Deck 21: Material Requirements Planning

ملء الشاشة (f)
exit full mode
سؤال
Net change MRP systems are "activity" driven.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
A modular bill-of-materials is the term for an item that can be produced and stocked as a subassembly.
سؤال
The deeper one looks into the product creation sequence, the more the requirements of dependent demand items tend to become "lumpy."
سؤال
Manufacturing firms maintain bill of materials (BOM) files, which are simply a sequencing of everything that goes into a final product.
سؤال
MRP is based on dependent demand.
سؤال
A modular bill-of-materials includes items with fractional options.
سؤال
An input to the material requirements planning (MRP) system is an inventory records file.
سؤال
A BOM file is often called a product structure file or product tree because it shows how a product is put together.
سؤال
MRP is a logical, easily understandable approach to the problem of determining the number of parts, components, and materials needed to produce each end item.
سؤال
An input to the material requirements planning (MRP) system is an exception report.
سؤال
MRP is most valuable where a number of products are made in batches using the same productive equipment.
سؤال
The deeper one looks into the product creation sequence, the more the requirements of dependent demand items tend to smooth out and become even over time.
سؤال
MRP provides the schedule specifying when each part and component of an end item should be ordered or produced.
سؤال
The master production schedule states the number of items to be produced during specific time periods.
سؤال
A master production schedule is an input to a material requirements planning (MRP) system.
سؤال
The MRP program performs its analysis from the bottom up of the product structure trees, imploding requirements level by level.
سؤال
An output of MRP is a bill of materials (BOM) file.
سؤال
MRP stands for Material Requirements Planning.
سؤال
Computing the quantity of each component that goes into a finished product can be done by expanding (or exploding) each item in a product structure file and summing at all levels.
سؤال
MRP is least valuable in industries where a number of products are made in batches using the same productive equipment.
سؤال
Projected available balance is the amount of inventory that is expected as of the beginning of a period.
سؤال
The least unit cost method of lot-sizing adds ordering, stock-out, and inventory carrying costs for each trial lot size and divides by the number of units in each lot size, picking the lot size with the lowest unit cost.
سؤال
The economic order quantity (EOQ) lot-sizing technique uses the "square root formula" to balance setup cost, carrying cost, and cost of stockouts.
سؤال
In a net change MRP program, a change in one item will result in a completely new inventory plan and schedule for every item in the master production schedule.
سؤال
The lot-for-lot (L4L) lot-sizing technique minimizes carrying cost by taking into account setup costs and capacity limitations.
سؤال
Generally, determining lot sizes in MRP systems is simple.
سؤال
The three main inputs to an MRP system are the bill-of-materials, the master schedule, and the inventory records file.
سؤال
In a net change MRP system, requirements and schedules are updated whenever a transaction is processed that has an impact on the item.
سؤال
When implemented correctly, MRP links all areas of the business.
سؤال
Lot-for-lot (L4L) is the most common lot-sizing technique.
سؤال
The economic order quantity (EOQ) lot-sizing technique produces or acquires exactly the amount of product that is needed each time period with none carried over into future periods.
سؤال
"Projected available balance" is a term referring to unsold finished goods inventory.
سؤال
The least unit cost method (LUC) lot-sizing technique calculates the order quantity by comparing the carrying cost and the setup (or ordering) costs for various lot sizes and then selects the lot in which these are most nearly equal.
سؤال
The least unit cost method of lot-sizing technique adds ordering and inventory carrying cost for each trial lot size and divides by the number of units in each lot size, picking the lot size with the lowest unit cost.
سؤال
A lot-for-lot (L4L) lot-sizing technique does not take into account setup costs or capacity limitations.
سؤال
Low-level coding in MRP indicates the exact status of each item managed by the system in "real time."
سؤال
The least total cost method (LTC) lot-sizing technique calculates the order quantity by comparing the carrying cost and the setup (or ordering) costs for various lot sizes and then selects the lot in which these are most nearly equal.
سؤال
Net change MRP reflects the exact status of each item managed by the system in "real time."
سؤال
In a net change MRP system, requirements and schedules are considered rigid and never updated.
سؤال
The economic order quantity (EOQ) lot-sizing technique uses the "square root formula" to balance setup costs and carrying costs.
سؤال
Which of the following industry types have high expected benefits from the application of MRP?

A) Fabricate-to-order
B) Hospitals
C) Assemble-to-order
D) Aircraft manufacturers
E) Oil refineries
سؤال
The time-phased plan specifying how many and when the firm plans to build each end item is called the master production schedule (MPS).
سؤال
In this industry type, items are manufactured by machine rather than assembled from parts. These are standard stock items carried in anticipation of customer demand.

A) Assemble-to-stock
B) Make-to-stock
C) Assemble-to-order
D) Make-to-order
E) Engineer-to-order
سؤال
This industry type combines multiple component parts into a finished product, which is then stocked in inventory to satisfy customer demand.

A) Assemble-to-stock
B) Make-to-stock
C) Assemble-to-order
D) Make-to-order
E) Engineer-to-order
سؤال
Time fences are periods of time having some specified level of opportunity for the customer to make changes.
سؤال
The customer grace period is a time span having some specified level of opportunity for the customer to make changes.
سؤال
A product tree can do which of the following?

A) Help to compute component usage.
B) Reduce product scrap.
C) Reduce labor overtime.
D) Reduce regular time labor.
E) Locate raw material supplies.
سؤال
Which of the following is an input to the master production schedule (MPS)?

A) Inventory records file
B) The aggregate plan
C) The bill-of-materials
D) The exception report
E) Planned order schedules
سؤال
Which of the following is not a direct input to the material planning?

A) Bill-of-material file
B) Aggregate production plan
C) Master production schedule
D) Inventory records file
سؤال
Which of the following industry types will not benefit greatly from the application of MRP?

A) Fabricate-to-order
B) Assemble-to-stock
C) Assemble-to-order
D) Manufacture-to-order
E) None of these choices are correct
سؤال
The master production schedule deals exclusively with dependent demand items.
سؤال
The time-phased plan specifying how many and when the firm plans to build each end item is called the materials requirements plan (MRP).
سؤال
This industry type includes industries such as foundries, rubber and plastics, specialty paper, chemicals, paint, drug, and food processors.

A) Process
B) Make-to-stock
C) Assemble-to-order
D) Make-to-order
E) Engineer-to-order
سؤال
A BOM file is also called which of the following?

A) Product tree
B) Stocking plan
C) Inventory usage record
D) Production parts plan
E) Time bucket schedule
سؤال
Which of the following industry types have high expected benefits from the application of MRP?

A) Fabricate-to-stock
B) Fabricate-to-order
C) Assemble-to-stock
D) Continuous process
E) Service and repair parts
سؤال
In this industry type, a final assembly is made from standard options that the customer chooses.

A) Assemble-to-stock
B) Make-to-stock
C) Assemble-to-order
D) Make-to-order
E) Engineer-to-order
سؤال
A super bill can specify that a fraction of a part, say 25 percent, is used.
سؤال
In this industry type, items are manufactured by machine to customer order. These are generally industrial orders.

A) Process
B) Make-to-stock
C) Assemble-to-order
D) Make-to-order
E) Engineer-to-order
سؤال
In this industry type, Iitems are fabricated or assembled completely to customer specification.

A) Process
B) Make-to-stock
C) Assemble-to-order
D) Make-to-order
E) Engineer-to-order
سؤال
Which of the following is one of the main purposes of an MRP system?

A) Educate personnel in basic work rules.
B) Determine the amount of materials needed to produce each end item.
C) Stimulate the workforce.
D) Decrease labor requirements.
E) Increase inventory accuracy.
سؤال
Which of the following is an input to the master production schedule?

A) Bill-of-materials (BOM) file
B) Inventory records file
C) Exception reports
D) Planned-order schedules
E) None of these choices are correct
سؤال
In an MRP program, the program accesses the status segment of an inventory record according to specific periods called which of the following?

A) Cubed time units
B) Time buckets
C) BOM units
D) Time modules
E) Time lines
سؤال
Which of the following is the planned-order release using an MRP program if the gross requirement is 5,000, inventory on hand is 1,200, and planned receipts are 800?

A) 7,000
B) 4,200
C) 3,000
D) 2,000
E) 1,200
سؤال
Which of the following is considered a primary report in an MRP system?

A) Planned-order schedule
B) Peg report
C) Planning report
D) Inventory accuracy report
E) Aggregate production plan report
سؤال
Which of the following is an input file necessary to run an MRP system?

A) Exception report
B) Computer-aided-design files
C) Inventory records file
D) Personnel files
E) Planned-order schedule
سؤال
Which of the following is the planned-order release using an MRP program if the gross requirement is 670 and the inventory on hand is 600?

A) 670
B) 600
C) 530
D) 70
E) None of these choices are correct
سؤال
Which of the following is the net requirement using an MRP program if the gross requirement is 1,000 and the inventory on hand is 500?

A) 1,000
B) 950
C) 500
D) 400
E) 350
سؤال
Which of the following is considered a secondary report in an MRP system?

A) Planned-order schedule
B) Exceptions reports
C) Inventory record
D) Firm orders from known customers
E) Engineering change reports
سؤال
Which of the following can be used for lot sizing in an MRP system?

A) Low-level coding
B) Time bucket size
C) Least unit cost
D) Inventory record file
E) Peg inventory
سؤال
Which of the following files allows us to retrace a material requirement upward in the product structure through each level, identifying each parent item that created the demand?

A) Planning bill-of-materials file
B) Modular bill-of-materials file
C) Super bill-of-materials file
D) Exception report file
E) Peg record file
سؤال
In a typical inventory status record, which of the following would you not expect to see?

A) Scrap allowance
B) Order quantity
C) Gross requirements
D) Planned-order releases
E) Lost items
سؤال
One of the main purposes of an MRP system is which of the following?

A) Track inventory levels.
B) Create productive capacity.
C) Decrease layers of management.
D) Develop schedules specifying when each component should be ordered or produced.
E) Upgrade manufacturing's professionalism.
سؤال
Which of the following is not a production activity report generated by MRP?

A) Exception report
B) Planning report
C) Performance control report
D) Planned-order schedules
E) Bill-of-materials report
سؤال
Which of the following is most closely related to the reason a firm might implement MRP?

A) So it can order the right parts
B) So it can order parts sufficient for immediate use
C) So it can ensure that parts to arrive prior to when they are needed
D) To ensure appropriate quality levels
E) To keep process costs between the LCL and the UCL
سؤال
MRP systems seek to achieve which of the following?

A) Minimize lot sizes.
B) Determine the number of dependent demand items needed.
C) Relieve capacity bottlenecks.
D) Provide a yardstick for future improvements.
E) Improve on JIT methods.
سؤال
Which of the following is an input to the master production schedule?

A) Prototype products from product development
B) Aggregate component schedule
C) Peg reports
D) Exception reports
E) Forecasts of random demand from customers
سؤال
We would expect to see which of the following in an MRP system's inventory status file?

A) End items produced
B) Late/early delivery records
C) Scrap parts
D) Labor efficiency
E) Computer errors
سؤال
Which of the following is the net requirement using an MRP program if the gross requirement is 1,250 and the inventory on hand is 50?

A) 1,200
B) 1,300
C) 1,150
D) 2,450
E) None of these choices are correct
سؤال
Which of the following is considered a primary report in an MRP system?

A) Planning reports
B) Performance reports
C) Exception reports
D) Planned-order schedules
E) Cycle counting reports
سؤال
Which of the following is an input file necessary to run an MRP system?

A) Bill-of-materials (BOM) file
B) Quality management report
C) Exception reports
D) Planned-order schedules
E) Purchasing contracts
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/91
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 21: Material Requirements Planning
1
Net change MRP systems are "activity" driven.
True
2
A modular bill-of-materials is the term for an item that can be produced and stocked as a subassembly.
True
3
The deeper one looks into the product creation sequence, the more the requirements of dependent demand items tend to become "lumpy."
True
4
Manufacturing firms maintain bill of materials (BOM) files, which are simply a sequencing of everything that goes into a final product.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
5
MRP is based on dependent demand.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
6
A modular bill-of-materials includes items with fractional options.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
7
An input to the material requirements planning (MRP) system is an inventory records file.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
8
A BOM file is often called a product structure file or product tree because it shows how a product is put together.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
9
MRP is a logical, easily understandable approach to the problem of determining the number of parts, components, and materials needed to produce each end item.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
10
An input to the material requirements planning (MRP) system is an exception report.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
11
MRP is most valuable where a number of products are made in batches using the same productive equipment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
12
The deeper one looks into the product creation sequence, the more the requirements of dependent demand items tend to smooth out and become even over time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
13
MRP provides the schedule specifying when each part and component of an end item should be ordered or produced.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
14
The master production schedule states the number of items to be produced during specific time periods.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
15
A master production schedule is an input to a material requirements planning (MRP) system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
16
The MRP program performs its analysis from the bottom up of the product structure trees, imploding requirements level by level.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
17
An output of MRP is a bill of materials (BOM) file.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
18
MRP stands for Material Requirements Planning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
19
Computing the quantity of each component that goes into a finished product can be done by expanding (or exploding) each item in a product structure file and summing at all levels.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
20
MRP is least valuable in industries where a number of products are made in batches using the same productive equipment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
21
Projected available balance is the amount of inventory that is expected as of the beginning of a period.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
22
The least unit cost method of lot-sizing adds ordering, stock-out, and inventory carrying costs for each trial lot size and divides by the number of units in each lot size, picking the lot size with the lowest unit cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
23
The economic order quantity (EOQ) lot-sizing technique uses the "square root formula" to balance setup cost, carrying cost, and cost of stockouts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
24
In a net change MRP program, a change in one item will result in a completely new inventory plan and schedule for every item in the master production schedule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
25
The lot-for-lot (L4L) lot-sizing technique minimizes carrying cost by taking into account setup costs and capacity limitations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
26
Generally, determining lot sizes in MRP systems is simple.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
27
The three main inputs to an MRP system are the bill-of-materials, the master schedule, and the inventory records file.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
28
In a net change MRP system, requirements and schedules are updated whenever a transaction is processed that has an impact on the item.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
29
When implemented correctly, MRP links all areas of the business.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
30
Lot-for-lot (L4L) is the most common lot-sizing technique.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
31
The economic order quantity (EOQ) lot-sizing technique produces or acquires exactly the amount of product that is needed each time period with none carried over into future periods.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
32
"Projected available balance" is a term referring to unsold finished goods inventory.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
33
The least unit cost method (LUC) lot-sizing technique calculates the order quantity by comparing the carrying cost and the setup (or ordering) costs for various lot sizes and then selects the lot in which these are most nearly equal.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
34
The least unit cost method of lot-sizing technique adds ordering and inventory carrying cost for each trial lot size and divides by the number of units in each lot size, picking the lot size with the lowest unit cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
35
A lot-for-lot (L4L) lot-sizing technique does not take into account setup costs or capacity limitations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
36
Low-level coding in MRP indicates the exact status of each item managed by the system in "real time."
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
37
The least total cost method (LTC) lot-sizing technique calculates the order quantity by comparing the carrying cost and the setup (or ordering) costs for various lot sizes and then selects the lot in which these are most nearly equal.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
38
Net change MRP reflects the exact status of each item managed by the system in "real time."
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
39
In a net change MRP system, requirements and schedules are considered rigid and never updated.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
40
The economic order quantity (EOQ) lot-sizing technique uses the "square root formula" to balance setup costs and carrying costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
41
Which of the following industry types have high expected benefits from the application of MRP?

A) Fabricate-to-order
B) Hospitals
C) Assemble-to-order
D) Aircraft manufacturers
E) Oil refineries
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
42
The time-phased plan specifying how many and when the firm plans to build each end item is called the master production schedule (MPS).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
43
In this industry type, items are manufactured by machine rather than assembled from parts. These are standard stock items carried in anticipation of customer demand.

A) Assemble-to-stock
B) Make-to-stock
C) Assemble-to-order
D) Make-to-order
E) Engineer-to-order
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
44
This industry type combines multiple component parts into a finished product, which is then stocked in inventory to satisfy customer demand.

A) Assemble-to-stock
B) Make-to-stock
C) Assemble-to-order
D) Make-to-order
E) Engineer-to-order
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
45
Time fences are periods of time having some specified level of opportunity for the customer to make changes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
46
The customer grace period is a time span having some specified level of opportunity for the customer to make changes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
47
A product tree can do which of the following?

A) Help to compute component usage.
B) Reduce product scrap.
C) Reduce labor overtime.
D) Reduce regular time labor.
E) Locate raw material supplies.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
48
Which of the following is an input to the master production schedule (MPS)?

A) Inventory records file
B) The aggregate plan
C) The bill-of-materials
D) The exception report
E) Planned order schedules
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
49
Which of the following is not a direct input to the material planning?

A) Bill-of-material file
B) Aggregate production plan
C) Master production schedule
D) Inventory records file
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
50
Which of the following industry types will not benefit greatly from the application of MRP?

A) Fabricate-to-order
B) Assemble-to-stock
C) Assemble-to-order
D) Manufacture-to-order
E) None of these choices are correct
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
51
The master production schedule deals exclusively with dependent demand items.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
52
The time-phased plan specifying how many and when the firm plans to build each end item is called the materials requirements plan (MRP).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
53
This industry type includes industries such as foundries, rubber and plastics, specialty paper, chemicals, paint, drug, and food processors.

A) Process
B) Make-to-stock
C) Assemble-to-order
D) Make-to-order
E) Engineer-to-order
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
54
A BOM file is also called which of the following?

A) Product tree
B) Stocking plan
C) Inventory usage record
D) Production parts plan
E) Time bucket schedule
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
55
Which of the following industry types have high expected benefits from the application of MRP?

A) Fabricate-to-stock
B) Fabricate-to-order
C) Assemble-to-stock
D) Continuous process
E) Service and repair parts
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
56
In this industry type, a final assembly is made from standard options that the customer chooses.

A) Assemble-to-stock
B) Make-to-stock
C) Assemble-to-order
D) Make-to-order
E) Engineer-to-order
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
57
A super bill can specify that a fraction of a part, say 25 percent, is used.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
58
In this industry type, items are manufactured by machine to customer order. These are generally industrial orders.

A) Process
B) Make-to-stock
C) Assemble-to-order
D) Make-to-order
E) Engineer-to-order
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
59
In this industry type, Iitems are fabricated or assembled completely to customer specification.

A) Process
B) Make-to-stock
C) Assemble-to-order
D) Make-to-order
E) Engineer-to-order
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
60
Which of the following is one of the main purposes of an MRP system?

A) Educate personnel in basic work rules.
B) Determine the amount of materials needed to produce each end item.
C) Stimulate the workforce.
D) Decrease labor requirements.
E) Increase inventory accuracy.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
61
Which of the following is an input to the master production schedule?

A) Bill-of-materials (BOM) file
B) Inventory records file
C) Exception reports
D) Planned-order schedules
E) None of these choices are correct
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
62
In an MRP program, the program accesses the status segment of an inventory record according to specific periods called which of the following?

A) Cubed time units
B) Time buckets
C) BOM units
D) Time modules
E) Time lines
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
63
Which of the following is the planned-order release using an MRP program if the gross requirement is 5,000, inventory on hand is 1,200, and planned receipts are 800?

A) 7,000
B) 4,200
C) 3,000
D) 2,000
E) 1,200
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
64
Which of the following is considered a primary report in an MRP system?

A) Planned-order schedule
B) Peg report
C) Planning report
D) Inventory accuracy report
E) Aggregate production plan report
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
65
Which of the following is an input file necessary to run an MRP system?

A) Exception report
B) Computer-aided-design files
C) Inventory records file
D) Personnel files
E) Planned-order schedule
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
66
Which of the following is the planned-order release using an MRP program if the gross requirement is 670 and the inventory on hand is 600?

A) 670
B) 600
C) 530
D) 70
E) None of these choices are correct
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
67
Which of the following is the net requirement using an MRP program if the gross requirement is 1,000 and the inventory on hand is 500?

A) 1,000
B) 950
C) 500
D) 400
E) 350
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
68
Which of the following is considered a secondary report in an MRP system?

A) Planned-order schedule
B) Exceptions reports
C) Inventory record
D) Firm orders from known customers
E) Engineering change reports
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
69
Which of the following can be used for lot sizing in an MRP system?

A) Low-level coding
B) Time bucket size
C) Least unit cost
D) Inventory record file
E) Peg inventory
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
70
Which of the following files allows us to retrace a material requirement upward in the product structure through each level, identifying each parent item that created the demand?

A) Planning bill-of-materials file
B) Modular bill-of-materials file
C) Super bill-of-materials file
D) Exception report file
E) Peg record file
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
71
In a typical inventory status record, which of the following would you not expect to see?

A) Scrap allowance
B) Order quantity
C) Gross requirements
D) Planned-order releases
E) Lost items
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
72
One of the main purposes of an MRP system is which of the following?

A) Track inventory levels.
B) Create productive capacity.
C) Decrease layers of management.
D) Develop schedules specifying when each component should be ordered or produced.
E) Upgrade manufacturing's professionalism.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
73
Which of the following is not a production activity report generated by MRP?

A) Exception report
B) Planning report
C) Performance control report
D) Planned-order schedules
E) Bill-of-materials report
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
74
Which of the following is most closely related to the reason a firm might implement MRP?

A) So it can order the right parts
B) So it can order parts sufficient for immediate use
C) So it can ensure that parts to arrive prior to when they are needed
D) To ensure appropriate quality levels
E) To keep process costs between the LCL and the UCL
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
75
MRP systems seek to achieve which of the following?

A) Minimize lot sizes.
B) Determine the number of dependent demand items needed.
C) Relieve capacity bottlenecks.
D) Provide a yardstick for future improvements.
E) Improve on JIT methods.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
76
Which of the following is an input to the master production schedule?

A) Prototype products from product development
B) Aggregate component schedule
C) Peg reports
D) Exception reports
E) Forecasts of random demand from customers
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
77
We would expect to see which of the following in an MRP system's inventory status file?

A) End items produced
B) Late/early delivery records
C) Scrap parts
D) Labor efficiency
E) Computer errors
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
78
Which of the following is the net requirement using an MRP program if the gross requirement is 1,250 and the inventory on hand is 50?

A) 1,200
B) 1,300
C) 1,150
D) 2,450
E) None of these choices are correct
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
79
Which of the following is considered a primary report in an MRP system?

A) Planning reports
B) Performance reports
C) Exception reports
D) Planned-order schedules
E) Cycle counting reports
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
80
Which of the following is an input file necessary to run an MRP system?

A) Bill-of-materials (BOM) file
B) Quality management report
C) Exception reports
D) Planned-order schedules
E) Purchasing contracts
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 91 في هذه المجموعة.