Deck 16: Performance Improvement

ملء الشاشة (f)
exit full mode
سؤال
Tools employed in Total Quality Management for problem solving and measurement are:

A) brainstorming and benchmarking
B) budgets and ratios
C) chronocyclegraph and pathway charts
D) QWL and QA
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
A Pareto chart is a problem solving tool.
سؤال
TQM is based on the systems approach to management.
سؤال
Which of the following is an example of a fundamental principle of motion economy?

A) placing a mixer between two work centers so that employees from both may use it
B) storing all tools in a locked cabinet in the storeroom when not in use
C) transferring food from cooking pans into serving pans
D) using both hands in opposite and symmetrical directions to crack eggs
سؤال
QA measures include meals/hour, efficiency percent, and lighting
intensity.
سؤال
The objectives of work simplification are to

A) design equipment that is efficient and effective
B) make work easier, less costly, and avoid waste
C) provide charts to analyze work to be done
D) provide in-service programs for employees
سؤال
TQM requires that management operate on Theory X assumptions.
سؤال
(Place the letter of Total Quality Management tool listed in Column B that corresponds to its use as listed in Column A.) (Place the letter of Total Quality Management tool listed in Column B that corresponds to its use as listed in Column A.)  <div style=padding-top: 35px>
سؤال
Which of the following methods is the least costly method of conducting a time and motion study?

A) completing operation and process charts
B) conducting micromotion studies
C) developing flow diagrams
D) performing work sampling
سؤال
In the TQM philosophy of management, reducing variation is viewed as the key to improving productivity and quality. This reduction in variation is focused on which part of the systems model?

A) transformations
B) inputs
C) outputs
D) environment
سؤال
(Place the letter of the work improvement study tool listed in Column B that corresponds to its description in Column A.) (Place the letter of the work improvement study tool listed in Column B that corresponds to its description in Column A.)  <div style=padding-top: 35px>
سؤال
The best definition of productivity is:

A) level of output for a given degree of input
B) measurement of quality of service rendered
C) number of full time equivalents available for a given task
D) number of man-hours worked per pay period
سؤال
One of the first steps in a job improvement plan should be to:

A) avoid the use of automatic timing and temperature control devices
B) eliminate the use of prepared foods
C) eliminate unnecessary operations, delays, and moves
D) select equipment designed for specific, single operations
سؤال
One of the overall objectives of work design is

A) decreased cost of goods produced
B) decreased cost of operations
C) increased employee satisfaction
D) increased level of output
سؤال
Lean Six Sigma differs from Six Sigma in the following way

A) the PDCA cycle is not used in order to make the process "leaner"
B) it is used only for lean manufacturing operations
C) verifiable data are not needed in order to make decisions
D) reducing waste has been added to the Six Sigma concept
سؤال
A fish diagram is a measurement tool.
سؤال
In a hospital foodservice which of the following would be a valuable measure of productivity?

A) food cost/patient day
B) number of meals/patient day
C) number of meals/worked hour
D) number of worked hours/patient day
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/17
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 16: Performance Improvement
1
Tools employed in Total Quality Management for problem solving and measurement are:

A) brainstorming and benchmarking
B) budgets and ratios
C) chronocyclegraph and pathway charts
D) QWL and QA
A
2
A Pareto chart is a problem solving tool.
True
3
TQM is based on the systems approach to management.
True
4
Which of the following is an example of a fundamental principle of motion economy?

A) placing a mixer between two work centers so that employees from both may use it
B) storing all tools in a locked cabinet in the storeroom when not in use
C) transferring food from cooking pans into serving pans
D) using both hands in opposite and symmetrical directions to crack eggs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 17 في هذه المجموعة.
فتح الحزمة
k this deck
5
QA measures include meals/hour, efficiency percent, and lighting
intensity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 17 في هذه المجموعة.
فتح الحزمة
k this deck
6
The objectives of work simplification are to

A) design equipment that is efficient and effective
B) make work easier, less costly, and avoid waste
C) provide charts to analyze work to be done
D) provide in-service programs for employees
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 17 في هذه المجموعة.
فتح الحزمة
k this deck
7
TQM requires that management operate on Theory X assumptions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 17 في هذه المجموعة.
فتح الحزمة
k this deck
8
(Place the letter of Total Quality Management tool listed in Column B that corresponds to its use as listed in Column A.) (Place the letter of Total Quality Management tool listed in Column B that corresponds to its use as listed in Column A.)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 17 في هذه المجموعة.
فتح الحزمة
k this deck
9
Which of the following methods is the least costly method of conducting a time and motion study?

A) completing operation and process charts
B) conducting micromotion studies
C) developing flow diagrams
D) performing work sampling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 17 في هذه المجموعة.
فتح الحزمة
k this deck
10
In the TQM philosophy of management, reducing variation is viewed as the key to improving productivity and quality. This reduction in variation is focused on which part of the systems model?

A) transformations
B) inputs
C) outputs
D) environment
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 17 في هذه المجموعة.
فتح الحزمة
k this deck
11
(Place the letter of the work improvement study tool listed in Column B that corresponds to its description in Column A.) (Place the letter of the work improvement study tool listed in Column B that corresponds to its description in Column A.)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 17 في هذه المجموعة.
فتح الحزمة
k this deck
12
The best definition of productivity is:

A) level of output for a given degree of input
B) measurement of quality of service rendered
C) number of full time equivalents available for a given task
D) number of man-hours worked per pay period
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 17 في هذه المجموعة.
فتح الحزمة
k this deck
13
One of the first steps in a job improvement plan should be to:

A) avoid the use of automatic timing and temperature control devices
B) eliminate the use of prepared foods
C) eliminate unnecessary operations, delays, and moves
D) select equipment designed for specific, single operations
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 17 في هذه المجموعة.
فتح الحزمة
k this deck
14
One of the overall objectives of work design is

A) decreased cost of goods produced
B) decreased cost of operations
C) increased employee satisfaction
D) increased level of output
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 17 في هذه المجموعة.
فتح الحزمة
k this deck
15
Lean Six Sigma differs from Six Sigma in the following way

A) the PDCA cycle is not used in order to make the process "leaner"
B) it is used only for lean manufacturing operations
C) verifiable data are not needed in order to make decisions
D) reducing waste has been added to the Six Sigma concept
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 17 في هذه المجموعة.
فتح الحزمة
k this deck
16
A fish diagram is a measurement tool.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 17 في هذه المجموعة.
فتح الحزمة
k this deck
17
In a hospital foodservice which of the following would be a valuable measure of productivity?

A) food cost/patient day
B) number of meals/patient day
C) number of meals/worked hour
D) number of worked hours/patient day
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 17 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 17 في هذه المجموعة.