Deck 5: Capacity Management

ملء الشاشة (f)
exit full mode
سؤال
What variables affect capacity available in a production environment?
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Over a 4- week period, a work center produced 540 standard hours of work, was available for work 640 hours, and actually worked 480 hours. Calculate the utilization and the efficiency fo the work center.
سؤال
What is back scheduling and what must be known for each order to schedule?
سؤال
What are the steps in calculating work center load?
سؤال
Product__________ depend on the design of the product and the mix of products made.

A) specification and mix
B) specification
C) work effort
D) mix
سؤال
A work center consisting of 7 machines is operated 16 hours a day for a 5- day week. Utilization is 80% and efficiency is 110%. What is the rated weekly capacity in standard hours?
سؤال
The__________ time is the time a job waits at a work center before being handled.

A) wait
B) lead
C) queue
D) move
سؤال
A work center produces 120 units in a shift. THe standard for that item is 100 units a shift. What is the efficiency of the work center?

A) 1.2%
B) 100%
C) 120%
D) 80%
سؤال
In 1 week, a work center produces 85 standard hours of work. The hours scheduled are 80. But 75 hours are actually worked. Calculate the utilization and efficiency of the work center.
سؤال
__________is responsible for determining the capacity needed to achieve the priority plans as well as providing, monitoring, and controlling that capacity so the priority plan can be met.

A) Capacity planning
B) Capacity required
C) Capacity management
D) Capacity control
سؤال
Capacity is a__________ of doing work, not the__________ of work done.

A) rate, standard
B) rate, quantity
C) standard, rate
D) quantity, rate
سؤال
A work center is to process 150 units of gear shaft SG 123 on work order 333. The setup time is 1.5 hours and the run time is 0.2 hours per piece. What is the standard time needed to run the order?
سؤال
What information should exist for every component in the routing file?
سؤال
A work center file contains information on:

A) capacity
B) wait and queue time
C) move times
D) all of the above
سؤال
Over the previous 4 weeks, a work center produced 120, 130, 150, and 140 standard hours of work. What is the demonstrated capacity of the work center in standard hours?

A) 125
B) 135
C) 155
D) 145
سؤال
__________is the process of determining the resources required to meet the priority plan and the methods needed to make that capacity available.

A) Capacity management
B) Capacity control
C) Capacity planning
D) Capacity required
سؤال
__________is the capacity of a system or resource needed to product a desired output in a given time period.

A) Capacity management
B) Capacity required
C) Capacity planning
D) Capacity control
سؤال
Demonstrated capacity is figured from:

A) utilization
B) historical data
C) efficiency
D) available time
سؤال
A work center consists of 4 machines, each working a 16- hour day for 5 days a week. What is the weekly time available?
سؤال
What are the inputs needed for a CRP and how can it be obtained?
سؤال
The time needed for each order is the sum of the setup time and the queue time.
سؤال
Capacity available is the capacity of a system or resource to produce a quantity of output in a given time period.
سؤال
It is possible for a work center to utilize 100 hours a week but not produce 100 standard hours of work.
سؤال
A work center is composed of a number of machines or workers capable of doing a variety of different jobs.
سؤال
Most orders are processed in only one work center.
سؤال
Capacity requirements planning occurs at the material requirements planning level.
سؤال
Rated or calculated capacity is the number of hours a work center can be used.
سؤال
An open shop order appears as a scheduled receipt on the material requirements plan.
سؤال
Determining the capacity required begins with determining the time needed for each order at each work center then summing up the capacity required for individual orders to obtain the load.
سؤال
The result of capacity requirements planning should be a detailed workable plan that meets the priority objectives and provides the capacity to do so.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/30
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 5: Capacity Management
1
What variables affect capacity available in a production environment?
Capacity available is affected by product specifications, product mix, plant and equipment and work effort. Product specifications and product mix depend on the design of the product and the mix of products made.
2
Over a 4- week period, a work center produced 540 standard hours of work, was available for work 640 hours, and actually worked 480 hours. Calculate the utilization and the efficiency fo the work center.
Utilization - 480/640 * 100% = 75% Efficiency = 540/480 * 100% = 112.5%
3
What is back scheduling and what must be known for each order to schedule?
Back scheduling is a process that starts with the due date and using the lead times, works backward to find the start date for each operation. To schedule the following must be known: quantity and due date, sequence of operations and work centers needed, setup and run times for each operation, queue, wait, and move times, and the work center capacity available rated or demonstrated).
4
What are the steps in calculating work center load?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
5
Product__________ depend on the design of the product and the mix of products made.

A) specification and mix
B) specification
C) work effort
D) mix
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
6
A work center consisting of 7 machines is operated 16 hours a day for a 5- day week. Utilization is 80% and efficiency is 110%. What is the rated weekly capacity in standard hours?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
7
The__________ time is the time a job waits at a work center before being handled.

A) wait
B) lead
C) queue
D) move
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
8
A work center produces 120 units in a shift. THe standard for that item is 100 units a shift. What is the efficiency of the work center?

A) 1.2%
B) 100%
C) 120%
D) 80%
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
9
In 1 week, a work center produces 85 standard hours of work. The hours scheduled are 80. But 75 hours are actually worked. Calculate the utilization and efficiency of the work center.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
10
__________is responsible for determining the capacity needed to achieve the priority plans as well as providing, monitoring, and controlling that capacity so the priority plan can be met.

A) Capacity planning
B) Capacity required
C) Capacity management
D) Capacity control
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
11
Capacity is a__________ of doing work, not the__________ of work done.

A) rate, standard
B) rate, quantity
C) standard, rate
D) quantity, rate
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
12
A work center is to process 150 units of gear shaft SG 123 on work order 333. The setup time is 1.5 hours and the run time is 0.2 hours per piece. What is the standard time needed to run the order?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
13
What information should exist for every component in the routing file?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
14
A work center file contains information on:

A) capacity
B) wait and queue time
C) move times
D) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
15
Over the previous 4 weeks, a work center produced 120, 130, 150, and 140 standard hours of work. What is the demonstrated capacity of the work center in standard hours?

A) 125
B) 135
C) 155
D) 145
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
16
__________is the process of determining the resources required to meet the priority plan and the methods needed to make that capacity available.

A) Capacity management
B) Capacity control
C) Capacity planning
D) Capacity required
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
17
__________is the capacity of a system or resource needed to product a desired output in a given time period.

A) Capacity management
B) Capacity required
C) Capacity planning
D) Capacity control
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
18
Demonstrated capacity is figured from:

A) utilization
B) historical data
C) efficiency
D) available time
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
19
A work center consists of 4 machines, each working a 16- hour day for 5 days a week. What is the weekly time available?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
20
What are the inputs needed for a CRP and how can it be obtained?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
21
The time needed for each order is the sum of the setup time and the queue time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
22
Capacity available is the capacity of a system or resource to produce a quantity of output in a given time period.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
23
It is possible for a work center to utilize 100 hours a week but not produce 100 standard hours of work.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
24
A work center is composed of a number of machines or workers capable of doing a variety of different jobs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
25
Most orders are processed in only one work center.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
26
Capacity requirements planning occurs at the material requirements planning level.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
27
Rated or calculated capacity is the number of hours a work center can be used.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
28
An open shop order appears as a scheduled receipt on the material requirements plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
29
Determining the capacity required begins with determining the time needed for each order at each work center then summing up the capacity required for individual orders to obtain the load.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
30
The result of capacity requirements planning should be a detailed workable plan that meets the priority objectives and provides the capacity to do so.