Deck 14: Determining Project Progress and Results

ملء الشاشة (f)
exit full mode
سؤال
When using a control chart,a point that occurs above the upper control limit typically means the variation is enough that it is not likely to have happened purely by chance - rather some sort of special cause explains the variation.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The purpose of quality control on projects is to reduce the number of defects in deliverables rather than to improve the project process.
سؤال
During project execution,monitoring refers to the act of comparing actual performance with planned performance and taking corrective action when needed.
سؤال
When using earned value techniques,Actual Cost (AC)refers to the total costs actually incurred and recorded in accomplishing work performed during a given time period.
سؤال
Inspection is keeping errors out of process while prevention is trying to find errors so they do not get to the customer.
سؤال
The concept behind a balanced scorecard is that an organization needs to be evaluated along supplier,external business,risk and human resource perspectives.
سؤال
The Cost Variance (CV)is a measure of cost efficiency on a project.
سؤال
When project managers authorize project work,they should empower others to the extent possible,yet control to the extent necessary.
سؤال
The Schedule Performance Index (SPI)is a measure of schedule efficiency on a project.
سؤال
Earned Value (EV)is the authorized budget assigned to the scheduled work to be accomplished.
سؤال
Two types of control are used extensively on projects: steering control and go / no go control.
سؤال
When reporting performance to sponsors and management,it is often helpful to organize the information in terms of three time periods: the past,the current and the future.
سؤال
A control limit is what the customer will accept,whereas a tolerance limit reflects what the process can consistently deliver when things are behaving normally.
سؤال
Detailed project progress should be reported to stakeholders and clients frequently - typically on a daily basis.
سؤال
Some scope changes start as proposed changes to cost or schedule,just as some changes to cost or schedule start as proposed scope changes.
سؤال
Meetings and reports are two common approaches that project managers can adopt to report project performance to sponsors,management and clients.
سؤال
The purpose of a check sheet is to quickly understand the primary causes of a particular problem using the 80/20 rule.
سؤال
When discrepancies are identified during a project quality audit,the presumption must be that workers failed to comply with procedures and should be reprimanded accordingly.
سؤال
It is often costly,difficult or even impossible to inspect an entire sample. When that is the case,it is best to inspect the population.
سؤال
It is possible for a project to be both behind schedule and under budget at the same time.
سؤال
Report Performance is the process of collecting and distributing performance information and typically includes all of the following EXCEPT:

A) status reporting.
B) managing stakeholder expectations
C) forecasting.
D) progress measurement.
سؤال
Benchmarking generally includes all of the following steps EXCEPT:

A) using management by objectives
B) active participation from another organization
C) adaptation and adoption of new or improved methods
D) determination of a process that needs dramatic improvement
سؤال
<strong>  Figure 14.1 Drug Surveillance Aircraft Project - Monthly Performance Report (October 31, 20XX) Consider the project performance report presented in figure 14.1. What valid conclusion can you draw regarding the project cost performance as of October 31,20XX?</strong> A) The project is $8,000 over budget. B) The project is $18,000 over budget. C) The project is on budget. D) The project is $26,000 under budget. <div style=padding-top: 35px>
Figure 14.1 Drug Surveillance Aircraft Project - Monthly Performance Report
(October 31, 20XX)
Consider the project performance report presented in figure 14.1. What valid conclusion can you draw regarding the project cost performance as of October 31,20XX?

A) The project is $8,000 over budget.
B) The project is $18,000 over budget.
C) The project is on budget.
D) The project is $26,000 under budget.
سؤال
Project managers interested in controlling quality on projects will often concentrate upon project inputs. Which of the following are important considerations for the project managers concentrating on inputs to ensure project quality?

A) ensure the workers assigned are capable of doing their work
B) ensure that rework is kept to a minimum
C) ensure that internal and external inspections are conducted
D) ensure that all outsourced deliverables are validated
سؤال
All of the following accurately describe the trade-offs that must be managed while accomplishing project work EXCEPT:

A) When confronted with trade-offs between cost, schedule and quality, quality should always come first
B) Team members must address trade-offs between cost, schedule and quality.
C) Sponsors may need to help project managers secure additional resources when confronted by trade-offs.
D) Team members must often make trade-offs between the current project and other higher priority projects.
سؤال
Which of the following tools is displayed as a special type of scatter diagram used to see how a variable of interest changes over time?

A) flow chart
B) cause and effect diagram
C) check sheet
D) run chart
سؤال
Change control includes which of the following activities?

A) identifying, documenting, approving or rejecting, and controlling changes to project baselines
B) brainstorming, selecting and implementing new ideas
C) recruiting, selecting and training new team members
D) identifying and implementing changes to the project charter
سؤال
Some organizations rely upon a formally constituted group of stakeholders to review,evaluate and approve changes to the project. This group is typically known as a:

A) stakeholder review board.
B) change control board.
C) project evaluation committee.
D) steering committee
سؤال
Which of the following serves as an important guideline concerning project inspections?

A) inspect after critical or expensive processes to make sure the inputs are good
B) inspect prior to key work handoff points
C) inspect at milestones identified in the project schedule
D) inspect only as a last resort
سؤال
The Budget at Completion (BAC)is the sum of all budgeted values established for the work to be performed on a project.As such it is equivalent to:

A) the total planned value of the project.
B) the total earned value of the project.
C) the total actual cost of the project.
D) the total value of the work completed to date
سؤال
The process of reviewing all change requests,approving changes and controlling changes to deliverables and organizational process assets is known as:

A) project monitoring.
B) variance analysis and control.
C) integrated change control.
D) configuration management
سؤال
When a project manager asks clarifying questions and paraphrases what is being communicated to them,he or she is using ?

A) Passive listening
B) Active listening
C) Information gathering techniques
D) Soft skills
سؤال
Which of the following are appropriate lessons that should guide the information distribution practices of project managers in the information age?

A) target communications to as many people as possible
B) replace communication methods as soon as new methods emerge
C) use the communication plan and always monitor additional communication needs
D) emails should be the only form of communications
سؤال
One useful method of process improvement involves consideration of how another organization performs a process with an eye toward determining how to improve your own performance. This method is known as:

A) comparative improvement.
B) benchmarking.
C) variance analysis.
D) sensitivity analysis
سؤال
<strong>  Figure 14.1 Drug Surveillance Aircraft Project - Monthly Performance Report (October 31, 20XX) Consider the project performance report presented in figure 14.1. What valid conclusion can you draw regarding the project schedule performance as of October 31,20XX?</strong> A) The project is $18,000 behind schedule. B) The project is $26,000 behind schedule. C) The project is 18 days behind schedule. D) The project is $26,000 ahead of schedule. <div style=padding-top: 35px>
Figure 14.1 Drug Surveillance Aircraft Project - Monthly Performance Report
(October 31, 20XX)
Consider the project performance report presented in figure 14.1. What valid conclusion can you draw regarding the project schedule performance as of October 31,20XX?

A) The project is $18,000 behind schedule.
B) The project is $26,000 behind schedule.
C) The project is 18 days behind schedule.
D) The project is $26,000 ahead of schedule.
سؤال
<strong>  Figure 14.1 Drug Surveillance Aircraft Project - Monthly Performance Report (October 31, 20XX) Consider the project performance report presented in figure 14.1. Your analyst has determined that your estimate to complete (ETC)is $226,000. Based on your performance to date and assuming future performance will proceed at the same level of efficiency as past performance,what is your estimate at completion (EAC)?</strong> A) $542,000 B) $550,000 C) $568,000 D) It can not be determined from the information provided. <div style=padding-top: 35px>
Figure 14.1 Drug Surveillance Aircraft Project - Monthly Performance Report
(October 31, 20XX)
Consider the project performance report presented in figure 14.1. Your analyst has determined that your estimate to complete (ETC)is $226,000. Based on your performance to date and assuming future performance will proceed at the same level of efficiency as past performance,what is your estimate at completion (EAC)?

A) $542,000
B) $550,000
C) $568,000
D) It can not be determined from the information provided.
سؤال
All of the following accurately describe earned value management EXCEPT:

A) It is used to objectively measure project performance and progress.
B) It enables a project team to understand progress in terms of both cost and schedule.
C) It is good for performance reporting but not for forecasting
D) It is in essence a decision-making tool.
سؤال
While the project is underway,effective information distribution often requires the project manager and team to accomplish all of the following activities EXCEPT:

A) determine any information needs beyond those addressed in the communication plan
B) establish an information retrieval and distribution system
C) report progress to all stakeholders
D) conduct stand-up meetings to maximize efficiency
سؤال
<strong>  Figure 14.1 Drug Surveillance Aircraft Project - Monthly Performance Report (October 31, 20XX) Consider the project performance report presented in figure 14.1. As a project manager,these results should lead you to...</strong> A) take actions to understand and remedy the schedule performance on the active avionics work packages. B) take actions to understand and resolve budgetary overruns on the active communications work packages. C) take actions to understand and remedy the schedule performance on the active training work packages. D) notify the project owner that you will not require all of the funding currently budgeted for this project. <div style=padding-top: 35px>
Figure 14.1 Drug Surveillance Aircraft Project - Monthly Performance Report
(October 31, 20XX)
Consider the project performance report presented in figure 14.1. As a project manager,these results should lead you to...

A) take actions to understand and remedy the schedule performance on the active avionics work packages.
B) take actions to understand and resolve budgetary overruns on the active communications work packages.
C) take actions to understand and remedy the schedule performance on the active training work packages.
D) notify the project owner that you will not require all of the funding currently budgeted for this project.
سؤال
All of the following accurately apply to project performance reporting EXCEPT:

A) Performance reporting includes meetings, reports and documentation.
B) Performance can be reported at fixed intervals or at key milestones.
C) Progress can be reported at varying degrees of frequency.
D) The same report format should be used for all stakeholders
سؤال
Describe how you would adopt a balanced score card approach to evaluate your project performance. Your response should identify specific measures you would use as well as the approach you would take to obtain the measures you identify.
سؤال
Identify a business process that is often critical to project success. Now describe the approach you would employ to improve the business process you identified.
سؤال
Describe the essential aspects of integrated change control.
سؤال
Which of the following measures is best suited for determining whether the project is on,ahead or behind schedule?

A) Estimate to Complete (ETC)
B) Schedule Variance (SV)
C) To Complete Performance Index (TCPI)
D) Schedule Compliance (SC)
سؤال
Your most recent project performance report indicates that your cumulative Schedule Performance Index (SPI)is .85 and your cumulative Cost Performance Index (CPI)is .90. What conclusions can you draw from these performance indices? What actions might you take to address project performance based on these results?
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/45
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 14: Determining Project Progress and Results
1
When using a control chart,a point that occurs above the upper control limit typically means the variation is enough that it is not likely to have happened purely by chance - rather some sort of special cause explains the variation.
True
2
The purpose of quality control on projects is to reduce the number of defects in deliverables rather than to improve the project process.
False
3
During project execution,monitoring refers to the act of comparing actual performance with planned performance and taking corrective action when needed.
False
4
When using earned value techniques,Actual Cost (AC)refers to the total costs actually incurred and recorded in accomplishing work performed during a given time period.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
5
Inspection is keeping errors out of process while prevention is trying to find errors so they do not get to the customer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
6
The concept behind a balanced scorecard is that an organization needs to be evaluated along supplier,external business,risk and human resource perspectives.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
7
The Cost Variance (CV)is a measure of cost efficiency on a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
8
When project managers authorize project work,they should empower others to the extent possible,yet control to the extent necessary.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
9
The Schedule Performance Index (SPI)is a measure of schedule efficiency on a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
10
Earned Value (EV)is the authorized budget assigned to the scheduled work to be accomplished.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
11
Two types of control are used extensively on projects: steering control and go / no go control.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
12
When reporting performance to sponsors and management,it is often helpful to organize the information in terms of three time periods: the past,the current and the future.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
13
A control limit is what the customer will accept,whereas a tolerance limit reflects what the process can consistently deliver when things are behaving normally.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
14
Detailed project progress should be reported to stakeholders and clients frequently - typically on a daily basis.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
15
Some scope changes start as proposed changes to cost or schedule,just as some changes to cost or schedule start as proposed scope changes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
16
Meetings and reports are two common approaches that project managers can adopt to report project performance to sponsors,management and clients.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
17
The purpose of a check sheet is to quickly understand the primary causes of a particular problem using the 80/20 rule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
18
When discrepancies are identified during a project quality audit,the presumption must be that workers failed to comply with procedures and should be reprimanded accordingly.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
19
It is often costly,difficult or even impossible to inspect an entire sample. When that is the case,it is best to inspect the population.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
20
It is possible for a project to be both behind schedule and under budget at the same time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
21
Report Performance is the process of collecting and distributing performance information and typically includes all of the following EXCEPT:

A) status reporting.
B) managing stakeholder expectations
C) forecasting.
D) progress measurement.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
22
Benchmarking generally includes all of the following steps EXCEPT:

A) using management by objectives
B) active participation from another organization
C) adaptation and adoption of new or improved methods
D) determination of a process that needs dramatic improvement
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
23
<strong>  Figure 14.1 Drug Surveillance Aircraft Project - Monthly Performance Report (October 31, 20XX) Consider the project performance report presented in figure 14.1. What valid conclusion can you draw regarding the project cost performance as of October 31,20XX?</strong> A) The project is $8,000 over budget. B) The project is $18,000 over budget. C) The project is on budget. D) The project is $26,000 under budget.
Figure 14.1 Drug Surveillance Aircraft Project - Monthly Performance Report
(October 31, 20XX)
Consider the project performance report presented in figure 14.1. What valid conclusion can you draw regarding the project cost performance as of October 31,20XX?

A) The project is $8,000 over budget.
B) The project is $18,000 over budget.
C) The project is on budget.
D) The project is $26,000 under budget.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
24
Project managers interested in controlling quality on projects will often concentrate upon project inputs. Which of the following are important considerations for the project managers concentrating on inputs to ensure project quality?

A) ensure the workers assigned are capable of doing their work
B) ensure that rework is kept to a minimum
C) ensure that internal and external inspections are conducted
D) ensure that all outsourced deliverables are validated
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
25
All of the following accurately describe the trade-offs that must be managed while accomplishing project work EXCEPT:

A) When confronted with trade-offs between cost, schedule and quality, quality should always come first
B) Team members must address trade-offs between cost, schedule and quality.
C) Sponsors may need to help project managers secure additional resources when confronted by trade-offs.
D) Team members must often make trade-offs between the current project and other higher priority projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
26
Which of the following tools is displayed as a special type of scatter diagram used to see how a variable of interest changes over time?

A) flow chart
B) cause and effect diagram
C) check sheet
D) run chart
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
27
Change control includes which of the following activities?

A) identifying, documenting, approving or rejecting, and controlling changes to project baselines
B) brainstorming, selecting and implementing new ideas
C) recruiting, selecting and training new team members
D) identifying and implementing changes to the project charter
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
28
Some organizations rely upon a formally constituted group of stakeholders to review,evaluate and approve changes to the project. This group is typically known as a:

A) stakeholder review board.
B) change control board.
C) project evaluation committee.
D) steering committee
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
29
Which of the following serves as an important guideline concerning project inspections?

A) inspect after critical or expensive processes to make sure the inputs are good
B) inspect prior to key work handoff points
C) inspect at milestones identified in the project schedule
D) inspect only as a last resort
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
30
The Budget at Completion (BAC)is the sum of all budgeted values established for the work to be performed on a project.As such it is equivalent to:

A) the total planned value of the project.
B) the total earned value of the project.
C) the total actual cost of the project.
D) the total value of the work completed to date
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
31
The process of reviewing all change requests,approving changes and controlling changes to deliverables and organizational process assets is known as:

A) project monitoring.
B) variance analysis and control.
C) integrated change control.
D) configuration management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
32
When a project manager asks clarifying questions and paraphrases what is being communicated to them,he or she is using ?

A) Passive listening
B) Active listening
C) Information gathering techniques
D) Soft skills
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
33
Which of the following are appropriate lessons that should guide the information distribution practices of project managers in the information age?

A) target communications to as many people as possible
B) replace communication methods as soon as new methods emerge
C) use the communication plan and always monitor additional communication needs
D) emails should be the only form of communications
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
34
One useful method of process improvement involves consideration of how another organization performs a process with an eye toward determining how to improve your own performance. This method is known as:

A) comparative improvement.
B) benchmarking.
C) variance analysis.
D) sensitivity analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
35
<strong>  Figure 14.1 Drug Surveillance Aircraft Project - Monthly Performance Report (October 31, 20XX) Consider the project performance report presented in figure 14.1. What valid conclusion can you draw regarding the project schedule performance as of October 31,20XX?</strong> A) The project is $18,000 behind schedule. B) The project is $26,000 behind schedule. C) The project is 18 days behind schedule. D) The project is $26,000 ahead of schedule.
Figure 14.1 Drug Surveillance Aircraft Project - Monthly Performance Report
(October 31, 20XX)
Consider the project performance report presented in figure 14.1. What valid conclusion can you draw regarding the project schedule performance as of October 31,20XX?

A) The project is $18,000 behind schedule.
B) The project is $26,000 behind schedule.
C) The project is 18 days behind schedule.
D) The project is $26,000 ahead of schedule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
36
<strong>  Figure 14.1 Drug Surveillance Aircraft Project - Monthly Performance Report (October 31, 20XX) Consider the project performance report presented in figure 14.1. Your analyst has determined that your estimate to complete (ETC)is $226,000. Based on your performance to date and assuming future performance will proceed at the same level of efficiency as past performance,what is your estimate at completion (EAC)?</strong> A) $542,000 B) $550,000 C) $568,000 D) It can not be determined from the information provided.
Figure 14.1 Drug Surveillance Aircraft Project - Monthly Performance Report
(October 31, 20XX)
Consider the project performance report presented in figure 14.1. Your analyst has determined that your estimate to complete (ETC)is $226,000. Based on your performance to date and assuming future performance will proceed at the same level of efficiency as past performance,what is your estimate at completion (EAC)?

A) $542,000
B) $550,000
C) $568,000
D) It can not be determined from the information provided.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
37
All of the following accurately describe earned value management EXCEPT:

A) It is used to objectively measure project performance and progress.
B) It enables a project team to understand progress in terms of both cost and schedule.
C) It is good for performance reporting but not for forecasting
D) It is in essence a decision-making tool.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
38
While the project is underway,effective information distribution often requires the project manager and team to accomplish all of the following activities EXCEPT:

A) determine any information needs beyond those addressed in the communication plan
B) establish an information retrieval and distribution system
C) report progress to all stakeholders
D) conduct stand-up meetings to maximize efficiency
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
39
<strong>  Figure 14.1 Drug Surveillance Aircraft Project - Monthly Performance Report (October 31, 20XX) Consider the project performance report presented in figure 14.1. As a project manager,these results should lead you to...</strong> A) take actions to understand and remedy the schedule performance on the active avionics work packages. B) take actions to understand and resolve budgetary overruns on the active communications work packages. C) take actions to understand and remedy the schedule performance on the active training work packages. D) notify the project owner that you will not require all of the funding currently budgeted for this project.
Figure 14.1 Drug Surveillance Aircraft Project - Monthly Performance Report
(October 31, 20XX)
Consider the project performance report presented in figure 14.1. As a project manager,these results should lead you to...

A) take actions to understand and remedy the schedule performance on the active avionics work packages.
B) take actions to understand and resolve budgetary overruns on the active communications work packages.
C) take actions to understand and remedy the schedule performance on the active training work packages.
D) notify the project owner that you will not require all of the funding currently budgeted for this project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
40
All of the following accurately apply to project performance reporting EXCEPT:

A) Performance reporting includes meetings, reports and documentation.
B) Performance can be reported at fixed intervals or at key milestones.
C) Progress can be reported at varying degrees of frequency.
D) The same report format should be used for all stakeholders
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
41
Describe how you would adopt a balanced score card approach to evaluate your project performance. Your response should identify specific measures you would use as well as the approach you would take to obtain the measures you identify.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
42
Identify a business process that is often critical to project success. Now describe the approach you would employ to improve the business process you identified.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
43
Describe the essential aspects of integrated change control.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
44
Which of the following measures is best suited for determining whether the project is on,ahead or behind schedule?

A) Estimate to Complete (ETC)
B) Schedule Variance (SV)
C) To Complete Performance Index (TCPI)
D) Schedule Compliance (SC)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
45
Your most recent project performance report indicates that your cumulative Schedule Performance Index (SPI)is .85 and your cumulative Cost Performance Index (CPI)is .90. What conclusions can you draw from these performance indices? What actions might you take to address project performance based on these results?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.