Deck 9: Project Scheduling: Pertcpm

ملء الشاشة (f)
exit full mode
سؤال
Critical activities are those that can be delayed without delaying the entire project.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
It is possible to have more than one critical path at a time.
سؤال
The length of time an activity can be delayed without affecting the project completion time is the slack.
سؤال
The difference between an activity's earliest finish time and latest finish time equals the difference between its earliest start time and latest start time.
سؤال
PERT and CPM are applicable only when there is no dependence among activities.
سؤال
When activity times are uncertain, total project time is normally distributed with mean equal to the sum of the means of all of the critical activities.
سؤال
A path through a project network must reach every node.
سؤال
The earliest finish time for the final activity is the project duration.
سؤال
The variance in the project completion time is the sum of the variances of all activities in the project.
سؤال
Constraints in the LP models for crashing decisions are required to compare the activity's earliest finish time with the earliest finish time of each predecessor.
سؤال
Crashing refers to an unanticipated delay in a critical path activity that causes the total time to exceed its limit.
سؤال
All activities on a critical path have zero slack time.
سؤال
A critical activity can be part of a noncritical path.
سؤال
The linear programming model for crashing presented in the textbook assumes that any portion of the activity crash time can be achieved for a corresponding portion of the activity crashing cost.
سؤال
The earliest start time for an activity is equal to the smallest of the earliest finish times for all its immediate predecessors.
سؤال
When activity times are uncertain, an activity's most likely time is the same as its expected time.
سؤال
The project manager should monitor the progress of any activity with a large time variance even if the expected time does not identify the activity as a critical activity.
سؤال
​Precedence relationships among activities is critical in CPM analysis but not in PERT.
سؤال
Activities require time to complete while events do not.
سؤال
The latest finish time for an activity is the largest of the latest start times for all activities that immediately follow the activity.
سؤال
​A critical activity is

A) ​an activity that consumes no time but shows precedence between events.
B) ​a milestone accomplishment within the project.
C) ​an activity with zero slack.
D) ​the beginning of an event.
سؤال
For an activity with more than one immediate successor activity, its latest-finish time is equal to the

A) largest latest-finish time among its immediate successors.
B) smallest latest-finish time among its immediate successors.
C) largest latest-start time among its immediate successors.
D) smallest latest-start time among its immediate successors.
سؤال
Activities following a node

A) can begin as soon as any activity preceding the node has been completed.
B) have an earliest start time equal to the largest of the earliest finish times for all activities entering the node.
C) have a latest start time equal to the largest of the earliest finish times for all activities entering the node.
D) None of the alternatives is correct.
سؤال
Which of the following is a general rule for crashing activities?

A) Crash only non-critical activities.
B) Crash activities with zero slack.
C) Crash activities with the greatest number of predecessors.
D) Crash the path with the fewest activities.
سؤال
Activities K, M and S immediately follow activity H, and their latest start times are 14, 18, and 11. The latest finish time for activity H

A) is 11.
B) is 14.
C) is 18.
D) cannot be determined.
سؤال
Which is not a significant challenge of project scheduling?

A) deadlines exist.
B) activities are independent.
C) many employees could be required.
D) delays are costly.
سؤال
The earliest start time rule

A) compares the starting times of all activities for successors of an activity.
B) compares the finish times for all immediate predecessors of an activity.
C) determines when the project can begin.
D) determines when the project must begin.
سؤال
Activities G, P, and R are the immediate predecessors for activity W. If the earliest finish times for the three are 12, 15, and 10, then the earliest start time for W

A) is 10.
B) is 12.
C) is 15.
D) cannot be determined.
سؤال
Arcs in a project network indicate

A) completion times.
B) precedence relationships.
C) activities.
D) the critical path.
سؤال
Activities with zero slack

A) can be delayed.
B) must be completed first.
C) lie on a critical path.
D) have no predecessors.
سؤال
When activity times are uncertain,

A) assume they are normally distributed.
B) calculate the expected time, using (a + 4m + b)/6.
C) use the most likely time.
D) calculate the expected time, using (a + m + b)/3.
سؤال
In deciding which activities to crash, one must

A) crash all critical activities.
B) crash largest-duration activities.
C) crash lowest-cost activities.
D) crash activities on the critical path(s) only.
سؤال
The critical path

A) is any path that goes from the starting node to the completion node.
B) is a combination of all paths.
C) is the shortest path.
D) is the longest path.
سؤال
To calculate an activity's latest finish time, you should consider its

A) predecessors' latest finish times
B) predecessors' latest start times
C) successors' earliest start times
D) successors' latest start times
سؤال
For an activity with more than one immediate predecessor activity, which of the following is used to compute its earliest finish (EF) time?

A) the largest EF among the immediate predecessors.
B) the average EF among the immediate predecessors.
C) the largest LF among the immediate predecessors.
D) the difference in EF among the immediate predecessors.
سؤال
Slack equals

A) LF − EF.
B) EF − LF.
C) EF − LS.
D) LF − ES.
سؤال
To determine how to crash activity times

A) normal activity costs and costs under maximum crashing must be known.
B) shortest times with crashing must be known.
C) realize that new paths may become critical.
D) All of the alternatives are true.
سؤال
PERT and CPM

A) are most valuable when a small number of activities must be scheduled.
B) have different features and are not applied to the same situation.
C) do not require a chronological relationship among activities.
D) have been combined to develop a procedure that uses the best of each.
سؤال
​The normal distribution tends to be a better approximation of the distribution of total time for shorter projects where the critical path has relatively few activities.
سؤال
Which of the following is always true about a critical activity?

A) LS = EF.
B) LF = LS.
C) ES = LS.
D) EF = ES.
سؤال
A cookie recipe gives the following numbered steps.
1.Preheat oven.
2.Grease cookie sheets.
3.Cream shortening and sugar.
4.Add eggs and flavoring.
5.Measure and sift dry ingredients.
6.Add dry ingredients to mixture.
7.Drop by spoonfuls onto sheets and bake for 10 minutes.
Although the steps are numbered, they do not always reflect immediate precedence relationships. Develop a table that lists the immediate predecessors for each activity.
سؤال
​In PERT, the activity duration time is equal to the

A) ​pessimistic time.
B) ​optimistic time.
C) ​most likely time.
D) ​mean duration.
سؤال
The critical path for this network is A - E - F and the project completion time is 22 weeks. The critical path for this network is A - E - F and the project completion time is 22 weeks.     ​ If a deadline of 17 weeks is imposed, give the linear programming model for the crashing decision.<div style=padding-top: 35px> The critical path for this network is A - E - F and the project completion time is 22 weeks.     ​ If a deadline of 17 weeks is imposed, give the linear programming model for the crashing decision.<div style=padding-top: 35px>
If a deadline of 17 weeks is imposed, give the linear programming model for the crashing decision.
سؤال
Use the following network of related activities with their duration times (weeks) to complete a row for each activity under the column headings below. Use the following network of related activities with their duration times (weeks) to complete a row for each activity under the column headings below.    <div style=padding-top: 35px> Use the following network of related activities with their duration times (weeks) to complete a row for each activity under the column headings below.    <div style=padding-top: 35px>
سؤال
From this schedule of activities, draw the PERT/CPM network. From this schedule of activities, draw the PERT/CPM network.  <div style=padding-top: 35px>
سؤال
National Oil Company (NATOCO) must plan the shutdown of its Houston refinery for routine preventive maintenance. Each hour of downtime is lost production time and is very costly, so NATOCO wants the maintenance project completed in 22 hours. The PERT network below shows the precedence relationships of the activities involved in the project. The table gives the activity times and costs under normal operations and maximum crashing.
? National Oil Company (NATOCO) must plan the shutdown of its Houston refinery for routine preventive maintenance. Each hour of downtime is lost production time and is very costly, so NATOCO wants the maintenance project completed in 22 hours. The PERT network below shows the precedence relationships of the activities involved in the project. The table gives the activity times and costs under normal operations and maximum crashing. ?   ? NATOCO wants to know the minimum cost of completing the maintenance project within the 22-hour period. Formulate and solve a linear program that will yield this information. ???   ?<div style=padding-top: 35px> ?
NATOCO wants to know the minimum cost of completing the maintenance project within the 22-hour period. Formulate and solve a linear program that will yield this information.
??? National Oil Company (NATOCO) must plan the shutdown of its Houston refinery for routine preventive maintenance. Each hour of downtime is lost production time and is very costly, so NATOCO wants the maintenance project completed in 22 hours. The PERT network below shows the precedence relationships of the activities involved in the project. The table gives the activity times and costs under normal operations and maximum crashing. ?   ? NATOCO wants to know the minimum cost of completing the maintenance project within the 22-hour period. Formulate and solve a linear program that will yield this information. ???   ?<div style=padding-top: 35px> ?
سؤال
From this PERT/CPM network, determine the list of activities and their predecessors.
From this PERT/CPM network, determine the list of activities and their predecessors. ​  <div style=padding-top: 35px>
سؤال
Joseph King has ambitions to be mayor of Williston, North Dakota. Joe has determined the breakdown of the steps to the nomination and has estimated normal and crash costs and times for the campaign as follows (times are in weeks). Joseph King has ambitions to be mayor of Williston, North Dakota. Joe has determined the breakdown of the steps to the nomination and has estimated normal and crash costs and times for the campaign as follows (times are in weeks).   ​ ​   ​ Joe King is not a wealthy man and would like to organize a 16-week campaign at minimum cost. Write and solve a linear program to accomplish this task.<div style=padding-top: 35px>
Joseph King has ambitions to be mayor of Williston, North Dakota. Joe has determined the breakdown of the steps to the nomination and has estimated normal and crash costs and times for the campaign as follows (times are in weeks).   ​ ​   ​ Joe King is not a wealthy man and would like to organize a 16-week campaign at minimum cost. Write and solve a linear program to accomplish this task.<div style=padding-top: 35px>
Joe King is not a wealthy man and would like to organize a 16-week campaign at minimum cost. Write and solve a linear program to accomplish this task.
سؤال
A project network is shown below. Use a forward and a backward pass to determine the critical path, and then fill out the table below. Activity times are in weeks. A project network is shown below. Use a forward and a backward pass to determine the critical path, and then fill out the table below. Activity times are in weeks.     Now assume that the times listed are only the expected times instead of being fixed times. Is the probability of being finished in fewer than 25 weeks more or less than 50%?<div style=padding-top: 35px> A project network is shown below. Use a forward and a backward pass to determine the critical path, and then fill out the table below. Activity times are in weeks.     Now assume that the times listed are only the expected times instead of being fixed times. Is the probability of being finished in fewer than 25 weeks more or less than 50%?<div style=padding-top: 35px> Now assume that the times listed are only the expected times instead of being fixed times. Is the probability of being finished in fewer than 25 weeks more or less than 50%?
سؤال
For the project represented below, determine the earliest and latest start and finish times for each activity as well as the expected overall completion time. For the project represented below, determine the earliest and latest start and finish times for each activity as well as the expected overall completion time.    <div style=padding-top: 35px> For the project represented below, determine the earliest and latest start and finish times for each activity as well as the expected overall completion time.    <div style=padding-top: 35px>
سؤال
A project network is shown below. Use a forward and a backward pass to determine the critical path, and then fill out the table below. Activity times are in weeks. A project network is shown below. Use a forward and a backward pass to determine the critical path, and then fill out the table below. Activity times are in weeks.     Now assume that the times listed are only the expected times instead of being fixed times. Is the probability of being finished in more than 28 weeks more or less than 50%?<div style=padding-top: 35px> A project network is shown below. Use a forward and a backward pass to determine the critical path, and then fill out the table below. Activity times are in weeks.     Now assume that the times listed are only the expected times instead of being fixed times. Is the probability of being finished in more than 28 weeks more or less than 50%?<div style=padding-top: 35px> Now assume that the times listed are only the expected times instead of being fixed times. Is the probability of being finished in more than 28 weeks more or less than 50%?
سؤال
A project consists of five activities. Naturally the paint mixing precedes the painting activities. Also, both ceiling painting and floor sanding must be done prior to floor buffing. A project consists of five activities. Naturally the paint mixing precedes the painting activities. Also, both ceiling painting and floor sanding must be done prior to floor buffing.   ​ a. Construct the PERT/CPM network for this problem. b. What is the expected completion time of this project? c. What is the probability that the project can be completed within 9 hr.?<div style=padding-top: 35px>
a.
Construct the PERT/CPM network for this problem.
b.
What is the expected completion time of this project?
c.
What is the probability that the project can be completed within 9 hr.?
سؤال
​Marcy Fetter, a staff analyst at the Los Angeles plant of Computer Products Corporation, is assigned to the team that is developing the process design for producing an RFID sensor. The corporate planning group in San Jose, California has contacted her and has asked how confident the design group is about completing the project in 60 days. She has developed these estimated time durations in days for the project:
​Marcy Fetter, a staff analyst at the Los Angeles plant of Computer Products Corporation, is assigned to the team that is developing the process design for producing an RFID sensor. The corporate planning group in San Jose, California has contacted her and has asked how confident the design group is about completing the project in 60 days. She has developed these estimated time durations in days for the project: ​   ​ a. Compute the expected time and variance for each activity. b. Determine the critical path and the expected duration of the project. c. What is the probability that the project will take longer than 58 days to complete? d. Which path in the project network offers the greatest risk of overrunning a new deadline of 56 days?<div style=padding-top: 35px>
a. Compute the expected time and variance for each activity.
b. Determine the critical path and the expected duration of the project.
c. What is the probability that the project will take longer than 58 days to complete?
d. Which path in the project network offers the greatest risk of overrunning a new deadline of 56 days?
سؤال
Use the following network of related activities with their duration times (weeks) to complete a row for each activity under the column headings below. Use the following network of related activities with their duration times (weeks) to complete a row for each activity under the column headings below.    <div style=padding-top: 35px> Use the following network of related activities with their duration times (weeks) to complete a row for each activity under the column headings below.    <div style=padding-top: 35px>
سؤال
Consider a project that has been modeled as follows: Consider a project that has been modeled as follows:   ​ a. Draw the PERT/CPM network for this project and determine project's expected completion time and its critical path. b. Can activities E and G be performed simultaneously without delaying the minimum project completion time? c. Can one person perform A, G, and I without delaying the project? d. By how much can activities G and L be delayed without delaying the entire project? e. How much would the project be delayed if activity G was delayed by 7 hours and activity L was delayed by 4 hours? Explain.<div style=padding-top: 35px>
a.
Draw the PERT/CPM network for this project and determine project's expected completion time and its critical path.
b.
Can activities E and G be performed simultaneously without delaying the minimum project completion time?
c.
Can one person perform A, G, and I without delaying the project?
d.
By how much can activities G and L be delayed without delaying the entire project?
e.
How much would the project be delayed if activity G was delayed by 7 hours and activity L was delayed by 4 hours? Explain.
سؤال
Given the following network with activities and times estimated in days, Given the following network with activities and times estimated in days,     ​ a. What are the critical path activities? b. What is the expected time to complete the project? c. What is the probability the project will take more than 28 days to complete?<div style=padding-top: 35px> Given the following network with activities and times estimated in days,     ​ a. What are the critical path activities? b. What is the expected time to complete the project? c. What is the probability the project will take more than 28 days to complete?<div style=padding-top: 35px>
a.
What are the critical path activities?
b.
What is the expected time to complete the project?
c.
What is the probability the project will take more than 28 days to complete?
سؤال
Consider the following PERT/CPM network with estimated times in weeks. The project is scheduled to begin on May 1. Consider the following PERT/CPM network with estimated times in weeks. The project is scheduled to begin on May 1.   The three-time estimate approach was used to calculate the expected times and the following table gives the variance for each activity:   ​ a. Give the expected project completion date and the critical path. b. By what date are you 99% sure the project will be completed?<div style=padding-top: 35px> The three-time estimate approach was used to calculate the expected times and the following table gives the variance for each activity: Consider the following PERT/CPM network with estimated times in weeks. The project is scheduled to begin on May 1.   The three-time estimate approach was used to calculate the expected times and the following table gives the variance for each activity:   ​ a. Give the expected project completion date and the critical path. b. By what date are you 99% sure the project will be completed?<div style=padding-top: 35px>
a.
Give the expected project completion date and the critical path.
b.
By what date are you 99% sure the project will be completed?
سؤال
A senior MIS design class project team has developed the following schedule of activities for their project, using their best estimate of completion times. Both written and oral reports are required. Draw the project network. Can they complete the project in the 38 class days remaining until the end of the semester? A senior MIS design class project team has developed the following schedule of activities for their project, using their best estimate of completion times. Both written and oral reports are required. Draw the project network. Can they complete the project in the 38 class days remaining until the end of the semester?  <div style=padding-top: 35px>
سؤال
​The main difference between CPM and PERT is

A) ​the use of different activity time estimates.
B) ​PERT analysis is less expensive to conduct.
C) ​PERT lends itself to computerization while CPM networks must be constructed manually.
D) ​CPM integrates time and cost performance while PERT is based solely on time performance.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/59
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 9: Project Scheduling: Pertcpm
1
Critical activities are those that can be delayed without delaying the entire project.
False
2
It is possible to have more than one critical path at a time.
True
3
The length of time an activity can be delayed without affecting the project completion time is the slack.
True
4
The difference between an activity's earliest finish time and latest finish time equals the difference between its earliest start time and latest start time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
5
PERT and CPM are applicable only when there is no dependence among activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
6
When activity times are uncertain, total project time is normally distributed with mean equal to the sum of the means of all of the critical activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
7
A path through a project network must reach every node.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
8
The earliest finish time for the final activity is the project duration.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
9
The variance in the project completion time is the sum of the variances of all activities in the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
10
Constraints in the LP models for crashing decisions are required to compare the activity's earliest finish time with the earliest finish time of each predecessor.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
11
Crashing refers to an unanticipated delay in a critical path activity that causes the total time to exceed its limit.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
12
All activities on a critical path have zero slack time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
13
A critical activity can be part of a noncritical path.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
14
The linear programming model for crashing presented in the textbook assumes that any portion of the activity crash time can be achieved for a corresponding portion of the activity crashing cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
15
The earliest start time for an activity is equal to the smallest of the earliest finish times for all its immediate predecessors.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
16
When activity times are uncertain, an activity's most likely time is the same as its expected time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
17
The project manager should monitor the progress of any activity with a large time variance even if the expected time does not identify the activity as a critical activity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
18
​Precedence relationships among activities is critical in CPM analysis but not in PERT.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
19
Activities require time to complete while events do not.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
20
The latest finish time for an activity is the largest of the latest start times for all activities that immediately follow the activity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
21
​A critical activity is

A) ​an activity that consumes no time but shows precedence between events.
B) ​a milestone accomplishment within the project.
C) ​an activity with zero slack.
D) ​the beginning of an event.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
22
For an activity with more than one immediate successor activity, its latest-finish time is equal to the

A) largest latest-finish time among its immediate successors.
B) smallest latest-finish time among its immediate successors.
C) largest latest-start time among its immediate successors.
D) smallest latest-start time among its immediate successors.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
23
Activities following a node

A) can begin as soon as any activity preceding the node has been completed.
B) have an earliest start time equal to the largest of the earliest finish times for all activities entering the node.
C) have a latest start time equal to the largest of the earliest finish times for all activities entering the node.
D) None of the alternatives is correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
24
Which of the following is a general rule for crashing activities?

A) Crash only non-critical activities.
B) Crash activities with zero slack.
C) Crash activities with the greatest number of predecessors.
D) Crash the path with the fewest activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
25
Activities K, M and S immediately follow activity H, and their latest start times are 14, 18, and 11. The latest finish time for activity H

A) is 11.
B) is 14.
C) is 18.
D) cannot be determined.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
26
Which is not a significant challenge of project scheduling?

A) deadlines exist.
B) activities are independent.
C) many employees could be required.
D) delays are costly.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
27
The earliest start time rule

A) compares the starting times of all activities for successors of an activity.
B) compares the finish times for all immediate predecessors of an activity.
C) determines when the project can begin.
D) determines when the project must begin.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
28
Activities G, P, and R are the immediate predecessors for activity W. If the earliest finish times for the three are 12, 15, and 10, then the earliest start time for W

A) is 10.
B) is 12.
C) is 15.
D) cannot be determined.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
29
Arcs in a project network indicate

A) completion times.
B) precedence relationships.
C) activities.
D) the critical path.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
30
Activities with zero slack

A) can be delayed.
B) must be completed first.
C) lie on a critical path.
D) have no predecessors.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
31
When activity times are uncertain,

A) assume they are normally distributed.
B) calculate the expected time, using (a + 4m + b)/6.
C) use the most likely time.
D) calculate the expected time, using (a + m + b)/3.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
32
In deciding which activities to crash, one must

A) crash all critical activities.
B) crash largest-duration activities.
C) crash lowest-cost activities.
D) crash activities on the critical path(s) only.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
33
The critical path

A) is any path that goes from the starting node to the completion node.
B) is a combination of all paths.
C) is the shortest path.
D) is the longest path.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
34
To calculate an activity's latest finish time, you should consider its

A) predecessors' latest finish times
B) predecessors' latest start times
C) successors' earliest start times
D) successors' latest start times
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
35
For an activity with more than one immediate predecessor activity, which of the following is used to compute its earliest finish (EF) time?

A) the largest EF among the immediate predecessors.
B) the average EF among the immediate predecessors.
C) the largest LF among the immediate predecessors.
D) the difference in EF among the immediate predecessors.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
36
Slack equals

A) LF − EF.
B) EF − LF.
C) EF − LS.
D) LF − ES.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
37
To determine how to crash activity times

A) normal activity costs and costs under maximum crashing must be known.
B) shortest times with crashing must be known.
C) realize that new paths may become critical.
D) All of the alternatives are true.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
38
PERT and CPM

A) are most valuable when a small number of activities must be scheduled.
B) have different features and are not applied to the same situation.
C) do not require a chronological relationship among activities.
D) have been combined to develop a procedure that uses the best of each.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
39
​The normal distribution tends to be a better approximation of the distribution of total time for shorter projects where the critical path has relatively few activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
40
Which of the following is always true about a critical activity?

A) LS = EF.
B) LF = LS.
C) ES = LS.
D) EF = ES.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
41
A cookie recipe gives the following numbered steps.
1.Preheat oven.
2.Grease cookie sheets.
3.Cream shortening and sugar.
4.Add eggs and flavoring.
5.Measure and sift dry ingredients.
6.Add dry ingredients to mixture.
7.Drop by spoonfuls onto sheets and bake for 10 minutes.
Although the steps are numbered, they do not always reflect immediate precedence relationships. Develop a table that lists the immediate predecessors for each activity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
42
​In PERT, the activity duration time is equal to the

A) ​pessimistic time.
B) ​optimistic time.
C) ​most likely time.
D) ​mean duration.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
43
The critical path for this network is A - E - F and the project completion time is 22 weeks. The critical path for this network is A - E - F and the project completion time is 22 weeks.     ​ If a deadline of 17 weeks is imposed, give the linear programming model for the crashing decision. The critical path for this network is A - E - F and the project completion time is 22 weeks.     ​ If a deadline of 17 weeks is imposed, give the linear programming model for the crashing decision.
If a deadline of 17 weeks is imposed, give the linear programming model for the crashing decision.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
44
Use the following network of related activities with their duration times (weeks) to complete a row for each activity under the column headings below. Use the following network of related activities with their duration times (weeks) to complete a row for each activity under the column headings below.    Use the following network of related activities with their duration times (weeks) to complete a row for each activity under the column headings below.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
45
From this schedule of activities, draw the PERT/CPM network. From this schedule of activities, draw the PERT/CPM network.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
46
National Oil Company (NATOCO) must plan the shutdown of its Houston refinery for routine preventive maintenance. Each hour of downtime is lost production time and is very costly, so NATOCO wants the maintenance project completed in 22 hours. The PERT network below shows the precedence relationships of the activities involved in the project. The table gives the activity times and costs under normal operations and maximum crashing.
? National Oil Company (NATOCO) must plan the shutdown of its Houston refinery for routine preventive maintenance. Each hour of downtime is lost production time and is very costly, so NATOCO wants the maintenance project completed in 22 hours. The PERT network below shows the precedence relationships of the activities involved in the project. The table gives the activity times and costs under normal operations and maximum crashing. ?   ? NATOCO wants to know the minimum cost of completing the maintenance project within the 22-hour period. Formulate and solve a linear program that will yield this information. ???   ? ?
NATOCO wants to know the minimum cost of completing the maintenance project within the 22-hour period. Formulate and solve a linear program that will yield this information.
??? National Oil Company (NATOCO) must plan the shutdown of its Houston refinery for routine preventive maintenance. Each hour of downtime is lost production time and is very costly, so NATOCO wants the maintenance project completed in 22 hours. The PERT network below shows the precedence relationships of the activities involved in the project. The table gives the activity times and costs under normal operations and maximum crashing. ?   ? NATOCO wants to know the minimum cost of completing the maintenance project within the 22-hour period. Formulate and solve a linear program that will yield this information. ???   ? ?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
47
From this PERT/CPM network, determine the list of activities and their predecessors.
From this PERT/CPM network, determine the list of activities and their predecessors. ​
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
48
Joseph King has ambitions to be mayor of Williston, North Dakota. Joe has determined the breakdown of the steps to the nomination and has estimated normal and crash costs and times for the campaign as follows (times are in weeks). Joseph King has ambitions to be mayor of Williston, North Dakota. Joe has determined the breakdown of the steps to the nomination and has estimated normal and crash costs and times for the campaign as follows (times are in weeks).   ​ ​   ​ Joe King is not a wealthy man and would like to organize a 16-week campaign at minimum cost. Write and solve a linear program to accomplish this task.
Joseph King has ambitions to be mayor of Williston, North Dakota. Joe has determined the breakdown of the steps to the nomination and has estimated normal and crash costs and times for the campaign as follows (times are in weeks).   ​ ​   ​ Joe King is not a wealthy man and would like to organize a 16-week campaign at minimum cost. Write and solve a linear program to accomplish this task.
Joe King is not a wealthy man and would like to organize a 16-week campaign at minimum cost. Write and solve a linear program to accomplish this task.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
49
A project network is shown below. Use a forward and a backward pass to determine the critical path, and then fill out the table below. Activity times are in weeks. A project network is shown below. Use a forward and a backward pass to determine the critical path, and then fill out the table below. Activity times are in weeks.     Now assume that the times listed are only the expected times instead of being fixed times. Is the probability of being finished in fewer than 25 weeks more or less than 50%? A project network is shown below. Use a forward and a backward pass to determine the critical path, and then fill out the table below. Activity times are in weeks.     Now assume that the times listed are only the expected times instead of being fixed times. Is the probability of being finished in fewer than 25 weeks more or less than 50%? Now assume that the times listed are only the expected times instead of being fixed times. Is the probability of being finished in fewer than 25 weeks more or less than 50%?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
50
For the project represented below, determine the earliest and latest start and finish times for each activity as well as the expected overall completion time. For the project represented below, determine the earliest and latest start and finish times for each activity as well as the expected overall completion time.    For the project represented below, determine the earliest and latest start and finish times for each activity as well as the expected overall completion time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
51
A project network is shown below. Use a forward and a backward pass to determine the critical path, and then fill out the table below. Activity times are in weeks. A project network is shown below. Use a forward and a backward pass to determine the critical path, and then fill out the table below. Activity times are in weeks.     Now assume that the times listed are only the expected times instead of being fixed times. Is the probability of being finished in more than 28 weeks more or less than 50%? A project network is shown below. Use a forward and a backward pass to determine the critical path, and then fill out the table below. Activity times are in weeks.     Now assume that the times listed are only the expected times instead of being fixed times. Is the probability of being finished in more than 28 weeks more or less than 50%? Now assume that the times listed are only the expected times instead of being fixed times. Is the probability of being finished in more than 28 weeks more or less than 50%?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
52
A project consists of five activities. Naturally the paint mixing precedes the painting activities. Also, both ceiling painting and floor sanding must be done prior to floor buffing. A project consists of five activities. Naturally the paint mixing precedes the painting activities. Also, both ceiling painting and floor sanding must be done prior to floor buffing.   ​ a. Construct the PERT/CPM network for this problem. b. What is the expected completion time of this project? c. What is the probability that the project can be completed within 9 hr.?
a.
Construct the PERT/CPM network for this problem.
b.
What is the expected completion time of this project?
c.
What is the probability that the project can be completed within 9 hr.?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
53
​Marcy Fetter, a staff analyst at the Los Angeles plant of Computer Products Corporation, is assigned to the team that is developing the process design for producing an RFID sensor. The corporate planning group in San Jose, California has contacted her and has asked how confident the design group is about completing the project in 60 days. She has developed these estimated time durations in days for the project:
​Marcy Fetter, a staff analyst at the Los Angeles plant of Computer Products Corporation, is assigned to the team that is developing the process design for producing an RFID sensor. The corporate planning group in San Jose, California has contacted her and has asked how confident the design group is about completing the project in 60 days. She has developed these estimated time durations in days for the project: ​   ​ a. Compute the expected time and variance for each activity. b. Determine the critical path and the expected duration of the project. c. What is the probability that the project will take longer than 58 days to complete? d. Which path in the project network offers the greatest risk of overrunning a new deadline of 56 days?
a. Compute the expected time and variance for each activity.
b. Determine the critical path and the expected duration of the project.
c. What is the probability that the project will take longer than 58 days to complete?
d. Which path in the project network offers the greatest risk of overrunning a new deadline of 56 days?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
54
Use the following network of related activities with their duration times (weeks) to complete a row for each activity under the column headings below. Use the following network of related activities with their duration times (weeks) to complete a row for each activity under the column headings below.    Use the following network of related activities with their duration times (weeks) to complete a row for each activity under the column headings below.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
55
Consider a project that has been modeled as follows: Consider a project that has been modeled as follows:   ​ a. Draw the PERT/CPM network for this project and determine project's expected completion time and its critical path. b. Can activities E and G be performed simultaneously without delaying the minimum project completion time? c. Can one person perform A, G, and I without delaying the project? d. By how much can activities G and L be delayed without delaying the entire project? e. How much would the project be delayed if activity G was delayed by 7 hours and activity L was delayed by 4 hours? Explain.
a.
Draw the PERT/CPM network for this project and determine project's expected completion time and its critical path.
b.
Can activities E and G be performed simultaneously without delaying the minimum project completion time?
c.
Can one person perform A, G, and I without delaying the project?
d.
By how much can activities G and L be delayed without delaying the entire project?
e.
How much would the project be delayed if activity G was delayed by 7 hours and activity L was delayed by 4 hours? Explain.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
56
Given the following network with activities and times estimated in days, Given the following network with activities and times estimated in days,     ​ a. What are the critical path activities? b. What is the expected time to complete the project? c. What is the probability the project will take more than 28 days to complete? Given the following network with activities and times estimated in days,     ​ a. What are the critical path activities? b. What is the expected time to complete the project? c. What is the probability the project will take more than 28 days to complete?
a.
What are the critical path activities?
b.
What is the expected time to complete the project?
c.
What is the probability the project will take more than 28 days to complete?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
57
Consider the following PERT/CPM network with estimated times in weeks. The project is scheduled to begin on May 1. Consider the following PERT/CPM network with estimated times in weeks. The project is scheduled to begin on May 1.   The three-time estimate approach was used to calculate the expected times and the following table gives the variance for each activity:   ​ a. Give the expected project completion date and the critical path. b. By what date are you 99% sure the project will be completed? The three-time estimate approach was used to calculate the expected times and the following table gives the variance for each activity: Consider the following PERT/CPM network with estimated times in weeks. The project is scheduled to begin on May 1.   The three-time estimate approach was used to calculate the expected times and the following table gives the variance for each activity:   ​ a. Give the expected project completion date and the critical path. b. By what date are you 99% sure the project will be completed?
a.
Give the expected project completion date and the critical path.
b.
By what date are you 99% sure the project will be completed?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
58
A senior MIS design class project team has developed the following schedule of activities for their project, using their best estimate of completion times. Both written and oral reports are required. Draw the project network. Can they complete the project in the 38 class days remaining until the end of the semester? A senior MIS design class project team has developed the following schedule of activities for their project, using their best estimate of completion times. Both written and oral reports are required. Draw the project network. Can they complete the project in the 38 class days remaining until the end of the semester?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
59
​The main difference between CPM and PERT is

A) ​the use of different activity time estimates.
B) ​PERT analysis is less expensive to conduct.
C) ​PERT lends itself to computerization while CPM networks must be constructed manually.
D) ​CPM integrates time and cost performance while PERT is based solely on time performance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 59 في هذه المجموعة.