سؤال
In a parallel conversion:

A)both the old and new systems are run for a period of time
B)the old and new system are run for an entire year
C)the old and new system are run while the old hardware is removed
D)the new system is installed on one weekend and the old system is removed on the next weekend
E)only one pilot site is used to run both the old and new systems in parallel
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
What options does a project manager have when considering a conversion location?

A)simultaneous, pilot and parallel
B)parallel, pilot and phased
C)waterfall, phased and prototyped
D)phased, pilot and simultaneous
E)simultaneous, direct and modular
سؤال
It has been a busy project experience for Omar.During the analysis phase,he encountered some negative feedback from users.During design,his best user-interface analyst left for a new position and a novice user-interface designer took over.And during the coding,the team had to rely on some off-shore developers who had trouble understand the programming specifications.To get the system running as expected,the testing time was reduced.Which of the following conversion approaches might be the safest approach for Omar and the project team?

A)direct, whole-system, simultaneous conversion
B)parallel, pilot site, simultaneous conversion
C)direct, phased, simultaneous conversion
D)direct, pilot and phased conversion
E)parallel, modular and top-down conversion
سؤال
If a trainer has been hired to train all staff before the new system goes 'live',it might be best to use:

A)direct conversion
B)pilot conversion
C)phased conversion
D)modular conversion
E)perpendicular conversion
سؤال
According to the quote from Machiavelli;s The Prince,'there is nothing more difficult' than ________

A)Death and taxes
B)The creation of a new system
C)In-fighting between developers and users
D)Over-throwing the current regime
E)Writing documentation for new systems
سؤال
The two types of conversion modules are:

A)whole-system and waterfall
B)waterfall and phased
C)modular conversion and whole-system
D)pilot and modular
E)parallel and modular
سؤال
Considering conversion style,conversion locations,and conversion modules,the most risky approach is probably:

A)direct, simultaneous, whole-system
B)direct, phased, whole-system
C)direct, pilot, modular
D)parallel, simultaneous, modular
E)parallel, phased, modular
سؤال
Plans to handle potential business disruption due to technical problems during conversion are covered in the:

A)System back-out plan
B)Conversion disruption plan
C)Alignment alteration plan
D)Business Contingency Plan
E)Help Desk plan
سؤال
The main difference between pilot and phased conversion location options is:

A)pilot is like an extended test; phased is for a set of sites
B)pilot does the headquarters site; phased is for regional sites
C)pilot is for a set of sites; phased is for modular conversion
D)pilot is for parallel conversion; phased is for direct conversion
E)pilot and phased are the same
سؤال
Juan is considering which of the two 'conversion styles' to use for his project.They are:

A)abrupt and direct
B)direct and instant
C)parallel and perpendicular
D)direct and parallel
E)parallel and analogous
سؤال
Frequently,when using the direct conversion strategy,the new system is activated:

A)on the project sponsor's birthday
B)on the 12?? of September (Herman's Hollerith's birthday)
C)to correspond with a fiscal year change or at midnight on New Year's Eve
D)when the current paper forms run out
E)on Christmas Day to give the users a 'gift'
سؤال
In the SDLC,the key person is the systems analyst who analyzed the business situation,identified opportunities for improvements and designed an information system to implement the improvements.
سؤال
When considering costs of a new system conversion,which is NOT a common cost to consider?

A)the cost of running two systems with a parallel conversion
B)the costs of more staff at more locations for support in a simultaneous conversion
C)the salary costs of users, trainers, administrators, consultants
D)the hardware costs for a pilot system
E)the extra programming costs for a modular conversion
سؤال
What is NOT normally part of transitioning to a new system?

A)Deciding on a conversion strategy
B)Planning on training
C)Developing the user interface screens
D)Overseeing data conversion from the old system to the new system
E)Preparing people for the new system
سؤال
Which is NOT a step in Lewin's model for managing organization change?

A)Program
B)Transition
C)Refreeze
D)Move
E)Unfreeze
سؤال
A lot of the 'unfreeze' part of Lewin's three step model for managing organization change:

A)is part of the user interface design activities
B)is generally accomplished by a strongly worded e-mail from the project sponsor to the development / project management team
C)has been accomplished to this point in the project by the systems development life cycle (SDLC)processes
D)is done by 'turning up the heat' (i.e. unfreeze)on the users to make them want to change
E)is accomplished by the organization's marketing vice president
سؤال
One of the problems with a parallel conversion is:

A)there is a higher risk
B)the old hardware might fail
C)there is a lower risk
D)the users have to enter data into both systems
E)there is an abrupt conversion
سؤال
The second step of Lewin's three step model for managing organizational change is:

A)unfreeze
B)refreeze
C)thaw
D)move
E)establish SOPs
سؤال
Which is NOT a post-implementation activity?

A)system support
B)system maintenance
C)system request
D)project assessment
E)providing help desk and telephone support for users
سؤال
Which of the following conversion options is the most risk-filled?

A)the parallel conversion style
B)the direct conversion style
C)the simultaneous conversion style
D)the perpendicular conversion style
E)none of these
سؤال
Which is NOT a step involved in preparing the technology?

A)install the hardware
B)install the telecommunications system
C)convert the logical DFDs into physical DFDs
D)convert the data
E)install the software
سؤال
Which is NOT a key role in any major organization change?

A)sponsor
B)chief financial officer (CFO)
C)change agent
D)potential adopter
E)none of the above
سؤال
The person who wants the change to a system most likely is:

A)the Internal Revenue Service
B)the head of the accounting department
C)the business sponsor
D)the director of human resources
E)the head project manager
سؤال
Which is NOT a basic tool for structuring work processes in organizations?

A)formal standard operating procedures
B)defining how people assign meaning to events (such as to 'be successful')
C)promoting earlier adopters to management positions
D)allocating funds for training
E)allocating funds for positive infrastructure
سؤال
One of the best contingency plans is to:

A)use a direct conversion
B)use an abrupt conversion
C)use a parallel conversion
D)use a back-up power generator in case the power fails
E)have your system insured by Lloyds of London
سؤال
Early adopters in the new customer resource management system received faster computers with more memory.In terms of management policy,this is probably an example of:

A)standard operating procedures
B)checks and balances
C)bonus processes
D)fair play
E)resource allocation
سؤال
Connie is trying to motivate users to adopt the new system.The first step she needs to consider is:

A)how to cajole the users into adopting the system
B)that people need to be paid to adopt a new system
C)the factors that inhibit change and the perception of costs and benefits
D)the standard operating procedures of the organization
E)the informal politics and the informal 'boss' of the users (and how to reach this person)
سؤال
A comment about why people resist change might be:

A)people like change and feeling part of a successful organization
B)what is good for the organization is not necessarily good for the people
C)change can be very uplifting and comforting
D)change is the motto of Wal-Mart
E)using new and updated systems makes a person look like a "yes-person"
سؤال
The authors suggest that "with new systems," it may be best:

A)to expect success with optimism
B)to expect the worst
C)to add three additional weeks of alpha and beta testing
D)to keep the existing system for two additional years
E)to hold daily developer & user troubleshooting meetings during the implementation stage
سؤال
Somebody who is generally outside the business unit and is leading the change effort is the:

A)business sponsor
B)project champion
C)reluctant adopter
D)the change agent
E)the database administrator (DBA)
سؤال
Connie knows that _________ when trying to motivate people to change

A)people act on what they believe to be true, not what actually is true
B)people act out of political reasons, such as trying to please the manager
C)people will change only when it is best for the organization
D)change is generally related to age; younger employees will embrace change; while older employees will not embrace change
E)change can only occur when negative pressures are in play
سؤال
What is probably a common scenario in most organizations when installing a new system?

A)users are excited about the new system
B)resistance to change exists
C)scope creep delays implementation by at least two months
D)the change agent is a member of the business unit adopting the change
E)the project sponsor is the lead systems analyst
سؤال
Which is NOT a change management plan step?

A)revising management policies
B)assessing the costs and benefit models of potential adopters
C)motivating adoption
D)installing 'user friendly' hardware
E)enabling people to adopt through training
سؤال
Marta's company falls under the Sarbanes-Oxley reporting standards.She has overseen a major project to change reporting functions in organizational systems.But,there are reluctant and resistant adopters among the user groups involved in this project.Which of the following might be a compelling organizational reason for change for those reluctant and resistant adopters?

A)If we do not adopt this system, the company will be heavily fined, and might become bankrupt or acquired by another company
B)If we don't adopt this system, we will be one of the few that has stood up to governmental manipulation
C)If we don't adopt this system, we will be viewed as trend setters within our industry
D)Marta will gain prestige and power if this system is adopted
E)A competitor to this company adopted Sarbanes-Oxley two years ago
سؤال
In terms of systems development projects,the philosophy of 'build it and they will come'

A)is common in system adoption
B)was first proposed by Machivelli in The Prince
C)was part of the economic feasibility analysis
D)is the motto of project teams
E)generally is not true, except in movies
سؤال
Which of the following is a true statement about successful change?

A)the migration plan is not clear
B)the likelihood of successful change is increased when the cost of the transition to individuals who must change is low
C)there is a need for significantly different new skills
D)there is a strong possibility of disruptions in how the company has done business with the new system
E)the change agent is a newcomer who has been viewed as 'pushy' by potential adopters
سؤال
____________ is usually the most technically complicated step in the migration plan.

A)installing hardware
B)installing telecommunications systems
C)installing software
D)motivating people to adopt the new system
E)converting data
سؤال
The habitual routines for how work is performed are called:

A)work norms
B)policies, processes and procedures (the "3Ps")
C)resource allocations
D)standard operating procedures
E)assignment infrastructures
سؤال
Which of the following might NOT be a reason for some people to favor adoption of a new system?

A)increased salary
B)reduced unpleasantness
C)opportunities for promotion
D)loss of political power
E)opportunities for personal development
سؤال
When installing hardware,it is best to:

A)leave this to the last minute, so to get the latest versions of the hardware from the vendor(s)
B)work closely with the vendors who are supplying the hardware
C)create a RFP two weeks before install date
D)call Home Depot
E)outsource the hardware installation to India
سؤال
A study of 10,000 end-users in the insurance industry in the United States found that only a small percentage of the users allowed the system work processes to become habits or norms.
سؤال
Most organizations provide a ____________ that provides a place for a user to talk with a person who can answer questions about organizational systems.

A)help desk
B)human resources center
C)mentor system
D)triage process
E)complaint desk
سؤال
Which is most likely NOT a part of Project Assessment?

A)project team review (reports on activities and performance with an eye for improvement)
B)system review of the costs that were initially used in starting the analysis
C)identifying mistakes in the project and understanding the causes of those mistakes
D)a thorough analysis of the software coding as to standards, cohesion and coupling
E)system review of the proposed benefits that were used in analysis
سؤال
Research has shown that about __________ of potential adopters will be ready adopters.

A)5% to 10%
B)10% to 20%
C)20% to 30%
D)40% to 50%
E)90 to 100%
سؤال
The goal of post-implementation activities is to:

A)praise the ready adopters
B)give encouragement to the reluctant adopters who joined in
C)institutionalize the use of the new system
D)quickly modify the system with the changes that were suggested during the project that were deemed as 'good', but identified as 'scope creep'
E)finally be able to relax and bond together (frequently with a post-implementation party)
سؤال
The authors suggest the following advice to motivate adoption:

A)keeping the new system 'under wraps' until the end
B)it is easier to convince potential adopters that a new system will remove a major problem rather than providing new benefits
C)it is better to stress the benefits of the new system over solving current problems - good news sells better than bad news
D)it is better to 'over sell' the new system, even if potential benefits are estimated on the high side in order to get reluctant adopters 'on board'
E)being forthright by saying 'this is what it is - you have two choices - take it or leave the organization'
سؤال
Project assessment is part of post-implementation.
سؤال
Training is probably the most _________ part of any change management initiative.

A)self-evident
B)expensive
C)overused
D)wasted
E)tedious
سؤال
_________________ is the process of refining the system to make sure it continues to meet business needs.

A)Business contingency plan
B)System maintenance
C)Help desk
D)SDLC
E)all of the above
سؤال
Once the project team has installed the system and performed the change management activities,the system is officially turned over to:

A)the users
B)the operations group
C)management
D)vendors
E)consultants
سؤال
Which is NOT a common source of change requests for an installed system?

A)bugs in the system that must be fixed
B)enhancements to the system from users
C)other systems development projects (that interact with this system)
D)senior management
E)specific requests made by the CEO
سؤال
Training should focus on:

A)how management views the new system
B)the enhanced and beneficial features of the new system
C)helping the users to accomplish their jobs
D)the underlying programming of the new system
E)how the analysts went from users use-cases to DFDs and ERDs
سؤال
According to the quote from Machiavelli The Prince,nothing is more difficult than the creation of a new system.
سؤال
Which is NOT a common training approach for introducing a new system?

A)classroom training
B)computer-based training (CBT)
C)one-on-one training
D)mentoring
E)sending employees to a nearby college or university to take a class
سؤال
Frequently,as people get used to certain ways of doing things,they view their job in terms of those processes rather than in terms of the business goals of serving customers.
سؤال
Generally the cheapest training to deliver would be:

A)classroom training
B)computer-based training (CBT)
C)one-on-one training
D)mentoring
E)sending employees to a nearby college or university
سؤال
One of the activities when considering post-implementation activities of a new system is to include systems maintenance.
سؤال
With resistant adopters (those that simply refuse to accept the change with the new system),it might be better to:

A)bring them together for a meeting and open debate on a unimpassioned, logical approach
B)ignore this small minority of resistant adopters and focus on the larger majority of ready and reluctant adopters
C)find the more vocal resistant adopters and 'bribe' them to accept the new system with such actions as updated computer systems, time off, and 'trinkets' (like banners, buttons, stuffed animals)
D)find the leaders of this resistance and fire one of two of them as a message to the others to get 'on board'
E)use an implementation JAD session with leaders from the ready adopters, reluctant adopters, and resistant adopters to find common ground
سؤال
Planning for the transition from the old system to the new system begins while programmers are still conducting interviews and drawing logical DFDs.
سؤال
The single most important factor in motivating a change is:

A)posting comments on a corporate blog
B)sending out an e-mail of reluctant and resistant adopters to everyone in the organization
C)providing clear and convincing evidence of the need for change
D)mandating that 'it must happen or else'
E)promising salary increases to upper management
سؤال
Most of the SDLC processes (including JAD sessions and interviews with users)have laid the groundwork for 'unfreezing' the current system so that a new system can replace it.
سؤال
Knowing that sometimes things happen due to technical problems when implementing a new system is a great reason to have a business contingency plan.
سؤال
One conversation strategy is 'conversion style' where the change from the old system to the new system can be instantaneous or gradual.
سؤال
Fredrick Brooks suggested a three step model for managing organizational change: (a)unfreeze;(b)move;and (c)refreeze.
سؤال
Generally speaking,the technical readiness portion is the most difficult aspect of the migration plan.
سؤال
The first step in Lewin's model is "thaw".
سؤال
At Mega-Mart,their financial year ends on June 30??.Chris,the project manager for the new reporting system,has set 11:59 p.m.as the time for the implementation of the new system.He is probably using the parallel conversion approach.
سؤال
One aspect of converting to a new system might be to convert data from one format into data that will be used by the new system.
سؤال
Post-implementation activities include correcting the logical DFDs and logical ERDs during a final JAD session with end-users.
سؤال
According to the authors,the most complex element of the migration plan is getting users to be ready and able to use the new system.
سؤال
A 'technology restructuring matrix' describes how to handle potential business disruptions due to technical problems during conversion.
سؤال
Part of the migration / transition plan should include helping people adopt the new system.
سؤال
Lewin's model for managing organizational change has four steps: (a)thaw;(b)enticement;(c)change;and (d)institutionalize.
سؤال
Of direct and parallel conversion,parallel is the most risky.
سؤال
Arranging for and installing any needed hardware and software and converting data as needed for the new system is called 'technical readiness'.
سؤال
TJ was the project manager on the ERP implementation project.He should lead an evaluation of the project to identify what went well and what could be improved for the next system development project.
سؤال
Technical readiness in a migration plan is achieved by installing fault tolerant,open-source Web 2.0 systems.
سؤال
The transition from the old business processes and computer programs to the new business processes and computer programs will be facilitated by ensuring that a number of business,technical and people issues are addressed.
سؤال
Michael,a project manager,is concerned that although the new system is fairly well tested,wants to run both the old and new systems for two months.He is using a 'parallel conversion' strategy.
سؤال
Ting-You is working on encouragement,training and incentives to get users to adopt the new system.That is one of the important activities of the transition process.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/139
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 13: Transition to the New System
1
In a parallel conversion:

A)both the old and new systems are run for a period of time
B)the old and new system are run for an entire year
C)the old and new system are run while the old hardware is removed
D)the new system is installed on one weekend and the old system is removed on the next weekend
E)only one pilot site is used to run both the old and new systems in parallel
A
2
What options does a project manager have when considering a conversion location?

A)simultaneous, pilot and parallel
B)parallel, pilot and phased
C)waterfall, phased and prototyped
D)phased, pilot and simultaneous
E)simultaneous, direct and modular
D
3
It has been a busy project experience for Omar.During the analysis phase,he encountered some negative feedback from users.During design,his best user-interface analyst left for a new position and a novice user-interface designer took over.And during the coding,the team had to rely on some off-shore developers who had trouble understand the programming specifications.To get the system running as expected,the testing time was reduced.Which of the following conversion approaches might be the safest approach for Omar and the project team?

A)direct, whole-system, simultaneous conversion
B)parallel, pilot site, simultaneous conversion
C)direct, phased, simultaneous conversion
D)direct, pilot and phased conversion
E)parallel, modular and top-down conversion
B
4
If a trainer has been hired to train all staff before the new system goes 'live',it might be best to use:

A)direct conversion
B)pilot conversion
C)phased conversion
D)modular conversion
E)perpendicular conversion
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
5
According to the quote from Machiavelli;s The Prince,'there is nothing more difficult' than ________

A)Death and taxes
B)The creation of a new system
C)In-fighting between developers and users
D)Over-throwing the current regime
E)Writing documentation for new systems
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
6
The two types of conversion modules are:

A)whole-system and waterfall
B)waterfall and phased
C)modular conversion and whole-system
D)pilot and modular
E)parallel and modular
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
7
Considering conversion style,conversion locations,and conversion modules,the most risky approach is probably:

A)direct, simultaneous, whole-system
B)direct, phased, whole-system
C)direct, pilot, modular
D)parallel, simultaneous, modular
E)parallel, phased, modular
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
8
Plans to handle potential business disruption due to technical problems during conversion are covered in the:

A)System back-out plan
B)Conversion disruption plan
C)Alignment alteration plan
D)Business Contingency Plan
E)Help Desk plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
9
The main difference between pilot and phased conversion location options is:

A)pilot is like an extended test; phased is for a set of sites
B)pilot does the headquarters site; phased is for regional sites
C)pilot is for a set of sites; phased is for modular conversion
D)pilot is for parallel conversion; phased is for direct conversion
E)pilot and phased are the same
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
10
Juan is considering which of the two 'conversion styles' to use for his project.They are:

A)abrupt and direct
B)direct and instant
C)parallel and perpendicular
D)direct and parallel
E)parallel and analogous
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
11
Frequently,when using the direct conversion strategy,the new system is activated:

A)on the project sponsor's birthday
B)on the 12?? of September (Herman's Hollerith's birthday)
C)to correspond with a fiscal year change or at midnight on New Year's Eve
D)when the current paper forms run out
E)on Christmas Day to give the users a 'gift'
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
12
In the SDLC,the key person is the systems analyst who analyzed the business situation,identified opportunities for improvements and designed an information system to implement the improvements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
13
When considering costs of a new system conversion,which is NOT a common cost to consider?

A)the cost of running two systems with a parallel conversion
B)the costs of more staff at more locations for support in a simultaneous conversion
C)the salary costs of users, trainers, administrators, consultants
D)the hardware costs for a pilot system
E)the extra programming costs for a modular conversion
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
14
What is NOT normally part of transitioning to a new system?

A)Deciding on a conversion strategy
B)Planning on training
C)Developing the user interface screens
D)Overseeing data conversion from the old system to the new system
E)Preparing people for the new system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
15
Which is NOT a step in Lewin's model for managing organization change?

A)Program
B)Transition
C)Refreeze
D)Move
E)Unfreeze
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
16
A lot of the 'unfreeze' part of Lewin's three step model for managing organization change:

A)is part of the user interface design activities
B)is generally accomplished by a strongly worded e-mail from the project sponsor to the development / project management team
C)has been accomplished to this point in the project by the systems development life cycle (SDLC)processes
D)is done by 'turning up the heat' (i.e. unfreeze)on the users to make them want to change
E)is accomplished by the organization's marketing vice president
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
17
One of the problems with a parallel conversion is:

A)there is a higher risk
B)the old hardware might fail
C)there is a lower risk
D)the users have to enter data into both systems
E)there is an abrupt conversion
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
18
The second step of Lewin's three step model for managing organizational change is:

A)unfreeze
B)refreeze
C)thaw
D)move
E)establish SOPs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
19
Which is NOT a post-implementation activity?

A)system support
B)system maintenance
C)system request
D)project assessment
E)providing help desk and telephone support for users
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
20
Which of the following conversion options is the most risk-filled?

A)the parallel conversion style
B)the direct conversion style
C)the simultaneous conversion style
D)the perpendicular conversion style
E)none of these
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
21
Which is NOT a step involved in preparing the technology?

A)install the hardware
B)install the telecommunications system
C)convert the logical DFDs into physical DFDs
D)convert the data
E)install the software
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
22
Which is NOT a key role in any major organization change?

A)sponsor
B)chief financial officer (CFO)
C)change agent
D)potential adopter
E)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
23
The person who wants the change to a system most likely is:

A)the Internal Revenue Service
B)the head of the accounting department
C)the business sponsor
D)the director of human resources
E)the head project manager
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
24
Which is NOT a basic tool for structuring work processes in organizations?

A)formal standard operating procedures
B)defining how people assign meaning to events (such as to 'be successful')
C)promoting earlier adopters to management positions
D)allocating funds for training
E)allocating funds for positive infrastructure
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
25
One of the best contingency plans is to:

A)use a direct conversion
B)use an abrupt conversion
C)use a parallel conversion
D)use a back-up power generator in case the power fails
E)have your system insured by Lloyds of London
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
26
Early adopters in the new customer resource management system received faster computers with more memory.In terms of management policy,this is probably an example of:

A)standard operating procedures
B)checks and balances
C)bonus processes
D)fair play
E)resource allocation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
27
Connie is trying to motivate users to adopt the new system.The first step she needs to consider is:

A)how to cajole the users into adopting the system
B)that people need to be paid to adopt a new system
C)the factors that inhibit change and the perception of costs and benefits
D)the standard operating procedures of the organization
E)the informal politics and the informal 'boss' of the users (and how to reach this person)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
28
A comment about why people resist change might be:

A)people like change and feeling part of a successful organization
B)what is good for the organization is not necessarily good for the people
C)change can be very uplifting and comforting
D)change is the motto of Wal-Mart
E)using new and updated systems makes a person look like a "yes-person"
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
29
The authors suggest that "with new systems," it may be best:

A)to expect success with optimism
B)to expect the worst
C)to add three additional weeks of alpha and beta testing
D)to keep the existing system for two additional years
E)to hold daily developer & user troubleshooting meetings during the implementation stage
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
30
Somebody who is generally outside the business unit and is leading the change effort is the:

A)business sponsor
B)project champion
C)reluctant adopter
D)the change agent
E)the database administrator (DBA)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
31
Connie knows that _________ when trying to motivate people to change

A)people act on what they believe to be true, not what actually is true
B)people act out of political reasons, such as trying to please the manager
C)people will change only when it is best for the organization
D)change is generally related to age; younger employees will embrace change; while older employees will not embrace change
E)change can only occur when negative pressures are in play
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
32
What is probably a common scenario in most organizations when installing a new system?

A)users are excited about the new system
B)resistance to change exists
C)scope creep delays implementation by at least two months
D)the change agent is a member of the business unit adopting the change
E)the project sponsor is the lead systems analyst
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
33
Which is NOT a change management plan step?

A)revising management policies
B)assessing the costs and benefit models of potential adopters
C)motivating adoption
D)installing 'user friendly' hardware
E)enabling people to adopt through training
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
34
Marta's company falls under the Sarbanes-Oxley reporting standards.She has overseen a major project to change reporting functions in organizational systems.But,there are reluctant and resistant adopters among the user groups involved in this project.Which of the following might be a compelling organizational reason for change for those reluctant and resistant adopters?

A)If we do not adopt this system, the company will be heavily fined, and might become bankrupt or acquired by another company
B)If we don't adopt this system, we will be one of the few that has stood up to governmental manipulation
C)If we don't adopt this system, we will be viewed as trend setters within our industry
D)Marta will gain prestige and power if this system is adopted
E)A competitor to this company adopted Sarbanes-Oxley two years ago
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
35
In terms of systems development projects,the philosophy of 'build it and they will come'

A)is common in system adoption
B)was first proposed by Machivelli in The Prince
C)was part of the economic feasibility analysis
D)is the motto of project teams
E)generally is not true, except in movies
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
36
Which of the following is a true statement about successful change?

A)the migration plan is not clear
B)the likelihood of successful change is increased when the cost of the transition to individuals who must change is low
C)there is a need for significantly different new skills
D)there is a strong possibility of disruptions in how the company has done business with the new system
E)the change agent is a newcomer who has been viewed as 'pushy' by potential adopters
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
37
____________ is usually the most technically complicated step in the migration plan.

A)installing hardware
B)installing telecommunications systems
C)installing software
D)motivating people to adopt the new system
E)converting data
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
38
The habitual routines for how work is performed are called:

A)work norms
B)policies, processes and procedures (the "3Ps")
C)resource allocations
D)standard operating procedures
E)assignment infrastructures
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
39
Which of the following might NOT be a reason for some people to favor adoption of a new system?

A)increased salary
B)reduced unpleasantness
C)opportunities for promotion
D)loss of political power
E)opportunities for personal development
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
40
When installing hardware,it is best to:

A)leave this to the last minute, so to get the latest versions of the hardware from the vendor(s)
B)work closely with the vendors who are supplying the hardware
C)create a RFP two weeks before install date
D)call Home Depot
E)outsource the hardware installation to India
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
41
A study of 10,000 end-users in the insurance industry in the United States found that only a small percentage of the users allowed the system work processes to become habits or norms.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
42
Most organizations provide a ____________ that provides a place for a user to talk with a person who can answer questions about organizational systems.

A)help desk
B)human resources center
C)mentor system
D)triage process
E)complaint desk
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
43
Which is most likely NOT a part of Project Assessment?

A)project team review (reports on activities and performance with an eye for improvement)
B)system review of the costs that were initially used in starting the analysis
C)identifying mistakes in the project and understanding the causes of those mistakes
D)a thorough analysis of the software coding as to standards, cohesion and coupling
E)system review of the proposed benefits that were used in analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
44
Research has shown that about __________ of potential adopters will be ready adopters.

A)5% to 10%
B)10% to 20%
C)20% to 30%
D)40% to 50%
E)90 to 100%
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
45
The goal of post-implementation activities is to:

A)praise the ready adopters
B)give encouragement to the reluctant adopters who joined in
C)institutionalize the use of the new system
D)quickly modify the system with the changes that were suggested during the project that were deemed as 'good', but identified as 'scope creep'
E)finally be able to relax and bond together (frequently with a post-implementation party)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
46
The authors suggest the following advice to motivate adoption:

A)keeping the new system 'under wraps' until the end
B)it is easier to convince potential adopters that a new system will remove a major problem rather than providing new benefits
C)it is better to stress the benefits of the new system over solving current problems - good news sells better than bad news
D)it is better to 'over sell' the new system, even if potential benefits are estimated on the high side in order to get reluctant adopters 'on board'
E)being forthright by saying 'this is what it is - you have two choices - take it or leave the organization'
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
47
Project assessment is part of post-implementation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
48
Training is probably the most _________ part of any change management initiative.

A)self-evident
B)expensive
C)overused
D)wasted
E)tedious
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
49
_________________ is the process of refining the system to make sure it continues to meet business needs.

A)Business contingency plan
B)System maintenance
C)Help desk
D)SDLC
E)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
50
Once the project team has installed the system and performed the change management activities,the system is officially turned over to:

A)the users
B)the operations group
C)management
D)vendors
E)consultants
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
51
Which is NOT a common source of change requests for an installed system?

A)bugs in the system that must be fixed
B)enhancements to the system from users
C)other systems development projects (that interact with this system)
D)senior management
E)specific requests made by the CEO
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
52
Training should focus on:

A)how management views the new system
B)the enhanced and beneficial features of the new system
C)helping the users to accomplish their jobs
D)the underlying programming of the new system
E)how the analysts went from users use-cases to DFDs and ERDs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
53
According to the quote from Machiavelli The Prince,nothing is more difficult than the creation of a new system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
54
Which is NOT a common training approach for introducing a new system?

A)classroom training
B)computer-based training (CBT)
C)one-on-one training
D)mentoring
E)sending employees to a nearby college or university to take a class
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
55
Frequently,as people get used to certain ways of doing things,they view their job in terms of those processes rather than in terms of the business goals of serving customers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
56
Generally the cheapest training to deliver would be:

A)classroom training
B)computer-based training (CBT)
C)one-on-one training
D)mentoring
E)sending employees to a nearby college or university
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
57
One of the activities when considering post-implementation activities of a new system is to include systems maintenance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
58
With resistant adopters (those that simply refuse to accept the change with the new system),it might be better to:

A)bring them together for a meeting and open debate on a unimpassioned, logical approach
B)ignore this small minority of resistant adopters and focus on the larger majority of ready and reluctant adopters
C)find the more vocal resistant adopters and 'bribe' them to accept the new system with such actions as updated computer systems, time off, and 'trinkets' (like banners, buttons, stuffed animals)
D)find the leaders of this resistance and fire one of two of them as a message to the others to get 'on board'
E)use an implementation JAD session with leaders from the ready adopters, reluctant adopters, and resistant adopters to find common ground
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
59
Planning for the transition from the old system to the new system begins while programmers are still conducting interviews and drawing logical DFDs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
60
The single most important factor in motivating a change is:

A)posting comments on a corporate blog
B)sending out an e-mail of reluctant and resistant adopters to everyone in the organization
C)providing clear and convincing evidence of the need for change
D)mandating that 'it must happen or else'
E)promising salary increases to upper management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
61
Most of the SDLC processes (including JAD sessions and interviews with users)have laid the groundwork for 'unfreezing' the current system so that a new system can replace it.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
62
Knowing that sometimes things happen due to technical problems when implementing a new system is a great reason to have a business contingency plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
63
One conversation strategy is 'conversion style' where the change from the old system to the new system can be instantaneous or gradual.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
64
Fredrick Brooks suggested a three step model for managing organizational change: (a)unfreeze;(b)move;and (c)refreeze.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
65
Generally speaking,the technical readiness portion is the most difficult aspect of the migration plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
66
The first step in Lewin's model is "thaw".
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
67
At Mega-Mart,their financial year ends on June 30??.Chris,the project manager for the new reporting system,has set 11:59 p.m.as the time for the implementation of the new system.He is probably using the parallel conversion approach.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
68
One aspect of converting to a new system might be to convert data from one format into data that will be used by the new system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
69
Post-implementation activities include correcting the logical DFDs and logical ERDs during a final JAD session with end-users.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
70
According to the authors,the most complex element of the migration plan is getting users to be ready and able to use the new system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
71
A 'technology restructuring matrix' describes how to handle potential business disruptions due to technical problems during conversion.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
72
Part of the migration / transition plan should include helping people adopt the new system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
73
Lewin's model for managing organizational change has four steps: (a)thaw;(b)enticement;(c)change;and (d)institutionalize.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
74
Of direct and parallel conversion,parallel is the most risky.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
75
Arranging for and installing any needed hardware and software and converting data as needed for the new system is called 'technical readiness'.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
76
TJ was the project manager on the ERP implementation project.He should lead an evaluation of the project to identify what went well and what could be improved for the next system development project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
77
Technical readiness in a migration plan is achieved by installing fault tolerant,open-source Web 2.0 systems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
78
The transition from the old business processes and computer programs to the new business processes and computer programs will be facilitated by ensuring that a number of business,technical and people issues are addressed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
79
Michael,a project manager,is concerned that although the new system is fairly well tested,wants to run both the old and new systems for two months.He is using a 'parallel conversion' strategy.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 139 في هذه المجموعة.
فتح الحزمة
k this deck
80
Ting-You is working on encouragement,training and incentives to get users to adopt the new system.That is one of the important activities of the transition process.