A cafeteria line would be an example of a process-focused layout.
سؤال
Intermittent processing can take the form of batch processing or a job shop.
سؤال
Process layouts feature departments or other functional groupings of personnel or equipment.
سؤال
Morale problems can be a reason for redesign of a facility layout.
سؤال
In general, job-shop systems have a lower unit cost than continuous systems do because continuous systems use costly specialized equipment.
سؤال
As a general rule, continuous processing systems produce products with very little variety.
سؤال
Continuous processing is the best way to produce customized output.
سؤال
Product layouts typically achieve high utilization of labor and equipment.
سؤال
Right-sized equipment tends to be larger than equipment used in traditional process layouts.
سؤال
Repetitive processing systems repetitively rotate production through small batches of a variety of products.
سؤال
There are three basic process types: input, processing, and output.
سؤال
Avoiding bottlenecks is the primary goal of product design.
سؤال
Continuous production systems are typically very rigid and costly to change.
سؤال
A possible disadvantage of a product layout is an inflexible system.
سؤال
The term "computer-aided manufacturing" refers primarily to the use of robotics in process control.
سؤال
A job-shop processing system generally requires less-skilled workers than a continuous processing system.
سؤال
Flexible manufacturing systems bring the benefits of automation to continuous processes.
سؤال
A manufacturing cell allows the production of a wide range of very different products.
سؤال
Product layouts can more easily adapt to variations in product requirements than process layouts can.
سؤال
Accounting, purchasing, and inventory control are fairly routine with process layouts.
سؤال
In some service industries, facility layout may influence sales volume and customer attitudes.
سؤال
An advantage of a U-shaped production line is that it facilitates teamwork and flexibility in work assignments.
سؤال
Mismatches between operational capabilities and market demand can have a negative impact on an organization.
سؤال
For a production line, daily capacity can be determined by dividing the daily operating time by the line's cycle time.
سؤال
A process layout is more susceptible to shutdowns caused by equipment breakdowns than a product layout.
سؤال
"Balance delay" is another name for the percentage of idle time in a product layout.
سؤال
Work design, technological change, and layout are inputs in capacity planning and process selection.
سؤال
An optimal set of assignments for a production line cannot be obtained by assigning tasks to workstations in order of either: (1)the most following tasks; or (2)the sum of the task's time and the times of all following tasks.
سؤال
The minimum number of workstations for a production line is determined in part by the desired output rate.
سؤال
Heuristic rules for line balancing will guarantee an optimal solution.
سؤال
"Balance delay" is another name for the percentage of idle time in a process layout.
سؤال
Among the benefits claimed for cellular manufacturing are less material handling and reduced setup time.
سؤال
In cellular manufacturing, machines and equipment are grouped by type (e.g., all grinders are grouped into a cell).
سؤال
The main issue in the design of process layouts concerns the relative positioning of the departments involved.
سؤال
A disadvantage of a product layout can be high in-process inventory costs.
سؤال
The percentage of idle time in an assembly line is called cycle time.
سؤال
Group technology is closely connected to cellular manufacturing.
سؤال
The goal of line balancing is to assign tasks to workstations in such a way that the workstations have approximately equal time requirements.
سؤال
An idle percentage of zero means a line is perfectly balanced.
سؤال
Common reasons for redesign of layouts include:
(I)efficient operations.
(II)accidents or safety hazards.
(III)new products or services.
(IV)morale problems.

A)I and II
B)II and IV
C)I and III
D)II, III, and IV
E)I, II, III, and IV
سؤال
When new products or services are being planned, process selection occurs as a matter of course. Process selection also comes into play as a result of:
(I)technological changes.
(II)competitive pressures.
(III)fundamental changes in demand patterns.

A)I only
B)II only
C)III only
D)I and II but not III
E)I, II, and III
سؤال
Process choice is _____ driven.

A)demand
B)operations
C)marketing
D)process
E)capacity
سؤال
As compared to rigid automation, the benefits of flexible manufacturing systems include

A)reduced labor requirements.
B)higher efficiency.
C)larger batch sizes.
D)significantly lower fixed costs.
E)significantly lower variable costs.
سؤال
The process of assigning tasks to workstations in such a way that the workstations have approximately equal time requirements is called

A)fair employment practices.
B)idle time analysis.
C)line balancing.
D)cycle time optimization.
E)capacity cycling.
سؤال
Job shops tend to be _____ while continuous processes tend to be _____.

A)in services; in manufacturing
B)short-term and capital intensive; long-term and labor intensive
C)small scale and flexible; large-scale and inflexible
D)standardized; customized
E)low cost-per-unit; high cost-per-unit
سؤال
Cellular layouts are associated with

A)closeness ratings.
B)part families.
C)functional (or process)layouts.
D)assembly lines.
E)job shops.
سؤال
Which of the following is not a process type commonly considered in making products or delivering services?

A)continuous
B)batch
C)repetitive
D)job shop
E)subcontracting
سؤال
An operations strategy for process selection should recognize that

A)process selection seldom requires technical expertise.
B)engineering "white elephants" are uncommon.
C)there is little need to manage technology.
D)flexibility is not always the best choice.
E)most technical skills can be contracted out to consultants.
سؤال
The substitution of machinery that has sensing and control devices for human labor is best described by the term

A)automation.
B)feedback control.
C)computer-aided manufacturing.
D)computer-integrated manufacturing.
E)flexible manufacturing system.
سؤال
The estimation of costs is generally most difficult when the _____ process has been chosen.

A)project
B)repetitive
C)continuous
D)batch
E)job shop
سؤال
The advantages of automation include:
(I)reduced output variability.
(II)reduced variable costs.
(III)machines don't strike or file grievances.
(IV)machines are always less expensive than human labor.

A)I and IV
B)II and III
C)I, II, and III
D)I and III
E)II and IV
سؤال
The type of processing system which is used for highly standardized products is

A)continuous.
B)intermittent.
C)project.
D)batch.
E)unit.
سؤال
A group of machines including supervisory computer control, automatic material handling, and possibly robots is called

A)computer-aided design.
B)a manufacturing cell.
C)computer-aided manufacturing.
D)computer-integrated manufacturing.
E)a flexible manufacturing system.
سؤال
In an environment in which demand is both substantial and stable, _____ technology tends to be the best choice.

A)batch production
B)fixed automation
C)project production
D)programmable automation
E)flexible automation
سؤال
Computer-integrated manufacturing integrates all of the following except _____ with manufacturing.

A)consumer satisfaction surveys
B)engineering design
C)purchasing
D)production planning and control
E)order processing
سؤال
In which type of operation are you likely to see, at most, only minor variations in the product or service being produced using the same process and the same equipment?

A)a project
B)a job shop
C)repetitive production
D)batch processing
E)intermittent production
سؤال
Which type of processing system tends to produce the most product variety?

A)assembly
B)job shop
C)batch
D)continuous
E)mass customization
سؤال
The key questions in the process selection task are:
(I)How will the product/service be priced?
(II)How much variety will be imposed on the process?
(III)What is the target market for the product/service?
(IV)At what volume will the process need to operate?

A)I and III
B)II and IV
C)II and III
D)I and IV
E)III and IV
سؤال
Computer-aided manufacturing refers to the use of computers in

A)product design.
B)decision making.
C)data analysis.
D)quality control.
E)process control.
سؤال
In which type of processing system would gasoline be produced from crude oil?

A)job shop
B)batch
C)assembly
D)continuous
E)project
سؤال
The type of layout in which workers, materials, and equipment are moved to the product as needed is

A)process.
B)product.
C)fixed-position.
D)batch.
E)mass.
سؤال
Layout design has many objectives, one of which is

A)reduce bottlenecks.
B)move materials and workers simultaneously.
C)use workers and space efficiently.
D)hold material handling costs to 27 percent or less.
E)install computer terminals every 500 feet.
سؤال
A service organization such as a hospital is likely to use a(n)_____ layout because of variability in customer processing requirements.

A)project
B)process
C)flow
D)assembly
E)nonrepetitive
سؤال
Which of the following is not true about process layouts when they are compared to product layouts?

A)higher in-process inventories
B)lower span of supervision
C)lower rates of output
D)more involved cost accounting
E)lower unit costs
سؤال
Product profiling links key product or service requirements to

A)market conditions.
B)order sizes.
C)pricing strategies.
D)schedule changes.
E)process capabilities.
سؤال
Which term is most closely associated with cellular manufacturing?

A)part families
B)assembly line
C)robotics
D)CAD
E)CAM
سؤال
The grouping of equipment by the operations needed to perform similar work for part families is

A)product layout.
B)cellular manufacturing layout.
C)functional layout.
D)fixed-position layout.
E)process layout.
سؤال
A production line is to be designed for a job with three tasks. The task times are 0.3 minutes, 1.4 minutes, and 0.7 minutes. For a single production line with no parallel activities, the minimum cycle time in minutes is

A)0.3.
B)0.7.
C)1.4.
D)2.4.
E)0.8.
سؤال
An example of automated services is

A)online banking.
B)build your own pizza.
C)haircuts.
D)massage parlors.
E)financial advising.
سؤال
Laser technology used in surgical procedures is an example of technological advances in

A)product.
B)facility layout.
C)process.
D)information.
E)reverse engineering.
سؤال
Which one of the following is not considered an important factor in retail layout design?

A)cost minimization
B)traffic patterns and traffic flow
C)opportunity to influence customer attitudes
D)degree of contact with the customer
E)degree of customization
سؤال
Which phrase most closely describes flexible manufacturing systems?

A)a variation of CAD
B)a more fully automated version of cellular manufacturing
C)manufacturing resource planning
D)a process layout with a manufacturing overlay
E)an approach that allows workers to begin work at a time of their choosing
سؤال
The minimum possible cycle time in a typical product layout with no parallel activities is determined by the

A)longest task time.
B)shortest task time.
C)average task time.
D)total task time.
E)per-unit setup time.
سؤال
Which of the following is not a characteristic of layout decisions in system design?

A)substantial investment of both money and effort
B)long-term commitment
C)significant impact on short-term efficiency
D)usually well received by operative personnel
E)can affect supplier or customer processes
سؤال
Daily capacity of a product layout is determined by

A)cycle time divided by operating time.
B)operating time divided by cycle time.
C)operating time divided by total task time.
D)total task time divided by cycle time.
E)cycle time divided by total task time.
سؤال
Which one of the following is not common to product layouts?

A)a high rate of output
B)specialization of labor
C)low unit costs
D)ability to adjust to changes in demand
E)special-purpose technology
سؤال
A production line is to be designed for a job with three tasks. The task times are 0.4 minutes, 1.2 minutes, and 0.5 minutes. The maximum cycle time in minutes is

A)0.4.
B)0.5.
C)1.2.
D)2.1.
E)0.7.
سؤال
In a product layout, the task of deciding how to assign work to specific stations is referred to as

A)process balancing.
B)task allocation.
C)line balancing.
D)work allocation.
E)station balancing.
سؤال
The type of layout which features departments or other functional groupings in which similar activities are performed is

A)process.
B)product.
C)fixed-position.
D)mass.
E)unit.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/137
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 6: Process Selection and Facility Layout
1
Information technology refers to competitive data.
False
2
A cafeteria line would be an example of a process-focused layout.
False
3
Intermittent processing can take the form of batch processing or a job shop.
True
4
Process layouts feature departments or other functional groupings of personnel or equipment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
5
Morale problems can be a reason for redesign of a facility layout.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
6
In general, job-shop systems have a lower unit cost than continuous systems do because continuous systems use costly specialized equipment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
7
As a general rule, continuous processing systems produce products with very little variety.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
8
Continuous processing is the best way to produce customized output.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
9
Product layouts typically achieve high utilization of labor and equipment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
10
Right-sized equipment tends to be larger than equipment used in traditional process layouts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
11
Repetitive processing systems repetitively rotate production through small batches of a variety of products.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
12
There are three basic process types: input, processing, and output.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
13
Avoiding bottlenecks is the primary goal of product design.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
14
Continuous production systems are typically very rigid and costly to change.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
15
A possible disadvantage of a product layout is an inflexible system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
16
The term "computer-aided manufacturing" refers primarily to the use of robotics in process control.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
17
A job-shop processing system generally requires less-skilled workers than a continuous processing system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
18
Flexible manufacturing systems bring the benefits of automation to continuous processes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
19
A manufacturing cell allows the production of a wide range of very different products.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
20
Product layouts can more easily adapt to variations in product requirements than process layouts can.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
21
Accounting, purchasing, and inventory control are fairly routine with process layouts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
22
In some service industries, facility layout may influence sales volume and customer attitudes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
23
An advantage of a U-shaped production line is that it facilitates teamwork and flexibility in work assignments.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
24
Mismatches between operational capabilities and market demand can have a negative impact on an organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
25
For a production line, daily capacity can be determined by dividing the daily operating time by the line's cycle time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
26
A process layout is more susceptible to shutdowns caused by equipment breakdowns than a product layout.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
27
"Balance delay" is another name for the percentage of idle time in a product layout.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
28
Work design, technological change, and layout are inputs in capacity planning and process selection.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
29
An optimal set of assignments for a production line cannot be obtained by assigning tasks to workstations in order of either: (1)the most following tasks; or (2)the sum of the task's time and the times of all following tasks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
30
The minimum number of workstations for a production line is determined in part by the desired output rate.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
31
Heuristic rules for line balancing will guarantee an optimal solution.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
32
"Balance delay" is another name for the percentage of idle time in a process layout.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
33
Among the benefits claimed for cellular manufacturing are less material handling and reduced setup time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
34
In cellular manufacturing, machines and equipment are grouped by type (e.g., all grinders are grouped into a cell).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
35
The main issue in the design of process layouts concerns the relative positioning of the departments involved.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
36
A disadvantage of a product layout can be high in-process inventory costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
37
The percentage of idle time in an assembly line is called cycle time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
38
Group technology is closely connected to cellular manufacturing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
39
The goal of line balancing is to assign tasks to workstations in such a way that the workstations have approximately equal time requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
40
An idle percentage of zero means a line is perfectly balanced.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
41
Common reasons for redesign of layouts include:
(I)efficient operations.
(II)accidents or safety hazards.
(III)new products or services.
(IV)morale problems.

A)I and II
B)II and IV
C)I and III
D)II, III, and IV
E)I, II, III, and IV
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
42
When new products or services are being planned, process selection occurs as a matter of course. Process selection also comes into play as a result of:
(I)technological changes.
(II)competitive pressures.
(III)fundamental changes in demand patterns.

A)I only
B)II only
C)III only
D)I and II but not III
E)I, II, and III
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
43
Process choice is _____ driven.

A)demand
B)operations
C)marketing
D)process
E)capacity
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
44
As compared to rigid automation, the benefits of flexible manufacturing systems include

A)reduced labor requirements.
B)higher efficiency.
C)larger batch sizes.
D)significantly lower fixed costs.
E)significantly lower variable costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
45
The process of assigning tasks to workstations in such a way that the workstations have approximately equal time requirements is called

A)fair employment practices.
B)idle time analysis.
C)line balancing.
D)cycle time optimization.
E)capacity cycling.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
46
Job shops tend to be _____ while continuous processes tend to be _____.

A)in services; in manufacturing
B)short-term and capital intensive; long-term and labor intensive
C)small scale and flexible; large-scale and inflexible
D)standardized; customized
E)low cost-per-unit; high cost-per-unit
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
47
Cellular layouts are associated with

A)closeness ratings.
B)part families.
C)functional (or process)layouts.
D)assembly lines.
E)job shops.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
48
Which of the following is not a process type commonly considered in making products or delivering services?

A)continuous
B)batch
C)repetitive
D)job shop
E)subcontracting
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
49
An operations strategy for process selection should recognize that

A)process selection seldom requires technical expertise.
B)engineering "white elephants" are uncommon.
C)there is little need to manage technology.
D)flexibility is not always the best choice.
E)most technical skills can be contracted out to consultants.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
50
The substitution of machinery that has sensing and control devices for human labor is best described by the term

A)automation.
B)feedback control.
C)computer-aided manufacturing.
D)computer-integrated manufacturing.
E)flexible manufacturing system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
51
The estimation of costs is generally most difficult when the _____ process has been chosen.

A)project
B)repetitive
C)continuous
D)batch
E)job shop
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
52
The advantages of automation include:
(I)reduced output variability.
(II)reduced variable costs.
(III)machines don't strike or file grievances.
(IV)machines are always less expensive than human labor.

A)I and IV
B)II and III
C)I, II, and III
D)I and III
E)II and IV
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
53
The type of processing system which is used for highly standardized products is

A)continuous.
B)intermittent.
C)project.
D)batch.
E)unit.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
54
A group of machines including supervisory computer control, automatic material handling, and possibly robots is called

A)computer-aided design.
B)a manufacturing cell.
C)computer-aided manufacturing.
D)computer-integrated manufacturing.
E)a flexible manufacturing system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
55
In an environment in which demand is both substantial and stable, _____ technology tends to be the best choice.

A)batch production
B)fixed automation
C)project production
D)programmable automation
E)flexible automation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
56
Computer-integrated manufacturing integrates all of the following except _____ with manufacturing.

A)consumer satisfaction surveys
B)engineering design
C)purchasing
D)production planning and control
E)order processing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
57
In which type of operation are you likely to see, at most, only minor variations in the product or service being produced using the same process and the same equipment?

A)a project
B)a job shop
C)repetitive production
D)batch processing
E)intermittent production
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
58
Which type of processing system tends to produce the most product variety?

A)assembly
B)job shop
C)batch
D)continuous
E)mass customization
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
59
The key questions in the process selection task are:
(I)How will the product/service be priced?
(II)How much variety will be imposed on the process?
(III)What is the target market for the product/service?
(IV)At what volume will the process need to operate?

A)I and III
B)II and IV
C)II and III
D)I and IV
E)III and IV
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
60
Computer-aided manufacturing refers to the use of computers in

A)product design.
B)decision making.
C)data analysis.
D)quality control.
E)process control.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
61
In which type of processing system would gasoline be produced from crude oil?

A)job shop
B)batch
C)assembly
D)continuous
E)project
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
62
The type of layout in which workers, materials, and equipment are moved to the product as needed is

A)process.
B)product.
C)fixed-position.
D)batch.
E)mass.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
63
Layout design has many objectives, one of which is

A)reduce bottlenecks.
B)move materials and workers simultaneously.
C)use workers and space efficiently.
D)hold material handling costs to 27 percent or less.
E)install computer terminals every 500 feet.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
64
A service organization such as a hospital is likely to use a(n)_____ layout because of variability in customer processing requirements.

A)project
B)process
C)flow
D)assembly
E)nonrepetitive
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
65
Which of the following is not true about process layouts when they are compared to product layouts?

A)higher in-process inventories
B)lower span of supervision
C)lower rates of output
D)more involved cost accounting
E)lower unit costs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
66
Product profiling links key product or service requirements to

A)market conditions.
B)order sizes.
C)pricing strategies.
D)schedule changes.
E)process capabilities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
67
Which term is most closely associated with cellular manufacturing?

A)part families
B)assembly line
C)robotics
D)CAD
E)CAM
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
68
The grouping of equipment by the operations needed to perform similar work for part families is

A)product layout.
B)cellular manufacturing layout.
C)functional layout.
D)fixed-position layout.
E)process layout.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
69
A production line is to be designed for a job with three tasks. The task times are 0.3 minutes, 1.4 minutes, and 0.7 minutes. For a single production line with no parallel activities, the minimum cycle time in minutes is

A)0.3.
B)0.7.
C)1.4.
D)2.4.
E)0.8.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
70
An example of automated services is

A)online banking.
B)build your own pizza.
C)haircuts.
D)massage parlors.
E)financial advising.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
71
Laser technology used in surgical procedures is an example of technological advances in

A)product.
B)facility layout.
C)process.
D)information.
E)reverse engineering.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
72
Which one of the following is not considered an important factor in retail layout design?

A)cost minimization
B)traffic patterns and traffic flow
C)opportunity to influence customer attitudes
D)degree of contact with the customer
E)degree of customization
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
73
Which phrase most closely describes flexible manufacturing systems?

A)a variation of CAD
B)a more fully automated version of cellular manufacturing
C)manufacturing resource planning
D)a process layout with a manufacturing overlay
E)an approach that allows workers to begin work at a time of their choosing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
74
The minimum possible cycle time in a typical product layout with no parallel activities is determined by the

A)longest task time.
B)shortest task time.
C)average task time.
D)total task time.
E)per-unit setup time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
75
Which of the following is not a characteristic of layout decisions in system design?

A)substantial investment of both money and effort
B)long-term commitment
C)significant impact on short-term efficiency
D)usually well received by operative personnel
E)can affect supplier or customer processes
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
76
Daily capacity of a product layout is determined by

A)cycle time divided by operating time.
B)operating time divided by cycle time.
C)operating time divided by total task time.
D)total task time divided by cycle time.
E)cycle time divided by total task time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
77
Which one of the following is not common to product layouts?

A)a high rate of output
B)specialization of labor
C)low unit costs
D)ability to adjust to changes in demand
E)special-purpose technology
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
78
A production line is to be designed for a job with three tasks. The task times are 0.4 minutes, 1.2 minutes, and 0.5 minutes. The maximum cycle time in minutes is

A)0.4.
B)0.5.
C)1.2.
D)2.1.
E)0.7.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
79
In a product layout, the task of deciding how to assign work to specific stations is referred to as

A)process balancing.
B)task allocation.
C)line balancing.
D)work allocation.
E)station balancing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
80
The type of layout which features departments or other functional groupings in which similar activities are performed is

A)process.
B)product.
C)fixed-position.
D)mass.
E)unit.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 137 في هذه المجموعة.