سؤال
Application of PERT Network Analysis
Grace has just graduated from college with a degree in business administration and is totally overwhelmed by her first job. When she was in school, she could work on projects one at a time, and now she finds that she must juggle several projects with multiple activities. Grace is amazed that her supervisor, Linda, seems to have everything planned in a neat flowchart. Linda's current project is to oversee the construction of an office building, and Grace is determined to understand all of the actions that must take place, the major activities, and potential problems so she can be proactive.

-The actions that take place in Linda's analysis are called_____________in PERT network analysis.

A)critical path
B)slack time
C)events
D)activities
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Which of the following is not a benefit of just- in- time (JIT)inventory systems?

A)increased demand
B)reduced inventories
C)less space consumption
D)shorter manufacturing time
سؤال
Anything that has the immediate potential for delaying a project must be_____________ .

A)monitored very closely
B)minimized
C)stopped immediately
D)none of the above
سؤال
Application of PERT Network Analysis
Grace has just graduated from college with a degree in business administration and is totally overwhelmed by her first job. When she was in school, she could work on projects one at a time, and now she finds that she must juggle several projects with multiple activities. Grace is amazed that her supervisor, Linda, seems to have everything planned in a neat flowchart. Linda's current project is to oversee the construction of an office building, and Grace is determined to understand all of the actions that must take place, the major activities, and potential problems so she can be proactive.

-In PERT analysis, _____________is the time difference between the critical path and all other paths.

A)events
B)activities
C)critical path
D)slack time
سؤال
Which type of chart can schedule capacity by workstations?

A)load
B)Gantt
C)forecasting
D)zero- based budgeting
سؤال
_____________are not one of the major types of barrier that limit the success of value chain management listed in the text.

A)Organizational factors
B)Required capabilities
C)Technology investments
D)Cultural factors
سؤال
All of the following are benefits of effectively implementing a JIT inventory management systems within manufacturing except

A)increased customer satisfaction.
B)less space consumption.
C)better workflow, fewer bottlenecks.
D)reduced set- up time.
سؤال
Three tools that can be used to determine an efficiency sequence are Gantt charts, load charts, and_____________ .

A)control charts
B)PERT network analysis
C)critical path analysis
D)break- even analysis
سؤال
If a project requires coordinating hundreds of activities, some that must be done simultaneously and some that cannot begin until earlier activities have been completed, which of the following would be used?

A)break- even analysis
B)load chart
C)Gantt chart
D)PERT network analysis
سؤال
Aron can assemble 1000 widgets with 10 hours of direct labor at a fixed cost of materials and capital. What is his labor productivity?

A)10 percent
B)50 percent
C)100 percent
D)none of the above
سؤال
Which of the following is not a method of managing quality?

A)flexible manufacturing
B)continuous improvement
C)kanban
D)just- in- time
سؤال
Application of PERT Network Analysis
Grace has just graduated from college with a degree in business administration and is totally overwhelmed by her first job. When she was in school, she could work on projects one at a time, and now she finds that she must juggle several projects with multiple activities. Grace is amazed that her supervisor, Linda, seems to have everything planned in a neat flowchart. Linda's current project is to oversee the construction of an office building, and Grace is determined to understand all of the actions that must take place, the major activities, and potential problems so she can be proactive.
The flowchart that Linda is using depicts the sequence of activities necessary to construct the office building and the time and costs associated with each activity. Linda is using

A)internal auditing.
B)a management information system.
C)a Gantt chart.
D)PERT network analysis.
سؤال
A Gantt charts list tasks, compared to load charts which list_____________ .

A)resources or people
B)activities
C)time frames
D)events
سؤال
The formula for productivity is _____________divided by labor plus capital plus materials.

A)sales
B)outputs
C)personnel
D)profits
سؤال
Application of Operations Management
Leeann has been hired as an intern at BNR, a small custom embroidery and design business. She is amazed at the many uses her manager has found for technology. She is able to draft customer designs using software, and her manager has even told her about machines that can act and see like human beings. The embroidery machines are so sophisticated that in order to change from one product to another, all that she has to do is change the computer program. BNR sells many of its products over the Internet so there is no intermediary.

-BNR is using _____________ when it can manage inventory most efficiently.

A)flexible manufacturing
B)quality control
C)kanban
D)just- in- time (JIT)
سؤال
Any event on the on the critical path that is delayed will

A)increase the resources needed for the project.
B)increase the cost of the project.
C)increase the number of people assigned to the project.
D)delay the overall project.
سؤال
Application of Value Chain Management
Glenn is a novice at using value chain management, but realizes that he has to learn more about making it a success and how it is reshaping the office. Glenn has several problems with which he needs help. Here are his perceived needs:
1. comprehensive and seamless integration,
2. new technology,
3. better ways to get work done,
4. vision from people- centered managers, and
5. quality work.

-Glenn's first need is/are_____________ .

A)leadership
B)coordination and collaboration
C)organizational processes
D)technology investment
سؤال
Application of PERT Network Analysis
Grace has just graduated from college with a degree in business administration and is totally overwhelmed by her first job. When she was in school, she could work on projects one at a time, and now she finds that she must juggle several projects with multiple activities. Grace is amazed that her supervisor, Linda, seems to have everything planned in a neat flowchart. Linda's current project is to oversee the construction of an office building, and Grace is determined to understand all of the actions that must take place, the major activities, and potential problems so she can be proactive.

-Grace is using a load chart, which visually displays resources and the sequence of events. This tool is a type of_____________ .

A)quality control
B)critical path diagram
C)PERT network analysis
D)Gantt chart
سؤال
Which of the following is not a key component of PERT?

A)activities
B)events
C)critical path
D)times
سؤال
Which two variables are used in the Gantt chart?

A)time and activities to be scheduled
B)expenses incurred and activities to be scheduled
C)time and expenses incurred
D)efficiency of activities to be scheduled and expenses
سؤال
What is the ultimate goal of a just- in- time (JIT)inventory system?

A)eliminate raw material inventory
B)acquire firms that supply our inventory
C)disintermediation
D)reduce kanban
سؤال
Since a delay on this course will delay the whole project, where should management's attention be primarily focused?

A)activities
B)events
C)times
D)critical path
سؤال
Which planning technique allows managers to easily determine if they are ahead, behind, or on schedule?

A)forecasting
B)strategic planning
C)zero- based budgeting chart
D)Gantt chart
سؤال
PERT is primarily used as a _____________tool.

A)monitoring
B)planning;
C)controlling
D)measurement
سؤال
_____________is flowchart like diagram that depicts the sequence of activities needed to complete a project and the time or costs associated with each activity.

A)A project control chart
B)A Gantt chart
C)PERT network analysis chart
D)A load chart
سؤال
What do Gantt charts, load charts, and PERT network analysis charts all have in common?

A)They are used to manage inventories and supplies.
B)They sequence events concurrently.
C)They are part of the continuous improvement process.
D)They are part of the input process.
سؤال
_____________are the supplies or raw materials needed to create a product.

A)Processes
B)Inputs
C)Outputs
D)Investments
سؤال
_____________is the task of getting activities done on time, within budget, and according to specifications.

A)Project management
B)Quality control
C)Continuous process improvement
D)Process value analysis
سؤال
PERT is both a _____________and _____________tool.

A)planning; control
B)directing; planning
C)planning; organizing
D)control; staffing
سؤال
Application of PERT Network Analysis
Grace has just graduated from college with a degree in business administration and is totally overwhelmed by her first job. When she was in school, she could work on projects one at a time, and now she finds that she must juggle several projects with multiple activities. Grace is amazed that her supervisor, Linda, seems to have everything planned in a neat flowchart. Linda's current project is to oversee the construction of an office building, and Grace is determined to understand all of the actions that must take place, the major activities, and potential problems so she can be proactive.

-If Linda and Grace work together developing a new product that will be tested in several markets, the best device to use for this project would be _____________.

A)a Production chart
B)a PERT network analysis chart
C)a load chart
D)a Gantt chart
سؤال
Application of PERT Network Analysis
Grace has just graduated from college with a degree in business administration and is totally overwhelmed by her first job. When she was in school, she could work on projects one at a time, and now she finds that she must juggle several projects with multiple activities. Grace is amazed that her supervisor, Linda, seems to have everything planned in a neat flowchart. Linda's current project is to oversee the construction of an office building, and Grace is determined to understand all of the actions that must take place, the major activities, and potential problems so she can be proactive.
In PERT analysis, the longest or most time- consuming sequence of events and activities required to complete a project in the shortest amount of time is referred to as

A)critical path.
B)activities.
C)slack time.
D)events.
سؤال
What do we call the entire series of organizational work activities that add value at each step, beginning with the processing of raw materials and ending with a finished product in the hands of end users?

A)value chain management operations
B)value chain management
C)value chain
D)value
سؤال
Application of PERT Network Analysis
Grace has just graduated from college with a degree in business administration and is totally overwhelmed by her first job. When she was in school, she could work on projects one at a time, and now she finds that she must juggle several projects with multiple activities. Grace is amazed that her supervisor, Linda, seems to have everything planned in a neat flowchart. Linda's current project is to oversee the construction of an office building, and Grace is determined to understand all of the actions that must take place, the major activities, and potential problems so she can be proactive.
As Grace uses Gantt charts, load charts, and PERT network analysis charts on several of her projects, she notices that they have one thing in common, that

A)they sequence events concurrently.
B)they help control outputs.
C)they are part of the input process.
D)they are used to manage inventories.
سؤال
Application of Value Chain Management
Glenn is a novice at using value chain management, but realizes that he has to learn more about making it a success and how it is reshaping the office. Glenn has several problems with which he needs help. Here are his perceived needs:
1. comprehensive and seamless integration,
2. new technology,
3. better ways to get work done,
4. vision from people- centered managers, and
5. quality work.

-_____________is/are Glenn's third need.

A)Workflow automation
B)Leadership
C)A management information system
D)Organizational processes
سؤال
_____________is not one of the major steps involved in developing a PERT network chart.

A)Identifying project risks and obstacles
B)Identifying all significant project activities
C)Computing time estimates for each completing each activity
D)Determining the order of events that must be completed
سؤال
This area showed the least amount of overall improvement among all companies as result of sharing information with partners in the value chain partners.

A)customer service
B)cost savings
C)on- time delivery
D)sales and logistics
سؤال
Application of Operations Management
Leeann has been hired as an intern at BNR, a small custom embroidery and design business. She is amazed at the many uses her manager has found for technology. She is able to draft customer designs using software, and her manager has even told her about machines that can act and see like human beings. The embroidery machines are so sophisticated that in order to change from one product to another, all that she has to do is change the computer program. BNR sells many of its products over the Internet so there is no intermediary.
The machines that Leeann's manager has told her about, which can act and see like human beings and are able to perform complex operations, are termed

A)robotics.
B)kanban.
C)technology investment.
D)e- manufacturing.
سؤال
Application of Value Chain Management
Glenn is a novice at using value chain management, but realizes that he has to learn more about making it a success and how it is reshaping the office. Glenn has several problems with which he needs help. Here are his perceived needs:
1. comprehensive and seamless integration,
2. new technology,
3. better ways to get work done,
4. vision from people- centered managers, and
5. quality work.

-_____________is/are the last need.

A)Culture and attitudes
B)Employees
C)Technology investment
D)Leadership
سؤال
The process of managing the entire sequence of integrated activities and information about product flow is called _____________.

A)supply chain management
B)kaizen
C)total quality management
D)value chain management
سؤال
Application of Value Chain Management
Glenn is a novice at using value chain management, but realizes that he has to learn more about making it a success and how it is reshaping the office. Glenn has several problems with which he needs help. Here are his perceived needs:
1. comprehensive and seamless integration,
2. new technology,
3. better ways to get work done,
4. vision from people- centered managers, and
5. quality work.

-Glenn needs _____________ for the fourth organizational need.

A)better management
B)expert systems
C)flexible manufacturing systems
D)leadership
سؤال
All organizations produce goods or services through the _____________process.

A)transformation
B)manufacturing
C)engineering
D)operations
سؤال
A system in which inventory items arrive as they are needed in production instead of being stored in stock is known as

A)flexible manufacturing systems.
B)CAD.
C)just- in- time (JIT).
D)robotics.
سؤال
All of the following required capabilities are needed for effectiveness of value chain management except

A)ability to configure products to satisfy customers and suppliers.
B)ability to develop required technology.
C)ability to educate internal partners.
D)coordination and collaboration.
سؤال
Application of Operations Management
Leeann has been hired as an intern at BNR, a small custom embroidery and design business. She is amazed at the many uses her manager has found for technology. She is able to draft customer designs using software, and her manager has even told her about machines that can act and see like human beings. The embroidery machines are so sophisticated that in order to change from one product to another, all that she has to do is change the computer program. BNR sells many of its products over the Internet so there is no intermediary.

-BNR transforms its embroidery inputs into outputs through its _____________ .

A)just- in- time (JIT)system
B)quality control
C)robotics
D)technology
سؤال
_____________is/are not a requirement for successful value chain management listed in the text.

A)Technology investment
B)Coordination and collaboration
C)Organizational processes
D)Continuous process improvement
سؤال
A_____________ is a flowchart- like diagram that depicts the sequence of activities needed to complete a project and the time or costs associated with each activity.

A)TQM diagram
B)PERT network
C)break- even analysis
D)Gantt chart
سؤال
Choose the one statement below that is not an important conclusion about how organizational processes must change.

A)New measures are needed for setting realistic objectives in the value chain.
B)Selected functions may need to be done collaboratively with other partners in the value chain.
C)New measures are needed for evaluating the performance of various value chain activities.
D)Better demand forecasting is necessary and possible because of closer customer ties.
سؤال
Application of PERT Network Analysis
Grace has just graduated from college with a degree in business administration and is totally overwhelmed by her first job. When she was in school, she could work on projects one at a time, and now she finds that she must juggle several projects with multiple activities. Grace is amazed that her supervisor, Linda, seems to have everything planned in a neat flowchart. Linda's current project is to oversee the construction of an office building, and Grace is determined to understand all of the actions that must take place, the major activities, and potential problems so she can be proactive.

-Linda is using PERT network analysis primarily as a_____________ tool.

A)budgeting
B)monitoring
C)planning
D)management
سؤال
Continuous process improvement programs are designed to constantly improve the quality of the organization's _____________.

A)services
B)processes
C)products
D)all of the above
سؤال
Application of Operations Management
Leeann has been hired as an intern at BNR, a small custom embroidery and design business. She is amazed at the many uses her manager has found for technology. She is able to draft customer designs using software, and her manager has even told her about machines that can act and see like human beings. The embroidery machines are so sophisticated that in order to change from one product to another, all that she has to do is change the computer program. BNR sells many of its products over the Internet so there is no intermediary.

-BNR has used new Internet technology to ensure that what is produced meets its preestablished standards. BNR is concerned about_____________.

A)technology
B)quality control
C)just- in- time (JIT)inventory
D)value chain management
سؤال
The two most cited benefits from value chain management were_____________and _____________.

A)cost savings; accelerated delivery times
B)increased market share; increased sales
C)cost savings; increased market share
D)inventory reductions; improved logistics management
سؤال
Application of PERT Network Analysis
Grace has just graduated from college with a degree in business administration and is totally overwhelmed by her first job. When she was in school, she could work on projects one at a time, and now she finds that she must juggle several projects with multiple activities. Grace is amazed that her supervisor, Linda, seems to have everything planned in a neat flowchart. Linda's current project is to oversee the construction of an office building, and Grace is determined to understand all of the actions that must take place, the major activities, and potential problems so she can be proactive.
The program evaluation and review technique were originally developed in the late 1950s for the purpose of

A)building the Paris Metro.
B)working on the weapons system for the Polaris submarine.
C)minimizing time from grower to consumer for hog farmers.
D)coordinating the work on building the Vietnam Memorial.
سؤال
PERT network analysis teaches us that our attention needs to be focused on the _____________at all times.

A)critical activities
B)activities
C)events
D)critical path
سؤال
The study and application of the transformation process is called_____________ .

A)kanban
B)productivity
C)operations management
D)total quality control
سؤال
_____________would be the best tool to use if you were the project manager assigned to building a new office complex.

A)A process layout
B)A PERT Network chart
C)A break- even analysis
D)A Gantt chart
سؤال
If a project manager notices some slippage on a critical activity, perhaps _____________from a noncritical activity can be borrowed and temporarily assigned to work on the critical one.

A)ideal time
B)process time
C)slack time
D)critical time
سؤال
_____________refers to the facilities, functions, and activities involved in producing and delivering a product or service from supplier to customer.

A)Supply chain management
B)Inventory management
C)Continuous process improvement
D)Process value analysis
سؤال
Key issues related to operations management include all of the following except

A)capitalize on e- manufacturing technology.
B)parts arrive just in time.
C)quality.
D)market analysis.
سؤال
is not a major overall benefit of sharing information with partners in the value chain.

A)Accelerated delivery
B)Cost savings
C)Improved customer service
D)Increased employee satisfaction
سؤال
Application of PERT Network Analysis
Grace has just graduated from college with a degree in business administration and is totally overwhelmed by her first job. When she was in school, she could work on projects one at a time, and now she finds that she must juggle several projects with multiple activities. Grace is amazed that her supervisor, Linda, seems to have everything planned in a neat flowchart. Linda's current project is to oversee the construction of an office building, and Grace is determined to understand all of the actions that must take place, the major activities, and potential problems so she can be proactive.
Which of the following tools will help Linda produce chart displaying a visual sequence of the process steps used in planning, scheduling, and monitoring production?

A)a control chart
B)a load chart
C)a PERT network analysis chart
D)a Gantt chart
سؤال
Productivity refers to the design, operation, and control of the transformation process that converts such resources as labor and raw materials into goods and services, which are sold to customers.
سؤال
Technology is the primary focus of any manager's efforts to improve productivity.
سؤال
Describe the concept of a business model and describe how it relates to value chain management.
سؤال
Why discuss service organizations in this chapter?
سؤال
Supply chain management focuses on the efficient flow of raw materials into the organization and transformation of products and services that go outside of the organization.
سؤال
Application of Value Chain Management
Glenn is a novice at using value chain management, but realizes that he has to learn more about making it a success and how it is reshaping the office. Glenn has several problems with which he needs help. Here are his perceived needs:
1. comprehensive and seamless integration,
2. new technology,
3. better ways to get work done,
4. vision from people- centered managers, and
5. quality work.

-His second need is/are_____________ .

A)organizational processes
B)leadership
C)technology investment
D)coordination and collaboration
سؤال
Flexibility is the key description of job design in a value chain management organization.
سؤال
Define the term "slack time" and describe how it is used in managing a project.
سؤال
How can an organization improve productivity?
سؤال
What is the difference between a Gantt chart and a load chart?
سؤال
Kanban is part of which of the following processes in Japan?

A)continuous improvement
B)project management
C)flexible manufacturing
D)just- in- time
سؤال
As a result of sharing information with value chain partners, excellent companies reduced inventories and improved customer service by more than 50%.
سؤال
What is a Gantt chart? How can managers use Gantt charts?
سؤال
List the most benefits of value chain management cited in the text.
سؤال
What is just- in- time (JIT)inventory?
سؤال
Supply chain management is the process of managing the entire sequence of integrated activities and information about the flow and production of products along the entire value chain.
سؤال
Compare value chain management and supply chain management.
سؤال
Cost savings and accelerated delivery times are the two of the most important benefits gained from effective value chain management.
سؤال
Organizational processes are a requirement for successful value chain management.
سؤال
Briefly describe project management.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/106
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 14: Operations Management
1
Application of PERT Network Analysis
Grace has just graduated from college with a degree in business administration and is totally overwhelmed by her first job. When she was in school, she could work on projects one at a time, and now she finds that she must juggle several projects with multiple activities. Grace is amazed that her supervisor, Linda, seems to have everything planned in a neat flowchart. Linda's current project is to oversee the construction of an office building, and Grace is determined to understand all of the actions that must take place, the major activities, and potential problems so she can be proactive.

-The actions that take place in Linda's analysis are called_____________in PERT network analysis.

A)critical path
B)slack time
C)events
D)activities
activities
2
Which of the following is not a benefit of just- in- time (JIT)inventory systems?

A)increased demand
B)reduced inventories
C)less space consumption
D)shorter manufacturing time
A
3
Anything that has the immediate potential for delaying a project must be_____________ .

A)monitored very closely
B)minimized
C)stopped immediately
D)none of the above
monitored very closely
4
Application of PERT Network Analysis
Grace has just graduated from college with a degree in business administration and is totally overwhelmed by her first job. When she was in school, she could work on projects one at a time, and now she finds that she must juggle several projects with multiple activities. Grace is amazed that her supervisor, Linda, seems to have everything planned in a neat flowchart. Linda's current project is to oversee the construction of an office building, and Grace is determined to understand all of the actions that must take place, the major activities, and potential problems so she can be proactive.

-In PERT analysis, _____________is the time difference between the critical path and all other paths.

A)events
B)activities
C)critical path
D)slack time
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
5
Which type of chart can schedule capacity by workstations?

A)load
B)Gantt
C)forecasting
D)zero- based budgeting
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
6
_____________are not one of the major types of barrier that limit the success of value chain management listed in the text.

A)Organizational factors
B)Required capabilities
C)Technology investments
D)Cultural factors
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
7
All of the following are benefits of effectively implementing a JIT inventory management systems within manufacturing except

A)increased customer satisfaction.
B)less space consumption.
C)better workflow, fewer bottlenecks.
D)reduced set- up time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
8
Three tools that can be used to determine an efficiency sequence are Gantt charts, load charts, and_____________ .

A)control charts
B)PERT network analysis
C)critical path analysis
D)break- even analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
9
If a project requires coordinating hundreds of activities, some that must be done simultaneously and some that cannot begin until earlier activities have been completed, which of the following would be used?

A)break- even analysis
B)load chart
C)Gantt chart
D)PERT network analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
10
Aron can assemble 1000 widgets with 10 hours of direct labor at a fixed cost of materials and capital. What is his labor productivity?

A)10 percent
B)50 percent
C)100 percent
D)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
11
Which of the following is not a method of managing quality?

A)flexible manufacturing
B)continuous improvement
C)kanban
D)just- in- time
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
12
Application of PERT Network Analysis
Grace has just graduated from college with a degree in business administration and is totally overwhelmed by her first job. When she was in school, she could work on projects one at a time, and now she finds that she must juggle several projects with multiple activities. Grace is amazed that her supervisor, Linda, seems to have everything planned in a neat flowchart. Linda's current project is to oversee the construction of an office building, and Grace is determined to understand all of the actions that must take place, the major activities, and potential problems so she can be proactive.
The flowchart that Linda is using depicts the sequence of activities necessary to construct the office building and the time and costs associated with each activity. Linda is using

A)internal auditing.
B)a management information system.
C)a Gantt chart.
D)PERT network analysis.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
13
A Gantt charts list tasks, compared to load charts which list_____________ .

A)resources or people
B)activities
C)time frames
D)events
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
14
The formula for productivity is _____________divided by labor plus capital plus materials.

A)sales
B)outputs
C)personnel
D)profits
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
15
Application of Operations Management
Leeann has been hired as an intern at BNR, a small custom embroidery and design business. She is amazed at the many uses her manager has found for technology. She is able to draft customer designs using software, and her manager has even told her about machines that can act and see like human beings. The embroidery machines are so sophisticated that in order to change from one product to another, all that she has to do is change the computer program. BNR sells many of its products over the Internet so there is no intermediary.

-BNR is using _____________ when it can manage inventory most efficiently.

A)flexible manufacturing
B)quality control
C)kanban
D)just- in- time (JIT)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
16
Any event on the on the critical path that is delayed will

A)increase the resources needed for the project.
B)increase the cost of the project.
C)increase the number of people assigned to the project.
D)delay the overall project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
17
Application of Value Chain Management
Glenn is a novice at using value chain management, but realizes that he has to learn more about making it a success and how it is reshaping the office. Glenn has several problems with which he needs help. Here are his perceived needs:
1. comprehensive and seamless integration,
2. new technology,
3. better ways to get work done,
4. vision from people- centered managers, and
5. quality work.

-Glenn's first need is/are_____________ .

A)leadership
B)coordination and collaboration
C)organizational processes
D)technology investment
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
18
Application of PERT Network Analysis
Grace has just graduated from college with a degree in business administration and is totally overwhelmed by her first job. When she was in school, she could work on projects one at a time, and now she finds that she must juggle several projects with multiple activities. Grace is amazed that her supervisor, Linda, seems to have everything planned in a neat flowchart. Linda's current project is to oversee the construction of an office building, and Grace is determined to understand all of the actions that must take place, the major activities, and potential problems so she can be proactive.

-Grace is using a load chart, which visually displays resources and the sequence of events. This tool is a type of_____________ .

A)quality control
B)critical path diagram
C)PERT network analysis
D)Gantt chart
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
19
Which of the following is not a key component of PERT?

A)activities
B)events
C)critical path
D)times
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
20
Which two variables are used in the Gantt chart?

A)time and activities to be scheduled
B)expenses incurred and activities to be scheduled
C)time and expenses incurred
D)efficiency of activities to be scheduled and expenses
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
21
What is the ultimate goal of a just- in- time (JIT)inventory system?

A)eliminate raw material inventory
B)acquire firms that supply our inventory
C)disintermediation
D)reduce kanban
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
22
Since a delay on this course will delay the whole project, where should management's attention be primarily focused?

A)activities
B)events
C)times
D)critical path
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
23
Which planning technique allows managers to easily determine if they are ahead, behind, or on schedule?

A)forecasting
B)strategic planning
C)zero- based budgeting chart
D)Gantt chart
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
24
PERT is primarily used as a _____________tool.

A)monitoring
B)planning;
C)controlling
D)measurement
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
25
_____________is flowchart like diagram that depicts the sequence of activities needed to complete a project and the time or costs associated with each activity.

A)A project control chart
B)A Gantt chart
C)PERT network analysis chart
D)A load chart
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
26
What do Gantt charts, load charts, and PERT network analysis charts all have in common?

A)They are used to manage inventories and supplies.
B)They sequence events concurrently.
C)They are part of the continuous improvement process.
D)They are part of the input process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
27
_____________are the supplies or raw materials needed to create a product.

A)Processes
B)Inputs
C)Outputs
D)Investments
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
28
_____________is the task of getting activities done on time, within budget, and according to specifications.

A)Project management
B)Quality control
C)Continuous process improvement
D)Process value analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
29
PERT is both a _____________and _____________tool.

A)planning; control
B)directing; planning
C)planning; organizing
D)control; staffing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
30
Application of PERT Network Analysis
Grace has just graduated from college with a degree in business administration and is totally overwhelmed by her first job. When she was in school, she could work on projects one at a time, and now she finds that she must juggle several projects with multiple activities. Grace is amazed that her supervisor, Linda, seems to have everything planned in a neat flowchart. Linda's current project is to oversee the construction of an office building, and Grace is determined to understand all of the actions that must take place, the major activities, and potential problems so she can be proactive.

-If Linda and Grace work together developing a new product that will be tested in several markets, the best device to use for this project would be _____________.

A)a Production chart
B)a PERT network analysis chart
C)a load chart
D)a Gantt chart
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
31
Application of PERT Network Analysis
Grace has just graduated from college with a degree in business administration and is totally overwhelmed by her first job. When she was in school, she could work on projects one at a time, and now she finds that she must juggle several projects with multiple activities. Grace is amazed that her supervisor, Linda, seems to have everything planned in a neat flowchart. Linda's current project is to oversee the construction of an office building, and Grace is determined to understand all of the actions that must take place, the major activities, and potential problems so she can be proactive.
In PERT analysis, the longest or most time- consuming sequence of events and activities required to complete a project in the shortest amount of time is referred to as

A)critical path.
B)activities.
C)slack time.
D)events.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
32
What do we call the entire series of organizational work activities that add value at each step, beginning with the processing of raw materials and ending with a finished product in the hands of end users?

A)value chain management operations
B)value chain management
C)value chain
D)value
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
33
Application of PERT Network Analysis
Grace has just graduated from college with a degree in business administration and is totally overwhelmed by her first job. When she was in school, she could work on projects one at a time, and now she finds that she must juggle several projects with multiple activities. Grace is amazed that her supervisor, Linda, seems to have everything planned in a neat flowchart. Linda's current project is to oversee the construction of an office building, and Grace is determined to understand all of the actions that must take place, the major activities, and potential problems so she can be proactive.
As Grace uses Gantt charts, load charts, and PERT network analysis charts on several of her projects, she notices that they have one thing in common, that

A)they sequence events concurrently.
B)they help control outputs.
C)they are part of the input process.
D)they are used to manage inventories.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
34
Application of Value Chain Management
Glenn is a novice at using value chain management, but realizes that he has to learn more about making it a success and how it is reshaping the office. Glenn has several problems with which he needs help. Here are his perceived needs:
1. comprehensive and seamless integration,
2. new technology,
3. better ways to get work done,
4. vision from people- centered managers, and
5. quality work.

-_____________is/are Glenn's third need.

A)Workflow automation
B)Leadership
C)A management information system
D)Organizational processes
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
35
_____________is not one of the major steps involved in developing a PERT network chart.

A)Identifying project risks and obstacles
B)Identifying all significant project activities
C)Computing time estimates for each completing each activity
D)Determining the order of events that must be completed
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
36
This area showed the least amount of overall improvement among all companies as result of sharing information with partners in the value chain partners.

A)customer service
B)cost savings
C)on- time delivery
D)sales and logistics
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
37
Application of Operations Management
Leeann has been hired as an intern at BNR, a small custom embroidery and design business. She is amazed at the many uses her manager has found for technology. She is able to draft customer designs using software, and her manager has even told her about machines that can act and see like human beings. The embroidery machines are so sophisticated that in order to change from one product to another, all that she has to do is change the computer program. BNR sells many of its products over the Internet so there is no intermediary.
The machines that Leeann's manager has told her about, which can act and see like human beings and are able to perform complex operations, are termed

A)robotics.
B)kanban.
C)technology investment.
D)e- manufacturing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
38
Application of Value Chain Management
Glenn is a novice at using value chain management, but realizes that he has to learn more about making it a success and how it is reshaping the office. Glenn has several problems with which he needs help. Here are his perceived needs:
1. comprehensive and seamless integration,
2. new technology,
3. better ways to get work done,
4. vision from people- centered managers, and
5. quality work.

-_____________is/are the last need.

A)Culture and attitudes
B)Employees
C)Technology investment
D)Leadership
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
39
The process of managing the entire sequence of integrated activities and information about product flow is called _____________.

A)supply chain management
B)kaizen
C)total quality management
D)value chain management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
40
Application of Value Chain Management
Glenn is a novice at using value chain management, but realizes that he has to learn more about making it a success and how it is reshaping the office. Glenn has several problems with which he needs help. Here are his perceived needs:
1. comprehensive and seamless integration,
2. new technology,
3. better ways to get work done,
4. vision from people- centered managers, and
5. quality work.

-Glenn needs _____________ for the fourth organizational need.

A)better management
B)expert systems
C)flexible manufacturing systems
D)leadership
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
41
All organizations produce goods or services through the _____________process.

A)transformation
B)manufacturing
C)engineering
D)operations
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
42
A system in which inventory items arrive as they are needed in production instead of being stored in stock is known as

A)flexible manufacturing systems.
B)CAD.
C)just- in- time (JIT).
D)robotics.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
43
All of the following required capabilities are needed for effectiveness of value chain management except

A)ability to configure products to satisfy customers and suppliers.
B)ability to develop required technology.
C)ability to educate internal partners.
D)coordination and collaboration.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
44
Application of Operations Management
Leeann has been hired as an intern at BNR, a small custom embroidery and design business. She is amazed at the many uses her manager has found for technology. She is able to draft customer designs using software, and her manager has even told her about machines that can act and see like human beings. The embroidery machines are so sophisticated that in order to change from one product to another, all that she has to do is change the computer program. BNR sells many of its products over the Internet so there is no intermediary.

-BNR transforms its embroidery inputs into outputs through its _____________ .

A)just- in- time (JIT)system
B)quality control
C)robotics
D)technology
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
45
_____________is/are not a requirement for successful value chain management listed in the text.

A)Technology investment
B)Coordination and collaboration
C)Organizational processes
D)Continuous process improvement
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
46
A_____________ is a flowchart- like diagram that depicts the sequence of activities needed to complete a project and the time or costs associated with each activity.

A)TQM diagram
B)PERT network
C)break- even analysis
D)Gantt chart
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
47
Choose the one statement below that is not an important conclusion about how organizational processes must change.

A)New measures are needed for setting realistic objectives in the value chain.
B)Selected functions may need to be done collaboratively with other partners in the value chain.
C)New measures are needed for evaluating the performance of various value chain activities.
D)Better demand forecasting is necessary and possible because of closer customer ties.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
48
Application of PERT Network Analysis
Grace has just graduated from college with a degree in business administration and is totally overwhelmed by her first job. When she was in school, she could work on projects one at a time, and now she finds that she must juggle several projects with multiple activities. Grace is amazed that her supervisor, Linda, seems to have everything planned in a neat flowchart. Linda's current project is to oversee the construction of an office building, and Grace is determined to understand all of the actions that must take place, the major activities, and potential problems so she can be proactive.

-Linda is using PERT network analysis primarily as a_____________ tool.

A)budgeting
B)monitoring
C)planning
D)management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
49
Continuous process improvement programs are designed to constantly improve the quality of the organization's _____________.

A)services
B)processes
C)products
D)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
50
Application of Operations Management
Leeann has been hired as an intern at BNR, a small custom embroidery and design business. She is amazed at the many uses her manager has found for technology. She is able to draft customer designs using software, and her manager has even told her about machines that can act and see like human beings. The embroidery machines are so sophisticated that in order to change from one product to another, all that she has to do is change the computer program. BNR sells many of its products over the Internet so there is no intermediary.

-BNR has used new Internet technology to ensure that what is produced meets its preestablished standards. BNR is concerned about_____________.

A)technology
B)quality control
C)just- in- time (JIT)inventory
D)value chain management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
51
The two most cited benefits from value chain management were_____________and _____________.

A)cost savings; accelerated delivery times
B)increased market share; increased sales
C)cost savings; increased market share
D)inventory reductions; improved logistics management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
52
Application of PERT Network Analysis
Grace has just graduated from college with a degree in business administration and is totally overwhelmed by her first job. When she was in school, she could work on projects one at a time, and now she finds that she must juggle several projects with multiple activities. Grace is amazed that her supervisor, Linda, seems to have everything planned in a neat flowchart. Linda's current project is to oversee the construction of an office building, and Grace is determined to understand all of the actions that must take place, the major activities, and potential problems so she can be proactive.
The program evaluation and review technique were originally developed in the late 1950s for the purpose of

A)building the Paris Metro.
B)working on the weapons system for the Polaris submarine.
C)minimizing time from grower to consumer for hog farmers.
D)coordinating the work on building the Vietnam Memorial.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
53
PERT network analysis teaches us that our attention needs to be focused on the _____________at all times.

A)critical activities
B)activities
C)events
D)critical path
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
54
The study and application of the transformation process is called_____________ .

A)kanban
B)productivity
C)operations management
D)total quality control
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
55
_____________would be the best tool to use if you were the project manager assigned to building a new office complex.

A)A process layout
B)A PERT Network chart
C)A break- even analysis
D)A Gantt chart
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
56
If a project manager notices some slippage on a critical activity, perhaps _____________from a noncritical activity can be borrowed and temporarily assigned to work on the critical one.

A)ideal time
B)process time
C)slack time
D)critical time
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
57
_____________refers to the facilities, functions, and activities involved in producing and delivering a product or service from supplier to customer.

A)Supply chain management
B)Inventory management
C)Continuous process improvement
D)Process value analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
58
Key issues related to operations management include all of the following except

A)capitalize on e- manufacturing technology.
B)parts arrive just in time.
C)quality.
D)market analysis.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
59
is not a major overall benefit of sharing information with partners in the value chain.

A)Accelerated delivery
B)Cost savings
C)Improved customer service
D)Increased employee satisfaction
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
60
Application of PERT Network Analysis
Grace has just graduated from college with a degree in business administration and is totally overwhelmed by her first job. When she was in school, she could work on projects one at a time, and now she finds that she must juggle several projects with multiple activities. Grace is amazed that her supervisor, Linda, seems to have everything planned in a neat flowchart. Linda's current project is to oversee the construction of an office building, and Grace is determined to understand all of the actions that must take place, the major activities, and potential problems so she can be proactive.
Which of the following tools will help Linda produce chart displaying a visual sequence of the process steps used in planning, scheduling, and monitoring production?

A)a control chart
B)a load chart
C)a PERT network analysis chart
D)a Gantt chart
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
61
Productivity refers to the design, operation, and control of the transformation process that converts such resources as labor and raw materials into goods and services, which are sold to customers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
62
Technology is the primary focus of any manager's efforts to improve productivity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
63
Describe the concept of a business model and describe how it relates to value chain management.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
64
Why discuss service organizations in this chapter?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
65
Supply chain management focuses on the efficient flow of raw materials into the organization and transformation of products and services that go outside of the organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
66
Application of Value Chain Management
Glenn is a novice at using value chain management, but realizes that he has to learn more about making it a success and how it is reshaping the office. Glenn has several problems with which he needs help. Here are his perceived needs:
1. comprehensive and seamless integration,
2. new technology,
3. better ways to get work done,
4. vision from people- centered managers, and
5. quality work.

-His second need is/are_____________ .

A)organizational processes
B)leadership
C)technology investment
D)coordination and collaboration
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
67
Flexibility is the key description of job design in a value chain management organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
68
Define the term "slack time" and describe how it is used in managing a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
69
How can an organization improve productivity?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
70
What is the difference between a Gantt chart and a load chart?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
71
Kanban is part of which of the following processes in Japan?

A)continuous improvement
B)project management
C)flexible manufacturing
D)just- in- time
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
72
As a result of sharing information with value chain partners, excellent companies reduced inventories and improved customer service by more than 50%.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
73
What is a Gantt chart? How can managers use Gantt charts?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
74
List the most benefits of value chain management cited in the text.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
75
What is just- in- time (JIT)inventory?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
76
Supply chain management is the process of managing the entire sequence of integrated activities and information about the flow and production of products along the entire value chain.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
77
Compare value chain management and supply chain management.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
78
Cost savings and accelerated delivery times are the two of the most important benefits gained from effective value chain management.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
79
Organizational processes are a requirement for successful value chain management.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
80
Briefly describe project management.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.