Deck 15: Lean Production
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/27
العب
ملء الشاشة (f)
Deck 15: Lean Production
1
Linearity in a lean environment means:
A) produce small lot sizes
B) plan level schedules
C) each day achieve the plan, no more or less
D) eliminate all idle time
E) statistical process control
A) produce small lot sizes
B) plan level schedules
C) each day achieve the plan, no more or less
D) eliminate all idle time
E) statistical process control
C
2
Reduced setup has which of the following advantages?
I) Reduced lot sizes.
II) Reduce lead time and queue.
III) Improved quality.
A) all the above
B) I and II only
C) I and III only
D) II and III only
E) I only
I) Reduced lot sizes.
II) Reduce lead time and queue.
III) Improved quality.
A) all the above
B) I and II only
C) I and III only
D) II and III only
E) I only
A
3
Which of the following statements is true?
I) Value starts in the marketplace.
II) Cost and value are the same thing.
III) Counting and storing add value to the product.
A) I and II
B) I and III
C) II and III
D) I
E) III
I) Value starts in the marketplace.
II) Cost and value are the same thing.
III) Counting and storing add value to the product.
A) I and II
B) I and III
C) II and III
D) I
E) III
D
4
Overproduction causes waste by:
A) consuming unneeded raw materials and labor
B) creating excess inventory
C) causing confusion and hiding problems
D) a and b
E) all the above
A) consuming unneeded raw materials and labor
B) creating excess inventory
C) causing confusion and hiding problems
D) a and b
E) all the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 27 في هذه المجموعة.
فتح الحزمة
k this deck
5
A pull system is developed to provide which of the following?
A) an alternative to a classic MRP system
B) to provide only what is needed and when it is needed
C) only used when demand is constant and known
D) only used when demand is unknown
A) an alternative to a classic MRP system
B) to provide only what is needed and when it is needed
C) only used when demand is constant and known
D) only used when demand is unknown
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 27 في هذه المجموعة.
فتح الحزمة
k this deck
6
The buyer expects that a supplier will provide each of the following EXCEPT:
A) the quality needed at all times
B) information on competitors
C) frequent deliveries
D) improved quality and cost
A) the quality needed at all times
B) information on competitors
C) frequent deliveries
D) improved quality and cost
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 27 في هذه المجموعة.
فتح الحزمة
k this deck
7
An example of using the poka-yoke technique in process design is
A) Reducing the number and type of fasteners
B) Using standardized tooling
C) Using tooling to prevent a part from being inserted upside down
D) Eliminating bill of material levels
A) Reducing the number and type of fasteners
B) Using standardized tooling
C) Using tooling to prevent a part from being inserted upside down
D) Eliminating bill of material levels
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 27 في هذه المجموعة.
فتح الحزمة
k this deck
8
Which of the following statements is best?
I) Lean and manufacturing planning and control cannot work together.
II) The lean philosophy simplifies and reduces manufacturing planning and control problems.
III) Lean requires a very good planning and control system.
A) all the above are true
B) I and II
C) I and III
D) II and III
E) none of the above
I) Lean and manufacturing planning and control cannot work together.
II) The lean philosophy simplifies and reduces manufacturing planning and control problems.
III) Lean requires a very good planning and control system.
A) all the above are true
B) I and II
C) I and III
D) II and III
E) none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 27 في هذه المجموعة.
فتح الحزمة
k this deck
9
If a company standardizes on the components that are used in different models it will:
A) reduce waste
B) reduce the variety of options offered to the customer
C) reduce the length of production runs
D) require the use of general-purpose machinery
A) reduce waste
B) reduce the variety of options offered to the customer
C) reduce the length of production runs
D) require the use of general-purpose machinery
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 27 في هذه المجموعة.
فتح الحزمة
k this deck
10
Which of the following statements is best regarding lean production?
I) It is a philosophy that relates to the way in which a manufacturing company organizes and operates its business.
II) It is a set of techniques to make manufacturing more productive.
III) It is concerned with adding value to the product.
A) all the above are true
B) I and II are best
C) I and III are best
D) II and III are best
E) I only is best
I) It is a philosophy that relates to the way in which a manufacturing company organizes and operates its business.
II) It is a set of techniques to make manufacturing more productive.
III) It is concerned with adding value to the product.
A) all the above are true
B) I and II are best
C) I and III are best
D) II and III are best
E) I only is best
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 27 في هذه المجموعة.
فتح الحزمة
k this deck
11
Which of the following contribute to machine flexibility?
A) small general-purpose machinery
B) mobility of machines
C) automated high-capacity machines
D) a and b above
E) b and c above
A) small general-purpose machinery
B) mobility of machines
C) automated high-capacity machines
D) a and b above
E) b and c above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 27 في هذه المجموعة.
فتح الحزمة
k this deck
12
Which of the following are advantages of reducing inventory?
I) Engineering changes can be made sooner.
II) Quality can be improved.
III) Less space is needed in manufacturing.
IV) Lead time will be shorter.
A) all the above
B) only I, II and III
C) only I, II and IV
D) only II, III and IV
E) only III and IV
I) Engineering changes can be made sooner.
II) Quality can be improved.
III) Less space is needed in manufacturing.
IV) Lead time will be shorter.
A) all the above
B) only I, II and III
C) only I, II and IV
D) only II, III and IV
E) only III and IV
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 27 في هذه المجموعة.
فتح الحزمة
k this deck
13
Lean practices will change the material requirements planning process by:
A) reducing the number of levels in the bill of material
B) making the bill of material more complex
C) increasing the need for offsetting
D) increasing the need for netting
E) eliminating the need for MRP
A) reducing the number of levels in the bill of material
B) making the bill of material more complex
C) increasing the need for offsetting
D) increasing the need for netting
E) eliminating the need for MRP
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 27 في هذه المجموعة.
فتح الحزمة
k this deck
14
Lean production will influence master production scheduling by:
A) reducing time fences and making the MPS more responsive to customer demand
B) making it possible to use daily time buckets
C) making the MPS more unstable
D) a and b only
E) b and c only
A) reducing time fences and making the MPS more responsive to customer demand
B) making it possible to use daily time buckets
C) making the MPS more unstable
D) a and b only
E) b and c only
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 27 في هذه المجموعة.
فتح الحزمة
k this deck
15
Which of the following concepts is needed to achieve uninterrupted material flow?
A) uniform plant loading
B) pull system
C) valid schedules
D) all the above are needed
E) a and b only are needed
A) uniform plant loading
B) pull system
C) valid schedules
D) all the above are needed
E) a and b only are needed
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 27 في هذه المجموعة.
فتح الحزمة
k this deck
16
Employee involvement in a lean environment means:
I) Operators must take responsibility for improving the process.
II) Management must take more of a leadership role.
III) Staff must be trainers and assist line people.
A) all the above
B) I and II only
C) I and III only
D) II and III only
E) none of the above
I) Operators must take responsibility for improving the process.
II) Management must take more of a leadership role.
III) Staff must be trainers and assist line people.
A) all the above
B) I and II only
C) I and III only
D) II and III only
E) none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 27 في هذه المجموعة.
فتح الحزمة
k this deck
17
The ideal product is one that:
I) Meets or exceeds the needs of the customer.
II) Makes the best use of material.
III) Can be manufactured at least cost.
A) all the above
B) I and II only
C) II and III only
D) I only
I) Meets or exceeds the needs of the customer.
II) Makes the best use of material.
III) Can be manufactured at least cost.
A) all the above
B) I and II only
C) II and III only
D) I only
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 27 في هذه المجموعة.
فتح الحزمة
k this deck
18
Which of the following is a benefit to the purchaser in supplier partnerships?
A) frequent deliveries on a just-in-time basis
B) better quality
C) improved performance and cost
D) all the above
E) a and b above only
A) frequent deliveries on a just-in-time basis
B) better quality
C) improved performance and cost
D) all the above
E) a and b above only
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 27 في هذه المجموعة.
فتح الحزمة
k this deck
19
Which of the following is NOT an advantage of work cells?
A) queue and lead time are reduced
B) production activity control is simplified
C) need for floor space is reduced
D) immediate feedback
E) maximum machine utilization
A) queue and lead time are reduced
B) production activity control is simplified
C) need for floor space is reduced
D) immediate feedback
E) maximum machine utilization
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 27 في هذه المجموعة.
فتح الحزمة
k this deck
20
Which of the following statements is best about quality?
I) Quality can be inspected into a product.
II) Poor quality has no effect on work flow.
III) The process must be capable of producing the required quality consistently.
IV) Machinery must be maintained in excellent condition.
A) all the above
B) I and II only
C) II and III only
D) III and IV only
E) I and IV only
I) Quality can be inspected into a product.
II) Poor quality has no effect on work flow.
III) The process must be capable of producing the required quality consistently.
IV) Machinery must be maintained in excellent condition.
A) all the above
B) I and II only
C) II and III only
D) III and IV only
E) I and IV only
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 27 في هذه المجموعة.
فتح الحزمة
k this deck
21
The term that describes eliminating waste throughout a company is:
A) Kaizen
B) Lean Production
C) Theory of Constraints
D) Process Control
A) Kaizen
B) Lean Production
C) Theory of Constraints
D) Process Control
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 27 في هذه المجموعة.
فتح الحزمة
k this deck
22
Which of the following techniques reduces the cost of processing transactions?
A) Backflushing
B) Pareto analysis
C) Mean absolute deviation
D) SMED
A) Backflushing
B) Pareto analysis
C) Mean absolute deviation
D) SMED
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 27 في هذه المجموعة.
فتح الحزمة
k this deck
23
Which of the following terms refers to a pull system in which signals are used to withdraw parts from feeding operations or suppliers?
A) Andon
B) Kanban
C) Dispatching
D) Poka-yoke
A) Andon
B) Kanban
C) Dispatching
D) Poka-yoke
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 27 في هذه المجموعة.
فتح الحزمة
k this deck
24
Which of the following define the 5S approach to housekeeping?
A) Sort, Straighten, Safety, Schedule, Source
B) Straighten, Shine, Standardize, Source, Smooth
C) Sort, Straighten, Shine, Standardize, Sustain
D) Shine, Standardize, Sustain, Schedule, Smooth
A) Sort, Straighten, Safety, Schedule, Source
B) Straighten, Shine, Standardize, Source, Smooth
C) Sort, Straighten, Shine, Standardize, Sustain
D) Shine, Standardize, Sustain, Schedule, Smooth
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 27 في هذه المجموعة.
فتح الحزمة
k this deck
25
Employee participation in small, incremental improvements is known as:
A) Value stream mapping
B) Drum-buffer-rope
C) Kaizen
D) Motion economy
A) Value stream mapping
B) Drum-buffer-rope
C) Kaizen
D) Motion economy
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 27 في هذه المجموعة.
فتح الحزمة
k this deck
26
Bills of material used for MRP planning in a lean environment are likely to have which of the following characteristics?
A) fewer "phantom" or "blow-through" assemblies
B) increased complexity with regard to options
C) weekly time buckets
D) no need for where-used references
E) fewer levels in product structures
A) fewer "phantom" or "blow-through" assemblies
B) increased complexity with regard to options
C) weekly time buckets
D) no need for where-used references
E) fewer levels in product structures
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 27 في هذه المجموعة.
فتح الحزمة
k this deck
27
Matching the pace of production to match the rate of customer demand is known as:
A) Poka-yoke
B) Drum-buffer-rope
C) Bullwhip
D) Takt time
A) Poka-yoke
B) Drum-buffer-rope
C) Bullwhip
D) Takt time
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 27 في هذه المجموعة.
فتح الحزمة
k this deck