Deck 4: Material Requirements Planning

ملء الشاشة (f)
exit full mode
سؤال
__________bills are an artificial grouping of components for planning purposes. They are used to simplify forecasting, master production scheduling, and materials requirements planning.

A) Planning
B) Pegging
C) Indented
D) Summarized parts
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
__________include information such as order quantities, lead times, safety stock, and scrap.

A) Bill of materials
B) Bill of Material Processors
C) Planning factors
D) Inventory records
سؤال
Product X is made from two units of A and one unit of B. Product Y is made from one unit of B and two units of C. Each A is made up of two units of C and one unit of D. Each unit of B is made up of two units of E. Construct the product tree. How many Cs are needed to make 50 Xs and 100Ys?
سؤال
Describe situations that will generate exception messages in MRP.
سؤال
Complete the following table. Lead time for the part is two weeks. The lot size is 100. What is the projected available at the end of week 3? When is it planned to release an order? Complete the following table. Lead time for the part is two weeks. The lot size is 100. What is the projected available at the end of week 3? When is it planned to release an order?  <div style=padding-top: 35px>
سؤال
A__________ report is similar to a where- used report. However, the report shows only those parents for which there is an existing requirement.

A) indented
B) planning
C) pegging
D) manufacturing
سؤال
Each level in the bill of material is assigned a number starting from the __________and working __________.

A) bottom, up
B) top, down
C) bottom, down
D) top, up
سؤال
Where does feedback to the planner originate?
سؤال
The product tree and the bill of material are called single- level structures. As assembly is considered a __________and the items that compose it are called its__________ .

A) parent, component items
B) parent, multilevel bill
C) multilevel bill, parent
D) component, parents
سؤال
The dependency of a component on its parent is__________ .

A) vertical
B) horizontal
C) diagonal
D) circular
سؤال
Complete the following table. Lead time for the item is two weeks and the order quantity is 200. WeekGross RequirementsScheduled ReceiptsProjected Available 150Net RequirementsPlanned Order ReceiptPlanned Order Release12345025010050200\begin{array}{c}\begin{array}{lll}\text {Week}\\\text {Gross Requirements}\\\text {Scheduled Receipts}\\\text {Projected Available 150}\\\text {Net Requirements}\\\text {Planned Order Receipt}\\\text {Planned Order Release} \end{array} \begin{array}{lllll}& 1 & 2 & 3 & 4 \\50 & & 250 & 100 & 50 \\& & 200 & & \\\\\\\\\end{array}\end{array}
سؤال
The manufacturer of dishwashers uses flexible connection hose material in the assembly of the units. In the assembly of the dishwasher, the hose is a/an __________item.

A) can be dependent or independent
B) independent
C) dependent
D) none of the above
سؤال
What are the uses of bills of material?
سؤال
__________is the process of placing the exploded requirements in their proper periods based on lead time.

A) Offsetting
B) Planned order computation
C) Exploding the requirements
D) Lead time determination
سؤال
Each part or item has__________ part number.

A) multiple
B) less than five
C) two
D) only one
سؤال
What are the basic responsibilities of a planner?
سؤال
Complete the following table. Lead time for the part is two weeks and the order quantity is
40. What action should be taken? Complete the following table. Lead time for the part is two weeks and the order quantity is 40. What action should be taken?  <div style=padding-top: 35px>
سؤال
Define and describe MRP. How is it related to the MPS?
سؤال
Product cost is usually broken down into__________ .

A) direct material and direct labor
B) direct labor and overhead
C) direct material, direct labor, and overhead
D) direct material and overhead
سؤال
Complete the following table. Lead time for the part is two weeks. The order quantity, or lot size, is 100 units. Complete the following table. Lead time for the part is two weeks. The order quantity, or lot size, is 100 units.  <div style=padding-top: 35px>
سؤال
A good MRP system generated exception messages to advise the planner when some event needs attention.
سؤال
Sometimes requirements change rapidly and by small amounts, causing the materials requirements plan to change back and forth. The planner must judge whether the changes are important enough to react to and whether an order should be released.
سؤال
Transaction messages mean that the planner must tell the MRP software of all actions that that will influence the MRP records.
سؤال
Planned order releases are just planned; they have not been released.
سؤال
The people who manage the material requirements planning system are called planners.
سؤال
The number of periods in the record is called the planning horizon, which shows the number of past periods for which plans are being made.
سؤال
Most companies make more than one product and often use the same components in many of their products.
سؤال
Low- level codes are determined by starting at the highest level of a bill of materials and working down, recording the level against the part.
سؤال
Priority refers to maintaining the correct due dates by constantly evaluating the true due- date need for released orders and, if necessary,k expediting or de- expediting.
سؤال
When released, the order becomes an open order to the factory or to purchasing and appears on the MRP record as a schedule receipt.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/30
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 4: Material Requirements Planning
1
__________bills are an artificial grouping of components for planning purposes. They are used to simplify forecasting, master production scheduling, and materials requirements planning.

A) Planning
B) Pegging
C) Indented
D) Summarized parts
Planning
2
__________include information such as order quantities, lead times, safety stock, and scrap.

A) Bill of materials
B) Bill of Material Processors
C) Planning factors
D) Inventory records
Planning factors
3
Product X is made from two units of A and one unit of B. Product Y is made from one unit of B and two units of C. Each A is made up of two units of C and one unit of D. Each unit of B is made up of two units of E. Construct the product tree. How many Cs are needed to make 50 Xs and 100Ys?
400 Cs. 200 from parent X [hint: take A's quantity and multiply by 2] and 200 from parent Y)
4
Describe situations that will generate exception messages in MRP.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
5
Complete the following table. Lead time for the part is two weeks. The lot size is 100. What is the projected available at the end of week 3? When is it planned to release an order? Complete the following table. Lead time for the part is two weeks. The lot size is 100. What is the projected available at the end of week 3? When is it planned to release an order?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
6
A__________ report is similar to a where- used report. However, the report shows only those parents for which there is an existing requirement.

A) indented
B) planning
C) pegging
D) manufacturing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
7
Each level in the bill of material is assigned a number starting from the __________and working __________.

A) bottom, up
B) top, down
C) bottom, down
D) top, up
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
8
Where does feedback to the planner originate?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
9
The product tree and the bill of material are called single- level structures. As assembly is considered a __________and the items that compose it are called its__________ .

A) parent, component items
B) parent, multilevel bill
C) multilevel bill, parent
D) component, parents
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
10
The dependency of a component on its parent is__________ .

A) vertical
B) horizontal
C) diagonal
D) circular
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
11
Complete the following table. Lead time for the item is two weeks and the order quantity is 200. WeekGross RequirementsScheduled ReceiptsProjected Available 150Net RequirementsPlanned Order ReceiptPlanned Order Release12345025010050200\begin{array}{c}\begin{array}{lll}\text {Week}\\\text {Gross Requirements}\\\text {Scheduled Receipts}\\\text {Projected Available 150}\\\text {Net Requirements}\\\text {Planned Order Receipt}\\\text {Planned Order Release} \end{array} \begin{array}{lllll}& 1 & 2 & 3 & 4 \\50 & & 250 & 100 & 50 \\& & 200 & & \\\\\\\\\end{array}\end{array}
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
12
The manufacturer of dishwashers uses flexible connection hose material in the assembly of the units. In the assembly of the dishwasher, the hose is a/an __________item.

A) can be dependent or independent
B) independent
C) dependent
D) none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
13
What are the uses of bills of material?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
14
__________is the process of placing the exploded requirements in their proper periods based on lead time.

A) Offsetting
B) Planned order computation
C) Exploding the requirements
D) Lead time determination
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
15
Each part or item has__________ part number.

A) multiple
B) less than five
C) two
D) only one
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
16
What are the basic responsibilities of a planner?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
17
Complete the following table. Lead time for the part is two weeks and the order quantity is
40. What action should be taken? Complete the following table. Lead time for the part is two weeks and the order quantity is 40. What action should be taken?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
18
Define and describe MRP. How is it related to the MPS?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
19
Product cost is usually broken down into__________ .

A) direct material and direct labor
B) direct labor and overhead
C) direct material, direct labor, and overhead
D) direct material and overhead
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
20
Complete the following table. Lead time for the part is two weeks. The order quantity, or lot size, is 100 units. Complete the following table. Lead time for the part is two weeks. The order quantity, or lot size, is 100 units.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
21
A good MRP system generated exception messages to advise the planner when some event needs attention.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
22
Sometimes requirements change rapidly and by small amounts, causing the materials requirements plan to change back and forth. The planner must judge whether the changes are important enough to react to and whether an order should be released.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
23
Transaction messages mean that the planner must tell the MRP software of all actions that that will influence the MRP records.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
24
Planned order releases are just planned; they have not been released.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
25
The people who manage the material requirements planning system are called planners.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
26
The number of periods in the record is called the planning horizon, which shows the number of past periods for which plans are being made.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
27
Most companies make more than one product and often use the same components in many of their products.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
28
Low- level codes are determined by starting at the highest level of a bill of materials and working down, recording the level against the part.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
29
Priority refers to maintaining the correct due dates by constantly evaluating the true due- date need for released orders and, if necessary,k expediting or de- expediting.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
30
When released, the order becomes an open order to the factory or to purchasing and appears on the MRP record as a schedule receipt.