One difference between an assembly line process flow and a continuous process flow is that on the assembly line the flow is discrete rather than continuous.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
A continuous process indicates production of discrete parts moving from workstation to workstation at a controlled rate.
سؤال
The time needed to respond to a customer's order is called the customer response time.
سؤال
Break-even analysis can only be used in production equipment decision making when dealing solely with fixed costs, no variable costs.
سؤال
A general purpose machine is less capable than a special purpose machine in certain tasks but can perform a broader variety of tasks.
سؤال
The choice of which process structure to select is generally a function of the volume requirements for the product.
سؤال
The term "assembly line" refers to progressive assembly linked by some material handling device.
سؤال
Engineer-to-order firms will work with the customer to design the product, and then make it from purchased materials, parts, and components.
سؤال
Break-Even Analysis can be used to help decide whether to perform a task with a special purpose machine or with a general purpose machine.
سؤال
The closer the customer is to the customer order decoupling point the longer it takes the customer to receive the product.
سؤال
A project layout is characterized by a high degree of task ordering.
سؤال
Process selection refers to the strategic decision of choosing the volume of output to produce in a manufacturing facility depending upon the way that facility produces.
سؤال
Process selection refers to the strategic decision of selecting which kind of production processes to use to produce a product or provide a service.
سؤال
The product-process matrix shows the relationship between process structures and product volume and variety characteristics.
سؤال
One trade-off illustrated by the product-process matrix is between flexibility and cost.
سؤال
A project layout is characterized by a relatively low number of production units in comparison with process and product layout formats.
سؤال
One methodology used to evaluate equipment investment decisions where the investment entails a large initial investment, fixed costs, and variable costs is break-even analysis.
سؤال
Workcenter layouts allocate dissimilar machines into cells to work on products that have dissimilar processing requirements.
سؤال
A make-to-order firm will work with the customer to design the product, and then make it from purchased materials, parts, and components.
سؤال
The closer the customer is to the customer order decoupling point the more quickly the customer receives the product.
سؤال
Which of the following is a basic type of process structure?

A)Process flow diagram
B)Product matrix
C)Process matrix
D)Workcenter
E)Manual assembly
سؤال
Which of the following basic types of process structures is one which equipment or work processes are arranged according to the progressive steps by which the product is made?

A)Project
B)Workcenter
C)Manufacturing cell
D)Assembly line
E)Continuous process
سؤال
The placement of which of the following is not determined by process structure decisions?

A)Departments
B)Workgroups
C)Workstations
D)Machines
E)Emergency exits
سؤال
An example of an assemble-to-order firm is Dell Computer.
سؤال
You are hired as a consultant to decide if your client should purchase a new, highly specialized, piece of equipment.The product to be produced by this equipment is forecast to have a total worldwide demand of 15,000 units over the entire product life.The initial investment to acquire and install the equipment is $256,000.The variable cost to produce each unit will be $15 and the selling price for the finished product will be $30.Which of the following best describes the situation the firm is facing?

A)The company will recover its initial investment
B)The company's total margin will be less than its investment
C)It's a good investment
D)The break-even is lower than the 15,000 units that are expected to sell
E)All of the above
سؤال
Which of the following is not considered a major process flow structure?

A)Work Center
B)Project
C)Assembly line
D)Fabrication
E)Continuous Flow
سؤال
The essential issue in satisfying customers in the make-to-stock environment is to balance the cost of the finished item against the willingness of the consumer to pay for it.
سؤال
The focus in the make-to-stock environment is on providing finished goods where and when the customers want them.
سؤال
Assume a fixed cost for a process of $120,000.The variable cost to produce each unit of product is $35, and the selling price for the finished product is $50.Which of the following is the number of units that has to be produced and sold to break-even?

A)5,000 units
B)6,000 units
C)8,000 units
D)11,000 units
E)12,000 units
سؤال
Differentiate between a workcenter and a manufacturing cell.
سؤال
Assembling-to-order means moving the customer order decoupling point from finished goods to components.
سؤال
A difference between project and continuous flow categories of process flow structures is which two of the following?

A)The size of the product
B)Discrete parts moving from workstation to workstation
C)Degree of equipment specialization
D)Being a "Virtual Factory"
E)Profit per unit
سؤال
Which of the following basic types of process structures is one which similar equipment or functions are grouped together?

A)Project
B)Workcenter
C)Manufacturing cell
D)Assembly line
E)Continuous process
سؤال
Assume a fixed cost for a process of $15,000.The variable cost to produce each unit of product is $10 and the selling price for the finished product is $25.Which of the following is the number of units that has to be produced and sold to break-even?

A)500 units
B)667 units
C)790 units
D)900 units
E)1,000 units
سؤال
Give an example of a project layout.
سؤال
In a workcenter, machine A has a ten minute set-up time per batch and a two minute per unit run time. Machine B performs the identical function but has a set-up time of thirty minutes and a one minute run time per unit.The workcenter makes products in batches ranging from one unit to one hundred units.Assuming capacity is not a limitation on either machine, on which batches should machine B be used?

A)All batches should be run on machine B
B)Batches of more than 20 units should be run on machine B
C)Batches of fewer than 80 units should be run on machine B
D)Batches with up to 50 units should be run on machine B
E)No batches should be run on machine B
سؤال
Describe the implications of the product-process matrix for process design in a competitive situation.
سؤال
The essential issue in satisfying customers in the make-to-stock environment is to balance the level of finished inventory against the level of service to the customer.
سؤال
Assume a fixed cost for a process of $100,000.The variable cost to produce each unit of product is $10, and the selling price for the finished product is $50.Ignoring inventory, how many units must the firm sell to break-even?
سؤال
Which of the following is not a basic type of process structure?

A)Product-process matrix
B)Workcenter
C)Manufacturing cell
D)Assembly line
E)Continuous process
سؤال
Assume that you are offered a new piece of equipment for $10,000.The equipment will produce 10,000 units per year with a margin of $6.00 per unit.Demand for the product being produced has been 2,000 units per year.Your current equipment is fully depreciated and can produce the 2,000 units per year at but at a margin of only $4.00 per unit.Should you purchase the new equipment? Under what conditions?
سؤال
Assume a fixed cost for a process of $100,000.The variable cost to produce each unit of product is $10, and the selling price for the finished product is $50.Ignoring inventory, how many units must the firm sell to break-even?
سؤال
Describe the implications of the product-process matrix for process design in a competitive situation.
سؤال
A manufacturer has identified the options for acquiring a machined part.It can make the part on a numerically controlled lathe for $150 per unit (including materials.) It can make the part on a standard lathe for $250 per unit (also including materials.) It can make the part on a machining center for $50 per unit (also including materials.) The manufacturer can acquire a standard lathe for $10,000.It could acquire
سؤال
Assume that you are offered a new piece of equipment for $10,000.The equipment will produce 10,000 units per year with a margin of $6.00 per unit.Demand for the product being produced has been 2,000 units per year.Your current equipment is fully depreciated and can produce the 2,000 units per year at but at a margin of only $4.00 per unit.Should you purchase the new equipment? Under what conditions?
سؤال
A manufacturer has identified the options for acquiring a machined part.It can make the part on a numerically controlled lathe for $150 per unit (including materials.) It can make the part on a standard lathe for $250 per unit (also including materials.) It can make the part on a machining center for $50 per unit (also including materials.) The manufacturer can acquire a standard lathe for $10,000.It could acquire a numerically controlled lathe for $100,000.A machining center would cost $350,000.It has also found that it can purchase the part for $350 per unit.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/46
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 6: Production Processes
1
One difference between an assembly line process flow and a continuous process flow is that on the assembly line the flow is discrete rather than continuous.
True
2
A continuous process indicates production of discrete parts moving from workstation to workstation at a controlled rate.
False
3
The time needed to respond to a customer's order is called the customer response time.
False
4
Break-even analysis can only be used in production equipment decision making when dealing solely with fixed costs, no variable costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
5
A general purpose machine is less capable than a special purpose machine in certain tasks but can perform a broader variety of tasks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
6
The choice of which process structure to select is generally a function of the volume requirements for the product.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
7
The term "assembly line" refers to progressive assembly linked by some material handling device.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
8
Engineer-to-order firms will work with the customer to design the product, and then make it from purchased materials, parts, and components.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
9
Break-Even Analysis can be used to help decide whether to perform a task with a special purpose machine or with a general purpose machine.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
10
The closer the customer is to the customer order decoupling point the longer it takes the customer to receive the product.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
11
A project layout is characterized by a high degree of task ordering.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
12
Process selection refers to the strategic decision of choosing the volume of output to produce in a manufacturing facility depending upon the way that facility produces.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
13
Process selection refers to the strategic decision of selecting which kind of production processes to use to produce a product or provide a service.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
14
The product-process matrix shows the relationship between process structures and product volume and variety characteristics.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
15
One trade-off illustrated by the product-process matrix is between flexibility and cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
16
A project layout is characterized by a relatively low number of production units in comparison with process and product layout formats.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
17
One methodology used to evaluate equipment investment decisions where the investment entails a large initial investment, fixed costs, and variable costs is break-even analysis.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
18
Workcenter layouts allocate dissimilar machines into cells to work on products that have dissimilar processing requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
19
A make-to-order firm will work with the customer to design the product, and then make it from purchased materials, parts, and components.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
20
The closer the customer is to the customer order decoupling point the more quickly the customer receives the product.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
21
Which of the following is a basic type of process structure?

A)Process flow diagram
B)Product matrix
C)Process matrix
D)Workcenter
E)Manual assembly
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
22
Which of the following basic types of process structures is one which equipment or work processes are arranged according to the progressive steps by which the product is made?

A)Project
B)Workcenter
C)Manufacturing cell
D)Assembly line
E)Continuous process
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
23
The placement of which of the following is not determined by process structure decisions?

A)Departments
B)Workgroups
C)Workstations
D)Machines
E)Emergency exits
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
24
An example of an assemble-to-order firm is Dell Computer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
25
You are hired as a consultant to decide if your client should purchase a new, highly specialized, piece of equipment.The product to be produced by this equipment is forecast to have a total worldwide demand of 15,000 units over the entire product life.The initial investment to acquire and install the equipment is $256,000.The variable cost to produce each unit will be $15 and the selling price for the finished product will be $30.Which of the following best describes the situation the firm is facing?

A)The company will recover its initial investment
B)The company's total margin will be less than its investment
C)It's a good investment
D)The break-even is lower than the 15,000 units that are expected to sell
E)All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
26
Which of the following is not considered a major process flow structure?

A)Work Center
B)Project
C)Assembly line
D)Fabrication
E)Continuous Flow
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
27
The essential issue in satisfying customers in the make-to-stock environment is to balance the cost of the finished item against the willingness of the consumer to pay for it.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
28
The focus in the make-to-stock environment is on providing finished goods where and when the customers want them.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
29
Assume a fixed cost for a process of $120,000.The variable cost to produce each unit of product is $35, and the selling price for the finished product is $50.Which of the following is the number of units that has to be produced and sold to break-even?

A)5,000 units
B)6,000 units
C)8,000 units
D)11,000 units
E)12,000 units
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
30
Differentiate between a workcenter and a manufacturing cell.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
31
Assembling-to-order means moving the customer order decoupling point from finished goods to components.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
32
A difference between project and continuous flow categories of process flow structures is which two of the following?

A)The size of the product
B)Discrete parts moving from workstation to workstation
C)Degree of equipment specialization
D)Being a "Virtual Factory"
E)Profit per unit
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
33
Which of the following basic types of process structures is one which similar equipment or functions are grouped together?

A)Project
B)Workcenter
C)Manufacturing cell
D)Assembly line
E)Continuous process
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
34
Assume a fixed cost for a process of $15,000.The variable cost to produce each unit of product is $10 and the selling price for the finished product is $25.Which of the following is the number of units that has to be produced and sold to break-even?

A)500 units
B)667 units
C)790 units
D)900 units
E)1,000 units
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
35
Give an example of a project layout.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
36
In a workcenter, machine A has a ten minute set-up time per batch and a two minute per unit run time. Machine B performs the identical function but has a set-up time of thirty minutes and a one minute run time per unit.The workcenter makes products in batches ranging from one unit to one hundred units.Assuming capacity is not a limitation on either machine, on which batches should machine B be used?

A)All batches should be run on machine B
B)Batches of more than 20 units should be run on machine B
C)Batches of fewer than 80 units should be run on machine B
D)Batches with up to 50 units should be run on machine B
E)No batches should be run on machine B
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
37
Describe the implications of the product-process matrix for process design in a competitive situation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
38
The essential issue in satisfying customers in the make-to-stock environment is to balance the level of finished inventory against the level of service to the customer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
39
Assume a fixed cost for a process of $100,000.The variable cost to produce each unit of product is $10, and the selling price for the finished product is $50.Ignoring inventory, how many units must the firm sell to break-even?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
40
Which of the following is not a basic type of process structure?

A)Product-process matrix
B)Workcenter
C)Manufacturing cell
D)Assembly line
E)Continuous process
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
41
Assume that you are offered a new piece of equipment for $10,000.The equipment will produce 10,000 units per year with a margin of $6.00 per unit.Demand for the product being produced has been 2,000 units per year.Your current equipment is fully depreciated and can produce the 2,000 units per year at but at a margin of only $4.00 per unit.Should you purchase the new equipment? Under what conditions?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
42
Assume a fixed cost for a process of $100,000.The variable cost to produce each unit of product is $10, and the selling price for the finished product is $50.Ignoring inventory, how many units must the firm sell to break-even?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
43
Describe the implications of the product-process matrix for process design in a competitive situation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
44
A manufacturer has identified the options for acquiring a machined part.It can make the part on a numerically controlled lathe for $150 per unit (including materials.) It can make the part on a standard lathe for $250 per unit (also including materials.) It can make the part on a machining center for $50 per unit (also including materials.) The manufacturer can acquire a standard lathe for $10,000.It could acquire
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
45
Assume that you are offered a new piece of equipment for $10,000.The equipment will produce 10,000 units per year with a margin of $6.00 per unit.Demand for the product being produced has been 2,000 units per year.Your current equipment is fully depreciated and can produce the 2,000 units per year at but at a margin of only $4.00 per unit.Should you purchase the new equipment? Under what conditions?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
46
A manufacturer has identified the options for acquiring a machined part.It can make the part on a numerically controlled lathe for $150 per unit (including materials.) It can make the part on a standard lathe for $250 per unit (also including materials.) It can make the part on a machining center for $50 per unit (also including materials.) The manufacturer can acquire a standard lathe for $10,000.It could acquire a numerically controlled lathe for $100,000.A machining center would cost $350,000.It has also found that it can purchase the part for $350 per unit.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.