PV.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
9
is the process of monitoring and measuring project progress and influencing the plan to account for any discrepancies between planned progress and actual progress.

A)Project control
B)Project execution
C)Progress monitoring
D)Project monitoring
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
10
measures project performance over time, and provides a way to forecast future performance based on past performance.

A)Earned value management.
B)Project performance analysis
C)Schedule analysis
D)Variance analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
11
is the management style the manager employs in following a plan and dealing with problems or changes in the plan.

A)Project control style
B)Philosophy of project control
C)Approach to project control
D)Style of project control
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
12
is the final implementation and training related to the project, getting acceptance and signoff on the project, and archiving of the project's results.

A)Project implementation
B)Project closure
C)Project signoff
D)Project handover
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
13
Earned value management is a powerful cost control technique that provides estimates on the likelihood the project will meet requirements.

A)schedule
B)budget
C)project
D)both A and B
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
14
The is calculated by dividing the BAC by the CPI.

A)estimated cost at completion
B)budget at completion
C)estimated time to complete
D)completion performance index
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
15
For large, complex projects, the may be most appropriate.

A)dogmatic philosophy
B)pragmatic philosophy
C)laid- back philosophy
D)relaxed philosophy
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
16
Controlling processes are important factor in all of the following project management knowledge areas EXCEPT management.

A)time
B)procurement
C)cost
D)integration
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
17
All of the following are philosophies of project control EXCEPT:

A)relaxed philosophy.
B)laid- back philosophy.
C)pragmatic philosophy .
D)dogmatic philosophy.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
18
For relatively small projects, the may be most appropriate.

A)dogmatic philosophy
B)relaxed philosophy
C)laid- back philosophy
D)pragmatic philosophy
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
19
The is a time- phased budget that is used to measure and monitor cost performance.

A)cost baseline
B)budget baseline
C)project budget
D)project resources baseline
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
20
The is the ratio of EV to AC.

A)schedule performance ratio
B)cost performance index
C)cost performance ratio
D)schedule performance index
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
21
are documented and authorized changes that are scheduled for implementation by the project team.

A)Approved preventive actions
B)Approved change requests
C)Approved corrective actions
D)Approved defect repair
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
22
The is the ratio of EV to PV.

A)schedule performance ratio
B)cost performance ratio
C)schedule performance index
D)cost performance index
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
23
A post- implementation review is conducted:

A)a few weeks after user training has commenced.
B)right after a project was implemented.
C)6- 12 months after implementation.
D)once the client has become familiar with the product.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
24
A is a systematic and formal enquiry into a project's expenditures, schedule, and quality of work.

A)project audit
B)project review
C)project assessment
D)project control
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
25
are approved and authorized actions that are recommended to correct defects in the project deliverables.

A)Approved preventive actions
B)Approved change requests
C)Approved corrective actions
D)Approved defect repair
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
26
is the difference between the scheduled completion of an activity and the actual completion.

A)SD
B)CV
C)SV
D)CD
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
27
A cost control method for examining project cost performance over time to determine whether performance is improving or deteriorating is:

A)variance analysis.
B)earned value analysis.
C)cost analysis.
D)trend analysis.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
28
The is calculated by dividing the original time estimate by the SPI.

A)estimated time to complete
B)completion time
C)estimated cost at completion
D)schedule performance index
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
29
Project control is the process of monitoring and __________ project progress and influencing the plan to account for any discrepancies between planned progress and actual progress.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
30
is the difference between the earned value and the actual cost.

A)SD
B)CV
C)SV
D)CD
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
31
are activities and reporting methods instituted during the course of a project to monitor its progress and to provide reports for project managers and stakeholders.

A)Project guidelines
B)Standard project procedures
C)Standard operating procedures
D)Project rules
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
32
Reluctance to hear bad news communicated from lower levels of the organizational hierarchy is referred to as:

A)deaf effect.
B)fear of reprisal.
C)mum effect.
D)blowing the whistle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
33
A(n)contains a record of the project management techniques employed over the course of the project, surveys, and outstanding items that still need to be resolved.

A)outstanding item report
B)post- implementation report
C)handover report
D)end report
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
34
The 80/20 rule is another name for_________ .
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
35
The budgeted amount for the work actually completed on the activity during a given time period is referred to as:

A)PV.
B)EC.
C)PC.
D)EV.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
36
Pareto's law states that:

A)80 percent of the causes result in 20 percent problems.
B)the bar in histogram should be arranged in decreasing order.
C)in a histogram, the probabilities of occurrence are cumulative.
D)80 percent of the problems are the result of 20 percent of the causes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
37
Withholding negative information out of fear for negative consequences is known as:

A)deaf effect.
B)blowing the whistle.
C)fear of reprisal.
D)mum effect.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
38
A change control system is a documented process that describes the procedures by which:

A)system changes are managed.
B)the project and product scope can be changed.
C)changes are controlled.
D)all of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
39
The budgeted cost for the work scheduled to be completed on an activity up to a given point of time is referred to as:

A)PC.
B)PV.
C)EV.
D)EC.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
40
are documented and authorized guidelines necessary to bring future project performance in conformance with the project management plan.

A)Approved preventive actions
B)Approved change requests
C)Approved defect repair
D)Approved corrective actions
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
41
The approved project schedule is also referred to as schedule_________ .
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
42
A _________system is a formal, documented process that describes the procedures for changing the project scope and product scope.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
43
Part of the _________procedure includes training the end users and other organizational members on use of the new product.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
44
_________is the process of screening the project results to determine whether they conform to relevant quality standards and identifying means to eliminate causes of unsatisfactory results.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
45
A(n)_________contains a record of the project management techniques employed over the course of the project, surveys, and outstanding items that still need to be resolved.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
46
A_________ is a scope control technique that ensure that the requested changes to a project and product scope are thoroughly considered before being implemented.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
47
_________is the process of identifying the cause of variance relative to the project baseline and determining whether any corrective action is needed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
48
A __________ is a tool for controlling a project that involves recording information such as requested changes by the client, completion dates of deliverables, and so on.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
49
_________are items or activities that will still need to be addressed but, because of their nature, may need to be addressed by the clients themselves of assigned to a team member to attend after the official project handover.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
50
In many organizations, blowing the whistle is seen as _________behavior.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
51
_________are requested changes that were not chosen for implementation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
52
Outsourcing of_________ to a third party from outside the organization can help reduce the political consequences of whistle blowing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
53
Communicating bad news up the hierarchy is also known as _________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
54
_________is the process of identifying, analyzing, and planning for new risks, keeping track of identified risks, reanalyzing existing risks, monitoring trigger conditions for contingency plans, monitoring residual risks, and reviewing the executing of risk responses.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
55
The results of the perform quality control process can also lead to new_________ .
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
56
Indexes _________indicate possible problems with a project's progress.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
57
A __________ is a document that is usually completed 6- 12 months after implementation as a check on whether the outcomes of the project were as expected, whether ongoing costs are as expected, and whether implementing the product yields net benefits.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
58
The withholding of information for fearing negative consequences is also known as the_________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
59
A __________ is a process that helps the project team monitor and control the work being performed in accordance to the project management plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
60
For_________ projects, the laid- back philosophy of project control may be most appropriate.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
61
_________is the process of identifying, evaluating, and managing changes that occur from project initiation through project closure.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
62
An important issue during the closure process if the _________of the project management methods you have used.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
63
_________is the process of setting procedures and rules in place for controlling changes to the project schedule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
64
The reluctance to "hear the whistle" by upper management is also known as the _________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
65
In addition to the philosophy of project control employed, the manager also needs to_________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
66
If EV is greater than the PV, then SV is positive and the project is ahead of schedule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
67
Project risk audits are usually only performed during project execution.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
68
_________is a formal process for assuring that only agreed- upon changes are made to the project's scope.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
69
Recommended corrective actions are documented recommendations needed to bring future project performance into conformance with the project management plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
70
Earned value management measures project performance over time, and provides a way to forecast future performance base on_________ .
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
71
_________are estimates or predictions of conditions or events in the project's future.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
72
Cost control is the process of monitoring cost performance to ensure that only appropriate changes are included in the modified_________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
73
For _________projects, the dogmatic philosophy of project control may be most appropriate.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
74
In Microsoft Project, a_________ can be used to compare planned and actual project information.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
75
A negative CV means that it cost more to perform the work than was planned for
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
76
_________is the process of delivering the project to the client and training the personnel to use it.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
77
The _________change system provides the procedures by which changes can be made to the cost baseline.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
78
Formal signed- off _________helps prevent a project from going on and on without ever truly being finished.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
79
Project closure is the final implementation and training related to the project, getting acceptance and _________on the project, and archiving of the project's results.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
80
A _________CV means that it cost more to perform the work than was planned for.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.