In today's hypercompetitive business environment, firms that have strong project management skills have a higher likelihood of success because they are able to:

A) Spend money wisely.
B) Adapt processes and systems and therefore innovate faster than their competitors.
C) Optimize business processes.
D) Change and adapt in a slow yet methodical manner, reducing risk.
E) Utilize social and mobile platforms.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The project triangle includes 3 sides: time, scope and:

A) cost
B) product
C) event
D) quality
E) requirements
سؤال
This project cycle plan chart looks very much like a bar chart and is easy for management to read because of its visual nature.

A) PERT
B) Gantt
C) CPM
D) NPV
E) Flowchart
سؤال
What is at the center of the project triangle?

A) Agility
B) Quality
C) Speed
D) Cost
E) Focus
سؤال
Which of the following is a temporary endeavor undertaken to create a unique product, service, or result?

A) project
B) event
C) scope
D) requirement
E) system
سؤال
Scope may be divided into product scope and __________ scope.

A) project
B) cost
C) time
D) time
E) sequence
سؤال
An organization may convert from an old system to a new system by choosing to run both the old and new systems at the same time until the new system is fully accepted. This is known as:

A) Cutover
B) Parallel conversion
C) Direct cutover
D) Agile development
E) SDLC
سؤال
Increasing project success requires gaining commitment from stakeholders. All of the following help to sustain that commitment for the life of the project EXCEPT:

A) Continually reminding stakeholders of the project benefits
B) Placing key stakeholders on the project team
C) Encouraging the project sponsor to provide public support for the project
D) Surprising the stakeholders by keeping the system's workings a secret
E) Assigning the right leader to be the project sponsor
سؤال
Which development methodology is more traditional and more structured than other approaches?

A) Agile programming
B) Prototyping
C) Open source deployment
D) Software development life cycle (SDLC)
E) Critical path method (CPM)
سؤال
Which of the following development approaches is an iterative, incremental approach that allows development teams to respond to the unpredictability of building and implementing software?

A) Prototyping
B) SDLC
C) DSDM
D) Agile software development
E) RAD
سؤال
To maintain balance in a project with a fixed budget and a well-defined scope, a project team will require flexibility:

A) with the deadline.
B) in spending.
C) with project quality.
D) with assumed risks.
E) in achieving the goals of the business case.
سؤال
What does PMO stand for?

A) Project Maintenance Office
B) Project Mission and Objectives
C) Product Maintenance Office
D) Project Mission Office
E) Project Management Office
سؤال
To help with organization and complexity, a project manager will break a project up into:

A) Variables
B) Business processes
C) Subprojects
D) Infrastructure
E) Work
سؤال
Which one of the following is NOT one of the four essential elements of any project?

A) Common project vocabulary
B) Project team
C) System evaluation
D) Project cycle plan
E) Project management
سؤال
What type of software is released under a license approved by the Open Source Initiative (OSI)?

A) System Architecture Software (SAS)
B) Open System Software (OSS)
C) Shareware Software (SS)
D) Open Source Software (OSS)
E) Source System Software (SSS)
سؤال
All of the following are indications that the project is successful EXCEPT:

A) Customers receive a significant benefit from the project.
B) The project meets its return on investment goal.
C) The project meets the established time and budget criteria.
D) The project prepares the organization for future success and growth.
E) The project profits are high and last for a very short time period.
سؤال
A successful project begins with a ____________ that articulates the purpose and details of the project, benefits and costs, stakeholders, and required resources.

A) project plan
B) Gantt chart
C) business case
D) dashboard
E) strategy
سؤال
To reduce risk, a project should have which one of the following qualities?

A) High complexity
B) High clarity
C) Big in size
D) Large in budget
E) Lots of programmers.
سؤال
Which one of the following software products is NOT an open source software release?

A) PERL
B) Open Office
C) Linux
D) Mozilla
E) Microsoft Office
سؤال
Open source software:

A) is free.
B) requires an organization pay a per user fee.
C) is costly.
D) is not allowed to be modified.
E) is provided by software vendors like Microsoft and SAP.
سؤال
All of the following are examples of agile software development methodologies EXCEPT:

A) Scrum
B) Lean
C) Feature-Driven Development
D) Extreme Programming (XP)
E) SDLC
سؤال
The riskiest approach to system implementation is a parallel conversion.
سؤال
A project is a permanent endeavor undertaken to create a unique product or service.
سؤال
To transform resources into profits, organizations combine two types of work-operations and ________.
سؤال
Integrating within the organization is a mechanism to manage project complexity, and includes frequent team meetings as an example.
سؤال
Strong project leadership can trade off against strong project management processes. That is, if the leader is not strong, then processes can be strengthened to make up for it. And if the processes are weak, a strong leader is needed.
سؤال
According to Brooks, adding extra personnel to a system project more often makes it later, not earlier.
سؤال
Adding more people to a project can be helpful, but most projects are not made more efficient by simply adding labor.
سؤال
Small projects that are low in complexity and low in clarity are low in risk.
سؤال
Project cost and schedule estimates should be made only using documented facts.
سؤال
In calling something a "project," the issues of uniqueness and temporariness are very important.
سؤال
A research firm found that a majority of software projects are delivered late or over budget or simply fail to meet expectations.
سؤال
A system development life cycle:

A) Assures us that as some systems die others are born in a sort of "circle of life."
B) Is a chain of events that count down to the demise of a system.
C) Illustrates the steps needed to go from one stage to another: for example, analysis to design to construction to implementation to operation to maintenance.
D) Specifies how to build a prototype quickly then improve on it.
E) Is a self-propelled ride at the "Technology Amusement Park" in San Francisco.
سؤال
Prototyping and RAD can be used to minimize problems of defining a scope that is too broad or narrow at the beginning of a project.
سؤال
All of the following are drawback of prototyping EXCEPT:

A) Additional costs may be needed to make a prototype into an operational version.
B) An operational version needs to be made using desktop tools rather than enterprise-level tools.
C) Frequent changes over time making documentation more difficult.
D) A prototyping development process is difficult to manage because it can be impossible to determine when the prototype is complete.
E) Integration of prototyping methodology is difficult when there is a broad range of requirements.
سؤال
The mantra for prototyping is "code a little, test a little."
سؤال
Open source software is free but often an organization will have to pay for training and technical support for the software.
سؤال
The maintenance and review phase is the longest phase of the software development lifecycle.
سؤال
If someone wants a system cheaply, quickly, and with a large scope, we can conclude:

A) That desire represents the three sides of the Project Triangle
B) This is normally not possible: you can usually only achieve two of those three objectives at a time.
C) Management might be providing an impossible goal.
D) All of the above
E) None of the above
سؤال
To support a common language and improve communication, a project manager should develop a private collection of acronyms and make frequent use of them.
سؤال
Agile development tends to be _______-oriented rather than process-oriented.
سؤال
Explain why IT projects are seen as just business projects involving significant amounts of technology.
سؤال
Two or more teams that work interdependently and interface with each other and with a common superordinate goal is working within a ____________system.
سؤال
____________is the term used to describe what happens when a project's scope increases after it has started.
سؤال
A good project manager defines a realistic project scope and then manages the project so that it can be completed on time and within _________.
سؤال
Why does the addition of more people to a project not speed up the project efforts?
سؤال
____________,____________ , and____________ are the three outside elements of the project triangle?
سؤال
How do companies manage risk? What are the factors that contribute to a high-risk project?
سؤال
Distinguish between the iterative approaches of prototyping and agile software development.
سؤال
____________are the individuals and organizations that are involved in or may be affected by a given project.
سؤال
Classify the following organizational activity as either operations or a project.
 Operations  Backing up the data repository to support business  continuity plarning.  Operations  Monitoring the perfornance of all information  systems and networks using a dashboard  Project  Provide a mobile application to employees that  allow then to post travel expenses and verify  reimbursenent payments  Project  Development of a CRM-like system to integrate  marketing and sales activities with activities of the  global supply chain.  Project  Reengineering of the sales order process to include  social network analysis. \begin{array} { | l | l | } \hline \text { Operations } & \begin{array} { l } \text { Backing up the data repository to support business } \\\text { continuity plarning. }\end{array} \\\hline \text { Operations } & \begin{array} { l } \text { Monitoring the perfornance of all information } \\\text { systems and networks using a dashboard }\end{array} \\\hline \text { Project } & \begin{array} { l } \text { Provide a mobile application to employees that } \\\text { allow then to post travel expenses and verify } \\\text { reimbursenent payments }\end{array} \\\hline \text { Project } & \begin{array} { l } \text { Development of a CRM-like system to integrate } \\\text { marketing and sales activities with activities of the } \\\text { global supply chain. }\end{array} \\\hline \text { Project } & \begin{array} { l } \text { Reengineering of the sales order process to include } \\\text { social network analysis. }\end{array} \\\hline\end{array}
سؤال
Project risk is a function of____________ ,____________ , and____________ .
سؤال
Identify an example of project management software and the features/functionality you would expect it to provide.
سؤال
____________is the department that develops project management skills, boosts efficiency for projects, and improves project delivery.
سؤال
____________is one example of open source software.
سؤال
Match the project responsibility as being that of the project manager or the project sponsor.
 Project sponsor  Liaison between the project tearn and the  project stakeholders  Project sponsor  Senior level project charnpion  Project manager  Assign tearn members to work on the project  Project manager  Marage project risk  Project manager  Measure the projects status  Project manager  Take corrective action when recessary \begin{array} { | l | l | } \hline \text { Project sponsor } & \begin{array} { l } \text { Liaison between the project tearn and the } \\\text { project stakeholders }\end{array} \\\hline \text { Project sponsor } & \text { Senior level project charnpion } \\\hline \text { Project manager } & \text { Assign tearn members to work on the project } \\\hline \text { Project manager } & \text { Marage project risk } \\\hline \text { Project manager } & \text { Measure the projects status } \\\hline \text { Project manager } & \text { Take corrective action when recessary } \\\hline\end{array}
سؤال
Explain why in a project only two of the three project elements (cost, time, and scoop) can be optimized and the third must be adjusted to maintain balance.
سؤال
Identify the following qualities as either being associated with operations or project work.
 Operations  Repetitive  Operations  Fornal quality control  Project  Pupose is to sustain the enterprise  Project  Termporary \begin{array} { | l | l | } \hline \text { Operations } & \text { Repetitive } \\\hline \text { Operations } & \text { Fornal quality control } \\\hline \text { Project } & \text { Pupose is to sustain the enterprise } \\\hline \text { Project } & \text { Termporary } \\\hline\end{array}
سؤال
____________organizes the discrete project activities and orders them along a timeline, identifying the critical beginning and ending dates as well as necessary time and resources.
سؤال
List some strategies a manager should consider when trying to manage a project's technical complexity.
سؤال
Match the development methodology with its characteristics.
 Agile development  Iterative, speedy, and active user  interaction  Prototyping  Evolutionary development that provides a  tarnible model to users early in the process  SDLC  Traditional and struetured \begin{array} { | l | l | } \hline \text { Agile development } & \begin{array} { l } \text { Iterative, speedy, and active user } \\\text { interaction }\end{array} \\\hline \text { Prototyping } & \begin{array} { l } \text { Evolutionary development that provides a } \\\text { tarnible model to users early in the process }\end{array} \\\hline \text { SDLC } & \text { Traditional and struetured } \\\hline\end{array}
سؤال
Match the description to the SDLC project phase it represents.
 Initiation and feasibility  Project is scoped, considered and planned.  Requirements definition  System specifications are identified and  documented.  Functional design  The system is designed in conceptual  terms.  Technical design and  construction  The system is built or a purchased system  is customized.  Verification  The system is reviewed to ensure it meets  requirements.  Implementation  The system is brought up for use.  Maintenance and review  The system is repaired and upgraded as  needed. \begin{array}{|l|l|}\hline \text { Initiation and feasibility } & \text { Project is scoped, considered and planned. } \\\hline \text { Requirements definition } & \begin{array}{l}\text { System specifications are identified and } \\\text { documented. }\end{array} \\\hline \text { Functional design } & \begin{array}{l}\text { The system is designed in conceptual } \\\text { terms. }\end{array} \\\hline \begin{array}{l}\text { Technical design and } \\\text { construction }\end{array} & \begin{array}{l}\text { The system is built or a purchased system } \\\text { is customized. }\end{array} \\\hline \text { Verification } & \begin{array}{l}\text { The system is reviewed to ensure it meets } \\\text { requirements. }\end{array} \\\hline \text { Implementation } & \text { The system is brought up for use. } \\\hline \text { Maintenance and review } & \begin{array}{l}\text { The system is repaired and upgraded as } \\\text { needed. }\end{array} \\\hline\end{array}
سؤال
Match the activity to the SDLC project phase to which it belongs.
 Initiation and feasibility  Costs are detailed and timeline developed.  Requirements definition  Identify user requirements  Functional design  Complete a detailed analysis of the new  system including data-flow diagrams.  Technical design and  construction  The system is built.  Verification  End users test the system for usability,  security and operability.  Implementation  The system "goes live."  Maintenance and review  Evaluate and monitor system usage,  making minor adjustments as needed. \begin{array}{|l|l|}\hline \text { Initiation and feasibility } & \text { Costs are detailed and timeline developed. } \\\hline \text { Requirements definition } & \text { Identify user requirements } \\\hline \text { Functional design } & \begin{array}{l}\text { Complete a detailed analysis of the new } \\\text { system including data-flow diagrams. }\end{array} \\\hline \begin{array}{l}\text { Technical design and } \\\text { construction }\end{array} & \text { The system is built. } \\\hline \text { Verification } & \begin{array}{l}\text { End users test the system for usability, } \\\text { security and operability. }\end{array} \\\hline \text { Implementation } & \text { The system "goes live." } \\\hline \text { Maintenance and review } & \begin{array}{l}\text { Evaluate and monitor system usage, } \\\text { making minor adjustments as needed. }\end{array} \\\hline\end{array}
سؤال
Match the three major project periods to Lewin's phases of the change model.
 Requirements period  Unfreezing  Development period  Charging  Production/distribution period  Refreezing \begin{array} { | l | l | } \hline \text { Requirements period } & \text { Unfreezing } \\\hline \text { Development period } & \text { Charging } \\\hline \text { Production/distribution period } & \text { Refreezing } \\\hline\end{array}
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/64
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 12: Managing It Projects
1
In today's hypercompetitive business environment, firms that have strong project management skills have a higher likelihood of success because they are able to:

A) Spend money wisely.
B) Adapt processes and systems and therefore innovate faster than their competitors.
C) Optimize business processes.
D) Change and adapt in a slow yet methodical manner, reducing risk.
E) Utilize social and mobile platforms.
B
2
The project triangle includes 3 sides: time, scope and:

A) cost
B) product
C) event
D) quality
E) requirements
A
3
This project cycle plan chart looks very much like a bar chart and is easy for management to read because of its visual nature.

A) PERT
B) Gantt
C) CPM
D) NPV
E) Flowchart
B
4
What is at the center of the project triangle?

A) Agility
B) Quality
C) Speed
D) Cost
E) Focus
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
5
Which of the following is a temporary endeavor undertaken to create a unique product, service, or result?

A) project
B) event
C) scope
D) requirement
E) system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
6
Scope may be divided into product scope and __________ scope.

A) project
B) cost
C) time
D) time
E) sequence
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
7
An organization may convert from an old system to a new system by choosing to run both the old and new systems at the same time until the new system is fully accepted. This is known as:

A) Cutover
B) Parallel conversion
C) Direct cutover
D) Agile development
E) SDLC
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
8
Increasing project success requires gaining commitment from stakeholders. All of the following help to sustain that commitment for the life of the project EXCEPT:

A) Continually reminding stakeholders of the project benefits
B) Placing key stakeholders on the project team
C) Encouraging the project sponsor to provide public support for the project
D) Surprising the stakeholders by keeping the system's workings a secret
E) Assigning the right leader to be the project sponsor
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
9
Which development methodology is more traditional and more structured than other approaches?

A) Agile programming
B) Prototyping
C) Open source deployment
D) Software development life cycle (SDLC)
E) Critical path method (CPM)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
10
Which of the following development approaches is an iterative, incremental approach that allows development teams to respond to the unpredictability of building and implementing software?

A) Prototyping
B) SDLC
C) DSDM
D) Agile software development
E) RAD
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
11
To maintain balance in a project with a fixed budget and a well-defined scope, a project team will require flexibility:

A) with the deadline.
B) in spending.
C) with project quality.
D) with assumed risks.
E) in achieving the goals of the business case.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
12
What does PMO stand for?

A) Project Maintenance Office
B) Project Mission and Objectives
C) Product Maintenance Office
D) Project Mission Office
E) Project Management Office
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
13
To help with organization and complexity, a project manager will break a project up into:

A) Variables
B) Business processes
C) Subprojects
D) Infrastructure
E) Work
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
14
Which one of the following is NOT one of the four essential elements of any project?

A) Common project vocabulary
B) Project team
C) System evaluation
D) Project cycle plan
E) Project management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
15
What type of software is released under a license approved by the Open Source Initiative (OSI)?

A) System Architecture Software (SAS)
B) Open System Software (OSS)
C) Shareware Software (SS)
D) Open Source Software (OSS)
E) Source System Software (SSS)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
16
All of the following are indications that the project is successful EXCEPT:

A) Customers receive a significant benefit from the project.
B) The project meets its return on investment goal.
C) The project meets the established time and budget criteria.
D) The project prepares the organization for future success and growth.
E) The project profits are high and last for a very short time period.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
17
A successful project begins with a ____________ that articulates the purpose and details of the project, benefits and costs, stakeholders, and required resources.

A) project plan
B) Gantt chart
C) business case
D) dashboard
E) strategy
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
18
To reduce risk, a project should have which one of the following qualities?

A) High complexity
B) High clarity
C) Big in size
D) Large in budget
E) Lots of programmers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
19
Which one of the following software products is NOT an open source software release?

A) PERL
B) Open Office
C) Linux
D) Mozilla
E) Microsoft Office
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
20
Open source software:

A) is free.
B) requires an organization pay a per user fee.
C) is costly.
D) is not allowed to be modified.
E) is provided by software vendors like Microsoft and SAP.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
21
All of the following are examples of agile software development methodologies EXCEPT:

A) Scrum
B) Lean
C) Feature-Driven Development
D) Extreme Programming (XP)
E) SDLC
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
22
The riskiest approach to system implementation is a parallel conversion.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
23
A project is a permanent endeavor undertaken to create a unique product or service.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
24
To transform resources into profits, organizations combine two types of work-operations and ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
25
Integrating within the organization is a mechanism to manage project complexity, and includes frequent team meetings as an example.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
26
Strong project leadership can trade off against strong project management processes. That is, if the leader is not strong, then processes can be strengthened to make up for it. And if the processes are weak, a strong leader is needed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
27
According to Brooks, adding extra personnel to a system project more often makes it later, not earlier.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
28
Adding more people to a project can be helpful, but most projects are not made more efficient by simply adding labor.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
29
Small projects that are low in complexity and low in clarity are low in risk.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
30
Project cost and schedule estimates should be made only using documented facts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
31
In calling something a "project," the issues of uniqueness and temporariness are very important.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
32
A research firm found that a majority of software projects are delivered late or over budget or simply fail to meet expectations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
33
A system development life cycle:

A) Assures us that as some systems die others are born in a sort of "circle of life."
B) Is a chain of events that count down to the demise of a system.
C) Illustrates the steps needed to go from one stage to another: for example, analysis to design to construction to implementation to operation to maintenance.
D) Specifies how to build a prototype quickly then improve on it.
E) Is a self-propelled ride at the "Technology Amusement Park" in San Francisco.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
34
Prototyping and RAD can be used to minimize problems of defining a scope that is too broad or narrow at the beginning of a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
35
All of the following are drawback of prototyping EXCEPT:

A) Additional costs may be needed to make a prototype into an operational version.
B) An operational version needs to be made using desktop tools rather than enterprise-level tools.
C) Frequent changes over time making documentation more difficult.
D) A prototyping development process is difficult to manage because it can be impossible to determine when the prototype is complete.
E) Integration of prototyping methodology is difficult when there is a broad range of requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
36
The mantra for prototyping is "code a little, test a little."
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
37
Open source software is free but often an organization will have to pay for training and technical support for the software.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
38
The maintenance and review phase is the longest phase of the software development lifecycle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
39
If someone wants a system cheaply, quickly, and with a large scope, we can conclude:

A) That desire represents the three sides of the Project Triangle
B) This is normally not possible: you can usually only achieve two of those three objectives at a time.
C) Management might be providing an impossible goal.
D) All of the above
E) None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
40
To support a common language and improve communication, a project manager should develop a private collection of acronyms and make frequent use of them.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
41
Agile development tends to be _______-oriented rather than process-oriented.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
42
Explain why IT projects are seen as just business projects involving significant amounts of technology.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
43
Two or more teams that work interdependently and interface with each other and with a common superordinate goal is working within a ____________system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
44
____________is the term used to describe what happens when a project's scope increases after it has started.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
45
A good project manager defines a realistic project scope and then manages the project so that it can be completed on time and within _________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
46
Why does the addition of more people to a project not speed up the project efforts?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
47
____________,____________ , and____________ are the three outside elements of the project triangle?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
48
How do companies manage risk? What are the factors that contribute to a high-risk project?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
49
Distinguish between the iterative approaches of prototyping and agile software development.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
50
____________are the individuals and organizations that are involved in or may be affected by a given project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
51
Classify the following organizational activity as either operations or a project.
 Operations  Backing up the data repository to support business  continuity plarning.  Operations  Monitoring the perfornance of all information  systems and networks using a dashboard  Project  Provide a mobile application to employees that  allow then to post travel expenses and verify  reimbursenent payments  Project  Development of a CRM-like system to integrate  marketing and sales activities with activities of the  global supply chain.  Project  Reengineering of the sales order process to include  social network analysis. \begin{array} { | l | l | } \hline \text { Operations } & \begin{array} { l } \text { Backing up the data repository to support business } \\\text { continuity plarning. }\end{array} \\\hline \text { Operations } & \begin{array} { l } \text { Monitoring the perfornance of all information } \\\text { systems and networks using a dashboard }\end{array} \\\hline \text { Project } & \begin{array} { l } \text { Provide a mobile application to employees that } \\\text { allow then to post travel expenses and verify } \\\text { reimbursenent payments }\end{array} \\\hline \text { Project } & \begin{array} { l } \text { Development of a CRM-like system to integrate } \\\text { marketing and sales activities with activities of the } \\\text { global supply chain. }\end{array} \\\hline \text { Project } & \begin{array} { l } \text { Reengineering of the sales order process to include } \\\text { social network analysis. }\end{array} \\\hline\end{array}
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
52
Project risk is a function of____________ ,____________ , and____________ .
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
53
Identify an example of project management software and the features/functionality you would expect it to provide.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
54
____________is the department that develops project management skills, boosts efficiency for projects, and improves project delivery.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
55
____________is one example of open source software.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
56
Match the project responsibility as being that of the project manager or the project sponsor.
 Project sponsor  Liaison between the project tearn and the  project stakeholders  Project sponsor  Senior level project charnpion  Project manager  Assign tearn members to work on the project  Project manager  Marage project risk  Project manager  Measure the projects status  Project manager  Take corrective action when recessary \begin{array} { | l | l | } \hline \text { Project sponsor } & \begin{array} { l } \text { Liaison between the project tearn and the } \\\text { project stakeholders }\end{array} \\\hline \text { Project sponsor } & \text { Senior level project charnpion } \\\hline \text { Project manager } & \text { Assign tearn members to work on the project } \\\hline \text { Project manager } & \text { Marage project risk } \\\hline \text { Project manager } & \text { Measure the projects status } \\\hline \text { Project manager } & \text { Take corrective action when recessary } \\\hline\end{array}
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
57
Explain why in a project only two of the three project elements (cost, time, and scoop) can be optimized and the third must be adjusted to maintain balance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
58
Identify the following qualities as either being associated with operations or project work.
 Operations  Repetitive  Operations  Fornal quality control  Project  Pupose is to sustain the enterprise  Project  Termporary \begin{array} { | l | l | } \hline \text { Operations } & \text { Repetitive } \\\hline \text { Operations } & \text { Fornal quality control } \\\hline \text { Project } & \text { Pupose is to sustain the enterprise } \\\hline \text { Project } & \text { Termporary } \\\hline\end{array}
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
59
____________organizes the discrete project activities and orders them along a timeline, identifying the critical beginning and ending dates as well as necessary time and resources.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
60
List some strategies a manager should consider when trying to manage a project's technical complexity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
61
Match the development methodology with its characteristics.
 Agile development  Iterative, speedy, and active user  interaction  Prototyping  Evolutionary development that provides a  tarnible model to users early in the process  SDLC  Traditional and struetured \begin{array} { | l | l | } \hline \text { Agile development } & \begin{array} { l } \text { Iterative, speedy, and active user } \\\text { interaction }\end{array} \\\hline \text { Prototyping } & \begin{array} { l } \text { Evolutionary development that provides a } \\\text { tarnible model to users early in the process }\end{array} \\\hline \text { SDLC } & \text { Traditional and struetured } \\\hline\end{array}
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
62
Match the description to the SDLC project phase it represents.
 Initiation and feasibility  Project is scoped, considered and planned.  Requirements definition  System specifications are identified and  documented.  Functional design  The system is designed in conceptual  terms.  Technical design and  construction  The system is built or a purchased system  is customized.  Verification  The system is reviewed to ensure it meets  requirements.  Implementation  The system is brought up for use.  Maintenance and review  The system is repaired and upgraded as  needed. \begin{array}{|l|l|}\hline \text { Initiation and feasibility } & \text { Project is scoped, considered and planned. } \\\hline \text { Requirements definition } & \begin{array}{l}\text { System specifications are identified and } \\\text { documented. }\end{array} \\\hline \text { Functional design } & \begin{array}{l}\text { The system is designed in conceptual } \\\text { terms. }\end{array} \\\hline \begin{array}{l}\text { Technical design and } \\\text { construction }\end{array} & \begin{array}{l}\text { The system is built or a purchased system } \\\text { is customized. }\end{array} \\\hline \text { Verification } & \begin{array}{l}\text { The system is reviewed to ensure it meets } \\\text { requirements. }\end{array} \\\hline \text { Implementation } & \text { The system is brought up for use. } \\\hline \text { Maintenance and review } & \begin{array}{l}\text { The system is repaired and upgraded as } \\\text { needed. }\end{array} \\\hline\end{array}
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
63
Match the activity to the SDLC project phase to which it belongs.
 Initiation and feasibility  Costs are detailed and timeline developed.  Requirements definition  Identify user requirements  Functional design  Complete a detailed analysis of the new  system including data-flow diagrams.  Technical design and  construction  The system is built.  Verification  End users test the system for usability,  security and operability.  Implementation  The system "goes live."  Maintenance and review  Evaluate and monitor system usage,  making minor adjustments as needed. \begin{array}{|l|l|}\hline \text { Initiation and feasibility } & \text { Costs are detailed and timeline developed. } \\\hline \text { Requirements definition } & \text { Identify user requirements } \\\hline \text { Functional design } & \begin{array}{l}\text { Complete a detailed analysis of the new } \\\text { system including data-flow diagrams. }\end{array} \\\hline \begin{array}{l}\text { Technical design and } \\\text { construction }\end{array} & \text { The system is built. } \\\hline \text { Verification } & \begin{array}{l}\text { End users test the system for usability, } \\\text { security and operability. }\end{array} \\\hline \text { Implementation } & \text { The system "goes live." } \\\hline \text { Maintenance and review } & \begin{array}{l}\text { Evaluate and monitor system usage, } \\\text { making minor adjustments as needed. }\end{array} \\\hline\end{array}
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
64
Match the three major project periods to Lewin's phases of the change model.
 Requirements period  Unfreezing  Development period  Charging  Production/distribution period  Refreezing \begin{array} { | l | l | } \hline \text { Requirements period } & \text { Unfreezing } \\\hline \text { Development period } & \text { Charging } \\\hline \text { Production/distribution period } & \text { Refreezing } \\\hline\end{array}
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 64 في هذه المجموعة.