Deck 3: Master Scheduling

ملء الشاشة (f)
exit full mode
سؤال
Events that make it necessary to alter the MPS include:

A) problems in production
B) scarce components
C) demand changes
D) all of the above
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Master production scheduling's functions include:

A) to plan capacity requirements
B) to form the link between production planning and what manufacturing builds
C) to plan material requirements
D) all of the above
سؤال
Why is the MPS such a vital link in the production planning system?
سؤال
Daisy's dog food manufactures a premium line of pet food. The most popular is the beef delight and the sales department has prepared a forecast for six weeks. The opening inventory is 30 cases. Prepare a MPS. The dog food is manufactured in lots of 100 cases. Daisy's dog food manufactures a premium line of pet food. The most popular is the beef delight and the sales department has prepared a forecast for six weeks. The opening inventory is 30 cases. Prepare a MPS. The dog food is manufactured in lots of 100 cases.  <div style=padding-top: 35px>
سؤال
Calculate the available to promise using the following data. There are 100 units on hand. Calculate the available to promise using the following data. There are 100 units on hand.  <div style=padding-top: 35px>
سؤال
What is the final assembly schedule FAS)?
سؤال
How is the MPS judged?
سؤال
Discuss the possible errors in customer orders?
سؤال
Bruce Pet Supplies assembles cat toys from fabric which it purchases from an outside supplier. The sales department has prepared the following forecast for the "evil rat," the most popular stuffed toy. The rats are sewn and stuffed in lots of 200 and the opening inventory is 300 rats. Completed the projected available balance and the master production schedule. Bruce Pet Supplies assembles cat toys from fabric which it purchases from an outside supplier. The sales department has prepared the following forecast for the evil rat, the most popular stuffed toy. The rats are sewn and stuffed in lots of 200 and the opening inventory is 300 rats. Completed the projected available balance and the master production schedule.  <div style=padding-top: 35px>
سؤال
Using the MPS, sales and distribution can determine the __________.

A) MRP
B) MPS
C) JIT
D) ERP
سؤال
The MPS must be realistic and based on what production can and will do. If it is not,

A) overloading of plant resources could result
B) underloading of plant resources could result
C) unreliable schedules will result in poor delivery performance
D) all of the above
سؤال
The _________ is calculated based on whether the period is before or after the demand time fence.

A) schedule receipt
B) projected available balance
C) available to promise
D) forecast demand
سؤال
What are the results of changes to production schedules?
سؤال
Changes to the master production schedule will occur when:

A) machines break down or new machines are added, changing capacity
B) customers cancel or change orders
C) suppliers have problems and miss delivery dates
D) all of the above
سؤال
Senior managements approval is usually required to make changes with the __________ .

A) slushy zone
B) frozen zone
C) time fence
D) demand time fence
سؤال
The _________is the number of periods, beginning with period 1, in which changes are not excepted due to excessive cost caused by schedule disruptions.

A) available to promise
B) demand time fence
C) forecast demand
D) projected available balance
سؤال
Any changes can be made to the MRP as long as it is within the limits set by the production plan in the _________ .

A) liquid zone
B) frozen zone
C) demand time fence
D) slushy zone
سؤال
The planning horizon must cover a period less than the time required to accomplish the plan.
سؤال
A _________is an order that has been issued, either to manufacturing or to a supplier.

A) delivery promise
B) master production schedule
C) scheduled receipt
D) available to promise
سؤال
EnviroGuard manufacturing makes two garden hoses. The production plan and the MPS are developed on a quarterly basis. Forecasts for the product group follows. The opening inventory is 270 units and the company want to reduce this to 150 units at the end of the year. Develop a production plan. EnviroGuard manufacturing makes two garden hoses. The production plan and the MPS are developed on a quarterly basis. Forecasts for the product group follows. The opening inventory is 270 units and the company want to reduce this to 150 units at the end of the year. Develop a production plan.  <div style=padding-top: 35px>
سؤال
The planning horizon is the time span for which plans are made.
سؤال
If the total planned production of all items in the family and the total ending inventory do not agree with the production plan, some adjustment to the individual plans must be made so the total production is the same.
سؤال
The production plan limits the MPS. Therefore the total of the items int he MPS should be different from the total shown on the production plan.
سؤال
The planning horizon for a final assembly schedule must include time to assemble a customer's order and also should include the time necessary to manufacture the components.
سؤال
The production plan and the MPS uncouple the sales forecast from manufacturing by establishing a manufacturing plan.
سؤال
The MPS is built from forecasts and actual demand for individual end items.
سؤال
The MPS is a plan of what it to be produced and when. As such, it tells sales and manufacturing when goods will be available for delivery.
سؤال
In each of the manufacturing environments - make- to- stock, make- to- order, and assemble- to- order - master scheduling should take place where the largest number of product options exist.
سؤال
The term "master schedule" refers to the process of arriving at the master production schedule.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/29
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 3: Master Scheduling
1
Events that make it necessary to alter the MPS include:

A) problems in production
B) scarce components
C) demand changes
D) all of the above
D
2
Master production scheduling's functions include:

A) to plan capacity requirements
B) to form the link between production planning and what manufacturing builds
C) to plan material requirements
D) all of the above
D
3
Why is the MPS such a vital link in the production planning system?
It forms the link between production planning and what manufacturing will actually build. It forms the basis for calculating the capacity and resources needed. The MPS drives the material requirements plan. As a schedule of items to be built, the MPS and bills of material determine what components are needed from manufacturing and purchasing. It also keeps priorities valid. The MPS is a priority plan for manufacturing.
4
Daisy's dog food manufactures a premium line of pet food. The most popular is the beef delight and the sales department has prepared a forecast for six weeks. The opening inventory is 30 cases. Prepare a MPS. The dog food is manufactured in lots of 100 cases. Daisy's dog food manufactures a premium line of pet food. The most popular is the beef delight and the sales department has prepared a forecast for six weeks. The opening inventory is 30 cases. Prepare a MPS. The dog food is manufactured in lots of 100 cases.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
5
Calculate the available to promise using the following data. There are 100 units on hand. Calculate the available to promise using the following data. There are 100 units on hand.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
6
What is the final assembly schedule FAS)?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
7
How is the MPS judged?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
8
Discuss the possible errors in customer orders?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
9
Bruce Pet Supplies assembles cat toys from fabric which it purchases from an outside supplier. The sales department has prepared the following forecast for the "evil rat," the most popular stuffed toy. The rats are sewn and stuffed in lots of 200 and the opening inventory is 300 rats. Completed the projected available balance and the master production schedule. Bruce Pet Supplies assembles cat toys from fabric which it purchases from an outside supplier. The sales department has prepared the following forecast for the evil rat, the most popular stuffed toy. The rats are sewn and stuffed in lots of 200 and the opening inventory is 300 rats. Completed the projected available balance and the master production schedule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
10
Using the MPS, sales and distribution can determine the __________.

A) MRP
B) MPS
C) JIT
D) ERP
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
11
The MPS must be realistic and based on what production can and will do. If it is not,

A) overloading of plant resources could result
B) underloading of plant resources could result
C) unreliable schedules will result in poor delivery performance
D) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
12
The _________ is calculated based on whether the period is before or after the demand time fence.

A) schedule receipt
B) projected available balance
C) available to promise
D) forecast demand
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
13
What are the results of changes to production schedules?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
14
Changes to the master production schedule will occur when:

A) machines break down or new machines are added, changing capacity
B) customers cancel or change orders
C) suppliers have problems and miss delivery dates
D) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
15
Senior managements approval is usually required to make changes with the __________ .

A) slushy zone
B) frozen zone
C) time fence
D) demand time fence
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
16
The _________is the number of periods, beginning with period 1, in which changes are not excepted due to excessive cost caused by schedule disruptions.

A) available to promise
B) demand time fence
C) forecast demand
D) projected available balance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
17
Any changes can be made to the MRP as long as it is within the limits set by the production plan in the _________ .

A) liquid zone
B) frozen zone
C) demand time fence
D) slushy zone
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
18
The planning horizon must cover a period less than the time required to accomplish the plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
19
A _________is an order that has been issued, either to manufacturing or to a supplier.

A) delivery promise
B) master production schedule
C) scheduled receipt
D) available to promise
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
20
EnviroGuard manufacturing makes two garden hoses. The production plan and the MPS are developed on a quarterly basis. Forecasts for the product group follows. The opening inventory is 270 units and the company want to reduce this to 150 units at the end of the year. Develop a production plan. EnviroGuard manufacturing makes two garden hoses. The production plan and the MPS are developed on a quarterly basis. Forecasts for the product group follows. The opening inventory is 270 units and the company want to reduce this to 150 units at the end of the year. Develop a production plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
21
The planning horizon is the time span for which plans are made.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
22
If the total planned production of all items in the family and the total ending inventory do not agree with the production plan, some adjustment to the individual plans must be made so the total production is the same.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
23
The production plan limits the MPS. Therefore the total of the items int he MPS should be different from the total shown on the production plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
24
The planning horizon for a final assembly schedule must include time to assemble a customer's order and also should include the time necessary to manufacture the components.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
25
The production plan and the MPS uncouple the sales forecast from manufacturing by establishing a manufacturing plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
26
The MPS is built from forecasts and actual demand for individual end items.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
27
The MPS is a plan of what it to be produced and when. As such, it tells sales and manufacturing when goods will be available for delivery.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
28
In each of the manufacturing environments - make- to- stock, make- to- order, and assemble- to- order - master scheduling should take place where the largest number of product options exist.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
29
The term "master schedule" refers to the process of arriving at the master production schedule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.