Deck 11: Managing Systems Implementation

ملء الشاشة (f)
exit full mode
سؤال
Software ____ is a software development process that stresses solid design, effective structure, accurate documentation, and careful testing.

A) analysis
B) engineering
C) agility
D) synthesis
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
____ is the process of reviewing the program code to spot logic errors, which produce incorrect results.

A) Desk checking
B) Code review
C) Results walkthrough
D) Logic review
سؤال
A class diagram includes the class ____, which represent the program logic.

A) attributes
B) events
C) methods
D) characters
سؤال
____ measures a module's scope and processing characteristics.

A) Coupling
B) Indexing
C) Cohesion
D) Piloting
سؤال
____ requires that a software supplier document all testing and maintain records of test results.

A) ISO (International Organization for Standardization)
B) SEI (Software Engineering Institute)
C) ODBC (Open Database Connectivity)
D) CAIT (Center for the Application of Information Technologies)
سؤال
A class diagram includes the class ____, which describe the characteristics of objects in the class.

A) methods
B) keys
C) events
D) attributes
سؤال
Application ____ is the process of constructing the programs and code modules that serves as the building blocks of an information system.

A) structuring
B) analysis
C) development
D) connectivity
سؤال
____ graphically represent the logic and interaction between program modules using a series of symbols connected by arrows.

A) Training plans
B) Acceptance tests
C) Flowcharts
D) Simulations
سؤال
A ____ consists of related program code organized into small units that are easy to understand and maintain.

A) mode
B) stub
C) decision tree
D) module
سؤال
____ describes the degree of interdependence among modules.

A) Resolution
B) Modularity
C) Dynamism
D) Coupling
سؤال
Many organizations require a more formal type of desk checking called a structured walkthrough, or ____ review.

A) design
B) integrated
C) code
D) interpolated
سؤال
In ____ programming, two programmers work on the same task on the same computer.

A) parallel
B) duo
C) double
D) driver
سؤال
The objective of ____ testing is to identify and eliminate execution errors that could cause a program to terminate abnormally, and logic errors that could have been missed during desk checking.

A) unit
B) integration
C) user
D) system
سؤال
To achieve better, faster, and less expensive methods of software development, ____ designed the Capability Maturity Model (CMM)®, which improves quality, reduces development time, and cuts costs.

A) ISO (International Organization for Standardization)
B) SEI (Software Engineering Institute)
C) ODBC (Open Database Connectivity)
D) CAIT (Center for the Application of Information Technologies)
سؤال
In sequence, the four steps typically followed to create a structure chart are ____.

A) review the DFDs; identify modules and relationships; add couples, loops, and conditions; analyze the structure chart and the data dictionary
B) identify modules and relationships; add couples, loops, and conditions; analyze the structure chart and the data dictionary; review the DFDs
C) add couples, loops, and conditions; analyze the structure chart and the data dictionary; review the DFDs; identify modules and relationships
D) analyze the structure chart and the data dictionary; review the DFDs; identify modules and relationships; add couples, loops, and conditions
سؤال
In a(n) ____ approach, the systems analyst defines the overall objectives of a system and then breaks them down into subsystems and modules.

A) top-down
B) piloted
C) indexed
D) integrated
سؤال
In a structure chart, a curved arrow represents a ____, which indicates that one or more modules are repeated.

A) pilot
B) flag
C) loop
D) unit
سؤال
A module that performs a single function or task has a high degree of ____, which is desirable.

A) piloting
B) indexing
C) cohesion
D) resolution
سؤال
In a structure chart, a control couple shows a message, also called a status ____, which one module sends to another.

A) pilot
B) flag
C) loop
D) unit
سؤال
In a structure chart, a(n) ____ line, which has a diamond on one end, indicates that a control module determines which subordinate modules will be invoked.

A) method
B) condition
C) class
D) attribute
سؤال
During ____ testing, programmers must test programs that interact with other programs and files individually, before they are integrated into the system.

A) unit
B) integrated
C) link
D) outcome
سؤال
<strong>  As the accompanying figure illustrates, the ____ approach causes the changeover from the old system to the new system to occur immediately when the new system becomes operational.</strong> A) phased operation B) parallel operation C) pilot operation D) direct cutover <div style=padding-top: 35px>
As the accompanying figure illustrates, the ____ approach causes the changeover from the old system to the new system to occur immediately when the new system becomes operational.

A) phased operation
B) parallel operation
C) pilot operation
D) direct cutover
سؤال
At the end of the systems implementation phase, the final report to management should include ____.

A) final versions of all system documentation
B) a comparison of actual costs and schedules to the original estimates
C) planned modifications and enhancements to the system that have been identified
D) all of the above
سؤال
Program documentation ____.

A) describes the inputs, outputs, and processing logic for all program modules
B) describes a system's functions and how they are implemented
C) contains all the information needed for processing and distributing printed output
D) consists of instructions and information to users who will interact with the system
سؤال
Unless a problem must be corrected, or modifications or enhancements must be made, access to the operational environment is limited to ____ and must be strictly controlled.

A) systems analysts
B) users
C) programmers
D) all of the above
سؤال
In a technique called ____ testing, the programmer simulates each program outcome or result and displays a message to indicate whether or not the program executed successfully.

A) modular
B) stub
C) outcome
D) unit
سؤال
A test plan consists of detailed procedures that specify ____.

A) how and when testing will be performed
B) what test data will be used
C) who will participate
D) all of the above
سؤال
____ cutover involves more risk than other changeover methods.

A) Direct
B) Pilot
C) Parallel
D) Phased
سؤال
Operations documentation ____.

A) describes the inputs, outputs, and processing logic for all program modules
B) describes a system's functions and how they are implemented
C) contains all the information needed for processing and distributing online and printed output
D) consists of instructions and information to users who will interact with the system
سؤال
In addition to analyzing logic and program code, a project team usually holds a session with users, called a ____ walkthrough, to review the interface with a cross-section of people who will work with the new system and ensure that all the necessary features have been included.

A) unit
B) design
C) testing
D) user
سؤال
<strong>  As the accompanying figure illustrates, the ____ changeover method requires that both the old and the new information systems operate fully for a specific period.</strong> A) phased operation B) parallel operation C) pilot operation D) direct cutover <div style=padding-top: 35px>
As the accompanying figure illustrates, the ____ changeover method requires that both the old and the new information systems operate fully for a specific period.

A) phased operation
B) parallel operation
C) pilot operation
D) direct cutover
سؤال
<strong>  As the accompanying figure illustrates, the ____ changeover method involves implementing the complete new system at a selected location of the company.</strong> A) phased operation B) parallel operation C) pilot operation D) direct cutover <div style=padding-top: 35px>
As the accompanying figure illustrates, the ____ changeover method involves implementing the complete new system at a selected location of the company.

A) phased operation
B) parallel operation
C) pilot operation
D) direct cutover
سؤال
The testing of an individual module is called ____ testing.

A) modular
B) index
C) stub
D) unit
سؤال
Using a ____ strategy, knowledgeable users can be selected who then conduct sessions for others.

A) structured walkthrough
B) train-the-trainer
C) desk checking
D) top-down design
سؤال
User documentation ____.

A) describes the inputs, outputs, and processing logic for all program modules
B) describes a system's functions and how they are implemented
C) contains all the information needed for processing and distributing printed output
D) consists of instructions and information to users who will interact with the system
سؤال
A Web site for the ____ describes a variety of IT education and training resources.

A) International Organization for Standardization (ISO)
B) Software Engineering Institute (SEI)
C) Open Database Connectivity (ODBC)
D) Center for the Application of Information Technologies (CAIT)
سؤال
When evaluating a system, a systems analyst should do all of the following except ____.

A) observe users and computer operations personnel working with the new system
B) examine all source documents, output reports, and screen displays
C) use interviews to gather information and opinions from a large number of users
D) read all documentation and training materials
سؤال
Successful completion of system testing is the key to user and management approval, which is why system tests sometimes are called ____.

A) implementation tests
B) modular tests
C) structure tests
D) acceptance tests
سؤال
<strong>  As the accompanying figure illustrates, the ____ changeover method allows the new system to be implemented in stages, or modules.</strong> A) phased operation B) parallel operation C) pilot operation D) direct cutover <div style=padding-top: 35px>
As the accompanying figure illustrates, the ____ changeover method allows the new system to be implemented in stages, or modules.

A) phased operation
B) parallel operation
C) pilot operation
D) direct cutover
سؤال
Integration testing is sometimes known as ____ testing.

A) unit
B) modular
C) link
D) outcome
سؤال
Structure charts are based on the DFDs constructed during data and process modeling and object models that might have been developed.
سؤال
If a module must perform multiple tasks, ____.

A) the module will be less difficult to create and maintain
B) the module will be more difficult to create and maintain
C) less complex coding is required
D) more complex coding is required
سؤال
In a top-down design, the overall objectives of a system are broken down into ____ in a process called partitioning.

A) subsystems
B) flags
C) modules
D) pilot sites
سؤال
User documentation includes ____.

A) security and audit trail information
B) program, systems analyst, programmer, and system identification
C) frequently asked questions (FAQs)
D) description of source document content, preparation, processing, and samples
سؤال
If one module refers to internal logic contained in another module, the modules are loosely coupled. _________________________
سؤال
Errors found during a structured walkthrough are harder to fix. _________________________
سؤال
To draw a structure chart, working from a logical model the systems analyst transforms program modules into functional primitives and object methods.
سؤال
Podcasts can be prescheduled, made available on demand, or delivered as automatic updates. _________________________
سؤال
When the output from a validation program becomes input to a master file update program, testing the two programs independently guarantees that the data passed between them is correct.
سؤال
Compiling a program using a CASE tool or a language compiler detects syntax errors, which are language grammar errors.
سؤال
Although programmers perform the actual coding, IT managers usually assign systems analysts to work with them as part of a team effort.
سؤال
If a module must be made more cohesive, it can be combined into one unit, which performs multiple functions.
سؤال
A testing sequence should move to the integration stage as soon as it has performed properly in any unit tests.
سؤال
Systems analysts use application generators, report writers, screen generators, fourth-generation languages, and other CASE tools that produce code directly from program design specifications.
سؤال
Parallel operation is the least costly changeover method. _________________________
سؤال
Modules that are independent are tightly coupled. _________________________
سؤال
Working from a general plan, a programmer uses a programming language to transform code statements into program logic.
سؤال
Using flowcharts, programmers can break large systems into subsystems that are easier to understand and code.
سؤال
The test environment for an information system contains ____.

A) hardware and software configurations and settings
B) system utilities
C) copies of all programs and procedures
D) copies of test data files
سؤال
When developing a training program, which of the following guidelines should be kept in mind?

A) train people individually, with shared training programs for distinct groups
B) select the most effective place to conduct the training
C) provide for learning by hearing, seeing, and doing
D) rely on previous trainees
سؤال
Phased operation is more expensive than full parallel operation because the entire system must be worked with at a time.
سؤال
Whenever possible, people who were not directly involved in developing a system should conduct the post-implementation evaluation.
سؤال
The main objective of ____________________ is to avoid problems or to detect them as soon as possible.
سؤال
Post-implementation evaluation primarily is concerned with assessing the quality of a new system.
سؤال
The post-implementation evaluation verifies that a new system meets specified requirements, complies with user objectives, and produces the anticipated benefits.
سؤال
Effective online documentation is an important productivity tool because it empowers users and reduces the time that IT staff members must spend in providing telephone, e-mail, or face-to-face assistance.
سؤال
  A(n) ____________________, such as that illustrated in the accompanying figure, consists of rectangles that represent the program modules, with arrows and other symbols that provide additional information.<div style=padding-top: 35px>
A(n) ____________________, such as that illustrated in the accompanying figure, consists of rectangles that represent the program modules, with arrows and other symbols that provide additional information.
سؤال
  In a structure chart, such as the one shown in the accompanying figure, a higher-level module, called a(n) ____________________ module, directs lower-level modules.<div style=padding-top: 35px>
In a structure chart, such as the one shown in the accompanying figure, a higher-level module, called a(n) ____________________ module, directs lower-level modules.
سؤال
A systems analyst prepares most of the systems documentation during the systems analysis and systems design phases.
سؤال
Restricting the implementation to a pilot site increases the risk of system failure, compared with a direct cutover method, and operating both systems for only the pilot site is more expensive than a parallel operation for the entire company.
سؤال
  In a structure chart, such as the one shown in the accompanying figure, a(n) ____________________ module is reusable code and can be invoked from more than one point in a structure chart.<div style=padding-top: 35px>
In a structure chart, such as the one shown in the accompanying figure, a(n) ____________________ module is reusable code and can be invoked from more than one point in a structure chart.
سؤال
Systems analysts prepare overall documentation, such as process descriptions and report layouts, early in the SDLC.
سؤال
The skill set required to develop documentation usually is the same as that to develop a system.
سؤال
Commercial software packages must undergo unit and integration testing similar to that of in-house developed systems, although system testing usually is not performed.
سؤال
Post-implementation evaluations are optional for most information systems projects.
سؤال
To minimize the need to require information from two different systems, cyclical information systems usually are converted using the direct cutover method at the beginning of a quarter, calendar year, or fiscal year.
سؤال
  In a structure chart, such as the one shown in the accompanying figure, a lower-level module is called a(n) ____________________ module.<div style=padding-top: 35px>
In a structure chart, such as the one shown in the accompanying figure, a lower-level module is called a(n) ____________________ module.
سؤال
Systems analysts seldom are responsible for preparing documentation to help users learn a system.
سؤال
Most Webinars are Web-based broadcasts that allow a user to receive audio or multimedia files using music player software.
سؤال
Data conversion is easier when the new system replaces a manual system, because all data can be entered manually, unless it must be scanned.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/112
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 11: Managing Systems Implementation
1
Software ____ is a software development process that stresses solid design, effective structure, accurate documentation, and careful testing.

A) analysis
B) engineering
C) agility
D) synthesis
B
2
____ is the process of reviewing the program code to spot logic errors, which produce incorrect results.

A) Desk checking
B) Code review
C) Results walkthrough
D) Logic review
A
3
A class diagram includes the class ____, which represent the program logic.

A) attributes
B) events
C) methods
D) characters
C
4
____ measures a module's scope and processing characteristics.

A) Coupling
B) Indexing
C) Cohesion
D) Piloting
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
5
____ requires that a software supplier document all testing and maintain records of test results.

A) ISO (International Organization for Standardization)
B) SEI (Software Engineering Institute)
C) ODBC (Open Database Connectivity)
D) CAIT (Center for the Application of Information Technologies)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
6
A class diagram includes the class ____, which describe the characteristics of objects in the class.

A) methods
B) keys
C) events
D) attributes
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
7
Application ____ is the process of constructing the programs and code modules that serves as the building blocks of an information system.

A) structuring
B) analysis
C) development
D) connectivity
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
8
____ graphically represent the logic and interaction between program modules using a series of symbols connected by arrows.

A) Training plans
B) Acceptance tests
C) Flowcharts
D) Simulations
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
9
A ____ consists of related program code organized into small units that are easy to understand and maintain.

A) mode
B) stub
C) decision tree
D) module
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
10
____ describes the degree of interdependence among modules.

A) Resolution
B) Modularity
C) Dynamism
D) Coupling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
11
Many organizations require a more formal type of desk checking called a structured walkthrough, or ____ review.

A) design
B) integrated
C) code
D) interpolated
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
12
In ____ programming, two programmers work on the same task on the same computer.

A) parallel
B) duo
C) double
D) driver
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
13
The objective of ____ testing is to identify and eliminate execution errors that could cause a program to terminate abnormally, and logic errors that could have been missed during desk checking.

A) unit
B) integration
C) user
D) system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
14
To achieve better, faster, and less expensive methods of software development, ____ designed the Capability Maturity Model (CMM)®, which improves quality, reduces development time, and cuts costs.

A) ISO (International Organization for Standardization)
B) SEI (Software Engineering Institute)
C) ODBC (Open Database Connectivity)
D) CAIT (Center for the Application of Information Technologies)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
15
In sequence, the four steps typically followed to create a structure chart are ____.

A) review the DFDs; identify modules and relationships; add couples, loops, and conditions; analyze the structure chart and the data dictionary
B) identify modules and relationships; add couples, loops, and conditions; analyze the structure chart and the data dictionary; review the DFDs
C) add couples, loops, and conditions; analyze the structure chart and the data dictionary; review the DFDs; identify modules and relationships
D) analyze the structure chart and the data dictionary; review the DFDs; identify modules and relationships; add couples, loops, and conditions
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
16
In a(n) ____ approach, the systems analyst defines the overall objectives of a system and then breaks them down into subsystems and modules.

A) top-down
B) piloted
C) indexed
D) integrated
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
17
In a structure chart, a curved arrow represents a ____, which indicates that one or more modules are repeated.

A) pilot
B) flag
C) loop
D) unit
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
18
A module that performs a single function or task has a high degree of ____, which is desirable.

A) piloting
B) indexing
C) cohesion
D) resolution
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
19
In a structure chart, a control couple shows a message, also called a status ____, which one module sends to another.

A) pilot
B) flag
C) loop
D) unit
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
20
In a structure chart, a(n) ____ line, which has a diamond on one end, indicates that a control module determines which subordinate modules will be invoked.

A) method
B) condition
C) class
D) attribute
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
21
During ____ testing, programmers must test programs that interact with other programs and files individually, before they are integrated into the system.

A) unit
B) integrated
C) link
D) outcome
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
22
<strong>  As the accompanying figure illustrates, the ____ approach causes the changeover from the old system to the new system to occur immediately when the new system becomes operational.</strong> A) phased operation B) parallel operation C) pilot operation D) direct cutover
As the accompanying figure illustrates, the ____ approach causes the changeover from the old system to the new system to occur immediately when the new system becomes operational.

A) phased operation
B) parallel operation
C) pilot operation
D) direct cutover
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
23
At the end of the systems implementation phase, the final report to management should include ____.

A) final versions of all system documentation
B) a comparison of actual costs and schedules to the original estimates
C) planned modifications and enhancements to the system that have been identified
D) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
24
Program documentation ____.

A) describes the inputs, outputs, and processing logic for all program modules
B) describes a system's functions and how they are implemented
C) contains all the information needed for processing and distributing printed output
D) consists of instructions and information to users who will interact with the system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
25
Unless a problem must be corrected, or modifications or enhancements must be made, access to the operational environment is limited to ____ and must be strictly controlled.

A) systems analysts
B) users
C) programmers
D) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
26
In a technique called ____ testing, the programmer simulates each program outcome or result and displays a message to indicate whether or not the program executed successfully.

A) modular
B) stub
C) outcome
D) unit
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
27
A test plan consists of detailed procedures that specify ____.

A) how and when testing will be performed
B) what test data will be used
C) who will participate
D) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
28
____ cutover involves more risk than other changeover methods.

A) Direct
B) Pilot
C) Parallel
D) Phased
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
29
Operations documentation ____.

A) describes the inputs, outputs, and processing logic for all program modules
B) describes a system's functions and how they are implemented
C) contains all the information needed for processing and distributing online and printed output
D) consists of instructions and information to users who will interact with the system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
30
In addition to analyzing logic and program code, a project team usually holds a session with users, called a ____ walkthrough, to review the interface with a cross-section of people who will work with the new system and ensure that all the necessary features have been included.

A) unit
B) design
C) testing
D) user
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
31
<strong>  As the accompanying figure illustrates, the ____ changeover method requires that both the old and the new information systems operate fully for a specific period.</strong> A) phased operation B) parallel operation C) pilot operation D) direct cutover
As the accompanying figure illustrates, the ____ changeover method requires that both the old and the new information systems operate fully for a specific period.

A) phased operation
B) parallel operation
C) pilot operation
D) direct cutover
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
32
<strong>  As the accompanying figure illustrates, the ____ changeover method involves implementing the complete new system at a selected location of the company.</strong> A) phased operation B) parallel operation C) pilot operation D) direct cutover
As the accompanying figure illustrates, the ____ changeover method involves implementing the complete new system at a selected location of the company.

A) phased operation
B) parallel operation
C) pilot operation
D) direct cutover
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
33
The testing of an individual module is called ____ testing.

A) modular
B) index
C) stub
D) unit
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
34
Using a ____ strategy, knowledgeable users can be selected who then conduct sessions for others.

A) structured walkthrough
B) train-the-trainer
C) desk checking
D) top-down design
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
35
User documentation ____.

A) describes the inputs, outputs, and processing logic for all program modules
B) describes a system's functions and how they are implemented
C) contains all the information needed for processing and distributing printed output
D) consists of instructions and information to users who will interact with the system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
36
A Web site for the ____ describes a variety of IT education and training resources.

A) International Organization for Standardization (ISO)
B) Software Engineering Institute (SEI)
C) Open Database Connectivity (ODBC)
D) Center for the Application of Information Technologies (CAIT)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
37
When evaluating a system, a systems analyst should do all of the following except ____.

A) observe users and computer operations personnel working with the new system
B) examine all source documents, output reports, and screen displays
C) use interviews to gather information and opinions from a large number of users
D) read all documentation and training materials
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
38
Successful completion of system testing is the key to user and management approval, which is why system tests sometimes are called ____.

A) implementation tests
B) modular tests
C) structure tests
D) acceptance tests
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
39
<strong>  As the accompanying figure illustrates, the ____ changeover method allows the new system to be implemented in stages, or modules.</strong> A) phased operation B) parallel operation C) pilot operation D) direct cutover
As the accompanying figure illustrates, the ____ changeover method allows the new system to be implemented in stages, or modules.

A) phased operation
B) parallel operation
C) pilot operation
D) direct cutover
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
40
Integration testing is sometimes known as ____ testing.

A) unit
B) modular
C) link
D) outcome
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
41
Structure charts are based on the DFDs constructed during data and process modeling and object models that might have been developed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
42
If a module must perform multiple tasks, ____.

A) the module will be less difficult to create and maintain
B) the module will be more difficult to create and maintain
C) less complex coding is required
D) more complex coding is required
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
43
In a top-down design, the overall objectives of a system are broken down into ____ in a process called partitioning.

A) subsystems
B) flags
C) modules
D) pilot sites
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
44
User documentation includes ____.

A) security and audit trail information
B) program, systems analyst, programmer, and system identification
C) frequently asked questions (FAQs)
D) description of source document content, preparation, processing, and samples
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
45
If one module refers to internal logic contained in another module, the modules are loosely coupled. _________________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
46
Errors found during a structured walkthrough are harder to fix. _________________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
47
To draw a structure chart, working from a logical model the systems analyst transforms program modules into functional primitives and object methods.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
48
Podcasts can be prescheduled, made available on demand, or delivered as automatic updates. _________________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
49
When the output from a validation program becomes input to a master file update program, testing the two programs independently guarantees that the data passed between them is correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
50
Compiling a program using a CASE tool or a language compiler detects syntax errors, which are language grammar errors.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
51
Although programmers perform the actual coding, IT managers usually assign systems analysts to work with them as part of a team effort.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
52
If a module must be made more cohesive, it can be combined into one unit, which performs multiple functions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
53
A testing sequence should move to the integration stage as soon as it has performed properly in any unit tests.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
54
Systems analysts use application generators, report writers, screen generators, fourth-generation languages, and other CASE tools that produce code directly from program design specifications.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
55
Parallel operation is the least costly changeover method. _________________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
56
Modules that are independent are tightly coupled. _________________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
57
Working from a general plan, a programmer uses a programming language to transform code statements into program logic.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
58
Using flowcharts, programmers can break large systems into subsystems that are easier to understand and code.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
59
The test environment for an information system contains ____.

A) hardware and software configurations and settings
B) system utilities
C) copies of all programs and procedures
D) copies of test data files
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
60
When developing a training program, which of the following guidelines should be kept in mind?

A) train people individually, with shared training programs for distinct groups
B) select the most effective place to conduct the training
C) provide for learning by hearing, seeing, and doing
D) rely on previous trainees
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
61
Phased operation is more expensive than full parallel operation because the entire system must be worked with at a time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
62
Whenever possible, people who were not directly involved in developing a system should conduct the post-implementation evaluation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
63
The main objective of ____________________ is to avoid problems or to detect them as soon as possible.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
64
Post-implementation evaluation primarily is concerned with assessing the quality of a new system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
65
The post-implementation evaluation verifies that a new system meets specified requirements, complies with user objectives, and produces the anticipated benefits.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
66
Effective online documentation is an important productivity tool because it empowers users and reduces the time that IT staff members must spend in providing telephone, e-mail, or face-to-face assistance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
67
  A(n) ____________________, such as that illustrated in the accompanying figure, consists of rectangles that represent the program modules, with arrows and other symbols that provide additional information.
A(n) ____________________, such as that illustrated in the accompanying figure, consists of rectangles that represent the program modules, with arrows and other symbols that provide additional information.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
68
  In a structure chart, such as the one shown in the accompanying figure, a higher-level module, called a(n) ____________________ module, directs lower-level modules.
In a structure chart, such as the one shown in the accompanying figure, a higher-level module, called a(n) ____________________ module, directs lower-level modules.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
69
A systems analyst prepares most of the systems documentation during the systems analysis and systems design phases.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
70
Restricting the implementation to a pilot site increases the risk of system failure, compared with a direct cutover method, and operating both systems for only the pilot site is more expensive than a parallel operation for the entire company.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
71
  In a structure chart, such as the one shown in the accompanying figure, a(n) ____________________ module is reusable code and can be invoked from more than one point in a structure chart.
In a structure chart, such as the one shown in the accompanying figure, a(n) ____________________ module is reusable code and can be invoked from more than one point in a structure chart.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
72
Systems analysts prepare overall documentation, such as process descriptions and report layouts, early in the SDLC.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
73
The skill set required to develop documentation usually is the same as that to develop a system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
74
Commercial software packages must undergo unit and integration testing similar to that of in-house developed systems, although system testing usually is not performed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
75
Post-implementation evaluations are optional for most information systems projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
76
To minimize the need to require information from two different systems, cyclical information systems usually are converted using the direct cutover method at the beginning of a quarter, calendar year, or fiscal year.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
77
  In a structure chart, such as the one shown in the accompanying figure, a lower-level module is called a(n) ____________________ module.
In a structure chart, such as the one shown in the accompanying figure, a lower-level module is called a(n) ____________________ module.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
78
Systems analysts seldom are responsible for preparing documentation to help users learn a system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
79
Most Webinars are Web-based broadcasts that allow a user to receive audio or multimedia files using music player software.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
80
Data conversion is easier when the new system replaces a manual system, because all data can be entered manually, unless it must be scanned.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.