Deck 7: Moving Into Design

ملء الشاشة (f)
exit full mode
سؤال
What makes systems integration so difficult?

A)Finding the original data to install on the new server
B)Creating a ghost drive to house the old information
C)Installing new software packages on older machines
D)Bringing legacy system data and new data together
E)None of the above
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Which is probably true about packaged software

A)In most cases,the software is a perfect fit for the companies need
B)Packaged software works best where the company has a unique need
C)The time frame is flexible to long
D)The business need is common
E)The project has a highly skills project manager who has been with the company for many years and has an excellent relationship with both business users and the IT development staff
سؤال
System design is the determination of the overall system architecture-consisting of a set of physical processing components,_______________,and the communication among them-that will satisfy the system's essential requirements.

A)Workmanship
B)Order entry methods,HR feedback
C)Hardware,Software,People
D)Engineering data plans,fiber optic specifications
E)None of the above
سؤال
Which of the following lists indicates the correct ordering of deliverables in a system specification document?

A)System Acquisition Weighted Alternative Matrix,Interface Design,Physical Data Model Data Storage Design
B)Data Storage Design,Interface Design,Architecture Design,Updated Crud Matrix
C)Hardware and Software Specifications,Interface Design,Data Storage Design,Architecture Design
D)Program Design Specifications,Physical Data Model,Data Storage Design,Architecture Design
E)Update CASE Repository Entries,Update CRUD Matrix,Interface Design,Architecture Design
سؤال
Systems Integration refers to:

A)The process of synching all computers to the mainframe
B)The delivery of systems to the final destination office
C)Combining packaged software,the legacy system and new software
D)Adding the original hard drives to a newer system
E)Creating a new software to monitor power consumption
سؤال
For efficiency purposes,it is wise to___________ when there is a basic software need to be satisfied.

A)Implement a company-wide project team to handle a custom software scripting
B)Purchase a packaged system
C)Design a blueprint and contract an outside vendor to develop a program
D)Make do with the current software package
E)Utilize a professional consultant to develop a system of servers7
سؤال
In the initial stage of design,what are business requirements converted into?

A)System Requirements
B)Work Order Summary
C)Computer Qualifications Checklist
D)Vanilla System
E)Hardware Blueprint
سؤال
The system inputs and outputs will be designed along with a plan or__________ of the way the system's features will be navigated.

A)Blueprint
B)Compass
C)Instructional Guide
D)Roadmap
E)FAQ
سؤال
Enterprise Resource Planning (ERP)Systems are:

A)All-encompassing systems
B)Difficult to install and can result in serious problems for a company
C)Cheaper since they are created by a third party
D)A and B
E)B and C
سؤال
Where are the decisions stored that are made regarding the hardware and software that will be purchased to support the new system?

A)Order Manifest
B)Hardware Sales Receipt
C)Suppliers' Computer System
D)President's Office
E)Hardware and Software Specification
سؤال
Which might NOT be a good package software solution?

A)Payroll at Cloverfarms dairy
B)Accounts receivable at Staples
C)Rocket control software for NASA
D)Course management system at the University of Nebraska
E)Scanning software for Kroger grocery stores
سؤال
How many ways does the text suggest one can approach the creation of a new system?

A)1
B)2
C)3
D)4
E)7
سؤال
In what SDLC stage do we determine the business needs for an information systems project?

A)The design phase
B)The analysis phase
C)The dissection stage
D)The installation stage
E)The big bang stage
سؤال
Another name for custom development might be:

A)Offshore outsourcing
B)In-house development
C)Vendor supplied in-house consulting
D)CASE tools
E)Package software
سؤال
Workarounds are:

A)Not supported by a vendor who supplied the software
B)Designed by the vendor
C)Created to interface two software packages that are compatible with each other
D)Enterprise Wide Software Packages that are designed for satellite use
E)None of the above
سؤال
What skills are necessary when undertaking a custom software design?

A)Technical
B)Functional
C)Project Management
D)A and C
E)A,B,and C
سؤال
The system specification contains what?

A)Design documents,hardware and software specification
B)Physical process models,interface design
C)Physical data model
D)Architecture design
E)All of the above
سؤال
_______ repository entries are updated to reflect specific technology decisions as they are made.

A)DFD
B)Sequential
C)CASE
D)Hardware
E)None of the above
سؤال
During the design stage,the team must create a(n)_________ by specifying access restrictions and by identifying the need for ________,authentication and virus control.

A)System,integration
B)Security breach,emergency access
C)Secure system,encryption
D)Automated program,constant testing
E)Pecking order,governmental access
سؤال
If on a limited time budget,the best way to be sure you remain efficient and effective in designing a system is to utilize the ____________.

A)Porters 5 Forces Model
B)Outsourcing Model
C)RAD and Timeboxing Techniques
D)Hire/Fire Motivational Theory
E)Not Attempt the Project
سؤال
Becky is preparing a document that has detailed description of needs,special technical factors,evaluation criteria,timetable and more.She is probably working on a(n):

A)CRUD matrix
B)Alternative Matrix
C)RFP
D)ERP
E)DFD
سؤال
Custom development is used when:

A)The business need is unique
B)The business need is not core to the business
C)The project has a project manager who can coordinate vendor efforts
D)The time frame is short
E)The skills are not strategic
سؤال
Application service providers might be best associated with:

A)In-house development
B)Packaged software
C)Unique and strategic systems
D)Outsourcing
E)Internet Service Providers
سؤال
What can push a project off track?

A)Funding
B)Staffing
C)Business users
D)A and B
E)A,B and C
سؤال
Packaged systems are used when:

A)The business need is not core to the business
B)There is a desire to build in-house skills
C)The time frame is flexible
D)The project has a project manager who can coordinate vendor efforts
E)The decision to outsource is strategic
سؤال
Matt is an analyst for the Pauxtis Media Company.He is in his office at 5:00 a.m.every Tuesday morning for a project update videoconference.He is probably involved in:

A)In-house development
B)Working with vendors on an RFP
C)Customizing a package to fit Pauxtis
D)Working with his regional Ernst and Young consulting team
E)Offshore outsourcing
سؤال
The design phase of the SDLC:

A)Produces a user's manual,does users training and creates online documentation for the new system
B)Involves writing of code (generally in an object oriented language)
C)Uses the output of JAD sessions to create logical use cases and DFDs
D)Involves interviewing of users to determine requirements
E)Uses the requirements that were gathered during analysis to create a blueprint for the future system
سؤال
Fixed-price contracts are considered:

A)Very flexible
B)Very rigid
C)Always cheaper than any other option
D)Useless when considering a systems design
E)Always the best option for any project
سؤال
Outsourcing is used when:

A)The project has a project manager who can coordinate vendor efforts
B)There is a desire to build in-house skills
C)In-house functional and technical skills exist
D)The business need is not core to the business
E)None of the above
سؤال
The score column in the Alternative Matrix represents what?

A)How expensive the install will be
B)How easy the install will be
C)How well the criteria are met by the alternative
D)How long the coded page will be
E)A and D
سؤال
Requests for Proposals (RFPs)should contain

A)Detailed description of needs
B)Special technical needs
C)Evaluation criteria
D)A and B
E)A,B and C
سؤال
When only a price is needed from a vendor,the following will likely be requested from the possible vendors:

A)Request for Proposal (RFP)
B)Request for Information (RFI)
C)Request for Quote (RFQ)
D)Request for Efficient Information Distribution (REID)
E)More Optimal Desires (MOD)
سؤال
A Request for Information (RFI)is used with vendors when there is a need for ________?

A)Pricing
B)Data Analysis
C)Information
D)Network Associate Password Help
E)None of the above
سؤال
A time and arrangements deal is considered:

A)Very flexible
B)Very rigid
C)Cheaper than any other option
D)Useless when considering a systems design
E)Always the best option for any project
سؤال
The following document is utilized with possible vendors on projects with smaller budgets,instead of sending a lengthy document to all possible vendors:

A)Request for Proposal (RFP)
B)Request for Information (RFI)
C)Request for Quote (RFQ)
D)Request for Efficient Information Distribution (REID)
E)More Optimal Desires (MOD)
سؤال
Outsourcing can include:

A)Hiring an external vendor
B)Hiring an external developer
C)Hiring an external service provider
D)A and C
E)A,B and C
سؤال
Outsourcing firms called _____________ supply software applications and/or software related services through the Internet.

A)Application Service Providers (ASPs)
B)Enterprise Resource Providers (ERPs)
C)System Development Life Cycle Companies (SDLCs)
D)Information Technology Developers (ITDs)
E)None of the above
سؤال
Requests for Proposals (RFPs)serve what purpose?

A)Integrate systems with one another
B)Create synergy amongst staff members
C)Solicit information from providers
D)Engage mobile computers with mainframe technology
E)Develop morale amongst managers
سؤال
CRUD matrix can be used in the design phase to work with tables and possible user interaction with those tables.The letter "C" in CRUD stands for:

A)Computer
B)Create
C)Communicate
D)Complete
E)Constant
سؤال
Value-added projects are:

A)When the outsourcer earns a percentage of the completed systems benefits
B)Not a feasible option for any project at any time
C)Gaining popularity
D)A and C
E)None of the above
سؤال
If (a)the business need is common;(b)the skills needed are not strategic;(c)the time frame is short;it might be best to:

A)Use in-house / custom development
B)Hire a vendor to write the code for you
C)Outsource to India
D)Purchase a software package
E)Hire a consultant
سؤال
An advantage of custom development might be:

A)You get a system that is tailored to the current business and meets specific needs
B)The rapid development of custom systems
C)The low cost (as compared to buying a package)
D)The low risk factor
E)The ability for in-house developers to work on systems that are in new programming languages and in technologies that are unknown to them prior to the development
سؤال
RFP is an acronym for:

A)Reason for Programming
B)Request for Proposal
C)Rational Forensics Platform
D)Relationship with Foreign Providers
E)Real Forecast Project
سؤال
One problem with using packages software systems is:

A)It takes a very long time to get the system and get it installed
B)The company has to accept the functionality that is provided with the system
C)Many common software packages have been written and tested and are readily available
D)There are many good software packages that are reasonable in price
E)Most software packages allow for some customization
سؤال
Which of the following is normally NOT done in the design phase of the SDLC?

A)Decisions for hardware and software purchases are made
B)User interactions are planned out (inputs,outputs,user interfaces)
C)Cost / Benefits of the new system are carefully calculated
D)Logical DFDs and ERDs are converted into physical DFDs and ERDs
E)The physical data model is created
سؤال
Which is NOT a part of the System Specification document?

A)Use Cases
B)Physical Data Model
C)Updated CRUD matrix
D)Architecture Design
E)System Acquisition Weighted alternative Matrix
سؤال
If (a)the business need is not core to the business;(b)the project has a highly skilled project manager;(c)in-house functional or technical experience does not exist;it might be best to:

A)Use in-house / custom development
B)Buy an ERP system
C)Outsource to a company specializing in that technology
D)Purchase a software package
E)Hire a consultant
سؤال
What percentage of companies on the InformationWeek 500 list of business technology innovators say they engage in offshore IT outsourcing?

A)0 to 10%
B)10% to 25%
C)25% to 40%
D)40% to 60%
E)Over 60%
سؤال
Which of the following is NOT a system acquisition strategy as presented in the book?

A)Custom development
B)Outsourcing to a regional consultant (like IBM)
C)Use a JAD session to acquire the system
D)Using the company's programming staff to write the code (aka 'in-house development')
E)Buying a pre-written software package
سؤال
A Request for Proposal (RFP)will result in a:

A)Vendor proposal that is a binding offer to accomplish the tasks described in the RFP
B)Gentleman's agreement on the offer
C)Substantially more expensive project
D)Custom development
E)Reduction in in-house programming effort
سؤال
Which is NOT a factor in choosing a development option?

A)Data base normalization
B)In-house experience
C)Time frame
D)Project skills
E)Project management
سؤال
Which is NOT a recommended guideline for managing outsourcing?

A)Define and stabilize requirements before signing a contract
B)Don't outsource what you don't understand
C)Emphasize rigid expectations and short-term relationships
D)Select the vendor,developer or service provider carefully
E)Keep the lines of communication open between you and your outsourcer
سؤال
A table that can be used to look at various design options is a(n):

A)RFP
B)CRUD
C)Gantt Chart
D)Alternative Matrix
E)SQL query
سؤال
If (a)the business need is unique,(b)there is a desire to build in-house skills;(c)the time frame is flexible,it might be best to:

A)Do in-house / custom development
B)Buy an ERP system
C)Outsource to India
D)Purchase a software package
E)Hire a consultant
سؤال
The letter 'R' in CRUD matrix (for tables and user involvement)stands for:

A)Replace
B)Replicate
C)Relationship
D)Read
E)Read-only
سؤال
Which is NOT true of outsourcing?

A)It can be done offshore
B)It can be done by an ASP
C)There can be a low cost of entry
D)It requires a large in-house staff
E)It can reduce internal IT costs
سؤال
In terms of project management,which option might require excellent project management skills and a proven methodology?

A)Outsourcing to Nebraska
B)Outsourcing to India
C)Buying a packaged solution
D)Doing custom development
E)Buying an ERP system
سؤال
Which is NOT one of the primary contract types made with outsourcing?

A)Time and arrangements
B)Fixed-price contract
C)Distance and confluence contract
D)Value-added contract
E)Paying for the expenses and time to get the job done
سؤال
The letter "D" in CRUD matrix stands for:

A)Delete
B)Deny use
C)Deliver
D)Document
E)Denormalize
سؤال
Which of the following will probably NOT be part of a Request for Proposal (RFP)?

A)Certain key facts that the vendor requires
B)Special technical needs
C)Procedures to follow
D)Project timetable
E)Use case diagrams
سؤال
When using an alternative matrix,frequently analysts will assign ____________ to certain factors to signify the importance of the factor in the decision.

A)Probabilities
B)Reluctance factors
C)Weights
D)Project sponsors
E)Data stores
سؤال
Time and arrangements deals are potentially more expensive if the service provider requires unforeseen resources to complete the project on time.
سؤال
There is absolutely no need for designing a custom system since there are already so many pre-packaged systems available to any company regardless of its size.
سؤال
Prototyping is the interface design step that often uncovers additional information that is needed in the system,leading to a revision of the physical DFDs or ERPs.
سؤال
There is no need to determine the reliability or performance of a new system due to the inherent dangers all technologies pose.
سؤال
In a custom software case,all parts of the system need to be completely customized and scripted to the company's specifications including ancillary software to the current system.
سؤال
A workaround is a custom-built add-on program that interfaces with packaged applications to handle specific needs.
سؤال
The decision to make,to buy,or to outsource influences the design tasks that are performed throughout the rest of the design phase.
سؤال
Outsourcing firms called Application Software Providers (ASPs)supply software applications and/or software related services through the Internet.
سؤال
CASE repository entries are updated to reflect specific technology decisions as they are made.
سؤال
Letting technology drive a business can be dangerous.
سؤال
System requirements are communicated through a collection of design documents and physical processes and data models.
سؤال
Application Software Providers (ASPs)should be utilized when considering non-core programming and/custom needs.
سؤال
The key challenge in systems integration is avoiding a system wide crash upon installation of legacy software.
سؤال
Highly skilled IS Professionals are easy to hire and retain.
سؤال
Outsourcing requires the least in-house resources.
سؤال
Business requirements are communicated through a collection of design documents and physical processes and data models.
سؤال
Building a system in-house builds technical skills and functional knowledge that one may not want to allow to walk out of the door.
سؤال
If the business need is core to the business then it is best to outsource the system development.
سؤال
An outsourcing arrangement where you pay no more than what was expected is known as a(n):

A)Time and arrangements contract
B)Fixed-price contract
C)Value-added contract
D)Distance and time contract
E)Billing operational contract
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/106
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 7: Moving Into Design
1
What makes systems integration so difficult?

A)Finding the original data to install on the new server
B)Creating a ghost drive to house the old information
C)Installing new software packages on older machines
D)Bringing legacy system data and new data together
E)None of the above
D
2
Which is probably true about packaged software

A)In most cases,the software is a perfect fit for the companies need
B)Packaged software works best where the company has a unique need
C)The time frame is flexible to long
D)The business need is common
E)The project has a highly skills project manager who has been with the company for many years and has an excellent relationship with both business users and the IT development staff
D
3
System design is the determination of the overall system architecture-consisting of a set of physical processing components,_______________,and the communication among them-that will satisfy the system's essential requirements.

A)Workmanship
B)Order entry methods,HR feedback
C)Hardware,Software,People
D)Engineering data plans,fiber optic specifications
E)None of the above
C
4
Which of the following lists indicates the correct ordering of deliverables in a system specification document?

A)System Acquisition Weighted Alternative Matrix,Interface Design,Physical Data Model Data Storage Design
B)Data Storage Design,Interface Design,Architecture Design,Updated Crud Matrix
C)Hardware and Software Specifications,Interface Design,Data Storage Design,Architecture Design
D)Program Design Specifications,Physical Data Model,Data Storage Design,Architecture Design
E)Update CASE Repository Entries,Update CRUD Matrix,Interface Design,Architecture Design
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
5
Systems Integration refers to:

A)The process of synching all computers to the mainframe
B)The delivery of systems to the final destination office
C)Combining packaged software,the legacy system and new software
D)Adding the original hard drives to a newer system
E)Creating a new software to monitor power consumption
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
6
For efficiency purposes,it is wise to___________ when there is a basic software need to be satisfied.

A)Implement a company-wide project team to handle a custom software scripting
B)Purchase a packaged system
C)Design a blueprint and contract an outside vendor to develop a program
D)Make do with the current software package
E)Utilize a professional consultant to develop a system of servers7
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
7
In the initial stage of design,what are business requirements converted into?

A)System Requirements
B)Work Order Summary
C)Computer Qualifications Checklist
D)Vanilla System
E)Hardware Blueprint
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
8
The system inputs and outputs will be designed along with a plan or__________ of the way the system's features will be navigated.

A)Blueprint
B)Compass
C)Instructional Guide
D)Roadmap
E)FAQ
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
9
Enterprise Resource Planning (ERP)Systems are:

A)All-encompassing systems
B)Difficult to install and can result in serious problems for a company
C)Cheaper since they are created by a third party
D)A and B
E)B and C
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
10
Where are the decisions stored that are made regarding the hardware and software that will be purchased to support the new system?

A)Order Manifest
B)Hardware Sales Receipt
C)Suppliers' Computer System
D)President's Office
E)Hardware and Software Specification
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
11
Which might NOT be a good package software solution?

A)Payroll at Cloverfarms dairy
B)Accounts receivable at Staples
C)Rocket control software for NASA
D)Course management system at the University of Nebraska
E)Scanning software for Kroger grocery stores
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
12
How many ways does the text suggest one can approach the creation of a new system?

A)1
B)2
C)3
D)4
E)7
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
13
In what SDLC stage do we determine the business needs for an information systems project?

A)The design phase
B)The analysis phase
C)The dissection stage
D)The installation stage
E)The big bang stage
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
14
Another name for custom development might be:

A)Offshore outsourcing
B)In-house development
C)Vendor supplied in-house consulting
D)CASE tools
E)Package software
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
15
Workarounds are:

A)Not supported by a vendor who supplied the software
B)Designed by the vendor
C)Created to interface two software packages that are compatible with each other
D)Enterprise Wide Software Packages that are designed for satellite use
E)None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
16
What skills are necessary when undertaking a custom software design?

A)Technical
B)Functional
C)Project Management
D)A and C
E)A,B,and C
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
17
The system specification contains what?

A)Design documents,hardware and software specification
B)Physical process models,interface design
C)Physical data model
D)Architecture design
E)All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
18
_______ repository entries are updated to reflect specific technology decisions as they are made.

A)DFD
B)Sequential
C)CASE
D)Hardware
E)None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
19
During the design stage,the team must create a(n)_________ by specifying access restrictions and by identifying the need for ________,authentication and virus control.

A)System,integration
B)Security breach,emergency access
C)Secure system,encryption
D)Automated program,constant testing
E)Pecking order,governmental access
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
20
If on a limited time budget,the best way to be sure you remain efficient and effective in designing a system is to utilize the ____________.

A)Porters 5 Forces Model
B)Outsourcing Model
C)RAD and Timeboxing Techniques
D)Hire/Fire Motivational Theory
E)Not Attempt the Project
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
21
Becky is preparing a document that has detailed description of needs,special technical factors,evaluation criteria,timetable and more.She is probably working on a(n):

A)CRUD matrix
B)Alternative Matrix
C)RFP
D)ERP
E)DFD
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
22
Custom development is used when:

A)The business need is unique
B)The business need is not core to the business
C)The project has a project manager who can coordinate vendor efforts
D)The time frame is short
E)The skills are not strategic
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
23
Application service providers might be best associated with:

A)In-house development
B)Packaged software
C)Unique and strategic systems
D)Outsourcing
E)Internet Service Providers
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
24
What can push a project off track?

A)Funding
B)Staffing
C)Business users
D)A and B
E)A,B and C
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
25
Packaged systems are used when:

A)The business need is not core to the business
B)There is a desire to build in-house skills
C)The time frame is flexible
D)The project has a project manager who can coordinate vendor efforts
E)The decision to outsource is strategic
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
26
Matt is an analyst for the Pauxtis Media Company.He is in his office at 5:00 a.m.every Tuesday morning for a project update videoconference.He is probably involved in:

A)In-house development
B)Working with vendors on an RFP
C)Customizing a package to fit Pauxtis
D)Working with his regional Ernst and Young consulting team
E)Offshore outsourcing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
27
The design phase of the SDLC:

A)Produces a user's manual,does users training and creates online documentation for the new system
B)Involves writing of code (generally in an object oriented language)
C)Uses the output of JAD sessions to create logical use cases and DFDs
D)Involves interviewing of users to determine requirements
E)Uses the requirements that were gathered during analysis to create a blueprint for the future system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
28
Fixed-price contracts are considered:

A)Very flexible
B)Very rigid
C)Always cheaper than any other option
D)Useless when considering a systems design
E)Always the best option for any project
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
29
Outsourcing is used when:

A)The project has a project manager who can coordinate vendor efforts
B)There is a desire to build in-house skills
C)In-house functional and technical skills exist
D)The business need is not core to the business
E)None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
30
The score column in the Alternative Matrix represents what?

A)How expensive the install will be
B)How easy the install will be
C)How well the criteria are met by the alternative
D)How long the coded page will be
E)A and D
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
31
Requests for Proposals (RFPs)should contain

A)Detailed description of needs
B)Special technical needs
C)Evaluation criteria
D)A and B
E)A,B and C
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
32
When only a price is needed from a vendor,the following will likely be requested from the possible vendors:

A)Request for Proposal (RFP)
B)Request for Information (RFI)
C)Request for Quote (RFQ)
D)Request for Efficient Information Distribution (REID)
E)More Optimal Desires (MOD)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
33
A Request for Information (RFI)is used with vendors when there is a need for ________?

A)Pricing
B)Data Analysis
C)Information
D)Network Associate Password Help
E)None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
34
A time and arrangements deal is considered:

A)Very flexible
B)Very rigid
C)Cheaper than any other option
D)Useless when considering a systems design
E)Always the best option for any project
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
35
The following document is utilized with possible vendors on projects with smaller budgets,instead of sending a lengthy document to all possible vendors:

A)Request for Proposal (RFP)
B)Request for Information (RFI)
C)Request for Quote (RFQ)
D)Request for Efficient Information Distribution (REID)
E)More Optimal Desires (MOD)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
36
Outsourcing can include:

A)Hiring an external vendor
B)Hiring an external developer
C)Hiring an external service provider
D)A and C
E)A,B and C
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
37
Outsourcing firms called _____________ supply software applications and/or software related services through the Internet.

A)Application Service Providers (ASPs)
B)Enterprise Resource Providers (ERPs)
C)System Development Life Cycle Companies (SDLCs)
D)Information Technology Developers (ITDs)
E)None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
38
Requests for Proposals (RFPs)serve what purpose?

A)Integrate systems with one another
B)Create synergy amongst staff members
C)Solicit information from providers
D)Engage mobile computers with mainframe technology
E)Develop morale amongst managers
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
39
CRUD matrix can be used in the design phase to work with tables and possible user interaction with those tables.The letter "C" in CRUD stands for:

A)Computer
B)Create
C)Communicate
D)Complete
E)Constant
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
40
Value-added projects are:

A)When the outsourcer earns a percentage of the completed systems benefits
B)Not a feasible option for any project at any time
C)Gaining popularity
D)A and C
E)None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
41
If (a)the business need is common;(b)the skills needed are not strategic;(c)the time frame is short;it might be best to:

A)Use in-house / custom development
B)Hire a vendor to write the code for you
C)Outsource to India
D)Purchase a software package
E)Hire a consultant
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
42
An advantage of custom development might be:

A)You get a system that is tailored to the current business and meets specific needs
B)The rapid development of custom systems
C)The low cost (as compared to buying a package)
D)The low risk factor
E)The ability for in-house developers to work on systems that are in new programming languages and in technologies that are unknown to them prior to the development
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
43
RFP is an acronym for:

A)Reason for Programming
B)Request for Proposal
C)Rational Forensics Platform
D)Relationship with Foreign Providers
E)Real Forecast Project
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
44
One problem with using packages software systems is:

A)It takes a very long time to get the system and get it installed
B)The company has to accept the functionality that is provided with the system
C)Many common software packages have been written and tested and are readily available
D)There are many good software packages that are reasonable in price
E)Most software packages allow for some customization
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
45
Which of the following is normally NOT done in the design phase of the SDLC?

A)Decisions for hardware and software purchases are made
B)User interactions are planned out (inputs,outputs,user interfaces)
C)Cost / Benefits of the new system are carefully calculated
D)Logical DFDs and ERDs are converted into physical DFDs and ERDs
E)The physical data model is created
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
46
Which is NOT a part of the System Specification document?

A)Use Cases
B)Physical Data Model
C)Updated CRUD matrix
D)Architecture Design
E)System Acquisition Weighted alternative Matrix
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
47
If (a)the business need is not core to the business;(b)the project has a highly skilled project manager;(c)in-house functional or technical experience does not exist;it might be best to:

A)Use in-house / custom development
B)Buy an ERP system
C)Outsource to a company specializing in that technology
D)Purchase a software package
E)Hire a consultant
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
48
What percentage of companies on the InformationWeek 500 list of business technology innovators say they engage in offshore IT outsourcing?

A)0 to 10%
B)10% to 25%
C)25% to 40%
D)40% to 60%
E)Over 60%
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
49
Which of the following is NOT a system acquisition strategy as presented in the book?

A)Custom development
B)Outsourcing to a regional consultant (like IBM)
C)Use a JAD session to acquire the system
D)Using the company's programming staff to write the code (aka 'in-house development')
E)Buying a pre-written software package
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
50
A Request for Proposal (RFP)will result in a:

A)Vendor proposal that is a binding offer to accomplish the tasks described in the RFP
B)Gentleman's agreement on the offer
C)Substantially more expensive project
D)Custom development
E)Reduction in in-house programming effort
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
51
Which is NOT a factor in choosing a development option?

A)Data base normalization
B)In-house experience
C)Time frame
D)Project skills
E)Project management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
52
Which is NOT a recommended guideline for managing outsourcing?

A)Define and stabilize requirements before signing a contract
B)Don't outsource what you don't understand
C)Emphasize rigid expectations and short-term relationships
D)Select the vendor,developer or service provider carefully
E)Keep the lines of communication open between you and your outsourcer
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
53
A table that can be used to look at various design options is a(n):

A)RFP
B)CRUD
C)Gantt Chart
D)Alternative Matrix
E)SQL query
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
54
If (a)the business need is unique,(b)there is a desire to build in-house skills;(c)the time frame is flexible,it might be best to:

A)Do in-house / custom development
B)Buy an ERP system
C)Outsource to India
D)Purchase a software package
E)Hire a consultant
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
55
The letter 'R' in CRUD matrix (for tables and user involvement)stands for:

A)Replace
B)Replicate
C)Relationship
D)Read
E)Read-only
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
56
Which is NOT true of outsourcing?

A)It can be done offshore
B)It can be done by an ASP
C)There can be a low cost of entry
D)It requires a large in-house staff
E)It can reduce internal IT costs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
57
In terms of project management,which option might require excellent project management skills and a proven methodology?

A)Outsourcing to Nebraska
B)Outsourcing to India
C)Buying a packaged solution
D)Doing custom development
E)Buying an ERP system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
58
Which is NOT one of the primary contract types made with outsourcing?

A)Time and arrangements
B)Fixed-price contract
C)Distance and confluence contract
D)Value-added contract
E)Paying for the expenses and time to get the job done
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
59
The letter "D" in CRUD matrix stands for:

A)Delete
B)Deny use
C)Deliver
D)Document
E)Denormalize
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
60
Which of the following will probably NOT be part of a Request for Proposal (RFP)?

A)Certain key facts that the vendor requires
B)Special technical needs
C)Procedures to follow
D)Project timetable
E)Use case diagrams
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
61
When using an alternative matrix,frequently analysts will assign ____________ to certain factors to signify the importance of the factor in the decision.

A)Probabilities
B)Reluctance factors
C)Weights
D)Project sponsors
E)Data stores
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
62
Time and arrangements deals are potentially more expensive if the service provider requires unforeseen resources to complete the project on time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
63
There is absolutely no need for designing a custom system since there are already so many pre-packaged systems available to any company regardless of its size.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
64
Prototyping is the interface design step that often uncovers additional information that is needed in the system,leading to a revision of the physical DFDs or ERPs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
65
There is no need to determine the reliability or performance of a new system due to the inherent dangers all technologies pose.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
66
In a custom software case,all parts of the system need to be completely customized and scripted to the company's specifications including ancillary software to the current system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
67
A workaround is a custom-built add-on program that interfaces with packaged applications to handle specific needs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
68
The decision to make,to buy,or to outsource influences the design tasks that are performed throughout the rest of the design phase.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
69
Outsourcing firms called Application Software Providers (ASPs)supply software applications and/or software related services through the Internet.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
70
CASE repository entries are updated to reflect specific technology decisions as they are made.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
71
Letting technology drive a business can be dangerous.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
72
System requirements are communicated through a collection of design documents and physical processes and data models.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
73
Application Software Providers (ASPs)should be utilized when considering non-core programming and/custom needs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
74
The key challenge in systems integration is avoiding a system wide crash upon installation of legacy software.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
75
Highly skilled IS Professionals are easy to hire and retain.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
76
Outsourcing requires the least in-house resources.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
77
Business requirements are communicated through a collection of design documents and physical processes and data models.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
78
Building a system in-house builds technical skills and functional knowledge that one may not want to allow to walk out of the door.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
79
If the business need is core to the business then it is best to outsource the system development.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
80
An outsourcing arrangement where you pay no more than what was expected is known as a(n):

A)Time and arrangements contract
B)Fixed-price contract
C)Value-added contract
D)Distance and time contract
E)Billing operational contract
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 106 في هذه المجموعة.