Deck 15: Just-In-Time Manufacturing and Lean Production

ملء الشاشة (f)
exit full mode
سؤال
Discuss process flexibility and its importance to the JIT environment.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Define quality at the source.
سؤال
Suppliers benefit from partnering with their customers with:

A) less long- term security
B) less competitive as a JIT supplier
C) reduction in planning ability
D) more competitive as a JIT supplier
سؤال
A company produces a line of golf putters composed of three models. The demand for model A is 500 per month, for B is 400 and for C is 300. What would be the mixed model sequence if some of each were made each day?
سؤال
Questions to be answered in a JIT environment include:

A) What must we get?
B) What do we have?
C) What are we going to make?
D) all of the above
سؤال
Production problems can include:

A) quality problems
B) machine downtime
C) both A and B
D) neither A nor B
سؤال
The benefits to the buyer of partnering with suppliers include:

A) reduction in the need for inbound inspections
B) JIT delivers
C) the ability to supply the quality needed all the time
D) all of the above
سؤال
The JIT system:

A) works to reduce lead times
B) does not require a stable system
C) does not require time fences
D) are not based on lead times
سؤال
A company decides to establish and EOQ for an item. The annual demand is 400,000 units each costing $8 to run, setup costs are $32 , and inventory carrying costs are 20%. Calculate the EOQ in units.
سؤال
The developers of the JIT concepts utilized a simple card system called ________.

A) ishikawa
B) time fences
C) coding
D) kanban
سؤال
What are the major elements or characteristics of a JIT environment. Discuss.
سؤال
The following MPS summary scheduled is leveled for capacity. Using the following table, level the schedule for material as well. The following MPS summary scheduled is leveled for capacity. Using the following table, level the schedule for material as well.  <div style=padding-top: 35px>
سؤال
A company decides to establish and EOQ for an item. The annual demand is 400,000 units each costing $8 to run, setup costs are $32 , and inventory carrying costs are 20%. Calculate the number of orders per year.
سؤال
A company decides to establish and EOQ for an item. The annual demand is 400,000 units each costing $8 to run, setup costs are $32 , and inventory carrying costs are 20%. Calculate the cost or ordering, cost of carrying inventory, and total cost.
سؤال
Discuss what constitutes value to the end user?
سؤال
Supplier selection should ensure the supplier has:

A) sincerity
B) stable management
C) effective quality systems
D) all of the above
سؤال
Alternatives to cards for indicating production and movement of materials include:

A) designated storage space
B) color coding of containers
C) computer systems
D) all of the above
سؤال
Key factors in supplier partnering include:

A) long- term commitment and trust
B) trust and shared vision
C) long- term commitment, trust, and shared vision
D) long- term commitment and shared vision
سؤال
Discuss total employee involvement in JIT and the changing role of top management.
سؤال
Mixed- model scheduling means:

A) the company doesn't switch model production frequently
B) the scheduled is leveled for capacity and material
C) the company makes only one product per day
D) inventories are at a maximum
سؤال
The pull system starts at the beginning of the line and pulls products from the preceeding operation as needed.
سؤال
For a process to continue to produce the required quality, machinery must be maintained in excellent condition.
سؤال
A successful JIT environment can be achieved without the cooperation and involvement of everyone in the organization.
سؤال
The major effect that JIT has on forecasting is increasing lead time.
سؤال
JIT has evolved from lean production concepts over the last several years.
سؤال
The emphasis in JIT is on achieving the plan - no more, no less.
سؤال
MRP is often called a push system meaning that the material needs are calculated ahead of time.
سؤال
Uniform plant loading means that the work done at each workstation should take about the same time.
سؤال
MRP plans the material flow based on the bill of material, lead times, and available inventory.
سؤال
If good schedules are to be maintained and a company is to develop a JIT environment, it is vital to have good, reliable suppliers.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/30
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 15: Just-In-Time Manufacturing and Lean Production
1
Discuss process flexibility and its importance to the JIT environment.
Process flexibility is desirable so the company can react swiftly to changes in the volume and mix of their products. To achieve this, operators and machinery must be flexible, and the system must be configured to be changed over quickly from one product to another.
2
Define quality at the source.
Quality at the source means doing it right the first time and, if something does go wrong, stopping the process and fixing it immediately. People become their own inspectors, personally responsible for the quality of what they produce.
3
Suppliers benefit from partnering with their customers with:

A) less long- term security
B) less competitive as a JIT supplier
C) reduction in planning ability
D) more competitive as a JIT supplier
D
4
A company produces a line of golf putters composed of three models. The demand for model A is 500 per month, for B is 400 and for C is 300. What would be the mixed model sequence if some of each were made each day?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
5
Questions to be answered in a JIT environment include:

A) What must we get?
B) What do we have?
C) What are we going to make?
D) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
6
Production problems can include:

A) quality problems
B) machine downtime
C) both A and B
D) neither A nor B
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
7
The benefits to the buyer of partnering with suppliers include:

A) reduction in the need for inbound inspections
B) JIT delivers
C) the ability to supply the quality needed all the time
D) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
8
The JIT system:

A) works to reduce lead times
B) does not require a stable system
C) does not require time fences
D) are not based on lead times
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
9
A company decides to establish and EOQ for an item. The annual demand is 400,000 units each costing $8 to run, setup costs are $32 , and inventory carrying costs are 20%. Calculate the EOQ in units.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
10
The developers of the JIT concepts utilized a simple card system called ________.

A) ishikawa
B) time fences
C) coding
D) kanban
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
11
What are the major elements or characteristics of a JIT environment. Discuss.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
12
The following MPS summary scheduled is leveled for capacity. Using the following table, level the schedule for material as well. The following MPS summary scheduled is leveled for capacity. Using the following table, level the schedule for material as well.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
13
A company decides to establish and EOQ for an item. The annual demand is 400,000 units each costing $8 to run, setup costs are $32 , and inventory carrying costs are 20%. Calculate the number of orders per year.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
14
A company decides to establish and EOQ for an item. The annual demand is 400,000 units each costing $8 to run, setup costs are $32 , and inventory carrying costs are 20%. Calculate the cost or ordering, cost of carrying inventory, and total cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
15
Discuss what constitutes value to the end user?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
16
Supplier selection should ensure the supplier has:

A) sincerity
B) stable management
C) effective quality systems
D) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
17
Alternatives to cards for indicating production and movement of materials include:

A) designated storage space
B) color coding of containers
C) computer systems
D) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
18
Key factors in supplier partnering include:

A) long- term commitment and trust
B) trust and shared vision
C) long- term commitment, trust, and shared vision
D) long- term commitment and shared vision
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
19
Discuss total employee involvement in JIT and the changing role of top management.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
20
Mixed- model scheduling means:

A) the company doesn't switch model production frequently
B) the scheduled is leveled for capacity and material
C) the company makes only one product per day
D) inventories are at a maximum
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
21
The pull system starts at the beginning of the line and pulls products from the preceeding operation as needed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
22
For a process to continue to produce the required quality, machinery must be maintained in excellent condition.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
23
A successful JIT environment can be achieved without the cooperation and involvement of everyone in the organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
24
The major effect that JIT has on forecasting is increasing lead time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
25
JIT has evolved from lean production concepts over the last several years.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
26
The emphasis in JIT is on achieving the plan - no more, no less.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
27
MRP is often called a push system meaning that the material needs are calculated ahead of time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
28
Uniform plant loading means that the work done at each workstation should take about the same time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
29
MRP plans the material flow based on the bill of material, lead times, and available inventory.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
30
If good schedules are to be maintained and a company is to develop a JIT environment, it is vital to have good, reliable suppliers.