Deck 7: Work Design and Measurement

ملء الشاشة (f)
exit full mode
سؤال
Learning curves are mostly relevant for complex, new activities that have not been done often.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
According to learning curve theory, every doubling of total output will produce a constant percentage decrease in time per unit .
سؤال
Learning curves generally apply to situations in which there is a high degree of human involvement and tasks are fairly repetitive.
سؤال
If an 80 percent curve is appropriate for a task and the first unit takes 10 hours, the average time for the first 2 units would be 8 hours.
سؤال
According to learning curve theory, the time reduction per unit decreases (improves)as the number of units increases.
سؤال
If the elapsed time for the task is short and the activity is somewhat routine, a modest amount of improvement occurs during the first few repetitions.
سؤال
Negotiated purchasing results in lower unit costs for smaller quantities.
سؤال
According to learning curve theory, for certain kinds of tasks the cost per unit decreases as the number of repetitions increases.
سؤال
For an 80 percent learning curve, if the first unit requires 10 hours, the second unit will require 8 hours and the third 6.4 hours.
سؤال
An 80 percent learning curve means that with each doubling of repetitions there will be a 20 percent decrease in time per unit.
سؤال
The learning curve principle would apply to the number of students in a class: a class twice as large will learn 80 percent faster.
سؤال
Ergonomics is the use of computers and robots in the workplace.
سؤال
A learning curve for an overqualified worker is higher than that for an average worker.
سؤال
Learning curves are used primarily for mass production applications.
سؤال
The decrease in time between the second and fourth units will be equal to the decrease in time between the first and second units.
سؤال
The learning curve is a basic tool for mass production-type activities because it can deal with large volumes of output.
سؤال
When the task is fairly complex and has a longer duration, it will take a larger number of repetitions before improvement is observed.
سؤال
The learning curve principle would apply to a baseball pitcher learning to throw a curveball.
سؤال
If we have never made the first unit but only think we know how much the labor time will be, we cannot draw a learning curve.
سؤال
A learning percentage of 95 percent indicates greater learning than a percentage of 90 percent.
سؤال
Potential benefits of self-directed teams include higher productivity and greater worker satisfaction.
سؤال
Methods analysis cannot be done for new jobs (ones that do not yet exist)since it requires observation of the process.
سؤال
Self-directed teams are allowed to make changes in the work processes under their control.
سؤال
Predetermined time standards are usually based on observing one very efficient worker performing the task.
سؤال
Self-directed teams help other work groups make changes to their processes.
سؤال
One disadvantage of specialization is worker dissatisfaction.
سؤال
Job design relates to people, therefore technology has little impact.
سؤال
Many lower-level jobs are monotonous and boring.
سؤال
The quickest, most effective way to improve an employee's job satisfaction is to increase his or her compensation.
سؤال
One of the potential benefits of self-directed teams is higher quality.
سؤال
Job enrichment involves an increase in the level of responsibility for planning and coordinating tasks.
سؤال
Motivation influences quality and productivity, but not the work environment.
سؤال
Specialization is one of the sources of disagreement between the efficiency and behavioral approaches to job design.
سؤال
One important factor that influences productivity is trust between workers and managers.
سؤال
One potential disadvantage of self-directed teams is higher turnover and absenteeism.
سؤال
Trust is a factor influencing productivity.
سؤال
Job enrichment involves giving workers a greater share of the total task, which is why they feel enriched.
سؤال
Ergonomics is an important part of job design to consider for factory work but not for office work.
سؤال
A flow process chart is helpful for visualizing the portions of a work cycle during which the equipment is busy or idle.
سؤال
One therblig is the equivalent of 1 hour of sustained work by one average person.
سؤال
A standard time is the amount of time it should take a fully trained and qualified worker to complete a specific task, working at an efficient, yet sustainable pace, using their choice of methods, tools, equipment, and workplace arrangement.
سؤال
No stopwatch is required in a work sampling study.
سؤال
Therbligs are basic elemental motions.
سؤال
Predetermined time standards use historical data from a company's own files.
سؤال
Work sampling involves the use of some method of randomizing the observations.
سؤال
Predetermined time standards involve the use of published data regarding how long various activities are expected to take.
سؤال
An advantage of work sampling, compared to a stopwatch time study, is that observations are spread out over a period of time in work sampling.
سؤال
Ergonomics is important for preventing common workplace injuries such as back injuries and repetitive-motion injuries.
سؤال
Work measurement concentrates on how long the tasks take to accomplish.
سؤال
For purposes of obtaining good time standards using a stopwatch time study, the analyst should try to avoid having the worker discover he or she is being observed.
سؤال
One factor in determining how many cycles to time in a time study is the degree of variation that is present in the observed times.
سؤال
The normal time in time study is obtained by multiplying the observed time by the performance rating.
سؤال
The standard time for a job can be obtained by multiplying the normal time by an appropriate allowance factor.
سؤال
A performance rating of less than 1.0 means that the observed worker was judged to be working at a faster than normal rate-doing the job more quickly than normal.
سؤال
Work sampling can be used to estimate the proportion of time a machine is idle.
سؤال
Work sampling provides a detailed elemental breakdown of a task for purposes of establishing reliable time standards.
سؤال
The normal time for a job is multiplied by the performance rating to obtain the standard time for the job.
سؤال
The two basic causes of accidents are worker carelessness and management demands for increased productivity.
سؤال
The design of work systems is based on objective standards and thereby avoids most ethical issues.
سؤال
Work sampling is most frequently used to set time standards.
سؤال
A worker-machine chart can help identify nonproductive parts of a process.
سؤال
Once production is underway and the learning curve effect is occurring, successive changes made to the production process will cause the time per unit to:

A)continue following the original learning curve without any impact.
B)cause a scallop effect.
C)increase the unit time and result in a higher percentage learning curve.
D)decrease the unit time and result in a higher percentage learning curve.
E)decrease the unit time and result in a lower percentage learning curve.
سؤال
Sometimes improvements in labor requirements are more apparent than real because of:

A)fixed costs increasing.
B)automation.
C)mass production.
D)increases in indirect labor.
E)greater precision in estimating the learning rate.
سؤال
Output-based systems compensate employees according to the amount of output they produce, thereby tying pay directly to performance.
سؤال
Specialization is a term that describes job that have a very wide scope.
سؤال
To which worker would learning curves be most applicable?

A)bus driver
B)printing press operator
C)assembly-line worker
D)auto service mechanic
E)baker or cook
سؤال
It took exactly 10 hours to perform the first kidney transplant on a 100 percent learning curve. The second kidney transplant will take how many hours to perform?

A)8 hours
B)10 hours
C)12 hours
D)A 100 percent learning curve cannot exist.
E)5 hours
سؤال
The more _____ a task, the less likely it is that a substantial learning curve will be in effect.

A)strategic
B)capital intensive
C)routine
D)tactical
E)unusual
سؤال
Suppose the first unit of output required 900 labor hours, and the second unit required only 810. At this rate, how many more units must be produced before labor requirements are less than 700 hours?

A)2
B)4
C)6
D)8
E)10
سؤال
Increasing volumes result in _____ the learning curve.

A)moving up
B)moving down
C)moving off
D)moving away from
E)stabilization of
سؤال
Methods analysis is more likely to lead to a relatively easy and successful implementation of an improved method if workers have been consulted throughout the process than if the analyst assumed sole responsibility for the development of the improved method.
سؤال
Work sampling provides both quick and accurate estimates of activity times.
سؤال
The fact that human activities typically improve when they are done on a repetitive basis is described by a(n):

A)normal distribution curve.
B)learning curve.
C)binomial distribution curve.
D)exponential curve.
E)fatigue factor allowance.
سؤال
The importance of work design is often underscored by the organization's dependence on technology.
سؤال
Measured daywork systems are output-based compensation systems.
سؤال
Time-based systems compensate employees according to the time they have worked and the amount of output they produce.
سؤال
On a log-log graph, learning curves appear as:

A)upward-curving lines.
B)downward-curving lines.
C)straight lines.
D)lines which increase at a decreasing rate.
E)lines which decrease at a decreasing rate.
سؤال
Increasing compensation is always the best way to improve worker satisfaction.
سؤال
It would be acceptable to use a group incentive plan for an assembly line operation.
سؤال
A worker-machine chart can be used to determine how many machines an operator can manage.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/200
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 7: Work Design and Measurement
1
Learning curves are mostly relevant for complex, new activities that have not been done often.
True
2
According to learning curve theory, every doubling of total output will produce a constant percentage decrease in time per unit .
True
3
Learning curves generally apply to situations in which there is a high degree of human involvement and tasks are fairly repetitive.
True
4
If an 80 percent curve is appropriate for a task and the first unit takes 10 hours, the average time for the first 2 units would be 8 hours.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
5
According to learning curve theory, the time reduction per unit decreases (improves)as the number of units increases.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
6
If the elapsed time for the task is short and the activity is somewhat routine, a modest amount of improvement occurs during the first few repetitions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
7
Negotiated purchasing results in lower unit costs for smaller quantities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
8
According to learning curve theory, for certain kinds of tasks the cost per unit decreases as the number of repetitions increases.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
9
For an 80 percent learning curve, if the first unit requires 10 hours, the second unit will require 8 hours and the third 6.4 hours.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
10
An 80 percent learning curve means that with each doubling of repetitions there will be a 20 percent decrease in time per unit.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
11
The learning curve principle would apply to the number of students in a class: a class twice as large will learn 80 percent faster.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
12
Ergonomics is the use of computers and robots in the workplace.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
13
A learning curve for an overqualified worker is higher than that for an average worker.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
14
Learning curves are used primarily for mass production applications.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
15
The decrease in time between the second and fourth units will be equal to the decrease in time between the first and second units.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
16
The learning curve is a basic tool for mass production-type activities because it can deal with large volumes of output.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
17
When the task is fairly complex and has a longer duration, it will take a larger number of repetitions before improvement is observed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
18
The learning curve principle would apply to a baseball pitcher learning to throw a curveball.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
19
If we have never made the first unit but only think we know how much the labor time will be, we cannot draw a learning curve.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
20
A learning percentage of 95 percent indicates greater learning than a percentage of 90 percent.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
21
Potential benefits of self-directed teams include higher productivity and greater worker satisfaction.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
22
Methods analysis cannot be done for new jobs (ones that do not yet exist)since it requires observation of the process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
23
Self-directed teams are allowed to make changes in the work processes under their control.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
24
Predetermined time standards are usually based on observing one very efficient worker performing the task.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
25
Self-directed teams help other work groups make changes to their processes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
26
One disadvantage of specialization is worker dissatisfaction.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
27
Job design relates to people, therefore technology has little impact.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
28
Many lower-level jobs are monotonous and boring.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
29
The quickest, most effective way to improve an employee's job satisfaction is to increase his or her compensation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
30
One of the potential benefits of self-directed teams is higher quality.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
31
Job enrichment involves an increase in the level of responsibility for planning and coordinating tasks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
32
Motivation influences quality and productivity, but not the work environment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
33
Specialization is one of the sources of disagreement between the efficiency and behavioral approaches to job design.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
34
One important factor that influences productivity is trust between workers and managers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
35
One potential disadvantage of self-directed teams is higher turnover and absenteeism.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
36
Trust is a factor influencing productivity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
37
Job enrichment involves giving workers a greater share of the total task, which is why they feel enriched.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
38
Ergonomics is an important part of job design to consider for factory work but not for office work.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
39
A flow process chart is helpful for visualizing the portions of a work cycle during which the equipment is busy or idle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
40
One therblig is the equivalent of 1 hour of sustained work by one average person.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
41
A standard time is the amount of time it should take a fully trained and qualified worker to complete a specific task, working at an efficient, yet sustainable pace, using their choice of methods, tools, equipment, and workplace arrangement.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
42
No stopwatch is required in a work sampling study.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
43
Therbligs are basic elemental motions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
44
Predetermined time standards use historical data from a company's own files.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
45
Work sampling involves the use of some method of randomizing the observations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
46
Predetermined time standards involve the use of published data regarding how long various activities are expected to take.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
47
An advantage of work sampling, compared to a stopwatch time study, is that observations are spread out over a period of time in work sampling.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
48
Ergonomics is important for preventing common workplace injuries such as back injuries and repetitive-motion injuries.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
49
Work measurement concentrates on how long the tasks take to accomplish.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
50
For purposes of obtaining good time standards using a stopwatch time study, the analyst should try to avoid having the worker discover he or she is being observed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
51
One factor in determining how many cycles to time in a time study is the degree of variation that is present in the observed times.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
52
The normal time in time study is obtained by multiplying the observed time by the performance rating.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
53
The standard time for a job can be obtained by multiplying the normal time by an appropriate allowance factor.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
54
A performance rating of less than 1.0 means that the observed worker was judged to be working at a faster than normal rate-doing the job more quickly than normal.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
55
Work sampling can be used to estimate the proportion of time a machine is idle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
56
Work sampling provides a detailed elemental breakdown of a task for purposes of establishing reliable time standards.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
57
The normal time for a job is multiplied by the performance rating to obtain the standard time for the job.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
58
The two basic causes of accidents are worker carelessness and management demands for increased productivity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
59
The design of work systems is based on objective standards and thereby avoids most ethical issues.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
60
Work sampling is most frequently used to set time standards.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
61
A worker-machine chart can help identify nonproductive parts of a process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
62
Once production is underway and the learning curve effect is occurring, successive changes made to the production process will cause the time per unit to:

A)continue following the original learning curve without any impact.
B)cause a scallop effect.
C)increase the unit time and result in a higher percentage learning curve.
D)decrease the unit time and result in a higher percentage learning curve.
E)decrease the unit time and result in a lower percentage learning curve.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
63
Sometimes improvements in labor requirements are more apparent than real because of:

A)fixed costs increasing.
B)automation.
C)mass production.
D)increases in indirect labor.
E)greater precision in estimating the learning rate.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
64
Output-based systems compensate employees according to the amount of output they produce, thereby tying pay directly to performance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
65
Specialization is a term that describes job that have a very wide scope.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
66
To which worker would learning curves be most applicable?

A)bus driver
B)printing press operator
C)assembly-line worker
D)auto service mechanic
E)baker or cook
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
67
It took exactly 10 hours to perform the first kidney transplant on a 100 percent learning curve. The second kidney transplant will take how many hours to perform?

A)8 hours
B)10 hours
C)12 hours
D)A 100 percent learning curve cannot exist.
E)5 hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
68
The more _____ a task, the less likely it is that a substantial learning curve will be in effect.

A)strategic
B)capital intensive
C)routine
D)tactical
E)unusual
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
69
Suppose the first unit of output required 900 labor hours, and the second unit required only 810. At this rate, how many more units must be produced before labor requirements are less than 700 hours?

A)2
B)4
C)6
D)8
E)10
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
70
Increasing volumes result in _____ the learning curve.

A)moving up
B)moving down
C)moving off
D)moving away from
E)stabilization of
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
71
Methods analysis is more likely to lead to a relatively easy and successful implementation of an improved method if workers have been consulted throughout the process than if the analyst assumed sole responsibility for the development of the improved method.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
72
Work sampling provides both quick and accurate estimates of activity times.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
73
The fact that human activities typically improve when they are done on a repetitive basis is described by a(n):

A)normal distribution curve.
B)learning curve.
C)binomial distribution curve.
D)exponential curve.
E)fatigue factor allowance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
74
The importance of work design is often underscored by the organization's dependence on technology.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
75
Measured daywork systems are output-based compensation systems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
76
Time-based systems compensate employees according to the time they have worked and the amount of output they produce.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
77
On a log-log graph, learning curves appear as:

A)upward-curving lines.
B)downward-curving lines.
C)straight lines.
D)lines which increase at a decreasing rate.
E)lines which decrease at a decreasing rate.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
78
Increasing compensation is always the best way to improve worker satisfaction.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
79
It would be acceptable to use a group incentive plan for an assembly line operation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
80
A worker-machine chart can be used to determine how many machines an operator can manage.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.