Deck 19: Sales and Operations Planning

ملء الشاشة (f)
exit full mode
سؤال
Subcontracting is viewed as a risky strategy because the firm may lose control of product design and pricing.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The aggregate operations plan is developed from the master schedule and the strategic capacity plan.
سؤال
The sales and operations planning process consists of a series of meetings.
سؤال
The widespread adoption of computing technology has led to the virtual abandonment of simple cut-and-try charting and graphical methods to develop aggregate operations plans.
سؤال
Accurate medium-range planning increases the likelihood of operating within the limits of a budget.
سؤال
The aggregate operations plan differs in virtually every aspect in service organizations as contrasted with manufacturing organizations.
سؤال
Costs incurred in hiring, training, and laying off personnel are considered relevant aggregate operations planning costs.
سؤال
The increasing complexity of modern operations management has made simple cut-and-try charting and graphical methods formerly used to develop aggregate operations plans impractical and obsolete.
سؤال
The sales and marketing plans are typically developed separately from the aggregate operations plan as a way of cross-checking results to ensure the integrity of assumptions about the future.
سؤال
Backordering costs incurred in producing a given product type in a given time period are relevant aggregate operations planning costs.
سؤال
The operations plan should not be updated but should be followed precisely until the longest-term planning horizon has passed.
سؤال
Foregone profit margins are considered as relevant aggregate operations planning costs.
سؤال
The International Aggregate Planning Society (IAPS) has developed aggregate operations planning guidelines that are followed by a majority of manufacturing firms.
سؤال
The main purpose of the aggregate production plan is to specify the optimal combination of workforce level and inventory on hand.
سؤال
The sales and operations planning process is made up of a variety of analytical techniques that interact to produce short- and intermediate-term goals.
سؤال
In a services organization, strategic capacity planning follows process planning.
سؤال
Aggregation in sales and operations planning is by groups of customers on the supply side and by product families on the demand side of the firm's supply chain.
سؤال
The objective of the aggregate operations plan is to ensure that the marketing and sales plans are realistic.
سؤال
Fixed and variable costs incurred in producing a given product type in a given time period are relevant aggregate operations planning costs.
سؤال
Aggregate sales and operations planning occur in a company about every 3 to 18 months.
سؤال
In a logistics organization, vehicle dispatching immediately precedes vehicle loading.
سؤال
One of the conditions that makes yield management effective is when inventory is easily stored and held for a time when demand is stronger.
سؤال
Firms that match the production rate to the order rate by hiring and laying off employees as the order rate varies are following what is known as the chase strategy.
سؤال
Yield management is the process of allocating the right type of capacity to the right type of customer at the right prices at the right time to maximize revenue or yield.
سؤال
Pricing for a service should primarily relate to the cost of providing the service and has little to do with capacity issues the service provider might face.
سؤال
The term sales and operations planning was coined by companies to refer to a process that was traditionally referred to as capacity planning.
سؤال
Firms facing cyclical demand fluctuations would be wise to introduce complementary products whose cycles are the same as their current products.
سؤال
In an overview of the major operations planning activities in a typical logistics organization, which of the following activities does not come after sales and operations (aggregate) planning?

A) Process planning
B) Workforce scheduling
C) Vehicle loading
D) Materials requirements planning
E) Order scheduling
سؤال
A rate fence is a logical justification for different prices for what is essentially the same service.
سؤال
The aggregate operations planning variable "inventory on hand" refers to the balance of unused inventory carried over from the previous time period.
سؤال
Sales and operations planning is a process that helps a firm design products that are easier for marketing to sell.
سؤال
A rate fence is a person who books airline seats at low rates far in advance and sells the seats at a profit later.
سؤال
In an overview of the major operations planning activities in a typical organization, which of the following activities precedes sales and operations (aggregate) planning?

A) Process planning
B) Workforce scheduling
C) Master production scheduling
D) Materials requirements planning
E) Order scheduling
سؤال
Order scheduling is the step in the aggregate operations planning process that immediately follows material requirements planning.
سؤال
In services, once the aggregate staffing level is determined, the focus is on short-term workforce scheduling.
سؤال
Long-range planning generally covers a period of eighteen months or more.
سؤال
The master scheduling is a crucial input into the aggregate operations plan.
سؤال
The aggregate operations planning variable "workforce level" refers to the number of workers needed to accomplish the planned production.
سؤال
Short-range planning covers a period from one day to two weeks.
سؤال
The aggregate operations planning variable "production rate" refers to the number of units completed per unit of time.
سؤال
From an operational perspective, yield management is least effective under which of the following circumstances?

A) Demand can be segmented by customer.
B) The product can be sold in advance.
C) The product can be kept to be sold when demand is stronger.
D) Fixed costs are high, and variable costs are low.
E) Demand is highly variable.
سؤال
Matching the production rate to the order rate by hiring and laying off employees as the order rate varies is which of the following pure production planning strategies?

A) Stable workforce, variable work hours
B) Chase
C) Level
D) Meeting demand
E) Minimizing inventory
سؤال
From an operational perspective, yield management is least effective under which of the following circumstances?

A) Demand can be segmented by customer.
B) The product can be sold in advance.
C) Demand is highly variable.
D) Fixed costs are high, and variable costs are low.
E) Demand is stable and close to capacity.
سؤال
Using the cut-and-try method for aggregate operations planning, we can determine the production requirement in units of product. If the beginning inventory is 100 units, the demand forecast is 1,200, and the necessary safety stock is 20 percent of the demand forecast, which of the following is the production requirement?

A) 1,200
B) 1,300
C) 1,340
D) 1,500
E) 1,540
سؤال
In conducting aggregate operations planning, there are a number of required inputs. Which of the following inputs are considered internal to the firm?

A) Inventory levels and economic conditions
B) Market demand and subcontractor capacity
C) Current physical capacity and current workforce
D) Competitor behavior and current workforce
E) Current physical capacity and raw material availability
سؤال
In an overview of the major operations planning activities in a typical service organization, which of the following activities follows sales and operations (aggregate) planning?

A) Process planning
B) Workforce scheduling
C) Master scheduling
D) Materials requirements planning
E) Order scheduling
سؤال
Maintaining a stable workforce working at a constant output rate while shortages and surpluses are absorbed by fluctuating inventory levels, order backlogs, and allowing lost sales is which of the following production planning strategies?

A) Stable workforce, variable work hours
B) Chase
C) Level
D) Full employment
E) Skill maintenance
سؤال
Which of the following is considered a "pure" production planning strategy?

A) Variable workforce, stable work hours
B) Lag demand
C) Level playing field
D) Stable workforce, variable work hours
E) Product warehouse
سؤال
In conducting aggregate operations planning, there are a number of required inputs. Which of the following inputs are considered external to the firm?

A) Inventory levels and market demand
B) Raw material availability and competitor's behavior
C) Current workforce and economic conditions
D) Current physical capacity and market demand
E) Subcontractor capacity and inventory levels
سؤال
In an overview of the major operations planning activities in a typical logistics organization, which of the following activities most immediately follows sales and operations (aggregate) planning?

A) Process planning
B) Strategic capacity planning
C) Vehicle dispatching
D) Vehicle capacity planning
E) Warehouse receipt planning
سؤال
Using the cut-and-try method for aggregate operations planning, we can determine the production requirement in units of product. If the beginning inventory is 500 units, the demand forecast is 1,000, and the necessary safety stock is 10 percent of the demand forecast, which of the following is the production requirement?

A) 1,000
B) 600
C) 550
D) 450
E) 100
سؤال
The main purpose of aggregate operations planning is to specify the optimal combination of which of the following?

A) Workforce levels and inventory on hand
B) Inventory on hand and financing costs for that inventory
C) The strategic plan and the products available for sale
D) The workforce level and the degree of automation
E) Operational costs and the cash flow to support operations
سؤال
In conducting aggregate operations planning, there are a number of required inputs. Which of the following inputs are considered external to the firm?

A) Competitor behavior and economic conditions
B) Market demand and inventory levels
C) Subcontractor capacity and current workforce
D) Economic conditions and current physical capacity
E) Raw material availability and inventory levels
سؤال
Which of the following is a production planning strategy presented in the textbook?

A) Level
B) Strategic
C) Balanced
D) Synchronous
E) Optimal
سؤال
From an operational perspective, yield management is most effective under which of the following circumstances?

A) Demand cannot be segmented by customer.
B) Inventory is perishable.
C) Fixed costs are low, and variable costs are high.
D) The customer is a "captive" of the system.
E) The firm doing yield management is very profitable.
سؤال
What should have been the initial inventory in units of demand, if the production requirement in units of product is 900, demand forecast is 1,000, and the necessary safety stock is 20 percent of the demand forecast?

A) 300
B) 500
C) 100
D) 1,900
E) Cannot find it
سؤال
Which of the following is not one of the "number of interesting issues that arise in yield management"?

A) Pricing structures that must appear logical to the customer and justify different prices
B) Designing yield management programs that cannot be imitated by a competitor
C) How to handle variability in customer arrivals, duration, and interval
D) Managing the service process
E) Training workers and managers to work in a yield management environment
سؤال
Which of the following methods discussed in the text requires generating several alternative aggregate plans?

A) Trial and error
B) Production smoothing
C) Graphing and charting
D) Aggregate plan simulation
E) Cut and try
سؤال
Which of the following costs are relevant to aggregate operations planning?

A) Sunk costs
B) Transaction costs
C) Backordering costs
D) Legal costs
E) Fixed costs
سؤال
Using the cut-and-try method for aggregate operations planning, we can calculate the ending inventory and then calculate the safety stock as a percent of forecast demand. Suppose that the beginning inventory is 300, the production requirement in units of product is 1,350, and demand forecast is 1,500. What is the ending inventory and percent safety stock?

A) 200 and 10%
B) 150 and 10%
C) 300 and 20%
D) 450 and 30%
E) 150 and 20%
سؤال
Assume that production required in periods 1, 2 and 3 respectively are 1,200, 1,500, and 900 units. One worker during the planning horizon can produce two units in one day. Number of workdays are 22 in period 1, −17 in period 2, and 21 in period 3. Assume that the beginning inventory and the ending inventory required are 300 units each. What is the number of workers required during the planning horizon of three periods?

A) 60
B) 600
C) 35
D) 30
E) 300
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/61
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 19: Sales and Operations Planning
1
Subcontracting is viewed as a risky strategy because the firm may lose control of product design and pricing.
False
2
The aggregate operations plan is developed from the master schedule and the strategic capacity plan.
False
3
The sales and operations planning process consists of a series of meetings.
True
4
The widespread adoption of computing technology has led to the virtual abandonment of simple cut-and-try charting and graphical methods to develop aggregate operations plans.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
5
Accurate medium-range planning increases the likelihood of operating within the limits of a budget.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
6
The aggregate operations plan differs in virtually every aspect in service organizations as contrasted with manufacturing organizations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
7
Costs incurred in hiring, training, and laying off personnel are considered relevant aggregate operations planning costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
8
The increasing complexity of modern operations management has made simple cut-and-try charting and graphical methods formerly used to develop aggregate operations plans impractical and obsolete.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
9
The sales and marketing plans are typically developed separately from the aggregate operations plan as a way of cross-checking results to ensure the integrity of assumptions about the future.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
10
Backordering costs incurred in producing a given product type in a given time period are relevant aggregate operations planning costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
11
The operations plan should not be updated but should be followed precisely until the longest-term planning horizon has passed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
12
Foregone profit margins are considered as relevant aggregate operations planning costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
13
The International Aggregate Planning Society (IAPS) has developed aggregate operations planning guidelines that are followed by a majority of manufacturing firms.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
14
The main purpose of the aggregate production plan is to specify the optimal combination of workforce level and inventory on hand.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
15
The sales and operations planning process is made up of a variety of analytical techniques that interact to produce short- and intermediate-term goals.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
16
In a services organization, strategic capacity planning follows process planning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
17
Aggregation in sales and operations planning is by groups of customers on the supply side and by product families on the demand side of the firm's supply chain.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
18
The objective of the aggregate operations plan is to ensure that the marketing and sales plans are realistic.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
19
Fixed and variable costs incurred in producing a given product type in a given time period are relevant aggregate operations planning costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
20
Aggregate sales and operations planning occur in a company about every 3 to 18 months.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
21
In a logistics organization, vehicle dispatching immediately precedes vehicle loading.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
22
One of the conditions that makes yield management effective is when inventory is easily stored and held for a time when demand is stronger.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
23
Firms that match the production rate to the order rate by hiring and laying off employees as the order rate varies are following what is known as the chase strategy.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
24
Yield management is the process of allocating the right type of capacity to the right type of customer at the right prices at the right time to maximize revenue or yield.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
25
Pricing for a service should primarily relate to the cost of providing the service and has little to do with capacity issues the service provider might face.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
26
The term sales and operations planning was coined by companies to refer to a process that was traditionally referred to as capacity planning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
27
Firms facing cyclical demand fluctuations would be wise to introduce complementary products whose cycles are the same as their current products.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
28
In an overview of the major operations planning activities in a typical logistics organization, which of the following activities does not come after sales and operations (aggregate) planning?

A) Process planning
B) Workforce scheduling
C) Vehicle loading
D) Materials requirements planning
E) Order scheduling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
29
A rate fence is a logical justification for different prices for what is essentially the same service.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
30
The aggregate operations planning variable "inventory on hand" refers to the balance of unused inventory carried over from the previous time period.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
31
Sales and operations planning is a process that helps a firm design products that are easier for marketing to sell.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
32
A rate fence is a person who books airline seats at low rates far in advance and sells the seats at a profit later.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
33
In an overview of the major operations planning activities in a typical organization, which of the following activities precedes sales and operations (aggregate) planning?

A) Process planning
B) Workforce scheduling
C) Master production scheduling
D) Materials requirements planning
E) Order scheduling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
34
Order scheduling is the step in the aggregate operations planning process that immediately follows material requirements planning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
35
In services, once the aggregate staffing level is determined, the focus is on short-term workforce scheduling.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
36
Long-range planning generally covers a period of eighteen months or more.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
37
The master scheduling is a crucial input into the aggregate operations plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
38
The aggregate operations planning variable "workforce level" refers to the number of workers needed to accomplish the planned production.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
39
Short-range planning covers a period from one day to two weeks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
40
The aggregate operations planning variable "production rate" refers to the number of units completed per unit of time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
41
From an operational perspective, yield management is least effective under which of the following circumstances?

A) Demand can be segmented by customer.
B) The product can be sold in advance.
C) The product can be kept to be sold when demand is stronger.
D) Fixed costs are high, and variable costs are low.
E) Demand is highly variable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
42
Matching the production rate to the order rate by hiring and laying off employees as the order rate varies is which of the following pure production planning strategies?

A) Stable workforce, variable work hours
B) Chase
C) Level
D) Meeting demand
E) Minimizing inventory
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
43
From an operational perspective, yield management is least effective under which of the following circumstances?

A) Demand can be segmented by customer.
B) The product can be sold in advance.
C) Demand is highly variable.
D) Fixed costs are high, and variable costs are low.
E) Demand is stable and close to capacity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
44
Using the cut-and-try method for aggregate operations planning, we can determine the production requirement in units of product. If the beginning inventory is 100 units, the demand forecast is 1,200, and the necessary safety stock is 20 percent of the demand forecast, which of the following is the production requirement?

A) 1,200
B) 1,300
C) 1,340
D) 1,500
E) 1,540
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
45
In conducting aggregate operations planning, there are a number of required inputs. Which of the following inputs are considered internal to the firm?

A) Inventory levels and economic conditions
B) Market demand and subcontractor capacity
C) Current physical capacity and current workforce
D) Competitor behavior and current workforce
E) Current physical capacity and raw material availability
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
46
In an overview of the major operations planning activities in a typical service organization, which of the following activities follows sales and operations (aggregate) planning?

A) Process planning
B) Workforce scheduling
C) Master scheduling
D) Materials requirements planning
E) Order scheduling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
47
Maintaining a stable workforce working at a constant output rate while shortages and surpluses are absorbed by fluctuating inventory levels, order backlogs, and allowing lost sales is which of the following production planning strategies?

A) Stable workforce, variable work hours
B) Chase
C) Level
D) Full employment
E) Skill maintenance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
48
Which of the following is considered a "pure" production planning strategy?

A) Variable workforce, stable work hours
B) Lag demand
C) Level playing field
D) Stable workforce, variable work hours
E) Product warehouse
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
49
In conducting aggregate operations planning, there are a number of required inputs. Which of the following inputs are considered external to the firm?

A) Inventory levels and market demand
B) Raw material availability and competitor's behavior
C) Current workforce and economic conditions
D) Current physical capacity and market demand
E) Subcontractor capacity and inventory levels
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
50
In an overview of the major operations planning activities in a typical logistics organization, which of the following activities most immediately follows sales and operations (aggregate) planning?

A) Process planning
B) Strategic capacity planning
C) Vehicle dispatching
D) Vehicle capacity planning
E) Warehouse receipt planning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
51
Using the cut-and-try method for aggregate operations planning, we can determine the production requirement in units of product. If the beginning inventory is 500 units, the demand forecast is 1,000, and the necessary safety stock is 10 percent of the demand forecast, which of the following is the production requirement?

A) 1,000
B) 600
C) 550
D) 450
E) 100
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
52
The main purpose of aggregate operations planning is to specify the optimal combination of which of the following?

A) Workforce levels and inventory on hand
B) Inventory on hand and financing costs for that inventory
C) The strategic plan and the products available for sale
D) The workforce level and the degree of automation
E) Operational costs and the cash flow to support operations
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
53
In conducting aggregate operations planning, there are a number of required inputs. Which of the following inputs are considered external to the firm?

A) Competitor behavior and economic conditions
B) Market demand and inventory levels
C) Subcontractor capacity and current workforce
D) Economic conditions and current physical capacity
E) Raw material availability and inventory levels
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
54
Which of the following is a production planning strategy presented in the textbook?

A) Level
B) Strategic
C) Balanced
D) Synchronous
E) Optimal
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
55
From an operational perspective, yield management is most effective under which of the following circumstances?

A) Demand cannot be segmented by customer.
B) Inventory is perishable.
C) Fixed costs are low, and variable costs are high.
D) The customer is a "captive" of the system.
E) The firm doing yield management is very profitable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
56
What should have been the initial inventory in units of demand, if the production requirement in units of product is 900, demand forecast is 1,000, and the necessary safety stock is 20 percent of the demand forecast?

A) 300
B) 500
C) 100
D) 1,900
E) Cannot find it
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
57
Which of the following is not one of the "number of interesting issues that arise in yield management"?

A) Pricing structures that must appear logical to the customer and justify different prices
B) Designing yield management programs that cannot be imitated by a competitor
C) How to handle variability in customer arrivals, duration, and interval
D) Managing the service process
E) Training workers and managers to work in a yield management environment
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
58
Which of the following methods discussed in the text requires generating several alternative aggregate plans?

A) Trial and error
B) Production smoothing
C) Graphing and charting
D) Aggregate plan simulation
E) Cut and try
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
59
Which of the following costs are relevant to aggregate operations planning?

A) Sunk costs
B) Transaction costs
C) Backordering costs
D) Legal costs
E) Fixed costs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
60
Using the cut-and-try method for aggregate operations planning, we can calculate the ending inventory and then calculate the safety stock as a percent of forecast demand. Suppose that the beginning inventory is 300, the production requirement in units of product is 1,350, and demand forecast is 1,500. What is the ending inventory and percent safety stock?

A) 200 and 10%
B) 150 and 10%
C) 300 and 20%
D) 450 and 30%
E) 150 and 20%
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
61
Assume that production required in periods 1, 2 and 3 respectively are 1,200, 1,500, and 900 units. One worker during the planning horizon can produce two units in one day. Number of workdays are 22 in period 1, −17 in period 2, and 21 in period 3. Assume that the beginning inventory and the ending inventory required are 300 units each. What is the number of workers required during the planning horizon of three periods?

A) 60
B) 600
C) 35
D) 30
E) 300
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 61 في هذه المجموعة.