Deck 8: Supplement: Job Scheduling and Vehicle Routing

ملء الشاشة (f)
exit full mode
سؤال
In a flow management context, customer orders are referred to as?

A) Actions
B) Jobs
C) Tasks
D) Projects
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Short production runs have what effect on the amount of average WIP held?

A) Increased amount of WIP
B) Decreased amount of WIP
C) No change to amount of WIP
D) It is impossible to determine the effect of short production runs on the amount of WIP
سؤال
If I is the input rate and O is the output rate, what happens when I < O?

A) WIP decreases
B) WIP increases
C) WIP remains constant
D) I and O are not related to the WIP
سؤال
If I is the input rate and O is the output rate, what happens when I > O?

A) WIP decreases
B) WIP increases
C) WIP remains constant
D) I and O are not related to the WIP
سؤال
Having high quality schedules for delivery vehicles can lead to?

A) Lower in-transit inventories
B) More on-time deliveries
C) Both lower in-transit inventories and more on-time deliveries
D) Neither lower in-transit inventories nor more on-time deliveries
سؤال
The primary scheduling objective(s) in a product-focused system is(are)?

A) Smooth flow of goods
B) High equipment/labor utilization
C) Both smooth flow of goods and high equipment/labor utilization
D) Neither smooth flow of goods nor high equipment/labor utilization
سؤال
Input and output control refers to?

A) Quality assurance of materials and completed goods
B) Management of input and output production flow rates
C) Proper training of employees for customer service
D) Handling of customer service calls at a call center
سؤال
If WIP levels are reasonable and product flow is steady, then the input rate for a job shop should be?

A) Equal to the daily output rate
B) Less than the daily output rate
C) More than the daily output rate
D) WIP and input rate are unrelated
سؤال
The primary scheduling issue in a product-focused facility is?

A) Fixed model sequencing
B) Constant model sequencing
C) Production model sequencing
D) Mixed model sequencing
سؤال
The orders of some important customers may be?

A) Given processing priority
B) Intentionally delayed
C) Refused
D) Placed at the end of the order queue
سؤال
The ability to produce a wide variety of product types is referred to as?

A) Production mapping
B) Production prowess
C) Production flexibility
D) Production differentiation
سؤال
Short production runs have what effect on the number of machine setups?

A) Increased number of setups
B) Decreased number of setups
C) No change to number of setups
D) It is impossible to determine the effect of short production runs on the number of setups
سؤال
Effectively scheduling jobs can result in all of the following except?

A) Reduced inventory carrying costs
B) Decreased queuing delays
C) Increased employee productivity
D) Decreased customer satisfaction
سؤال
If a job shop is underutilized, then the input rate for a job shop should be?

A) Equal to the daily output rate
B) Less than the daily output rate
C) More than the daily output rate
D) WIP and input rate are unrelated
سؤال
Completing more jobs per period can be achieved by?

A) Working on longer jobs first
B) Working on shorter jobs first
C) Working on random jobs first
D) Working on jobs does not influence job completion rate
سؤال
Short production runs have what effect on flexibility?

A) Decreased flexibility
B) Increased flexibility
C) No change to flexibility
D) It is impossible to determine the effect of short production runs on flexibility
سؤال
Accepting more work per period than can be completed per day results in all of the following except?

A) Increased WIP inventory
B) Increased shop congestion
C) Increased firm output rate
D) Increased job completion times
سؤال
All of the following may lead to delays except?

A) Machine breakdowns
B) Poor material quality
C) Processing errors
D) Routine maintenance
سؤال
Planning production that takes into account the demand for several product models is referred to as?

A) Mixed-component assembly line sequencing
B) Mixed-model assembly line sequencing
C) Mixed-inventory assembly line sequencing
D) Mixed-product assembly line sequencing
سؤال
If a job shop is heavily congested, then the input rate for a job shop should be?

A) Equal to the daily output rate
B) Less than the daily output rate
C) More than the daily output rate
D) WIP and input rate are unrelated
سؤال
The average of flow time minus processing time is?

A) Makespan
B) Average flow time
C) Average job tardiness
D) Average queue time
سؤال
If I is the input rate and O is the output rate, what happens when I = O?

A) WIP decreases
B) WIP increases
C) WIP remains constant
D) I and O are not related to the WIP
سؤال
Which job shop dispatch rule schedules the job with the earliest due date first?

A) CR
B) SPT
C) EDD
D) FCFS
سؤال
Two jobs (J1 and J2) are scheduled on two workcenters (WCA and WCB). J1 starts at time 0 on WCA and finishes on that workcenter at time 5. J2 starts at time 0 on WCB and finishes at time 3. J2 then starts on WCA at time 5 and finishes at time 9. J1 has a due date of time 6 and J2 has a due date of time 7. What is the lateness of J2?

A) 0
B) 1
C) 2
D) 4
سؤال
Two jobs (J1 and J2) are scheduled on two workcenters (WCA and WCB). J1 starts at time 0 on WCA and finishes on that workcenter at time 5. J2 starts at time 0 on WCB and finishes at time 3. J2 then starts on WCA at time 5 and finishes at time 9. What is the average flow time of these jobs?

A) 0
B) 7
C) 14
D) Cannot be determined from the information given
سؤال
Two jobs (J1 and J2) are scheduled on two workcenters (WCA and WCB). J1 starts at time 0 on WCA and finishes on that workcenter at time 5. J2 starts at time 0 on WCB and finishes at time 3. J2 then starts on WCA at time 5 and finishes at time 9. J1 has a due date of time 6 and J2 has a due date of time 7. What is the lateness of J1?

A) 0
B) 1
C) 2
D) 4
سؤال
A simple, one-vehicle routing problem with the vehicle starting and ending its route at the same node is referred to as?

A) Vehicle routing
B) Traveling salesman problem
C) Mixed-mode routing problem
D) Pickup and delivery problem
سؤال
Two jobs (J1 and J2) are scheduled on two workcenters (WCA and WCB). J1 starts at time 0 on WCA and finishes on that workcenter at time 5. J2 starts at time 0 on WCB and finishes at time 3. J2 then starts on WCA at time 5 and finishes at time 9. What is the makespan of these jobs?

A) 0
B) 5
C) 9
D) Cannot be determined from the information given
سؤال
Two jobs (J1 and J2) are scheduled on two workcenters (WCA and WCB). J1 starts at time 0 on WCA and finishes on that workcenter at time 5. J2 starts at time 0 on WCB and finishes at time 3. J2 then starts on WCA at time 5 and finishes at time 9. J1 has a due date of time 6 and J2 has a due date of time 7. What is the tardiness of J2?

A) 0
B) 1
C) 2
D) 4
سؤال
What type of chart is often used for forward scheduling?

A) Gary
B) Gravity
C) Garage
D) Gantt
سؤال
Which job shop dispatch rule tends to work well to minimize average flow time?

A) CR
B) SPT
C) EDD
D) FCFS
سؤال
Two jobs (J1 and J2) are to be scheduled on a single workcenter. J1 has a process time of 5 and J2 has a process time of 3. J1 has a due date of time 6 and J2 has a due date of time 7. If the jobs are scheduled by the EDD rule, in what order will they be processed?

A) J2 then J1
B) J1 then J2
C) Random order
D) The EDD rule is not related to processing order
سؤال
Scheduling jobs into the future based upon job arrival date refers to?

A) Backward scheduling
B) Forward scheduling
C) Inverse scheduling
D) Advance scheduling
سؤال
Two jobs (J1 and J2) are scheduled on two workcenters (WCA and WCB). J1 starts at time 0 on WCA and finishes on that workcenter at time 5. J2 starts at time 0 on WCB and finishes at time 3. J2 then starts on WCA at time 5 and finishes at time 9. What is the average queue time of these jobs?

A) 0
B) 1
C) 2
D) Cannot be determined from the information given
سؤال
What type of rules determine which job to process next from a queue of waiting jobs?

A) Delivery
B) Distance
C) Dispatch
D) Distribution
سؤال
Two jobs (J1 and J2) are to be scheduled on a single workcenter. J1 has a process time of 5 and J2 has a process time of 3. J1 has a due date of time 6 and J2 has a due date of time 7. If the jobs are scheduled by the SPT rule, in what order will they be processed?

A) J2 then J1
B) J1 then J2
C) Random order
D) The SPT rule is not related to processing order
سؤال
Which job shop dispatch rule schedules the job with the shortest process time first?

A) CR
B) SPT
C) EDD
D) FCFS
سؤال
The average amount of time a job finishes past the due date is?

A) Makespan
B) Average flow time
C) Average job tardiness
D) Average queue time
سؤال
The total elapsed time to complete a group of jobs is?

A) Makespan
B) Average flow time
C) Average job tardiness
D) Average queue time
سؤال
Two jobs (J1 and J2) are scheduled on two workcenters (WCA and WCB). J1 starts at time 0 on WCA and finishes on that workcenter at time 5. J2 starts at time 0 on WCB and finishes at time 3. J2 then starts on WCA at time 5 and finishes at time 9. J1 has a due date of time 6 and J2 has a due date of time 7. What is the tardiness of J1?

A) 0
B) 1
C) 2
D) 4
سؤال
In a job shop, ________ are used to identify incoming materials and purchases that may be behind schedule.
سؤال
There are rarely scheduling issues in an assembly line.
سؤال
Describe why a firm utilizing assembly lines may wish to utilize shorter production runs. What disadvantages might such an approach pose?
سؤال
Vehicle routing problems typically involve only a single objective.
سؤال
It is often advantageous for a firm to be able to build multiple models on the same assembly line.
سؤال
Customer orders, in a flow management context, are often referred to as jobs.
سؤال
Describe the challenges faced when scheduling jobs in a product-focused production system.
سؤال
The FCFS job shop dispatch rule has been shown to work very well under controlled conditions.
سؤال
The _________ and _________ Savings Heuristic builds vehicle routes by considering savings achieved by combining two nodes onto a single tour.

A) Hill and Lam
B) Scott and Palmer
C) Dantzig and Deming
D) Clark and Wright
سؤال
Briefly describe the relative advantages and disadvantages of the various dispatching rules listed in the textbook. Why might a firm wish to choose one rule over another?
سؤال
Shorter production runs tend to decrease production flexibility.
سؤال
Short production runs typically result in _______ WIP inventories.
سؤال
Short production run tend to result in _________ machine setups.
سؤال
In a vehicle routing problem _________ represent origin/destination points and pickup and/or delivery points.
سؤال
Heuristic approaches to vehicle routing problems are guaranteed to find the best (optimal) routes.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/55
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 8: Supplement: Job Scheduling and Vehicle Routing
1
In a flow management context, customer orders are referred to as?

A) Actions
B) Jobs
C) Tasks
D) Projects
B
2
Short production runs have what effect on the amount of average WIP held?

A) Increased amount of WIP
B) Decreased amount of WIP
C) No change to amount of WIP
D) It is impossible to determine the effect of short production runs on the amount of WIP
B
3
If I is the input rate and O is the output rate, what happens when I < O?

A) WIP decreases
B) WIP increases
C) WIP remains constant
D) I and O are not related to the WIP
A
4
If I is the input rate and O is the output rate, what happens when I > O?

A) WIP decreases
B) WIP increases
C) WIP remains constant
D) I and O are not related to the WIP
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
5
Having high quality schedules for delivery vehicles can lead to?

A) Lower in-transit inventories
B) More on-time deliveries
C) Both lower in-transit inventories and more on-time deliveries
D) Neither lower in-transit inventories nor more on-time deliveries
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
6
The primary scheduling objective(s) in a product-focused system is(are)?

A) Smooth flow of goods
B) High equipment/labor utilization
C) Both smooth flow of goods and high equipment/labor utilization
D) Neither smooth flow of goods nor high equipment/labor utilization
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
7
Input and output control refers to?

A) Quality assurance of materials and completed goods
B) Management of input and output production flow rates
C) Proper training of employees for customer service
D) Handling of customer service calls at a call center
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
8
If WIP levels are reasonable and product flow is steady, then the input rate for a job shop should be?

A) Equal to the daily output rate
B) Less than the daily output rate
C) More than the daily output rate
D) WIP and input rate are unrelated
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
9
The primary scheduling issue in a product-focused facility is?

A) Fixed model sequencing
B) Constant model sequencing
C) Production model sequencing
D) Mixed model sequencing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
10
The orders of some important customers may be?

A) Given processing priority
B) Intentionally delayed
C) Refused
D) Placed at the end of the order queue
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
11
The ability to produce a wide variety of product types is referred to as?

A) Production mapping
B) Production prowess
C) Production flexibility
D) Production differentiation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
12
Short production runs have what effect on the number of machine setups?

A) Increased number of setups
B) Decreased number of setups
C) No change to number of setups
D) It is impossible to determine the effect of short production runs on the number of setups
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
13
Effectively scheduling jobs can result in all of the following except?

A) Reduced inventory carrying costs
B) Decreased queuing delays
C) Increased employee productivity
D) Decreased customer satisfaction
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
14
If a job shop is underutilized, then the input rate for a job shop should be?

A) Equal to the daily output rate
B) Less than the daily output rate
C) More than the daily output rate
D) WIP and input rate are unrelated
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
15
Completing more jobs per period can be achieved by?

A) Working on longer jobs first
B) Working on shorter jobs first
C) Working on random jobs first
D) Working on jobs does not influence job completion rate
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
16
Short production runs have what effect on flexibility?

A) Decreased flexibility
B) Increased flexibility
C) No change to flexibility
D) It is impossible to determine the effect of short production runs on flexibility
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
17
Accepting more work per period than can be completed per day results in all of the following except?

A) Increased WIP inventory
B) Increased shop congestion
C) Increased firm output rate
D) Increased job completion times
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
18
All of the following may lead to delays except?

A) Machine breakdowns
B) Poor material quality
C) Processing errors
D) Routine maintenance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
19
Planning production that takes into account the demand for several product models is referred to as?

A) Mixed-component assembly line sequencing
B) Mixed-model assembly line sequencing
C) Mixed-inventory assembly line sequencing
D) Mixed-product assembly line sequencing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
20
If a job shop is heavily congested, then the input rate for a job shop should be?

A) Equal to the daily output rate
B) Less than the daily output rate
C) More than the daily output rate
D) WIP and input rate are unrelated
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
21
The average of flow time minus processing time is?

A) Makespan
B) Average flow time
C) Average job tardiness
D) Average queue time
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
22
If I is the input rate and O is the output rate, what happens when I = O?

A) WIP decreases
B) WIP increases
C) WIP remains constant
D) I and O are not related to the WIP
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
23
Which job shop dispatch rule schedules the job with the earliest due date first?

A) CR
B) SPT
C) EDD
D) FCFS
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
24
Two jobs (J1 and J2) are scheduled on two workcenters (WCA and WCB). J1 starts at time 0 on WCA and finishes on that workcenter at time 5. J2 starts at time 0 on WCB and finishes at time 3. J2 then starts on WCA at time 5 and finishes at time 9. J1 has a due date of time 6 and J2 has a due date of time 7. What is the lateness of J2?

A) 0
B) 1
C) 2
D) 4
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
25
Two jobs (J1 and J2) are scheduled on two workcenters (WCA and WCB). J1 starts at time 0 on WCA and finishes on that workcenter at time 5. J2 starts at time 0 on WCB and finishes at time 3. J2 then starts on WCA at time 5 and finishes at time 9. What is the average flow time of these jobs?

A) 0
B) 7
C) 14
D) Cannot be determined from the information given
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
26
Two jobs (J1 and J2) are scheduled on two workcenters (WCA and WCB). J1 starts at time 0 on WCA and finishes on that workcenter at time 5. J2 starts at time 0 on WCB and finishes at time 3. J2 then starts on WCA at time 5 and finishes at time 9. J1 has a due date of time 6 and J2 has a due date of time 7. What is the lateness of J1?

A) 0
B) 1
C) 2
D) 4
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
27
A simple, one-vehicle routing problem with the vehicle starting and ending its route at the same node is referred to as?

A) Vehicle routing
B) Traveling salesman problem
C) Mixed-mode routing problem
D) Pickup and delivery problem
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
28
Two jobs (J1 and J2) are scheduled on two workcenters (WCA and WCB). J1 starts at time 0 on WCA and finishes on that workcenter at time 5. J2 starts at time 0 on WCB and finishes at time 3. J2 then starts on WCA at time 5 and finishes at time 9. What is the makespan of these jobs?

A) 0
B) 5
C) 9
D) Cannot be determined from the information given
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
29
Two jobs (J1 and J2) are scheduled on two workcenters (WCA and WCB). J1 starts at time 0 on WCA and finishes on that workcenter at time 5. J2 starts at time 0 on WCB and finishes at time 3. J2 then starts on WCA at time 5 and finishes at time 9. J1 has a due date of time 6 and J2 has a due date of time 7. What is the tardiness of J2?

A) 0
B) 1
C) 2
D) 4
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
30
What type of chart is often used for forward scheduling?

A) Gary
B) Gravity
C) Garage
D) Gantt
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
31
Which job shop dispatch rule tends to work well to minimize average flow time?

A) CR
B) SPT
C) EDD
D) FCFS
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
32
Two jobs (J1 and J2) are to be scheduled on a single workcenter. J1 has a process time of 5 and J2 has a process time of 3. J1 has a due date of time 6 and J2 has a due date of time 7. If the jobs are scheduled by the EDD rule, in what order will they be processed?

A) J2 then J1
B) J1 then J2
C) Random order
D) The EDD rule is not related to processing order
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
33
Scheduling jobs into the future based upon job arrival date refers to?

A) Backward scheduling
B) Forward scheduling
C) Inverse scheduling
D) Advance scheduling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
34
Two jobs (J1 and J2) are scheduled on two workcenters (WCA and WCB). J1 starts at time 0 on WCA and finishes on that workcenter at time 5. J2 starts at time 0 on WCB and finishes at time 3. J2 then starts on WCA at time 5 and finishes at time 9. What is the average queue time of these jobs?

A) 0
B) 1
C) 2
D) Cannot be determined from the information given
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
35
What type of rules determine which job to process next from a queue of waiting jobs?

A) Delivery
B) Distance
C) Dispatch
D) Distribution
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
36
Two jobs (J1 and J2) are to be scheduled on a single workcenter. J1 has a process time of 5 and J2 has a process time of 3. J1 has a due date of time 6 and J2 has a due date of time 7. If the jobs are scheduled by the SPT rule, in what order will they be processed?

A) J2 then J1
B) J1 then J2
C) Random order
D) The SPT rule is not related to processing order
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
37
Which job shop dispatch rule schedules the job with the shortest process time first?

A) CR
B) SPT
C) EDD
D) FCFS
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
38
The average amount of time a job finishes past the due date is?

A) Makespan
B) Average flow time
C) Average job tardiness
D) Average queue time
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
39
The total elapsed time to complete a group of jobs is?

A) Makespan
B) Average flow time
C) Average job tardiness
D) Average queue time
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
40
Two jobs (J1 and J2) are scheduled on two workcenters (WCA and WCB). J1 starts at time 0 on WCA and finishes on that workcenter at time 5. J2 starts at time 0 on WCB and finishes at time 3. J2 then starts on WCA at time 5 and finishes at time 9. J1 has a due date of time 6 and J2 has a due date of time 7. What is the tardiness of J1?

A) 0
B) 1
C) 2
D) 4
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
41
In a job shop, ________ are used to identify incoming materials and purchases that may be behind schedule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
42
There are rarely scheduling issues in an assembly line.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
43
Describe why a firm utilizing assembly lines may wish to utilize shorter production runs. What disadvantages might such an approach pose?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
44
Vehicle routing problems typically involve only a single objective.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
45
It is often advantageous for a firm to be able to build multiple models on the same assembly line.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
46
Customer orders, in a flow management context, are often referred to as jobs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
47
Describe the challenges faced when scheduling jobs in a product-focused production system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
48
The FCFS job shop dispatch rule has been shown to work very well under controlled conditions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
49
The _________ and _________ Savings Heuristic builds vehicle routes by considering savings achieved by combining two nodes onto a single tour.

A) Hill and Lam
B) Scott and Palmer
C) Dantzig and Deming
D) Clark and Wright
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
50
Briefly describe the relative advantages and disadvantages of the various dispatching rules listed in the textbook. Why might a firm wish to choose one rule over another?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
51
Shorter production runs tend to decrease production flexibility.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
52
Short production runs typically result in _______ WIP inventories.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
53
Short production run tend to result in _________ machine setups.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
54
In a vehicle routing problem _________ represent origin/destination points and pickup and/or delivery points.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
55
Heuristic approaches to vehicle routing problems are guaranteed to find the best (optimal) routes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.