Deck 2: Analyzing the Business Case

ملء الشاشة (f)
exit full mode
سؤال
A feasibility study includes tests for ____ feasibility, which means that a proposed system will be used effectively after it has been developed.

A) operational
B) technical
C) schedule
D) economic
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
<strong>  Of the measures of feasibility in the accompanying figure, ____ considers questions such as Does management support the project? and Will the new system require training for users?</strong> A) schedule feasibility B) technical feasibility C) economic feasibility D) operational feasibility <div style=padding-top: 35px>
Of the measures of feasibility in the accompanying figure, ____ considers questions such as "Does management support the project?" and "Will the new system require training for users?"

A) schedule feasibility
B) technical feasibility
C) economic feasibility
D) operational feasibility
سؤال
A systems request form should not ____.

A) have complex instructions
B) be easy to understand
C) include enough space for all required information
D) indicate what supporting documents are needed
سؤال
A feasibility study includes tests for ____ feasibility, which means that the projected benefits of the proposed system outweigh the estimated costs.

A) economic
B) schedule
C) operational
D) technical
سؤال
If a problem arises that involves a mission-critical system, an IT ____ team would attempt to restore normal operations.

A) emergency
B) management
C) risk
D) maintenance
سؤال
____ limitations result when a system that was designed for a specific hardware configuration becomes obsolete when new hardware is introduced.

A) Mission
B) Relationship
C) Feasibility
D) Performance
سؤال
Examples of tangible benefits include all of the following except a(n) ____.

A) user-friendly system that improves employee job satisfaction
B) new scheduling system that reduces overtime
C) online package tracking system that decreases the need for clerical staff
D) sophisticated inventory control system that cuts excess inventory
سؤال
When evaluating systems requests, all of the following are disadvantages of a systems review committee EXCEPT ____.

A) action on requests must wait until the committee meets
B) one person's bias is more likely to affect the decisions
C) members might favor projects requested by their own departments
D) internal political differences could delay important decisions
سؤال
When setting priorities for systems requests, the highest priority goes to projects that provide the ____.

A) least benefit, at the highest cost, in the longest period of time
B) least benefit, at the lowest cost, in the longest period of time
C) greatest benefit, at the highest cost, in the shortest period of time
D) greatest benefit, at the lowest cost, in the shortest period of time
سؤال
____ planning is the process of identifying long-term organizational goals, strategies, and resources.

A) Opportunity
B) Preliminary
C) Strategic
D) Vertical
سؤال
During strategic planning, top managers ask a series of questions that is called a ____ analysis because it examines a company's strengths, weaknesses, opportunities, and threats.

A) CRM
B) TCO
C) JIT
D) SWOT
سؤال
A feasibility study includes tests for ____ feasibility, which refers to the practical resources needed to develop, purchase, install, or operate the system.

A) operational
B) technical
C) schedule
D) economic
سؤال
The estimated costs of a proposed system usually are considered the ____, which includes ongoing support and maintenance costs, as well as acquisition costs.

A) CRM
B) TCO
C) JIT
D) RFID
سؤال
____ components can provide automated response to sales inquiries, Web-based order processing, and online inventory tracking.

A) Mission statement
B) Customer relationship management (CRM)
C) Feasibility study
D) Total cost of ownership (TCO)
سؤال
Many companies implement ____ systems that integrate all customer-related events and transactions.

A) CRM
B) TCO
C) JIT
D) RFID
سؤال
Examples of intangible benefits include all of the following except a(n) ____.

A) user-friendly system that improves employee job satisfaction
B) sales tracking system that supplies better information for marketing decisions
C) new Web site that enhances the company's image
D) online package tracking system that decreases the need for clerical staff
سؤال
Hardware-based security controls include ____.

A) passwords
B) various levels of user access
C) coding data
D) none of the above
سؤال
Electronic data interchange (EDI) enables ____ inventory systems, which rely on computer-to-computer data exchange to minimize unnecessary inventory.

A) CRM
B) TCO
C) JIT
D) RFID
سؤال
Systems development typically starts with a ____.

A) feasibility study, followed by a systems request, which includes a preliminary investigation
B) systems request, followed by a preliminary investigation, which includes a feasibility study
C) preliminary investigation, followed by a feasibility study, which includes a systems request
D) feasibility study, followed by a preliminary investigation, which includes a systems request
سؤال
Strategic planning looks beyond day-to-day activities and focuses on a horizon that is ____ years in the future.

A) 3
B) 5
C) 10
D) any of the above
سؤال
The primary method of obtaining information during the preliminary investigation is to ____.

A) analyze organization charts
B) conduct interviews
C) review documentation
D) observe operations
سؤال
In the preliminary investigation report, the ____ section contains the results of the preliminary investigation, including a description of the project's scope, constraints, and feasibility.

A) appendix
B) introduction
C) case for action
D) findings
سؤال
Projects where management has no choice in implementing them are called ____ projects.

A) discretionary
B) nondiscretionary
C) appended
D) concatenated
سؤال
<strong>  Of the measures of feasibility in the accompanying figure, issues that relate to ____ include Has management established a firm timetable for the project? and Will a project manager be appointed?</strong> A) schedule feasibility B) technical feasibility C) economic feasibility D) operational feasibility <div style=padding-top: 35px>
Of the measures of feasibility in the accompanying figure, issues that relate to ____ include "Has management established a firm timetable for the project?" and "Will a project manager be appointed?"

A) schedule feasibility
B) technical feasibility
C) economic feasibility
D) operational feasibility
سؤال
When assessing priorities for systems requests, a systems analyst should look for high scores in all of the following EXCEPT____.

A) Will the proposed system serve customers better?
B) Will the proposed system reduce costs?
C) Will the proposed system serve the organization better?
D) Will the proposed system decrease revenue for the company?
سؤال
A(n) ____ is a requirement or condition that a system must satisfy or an outcome that a system must achieve.

A) condition
B) constraint
C) impediment
D) obstacle
سؤال
A systems analyst should provide ____ so managers can understand the full cost impact and timetable.

A) time figures for the next development phase
B) cost figures for the next development phase
C) an estimate for the overall project
D) all of the above
سؤال
Projects where management has a choice in implementing them are called ____ projects.

A) discretionary
B) nondiscretionary
C) appended
D) concatenated
سؤال
In a preliminary investigation report, the ____ contain(s) a brief description of the system, the name of the person or group performing the investigation, and the name of the person or group who initiated the investigation.

A) introduction
B) systems request summary
C) expected benefits
D) time and costs estimates
سؤال
Projects with very general scope definitions are at risk of expanding gradually, without specific authorization, in a process called project ____.

A) dilation
B) creep
C) expansion
D) drift
سؤال
____ is an example of a discretionary project.

A) Creating a new report for a user
B) Adding a report required by a new federal law
C) Including annual updates to payroll and tax percentages
D) All of the above
سؤال
A popular technique for investigating causes and effects is called a(n) ____ diagram, which is an analysis tool that represents the possible causes of a problem as a graphical outline.

A) wishbone
B) fishbone
C) jawbone
D) crossbones
سؤال
When using a ____ diagram to investigate causes of a problem, an analyst first states the problem and then draws a main bone with sub-bones that represent possible causes of the problem.

A) wishbone
B) fishbone
C) jawbone
D) crossbones
سؤال
A survey is ____, generally takes less time, and can involve a broad cross-section of people.

A) more flexible than a series of interviews, and it is less expensive
B) more flexible than a series of interviews, but it is more expensive
C) not as flexible as a series of interviews, but it is less expensive
D) not as flexible as a series of interviews, and it is more expensive
سؤال
Determining the project ____ means to define the boundaries, or extent, of a project - being as specific as possible.

A) index
B) matrix
C) scope
D) estimation
سؤال
<strong>  Of the measures of feasibility in the accompanying figure, ____ considers points such as Does the proposed platform have sufficient capacity for future needs? and Will the hardware and software environment be reliable?</strong> A) schedule feasibility B) technical feasibility C) economic feasibility D) operational feasibility <div style=padding-top: 35px>
Of the measures of feasibility in the accompanying figure, ____ considers points such as "Does the proposed platform have sufficient capacity for future needs?" and "Will the hardware and software environment be reliable?"

A) schedule feasibility
B) technical feasibility
C) economic feasibility
D) operational feasibility
سؤال
<strong>  Of the measures of feasibility in the accompanying figure, ____ assesses tangible and intangible benefits to the company in addition to costs.</strong> A) schedule feasibility B) technical feasibility C) economic feasibility D) operational feasibility <div style=padding-top: 35px>
Of the measures of feasibility in the accompanying figure, ____ assesses tangible and intangible benefits to the company in addition to costs.

A) schedule feasibility
B) technical feasibility
C) economic feasibility
D) operational feasibility
سؤال
In sequence, the interviewing process involves a series of steps: ____, conduct the interview, document the interview, and evaluate the interview.

A) determine the people to interview, establish objectives for the interview, develop interview questions, prepare for the interview
B) establish objectives for the interview, develop interview questions, prepare for the interview, determine the people to interview
C) develop interview questions, prepare for the interview, determine the people to interview, establish objectives for the interview
D) prepare for the interview, determine the people to interview, establish objectives for the interview, develop interview questions
سؤال
To avoid the problem of project creep, ____.

A) define project scope as vaguely as possible
B) leave project scope undefined
C) define project scope as clearly as possible
D) expand the focus beyond the problem at hand
سؤال
A systems analyst conducts a(n) ____ investigation to study the systems request and recommend specific action.

A) preliminary
B) appendix
C) systems
D) transitional
سؤال
Systems requests seldom are aimed at improving service to customers or users within a company.
سؤال
A strong business case suggests that a company should pursue other options, above the alternative, because it would be in the firm's best interest to do so.
سؤال
Information systems that interact with customers usually receive low priority.
سؤال
A clear definition of project scope and constraints promotes misunderstandings that arise where managers assume that the system will have a certain feature or support for a project, but later find that the feature is not included. _________________________
سؤال
Data entry controls should be excessive without being effective.
سؤال
____ is/are an external factor(s) that affect(s) IT systems projects.

A) Technology
B) Competitors
C) Managers
D) Suppliers
سؤال
Competition drives many information systems decisions.
سؤال
Regardless of the type, all constraints should be identified as late as possible. _________________________
سؤال
____ is/are an internal factor(s) that affect(s) IT systems projects.

A) The economy
B) User requests
C) Strategic plans
D) Existing systems and data
سؤال
By questioning users about additional capabilities they would like to have, instead of focusing on difficulties, a systems analyst ____.

A) leaves project scope undefined
B) gets a better understanding of operations
C) highlights ways to improve the user's job
D) builds better, more positive relationships with users
سؤال
As users rely more heavily on information systems to perform their jobs, they are likely to request even more IT services and support.
سؤال
A Gantt chart is drawn as a vertical bar graph; arranged in descending order, so the team can focus on the most important causes, the bars represent various causes of a problem. _________________________
سؤال
A company's mission statement is unrelated to its major goals, shorter-term objectives, and day-to-day business operations.
سؤال
It is easier to assign dollar values to intangible benefits. _________________________
سؤال
In a preliminary investigation report, the case for action section includes a summary of the project request and a specific recommendation. _________________________
سؤال
A common reason for systems requests is ____.

A) improved services
B) weaker controls
C) better performance
D) reduced cost
سؤال
Management leadership and information technology are unconnected, and no significant changes have occurred in either area.
سؤال
Internal and external factors affect every business decision that a company makes, and IT systems are no exception.
سؤال
A SWOT analysis contributes to the strategic planning process by identifying ____ resources.

A) technical
B) human
C) financial
D) logistical
سؤال
A strategic plan that stresses technology tends to create an unfavorable climate for IT projects that extends throughout an organization.
سؤال
If only one person has the necessary IT skills and experience to evaluate systems requests, that person should consult closely with users and managers throughout the company to ensure that business and operational needs are considered carefully.
سؤال
Few nondiscretionary projects are predictable.
سؤال
The first step in evaluating feasibility is to accept and include all systems requests, even those that are not feasible.
سؤال
The format of a preliminary investigation report is the same from one company to another.
سؤال
After composing a mission statement, a company identifies a set of _________________________ that will accomplish the mission.
سؤال
When interacting with users, a systems analyst should focus on difficulties instead of questioning users about additional capability they would like to have.
سؤال
Whenever possible, a systems analyst should evaluate a proposed project based on tangible costs and benefits that represent actual (or approximate) dollar values.
سؤال
Most large companies rely on one person to evaluate systems requests instead of a committee.
سؤال
A(n) _________________________ describes a company for its stakeholders and briefly states the company's overall purpose, products, services, and values.
سؤال
Economic activity has little influence on corporate information management.
سؤال
Even if users have difficulty with a new system, it still will produce the expected benefits.
سؤال
When assessing schedule feasibility, a systems analyst must consider the interaction between time and costs.
سؤال
Before beginning a preliminary investigation, a memo or an e-mail message should let people know about the investigation and explain the systems analyst's role.
سؤال
The term _________________________ refers to the reasons, or justification, for a systems development proposal.
سؤال
A systems project seldom produces significant changes in company operations.
سؤال
Often a change in one system has an unexpected effect on another system.
سؤال
To achieve its goals, a company develops a list of shorter-term _________________________, which translate into day-to-day business operations.
سؤال
Feasibility analysis is an ongoing task that must be performed throughout the systems development process.
سؤال
The purpose of an interview, and of the preliminary investigation itself, is to convince others that a project is justified, not to uncover facts.
سؤال
The outcome of the day-to-day business operations, supported by IT and other corporate resources, is a set of business results that affect company _________________________.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/112
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 2: Analyzing the Business Case
1
A feasibility study includes tests for ____ feasibility, which means that a proposed system will be used effectively after it has been developed.

A) operational
B) technical
C) schedule
D) economic
A
2
<strong>  Of the measures of feasibility in the accompanying figure, ____ considers questions such as Does management support the project? and Will the new system require training for users?</strong> A) schedule feasibility B) technical feasibility C) economic feasibility D) operational feasibility
Of the measures of feasibility in the accompanying figure, ____ considers questions such as "Does management support the project?" and "Will the new system require training for users?"

A) schedule feasibility
B) technical feasibility
C) economic feasibility
D) operational feasibility
D
3
A systems request form should not ____.

A) have complex instructions
B) be easy to understand
C) include enough space for all required information
D) indicate what supporting documents are needed
A
4
A feasibility study includes tests for ____ feasibility, which means that the projected benefits of the proposed system outweigh the estimated costs.

A) economic
B) schedule
C) operational
D) technical
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
5
If a problem arises that involves a mission-critical system, an IT ____ team would attempt to restore normal operations.

A) emergency
B) management
C) risk
D) maintenance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
6
____ limitations result when a system that was designed for a specific hardware configuration becomes obsolete when new hardware is introduced.

A) Mission
B) Relationship
C) Feasibility
D) Performance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
7
Examples of tangible benefits include all of the following except a(n) ____.

A) user-friendly system that improves employee job satisfaction
B) new scheduling system that reduces overtime
C) online package tracking system that decreases the need for clerical staff
D) sophisticated inventory control system that cuts excess inventory
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
8
When evaluating systems requests, all of the following are disadvantages of a systems review committee EXCEPT ____.

A) action on requests must wait until the committee meets
B) one person's bias is more likely to affect the decisions
C) members might favor projects requested by their own departments
D) internal political differences could delay important decisions
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
9
When setting priorities for systems requests, the highest priority goes to projects that provide the ____.

A) least benefit, at the highest cost, in the longest period of time
B) least benefit, at the lowest cost, in the longest period of time
C) greatest benefit, at the highest cost, in the shortest period of time
D) greatest benefit, at the lowest cost, in the shortest period of time
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
10
____ planning is the process of identifying long-term organizational goals, strategies, and resources.

A) Opportunity
B) Preliminary
C) Strategic
D) Vertical
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
11
During strategic planning, top managers ask a series of questions that is called a ____ analysis because it examines a company's strengths, weaknesses, opportunities, and threats.

A) CRM
B) TCO
C) JIT
D) SWOT
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
12
A feasibility study includes tests for ____ feasibility, which refers to the practical resources needed to develop, purchase, install, or operate the system.

A) operational
B) technical
C) schedule
D) economic
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
13
The estimated costs of a proposed system usually are considered the ____, which includes ongoing support and maintenance costs, as well as acquisition costs.

A) CRM
B) TCO
C) JIT
D) RFID
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
14
____ components can provide automated response to sales inquiries, Web-based order processing, and online inventory tracking.

A) Mission statement
B) Customer relationship management (CRM)
C) Feasibility study
D) Total cost of ownership (TCO)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
15
Many companies implement ____ systems that integrate all customer-related events and transactions.

A) CRM
B) TCO
C) JIT
D) RFID
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
16
Examples of intangible benefits include all of the following except a(n) ____.

A) user-friendly system that improves employee job satisfaction
B) sales tracking system that supplies better information for marketing decisions
C) new Web site that enhances the company's image
D) online package tracking system that decreases the need for clerical staff
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
17
Hardware-based security controls include ____.

A) passwords
B) various levels of user access
C) coding data
D) none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
18
Electronic data interchange (EDI) enables ____ inventory systems, which rely on computer-to-computer data exchange to minimize unnecessary inventory.

A) CRM
B) TCO
C) JIT
D) RFID
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
19
Systems development typically starts with a ____.

A) feasibility study, followed by a systems request, which includes a preliminary investigation
B) systems request, followed by a preliminary investigation, which includes a feasibility study
C) preliminary investigation, followed by a feasibility study, which includes a systems request
D) feasibility study, followed by a preliminary investigation, which includes a systems request
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
20
Strategic planning looks beyond day-to-day activities and focuses on a horizon that is ____ years in the future.

A) 3
B) 5
C) 10
D) any of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
21
The primary method of obtaining information during the preliminary investigation is to ____.

A) analyze organization charts
B) conduct interviews
C) review documentation
D) observe operations
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
22
In the preliminary investigation report, the ____ section contains the results of the preliminary investigation, including a description of the project's scope, constraints, and feasibility.

A) appendix
B) introduction
C) case for action
D) findings
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
23
Projects where management has no choice in implementing them are called ____ projects.

A) discretionary
B) nondiscretionary
C) appended
D) concatenated
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
24
<strong>  Of the measures of feasibility in the accompanying figure, issues that relate to ____ include Has management established a firm timetable for the project? and Will a project manager be appointed?</strong> A) schedule feasibility B) technical feasibility C) economic feasibility D) operational feasibility
Of the measures of feasibility in the accompanying figure, issues that relate to ____ include "Has management established a firm timetable for the project?" and "Will a project manager be appointed?"

A) schedule feasibility
B) technical feasibility
C) economic feasibility
D) operational feasibility
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
25
When assessing priorities for systems requests, a systems analyst should look for high scores in all of the following EXCEPT____.

A) Will the proposed system serve customers better?
B) Will the proposed system reduce costs?
C) Will the proposed system serve the organization better?
D) Will the proposed system decrease revenue for the company?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
26
A(n) ____ is a requirement or condition that a system must satisfy or an outcome that a system must achieve.

A) condition
B) constraint
C) impediment
D) obstacle
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
27
A systems analyst should provide ____ so managers can understand the full cost impact and timetable.

A) time figures for the next development phase
B) cost figures for the next development phase
C) an estimate for the overall project
D) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
28
Projects where management has a choice in implementing them are called ____ projects.

A) discretionary
B) nondiscretionary
C) appended
D) concatenated
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
29
In a preliminary investigation report, the ____ contain(s) a brief description of the system, the name of the person or group performing the investigation, and the name of the person or group who initiated the investigation.

A) introduction
B) systems request summary
C) expected benefits
D) time and costs estimates
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
30
Projects with very general scope definitions are at risk of expanding gradually, without specific authorization, in a process called project ____.

A) dilation
B) creep
C) expansion
D) drift
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
31
____ is an example of a discretionary project.

A) Creating a new report for a user
B) Adding a report required by a new federal law
C) Including annual updates to payroll and tax percentages
D) All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
32
A popular technique for investigating causes and effects is called a(n) ____ diagram, which is an analysis tool that represents the possible causes of a problem as a graphical outline.

A) wishbone
B) fishbone
C) jawbone
D) crossbones
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
33
When using a ____ diagram to investigate causes of a problem, an analyst first states the problem and then draws a main bone with sub-bones that represent possible causes of the problem.

A) wishbone
B) fishbone
C) jawbone
D) crossbones
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
34
A survey is ____, generally takes less time, and can involve a broad cross-section of people.

A) more flexible than a series of interviews, and it is less expensive
B) more flexible than a series of interviews, but it is more expensive
C) not as flexible as a series of interviews, but it is less expensive
D) not as flexible as a series of interviews, and it is more expensive
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
35
Determining the project ____ means to define the boundaries, or extent, of a project - being as specific as possible.

A) index
B) matrix
C) scope
D) estimation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
36
<strong>  Of the measures of feasibility in the accompanying figure, ____ considers points such as Does the proposed platform have sufficient capacity for future needs? and Will the hardware and software environment be reliable?</strong> A) schedule feasibility B) technical feasibility C) economic feasibility D) operational feasibility
Of the measures of feasibility in the accompanying figure, ____ considers points such as "Does the proposed platform have sufficient capacity for future needs?" and "Will the hardware and software environment be reliable?"

A) schedule feasibility
B) technical feasibility
C) economic feasibility
D) operational feasibility
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
37
<strong>  Of the measures of feasibility in the accompanying figure, ____ assesses tangible and intangible benefits to the company in addition to costs.</strong> A) schedule feasibility B) technical feasibility C) economic feasibility D) operational feasibility
Of the measures of feasibility in the accompanying figure, ____ assesses tangible and intangible benefits to the company in addition to costs.

A) schedule feasibility
B) technical feasibility
C) economic feasibility
D) operational feasibility
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
38
In sequence, the interviewing process involves a series of steps: ____, conduct the interview, document the interview, and evaluate the interview.

A) determine the people to interview, establish objectives for the interview, develop interview questions, prepare for the interview
B) establish objectives for the interview, develop interview questions, prepare for the interview, determine the people to interview
C) develop interview questions, prepare for the interview, determine the people to interview, establish objectives for the interview
D) prepare for the interview, determine the people to interview, establish objectives for the interview, develop interview questions
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
39
To avoid the problem of project creep, ____.

A) define project scope as vaguely as possible
B) leave project scope undefined
C) define project scope as clearly as possible
D) expand the focus beyond the problem at hand
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
40
A systems analyst conducts a(n) ____ investigation to study the systems request and recommend specific action.

A) preliminary
B) appendix
C) systems
D) transitional
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
41
Systems requests seldom are aimed at improving service to customers or users within a company.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
42
A strong business case suggests that a company should pursue other options, above the alternative, because it would be in the firm's best interest to do so.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
43
Information systems that interact with customers usually receive low priority.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
44
A clear definition of project scope and constraints promotes misunderstandings that arise where managers assume that the system will have a certain feature or support for a project, but later find that the feature is not included. _________________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
45
Data entry controls should be excessive without being effective.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
46
____ is/are an external factor(s) that affect(s) IT systems projects.

A) Technology
B) Competitors
C) Managers
D) Suppliers
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
47
Competition drives many information systems decisions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
48
Regardless of the type, all constraints should be identified as late as possible. _________________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
49
____ is/are an internal factor(s) that affect(s) IT systems projects.

A) The economy
B) User requests
C) Strategic plans
D) Existing systems and data
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
50
By questioning users about additional capabilities they would like to have, instead of focusing on difficulties, a systems analyst ____.

A) leaves project scope undefined
B) gets a better understanding of operations
C) highlights ways to improve the user's job
D) builds better, more positive relationships with users
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
51
As users rely more heavily on information systems to perform their jobs, they are likely to request even more IT services and support.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
52
A Gantt chart is drawn as a vertical bar graph; arranged in descending order, so the team can focus on the most important causes, the bars represent various causes of a problem. _________________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
53
A company's mission statement is unrelated to its major goals, shorter-term objectives, and day-to-day business operations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
54
It is easier to assign dollar values to intangible benefits. _________________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
55
In a preliminary investigation report, the case for action section includes a summary of the project request and a specific recommendation. _________________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
56
A common reason for systems requests is ____.

A) improved services
B) weaker controls
C) better performance
D) reduced cost
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
57
Management leadership and information technology are unconnected, and no significant changes have occurred in either area.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
58
Internal and external factors affect every business decision that a company makes, and IT systems are no exception.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
59
A SWOT analysis contributes to the strategic planning process by identifying ____ resources.

A) technical
B) human
C) financial
D) logistical
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
60
A strategic plan that stresses technology tends to create an unfavorable climate for IT projects that extends throughout an organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
61
If only one person has the necessary IT skills and experience to evaluate systems requests, that person should consult closely with users and managers throughout the company to ensure that business and operational needs are considered carefully.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
62
Few nondiscretionary projects are predictable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
63
The first step in evaluating feasibility is to accept and include all systems requests, even those that are not feasible.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
64
The format of a preliminary investigation report is the same from one company to another.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
65
After composing a mission statement, a company identifies a set of _________________________ that will accomplish the mission.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
66
When interacting with users, a systems analyst should focus on difficulties instead of questioning users about additional capability they would like to have.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
67
Whenever possible, a systems analyst should evaluate a proposed project based on tangible costs and benefits that represent actual (or approximate) dollar values.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
68
Most large companies rely on one person to evaluate systems requests instead of a committee.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
69
A(n) _________________________ describes a company for its stakeholders and briefly states the company's overall purpose, products, services, and values.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
70
Economic activity has little influence on corporate information management.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
71
Even if users have difficulty with a new system, it still will produce the expected benefits.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
72
When assessing schedule feasibility, a systems analyst must consider the interaction between time and costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
73
Before beginning a preliminary investigation, a memo or an e-mail message should let people know about the investigation and explain the systems analyst's role.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
74
The term _________________________ refers to the reasons, or justification, for a systems development proposal.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
75
A systems project seldom produces significant changes in company operations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
76
Often a change in one system has an unexpected effect on another system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
77
To achieve its goals, a company develops a list of shorter-term _________________________, which translate into day-to-day business operations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
78
Feasibility analysis is an ongoing task that must be performed throughout the systems development process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
79
The purpose of an interview, and of the preliminary investigation itself, is to convince others that a project is justified, not to uncover facts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
80
The outcome of the day-to-day business operations, supported by IT and other corporate resources, is a set of business results that affect company _________________________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.