Deck 7: Process Management

ملء الشاشة (f)
exit full mode
سؤال
Simplifying a product's design frequently reduces product cost,but rarely improves quality.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Unlike kaizen,the goal of reengineering is to achieve large and dramatic improvements in performance.
سؤال
Concurrent engineering processes improve product design quality but cause product development times to increase.
سؤال
A well-run manufacturing operation can usually compensate for a poor product design.
سؤال
Agility is crucial to customer-focused strategies.
سؤال
Reengineering usually results in additional process steps or activities in order to improve a process.
سؤال
Process design is more readily applied to manufacturing operations than to services.
سؤال
The act of taking apart a competitor's product and analyzing it is referred to as process benchmarking.
سؤال
The first step in the product development process is preliminary concept development.
سؤال
Automation is the most valuable asset in the kaizen philosophy.
سؤال
Support processes generally do not directly add value to products and services.
سؤال
One component of a control system is the comparison of actual results with a standard or goal.
سؤال
Stretch goals often result from benchmarking activities.
سؤال
Process management is defined as the controlling and improving of processes after they have been designed.
سؤال
Improvements under kaizen usually require minimal financial investment.
سؤال
The entire ISO 9000:2000 standards are focused on an organization's ability to understand,define,and document its processes.
سؤال
Product liability issues are best addressed once the product design phase has been completed.
سؤال
The configuration of Dell computers to meet individual customer requirements is an example of mass customization.
سؤال
Processes must be both measurable and repeatable to be improved.
سؤال
Long-term improvements cannot be made to a process unless the process is first brought under control.
سؤال
Which of the following terms best describes kaizen?

A)Concurrent engineering
B)Continuous improvement
C)Innovation
D)Statistical process control
سؤال
Documenting a process involves all of the following EXCEPT:

A)defining workforce distribution.
B)describing how it is performed.
C)developing a process "map" or flowchart.
D)writing standard operating procedures and work instructions.
سؤال
Which type of process drives the creation of products and services,is critical to customer satisfaction,and has a large impact on the organization's strategic goals?

A)Value-creation process
B)Support process
C)Outsourced process
D)Supplier process
سؤال
Enablers of agility include all of the following EXCEPT:

A)detachment from customers.
B)empowerment of employees as decision makers.
C)close supplier and partner relationships.
D)breakthrough improvement.
سؤال
Most cross-functional business value-creation processes and all support processes are primarily _____.

A)service-oriented
B)customer-oriented
C)supplier-oriented.
D)technology-oriented
سؤال
Which of the following is TRUE?

A)Process improvement is more efficiently undertaken within one organizational function.
B)Process improvement does not affect traditional organizational structures.
C)Processes generally cut across traditional organizational functions.
D)Process improvement is an operational decision, not a strategic decision.
سؤال
Internal activities are primarily concerned with _____,while external activities require attention to _____.

A)employees; customers
B)efficiency; effectiveness
C)production; service delivery
D)standardization; customization
سؤال
Process management consists of:

A)design, installation, and improvement.
B)design, control, and improvement.
C)design, control, and standardization.
D)analysis, control, and improvement.
سؤال
A graphical representation of a process sequence is known as:

A)an affinity diagram.
B)a Pareto chart.
C)a flowchart.
D)a control chart.
سؤال
The employees of an insurance firm are given the task of studying the very successful employee training program at a bank.This is an example of:

A)process management.
B)strategic reengineering.
C)benchmarking.
D)quality control.
سؤال
Which of the following is NOT a goal in designing a service?

A)The goal is to provide a service whose elements are internally consistent.
B)The service is directed at meeting the needs of a specific target market segment.
C)Too much or too little emphasis on one component is encouraged as a differentiator in the market.
D)Services differ in the degree of customer contact and interaction, labor intensity, and customization.
سؤال
Which of the following is NOT TRUE regarding kaizen?

A)Kaizen requires substantial investment to fund cutting-edge innovation.
B)Kaizen is different than reengineering.
C)Kaizen concentrates on small, gradual improvements over the long term.
D)Any improvement activity is a part of the kaizen philosophy.
سؤال
Rapid changeover from one product to another,rapid response to changing demands,or the ability to produce a wide range of customized services are all examples of:

A)motility.
B)mobility.
C)agility
D)flexibility.
سؤال
Which of the following is NOT one of the three basic components of a service?

A)Physical facilities, processes, and procedures
B)Customers' involvement
C)Employees behavior
D)Employees' professional judgment
سؤال
_______ are accountable for process performance.

A)Process managers
B)Process owners
C)Process workers
D)Process black belts
سؤال
In the context of process management,_____ is the activity of ensuring conformance to the requirements and taking corrective action when necessary to correct problems and maintain stable performance,whereas _____ implies enhancing performance.

A)performance, innovation
B)control, improvement
C)inspection, anticipation
D)standardization, customization
سؤال
The employees of a manufacturing company who bill customers are involved in a(n)_________ for this manufacturing company.

A)value-creation process
B)support process
C)outsourced process
D)supplier process
سؤال
Which of the following is TRUE of support processes?

A)Support processes are those that are most important to an organization's value- creation processes.
B)They provide infrastructure and add value directly to the product or service.
C)Support processes do not include administrative services.
D)Value creation processes require a higher level of attention than do support processes.
سؤال
Which of the following is NOT TRUE of process owners?

A)They are accountable for process performance.
B)They have the authority to manage and improve their process.
C)They may range from high-level executives to workers in the shop floor.
D)They assign sub-owners to manage the process and optimize its effectiveness.
سؤال
In many companies,value creation processes take the form of _____ temporary work structures that start up,produce products or services,and then shut down.

A)projects
B)outsourcing
C)crisis teams
D)product teams
سؤال
Which of the following does NOT represent a service standard?

A)Ninety five percent of customers checked in within three minutes of arrival.
B)Hamburger fat content of 98 percent plus or minus one percent.
C)Airplane departure plus or minus 15 minutes from scheduled time.
D)Telephone answered within five seconds of first ring.
سؤال
As customization increases,_____ becomes a bigger factor in the customer's perception of service quality.

A)employee behavior
B)process and procedures
C)physical facilities
D)professional judgment
سؤال
When considering effective service designing,a fast food restaurant would be considered _____ in customer contact and ______ in customization.

A)low, high
B)high, high
C)high, low
D)low, low
سؤال
A service is more similar to a manufacturing operation if it is _____ in degree of customer contact,_____ in degree of labor intensity,and _____ in degree of customization..

A)low, low, low
B)low, high, low
C)low, high, high
D)high, high, low
سؤال
Poka-yoke is:

A)an approach for mistake-proofing processes.
B)a Japanese organizational hierarchy.
C)an error-detection machine used in engineering industries.
D)a computer program used in streamlining processes.
سؤال
Which of the following is NOT one of the typical types of service errors and related poka-yokes?

A)Tangible errors
B)Customer errors at the resolution
C)Customer errors during an encounter
D)Customer errors in application
سؤال
In the implementation of kaizen,the principle asset is considered to be:

A)technology.
B)automation.
C)financial investment.
D)people.
سؤال
In services,_____ take(s)the place of the dimensions and tolerances applicable in manufacturing.

A)customer behavior
B)service level agreements
C)flow charts
D)quality standards
سؤال
These goals and standards set as part of a control system are reflected by measurable quality characteristics like all of the following EXCEPT:

A)workforce engagement.
B)product dimensions.
C)service times.
D)employee behavior.
سؤال
Which one of the following is NOT one of the three levels of mistake-proofing?

A)Designing potential errors out of the process.
B)Identifying potential defects and stopping a process before the defect is produced.
C)Training the workforce in implementing and monitoring the modified process.
D)Finding defects that enter or leave a process.
سؤال
Poka-yoke focuses on two aspects:

A)design and control.
B)prediction and detection.
C)production and delivery.
D)machine errors and human errors.
سؤال
_____ is a process in which all major functions responsible for bringing products to the market are continuously involved in product development activities.

A)Reengineering
B)Value engineering
C)Concurrent engineering
D)Design for marketability
سؤال
A goal to reduce the time required to fulfill a customer's order addresses the dimension of:

A)accuracy.
B)cycle time.
C)flexibility.
D)reliability.
سؤال
In a total-quality manufacturing environment,the burden of inspecting the quality of purchased material rests with the:

A)transporter of the material.
B)supplier of the material.
C)user of the material.
D)purchaser of the material.
سؤال
With higher levels of _____,appropriate staff behavior becomes increasingly important.

A)contact and interaction
B)customization
C)labor intensity
D)technology dependence
سؤال
In services low in _____,the customer's impression of physical facilities,processes,and procedures is important.

A)market appeal
B)customer contact
C)customization
D)labor intensity
سؤال
Customer errors _____ stage of a service include failure to signal service inadequacies,to learn from experience,to adjust expectations,and to execute appropriate post-encounter actions.

A)at the delivery
B)at the resolution
C)in the preparation
D)during an encounter
سؤال
Any process control system has all of the following EXCEPT:

A)a backup process.
B)comparison of actual results with the standard.
C)a means of measuring accomplishment.
D)a standard or goal.
سؤال
_____ arise in the contact between the server and the customer.

A)Customer errors in preparation
B)Tangible errors
C)Treatment errors
D)Task errors
سؤال
Providing personalized,custom-designed products to meet individual preferences at competitive prices is known as:

A)concurrent engineering.
B)strategic benchmarking.
C)mass customization.
D)volume flexibility.
سؤال
The term _____ refers to approaches that produce exceptional results,are usually innovative in terms of the use of technology or human resources,and are recognized by customers or industry experts.

A)value creation
B)benchmarking
C)stretch goals
D)best practices
سؤال
Benchmarking:

A)is a cost-benefit tool for justifying investment.
B)is a process improvement technique for assigning workers to the correct workstations.
C)is a form of process variance reduction.
D)uses information from industry leaders to set stretch goals.
سؤال
Long-term remedial action for a process is the responsibility of:

A)the workers.
B)management.
C)engineers.
D)the maintenance staff.
سؤال
An after-action review or debrief consists of asking the following basic questions EXCEPT:

A)What was supposed to happen?
B)What actually happened?
C)Who is/are responsible?
D)Why was there a difference?
سؤال
The major obstacle in describing and classifying the behavioral observations is:

A)the lack of management involvement in driving customer-facing skills.
B)identifying instances of behavioral inconsistencies.
C)developing operational definitions of behavioral characteristics.
D)the resistance of the frontline workforce to such classifications.
سؤال
Spell-checkers in word processing software help reduce document misspellings.This poka-yoke is an example of:

A)customer errors in preparation.
B)customer errors at the resolution.
C)a task error.
D)a tangible error.
سؤال
Removing the causes of abnormalities and maintaining consistent performance is the essence of _____.

A)control
B)quality assurance
C)feedback
D)process design
سؤال
A successful kaizen program within a company requires all of the following EXCEPT:

A)total employee involvement.
B)significant training.
C)substantial financial investment.
D)operating practices.
سؤال
_____ force an organization to think in a radically different way,and to encourage major improvements as well as incremental ones.

A)Kaizen blitzes
B)Stretch goals
C)Quality circles
D)Strategy maps
سؤال
A _____ is an intense and rapid improvement process in which a team or a department throws all its resources into an improvement project over a short time period,as opposed to traditional applications,which are performed on a part-time basis.

A)continuous improvement team
B)quality circle
C)kaizen blitz
D)poka-yoke
سؤال
Two approaches for breakthrough improvement that help companies achieve stretch goals are _____ and _____.

A)brainstorming; team development
B)Kaizen blitzes; quality circles
C)benchmarking; reengineering
D)innovation; feedback
سؤال
Which of the following is NOT a feature of Kaizen blitz teams?

A)It is comprised of employees from all areas involved in the process.
B)Compared to other approaches, this is long-term approach.
C)The team can implement changes on the spot.
D)Improvement is immediate and satisfying for all those involved in the process.
سؤال
In the Deming cycle,the three fundamental questions to consider are all of the following EXCEPT:

A)What are we trying to accomplish?
B)What changes can we make that will result in improvement?
C)What time period will it take for the improvement to be standardized?
D)How will we know that a change is an improvement?
سؤال
According to Deming and Juran,the majority of quality problems are management controllable - the result of:

A)special cause variation.
B)common cause variation.
C)short-term variation.
D)long-term variation.
سؤال
Documented control procedures are usually written down in a(n):

A)operations manual.
B)flow chart.
C)data control sheet.
D)process control plan.
سؤال
Long-term improvements in a process cannot be made until:

A)the process is considered a value-creation process.
B)process improvement teams reach a consensus.
C)the process in under control.
D)the defect rate is defined.
سؤال
The four stages (PDSA)of the Deming cycle are:

A)plan, do, study, and act.
B)product, delivery, systems, and accounts.
C)plan, discuss, structure, and assess.
D)prepare, deliver, simplify, and act.
سؤال
_____ refers to discontinuous change,as opposed to gradual,continuous improvement.

A)Quality circles
B)Poka-yoke
C)Kaizen
D)Breakthrough improvement
سؤال
Which of the following are the quality characteristics in services that are easily measurable as opposed to observable?

A)Competency
B)Wrong delivery
C)Promptness
D)Nonconformance
سؤال
Breakthrough improvements are often motivated by _____.

A)stretch goals
B)business objectives
C)cost drivers
D)economies of scale
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/98
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 7: Process Management
1
Simplifying a product's design frequently reduces product cost,but rarely improves quality.
False
2
Unlike kaizen,the goal of reengineering is to achieve large and dramatic improvements in performance.
True
3
Concurrent engineering processes improve product design quality but cause product development times to increase.
False
4
A well-run manufacturing operation can usually compensate for a poor product design.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
5
Agility is crucial to customer-focused strategies.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
6
Reengineering usually results in additional process steps or activities in order to improve a process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
7
Process design is more readily applied to manufacturing operations than to services.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
8
The act of taking apart a competitor's product and analyzing it is referred to as process benchmarking.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
9
The first step in the product development process is preliminary concept development.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
10
Automation is the most valuable asset in the kaizen philosophy.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
11
Support processes generally do not directly add value to products and services.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
12
One component of a control system is the comparison of actual results with a standard or goal.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
13
Stretch goals often result from benchmarking activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
14
Process management is defined as the controlling and improving of processes after they have been designed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
15
Improvements under kaizen usually require minimal financial investment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
16
The entire ISO 9000:2000 standards are focused on an organization's ability to understand,define,and document its processes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
17
Product liability issues are best addressed once the product design phase has been completed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
18
The configuration of Dell computers to meet individual customer requirements is an example of mass customization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
19
Processes must be both measurable and repeatable to be improved.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
20
Long-term improvements cannot be made to a process unless the process is first brought under control.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
21
Which of the following terms best describes kaizen?

A)Concurrent engineering
B)Continuous improvement
C)Innovation
D)Statistical process control
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
22
Documenting a process involves all of the following EXCEPT:

A)defining workforce distribution.
B)describing how it is performed.
C)developing a process "map" or flowchart.
D)writing standard operating procedures and work instructions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
23
Which type of process drives the creation of products and services,is critical to customer satisfaction,and has a large impact on the organization's strategic goals?

A)Value-creation process
B)Support process
C)Outsourced process
D)Supplier process
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
24
Enablers of agility include all of the following EXCEPT:

A)detachment from customers.
B)empowerment of employees as decision makers.
C)close supplier and partner relationships.
D)breakthrough improvement.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
25
Most cross-functional business value-creation processes and all support processes are primarily _____.

A)service-oriented
B)customer-oriented
C)supplier-oriented.
D)technology-oriented
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
26
Which of the following is TRUE?

A)Process improvement is more efficiently undertaken within one organizational function.
B)Process improvement does not affect traditional organizational structures.
C)Processes generally cut across traditional organizational functions.
D)Process improvement is an operational decision, not a strategic decision.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
27
Internal activities are primarily concerned with _____,while external activities require attention to _____.

A)employees; customers
B)efficiency; effectiveness
C)production; service delivery
D)standardization; customization
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
28
Process management consists of:

A)design, installation, and improvement.
B)design, control, and improvement.
C)design, control, and standardization.
D)analysis, control, and improvement.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
29
A graphical representation of a process sequence is known as:

A)an affinity diagram.
B)a Pareto chart.
C)a flowchart.
D)a control chart.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
30
The employees of an insurance firm are given the task of studying the very successful employee training program at a bank.This is an example of:

A)process management.
B)strategic reengineering.
C)benchmarking.
D)quality control.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
31
Which of the following is NOT a goal in designing a service?

A)The goal is to provide a service whose elements are internally consistent.
B)The service is directed at meeting the needs of a specific target market segment.
C)Too much or too little emphasis on one component is encouraged as a differentiator in the market.
D)Services differ in the degree of customer contact and interaction, labor intensity, and customization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
32
Which of the following is NOT TRUE regarding kaizen?

A)Kaizen requires substantial investment to fund cutting-edge innovation.
B)Kaizen is different than reengineering.
C)Kaizen concentrates on small, gradual improvements over the long term.
D)Any improvement activity is a part of the kaizen philosophy.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
33
Rapid changeover from one product to another,rapid response to changing demands,or the ability to produce a wide range of customized services are all examples of:

A)motility.
B)mobility.
C)agility
D)flexibility.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
34
Which of the following is NOT one of the three basic components of a service?

A)Physical facilities, processes, and procedures
B)Customers' involvement
C)Employees behavior
D)Employees' professional judgment
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
35
_______ are accountable for process performance.

A)Process managers
B)Process owners
C)Process workers
D)Process black belts
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
36
In the context of process management,_____ is the activity of ensuring conformance to the requirements and taking corrective action when necessary to correct problems and maintain stable performance,whereas _____ implies enhancing performance.

A)performance, innovation
B)control, improvement
C)inspection, anticipation
D)standardization, customization
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
37
The employees of a manufacturing company who bill customers are involved in a(n)_________ for this manufacturing company.

A)value-creation process
B)support process
C)outsourced process
D)supplier process
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
38
Which of the following is TRUE of support processes?

A)Support processes are those that are most important to an organization's value- creation processes.
B)They provide infrastructure and add value directly to the product or service.
C)Support processes do not include administrative services.
D)Value creation processes require a higher level of attention than do support processes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
39
Which of the following is NOT TRUE of process owners?

A)They are accountable for process performance.
B)They have the authority to manage and improve their process.
C)They may range from high-level executives to workers in the shop floor.
D)They assign sub-owners to manage the process and optimize its effectiveness.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
40
In many companies,value creation processes take the form of _____ temporary work structures that start up,produce products or services,and then shut down.

A)projects
B)outsourcing
C)crisis teams
D)product teams
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
41
Which of the following does NOT represent a service standard?

A)Ninety five percent of customers checked in within three minutes of arrival.
B)Hamburger fat content of 98 percent plus or minus one percent.
C)Airplane departure plus or minus 15 minutes from scheduled time.
D)Telephone answered within five seconds of first ring.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
42
As customization increases,_____ becomes a bigger factor in the customer's perception of service quality.

A)employee behavior
B)process and procedures
C)physical facilities
D)professional judgment
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
43
When considering effective service designing,a fast food restaurant would be considered _____ in customer contact and ______ in customization.

A)low, high
B)high, high
C)high, low
D)low, low
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
44
A service is more similar to a manufacturing operation if it is _____ in degree of customer contact,_____ in degree of labor intensity,and _____ in degree of customization..

A)low, low, low
B)low, high, low
C)low, high, high
D)high, high, low
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
45
Poka-yoke is:

A)an approach for mistake-proofing processes.
B)a Japanese organizational hierarchy.
C)an error-detection machine used in engineering industries.
D)a computer program used in streamlining processes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
46
Which of the following is NOT one of the typical types of service errors and related poka-yokes?

A)Tangible errors
B)Customer errors at the resolution
C)Customer errors during an encounter
D)Customer errors in application
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
47
In the implementation of kaizen,the principle asset is considered to be:

A)technology.
B)automation.
C)financial investment.
D)people.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
48
In services,_____ take(s)the place of the dimensions and tolerances applicable in manufacturing.

A)customer behavior
B)service level agreements
C)flow charts
D)quality standards
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
49
These goals and standards set as part of a control system are reflected by measurable quality characteristics like all of the following EXCEPT:

A)workforce engagement.
B)product dimensions.
C)service times.
D)employee behavior.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
50
Which one of the following is NOT one of the three levels of mistake-proofing?

A)Designing potential errors out of the process.
B)Identifying potential defects and stopping a process before the defect is produced.
C)Training the workforce in implementing and monitoring the modified process.
D)Finding defects that enter or leave a process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
51
Poka-yoke focuses on two aspects:

A)design and control.
B)prediction and detection.
C)production and delivery.
D)machine errors and human errors.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
52
_____ is a process in which all major functions responsible for bringing products to the market are continuously involved in product development activities.

A)Reengineering
B)Value engineering
C)Concurrent engineering
D)Design for marketability
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
53
A goal to reduce the time required to fulfill a customer's order addresses the dimension of:

A)accuracy.
B)cycle time.
C)flexibility.
D)reliability.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
54
In a total-quality manufacturing environment,the burden of inspecting the quality of purchased material rests with the:

A)transporter of the material.
B)supplier of the material.
C)user of the material.
D)purchaser of the material.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
55
With higher levels of _____,appropriate staff behavior becomes increasingly important.

A)contact and interaction
B)customization
C)labor intensity
D)technology dependence
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
56
In services low in _____,the customer's impression of physical facilities,processes,and procedures is important.

A)market appeal
B)customer contact
C)customization
D)labor intensity
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
57
Customer errors _____ stage of a service include failure to signal service inadequacies,to learn from experience,to adjust expectations,and to execute appropriate post-encounter actions.

A)at the delivery
B)at the resolution
C)in the preparation
D)during an encounter
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
58
Any process control system has all of the following EXCEPT:

A)a backup process.
B)comparison of actual results with the standard.
C)a means of measuring accomplishment.
D)a standard or goal.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
59
_____ arise in the contact between the server and the customer.

A)Customer errors in preparation
B)Tangible errors
C)Treatment errors
D)Task errors
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
60
Providing personalized,custom-designed products to meet individual preferences at competitive prices is known as:

A)concurrent engineering.
B)strategic benchmarking.
C)mass customization.
D)volume flexibility.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
61
The term _____ refers to approaches that produce exceptional results,are usually innovative in terms of the use of technology or human resources,and are recognized by customers or industry experts.

A)value creation
B)benchmarking
C)stretch goals
D)best practices
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
62
Benchmarking:

A)is a cost-benefit tool for justifying investment.
B)is a process improvement technique for assigning workers to the correct workstations.
C)is a form of process variance reduction.
D)uses information from industry leaders to set stretch goals.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
63
Long-term remedial action for a process is the responsibility of:

A)the workers.
B)management.
C)engineers.
D)the maintenance staff.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
64
An after-action review or debrief consists of asking the following basic questions EXCEPT:

A)What was supposed to happen?
B)What actually happened?
C)Who is/are responsible?
D)Why was there a difference?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
65
The major obstacle in describing and classifying the behavioral observations is:

A)the lack of management involvement in driving customer-facing skills.
B)identifying instances of behavioral inconsistencies.
C)developing operational definitions of behavioral characteristics.
D)the resistance of the frontline workforce to such classifications.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
66
Spell-checkers in word processing software help reduce document misspellings.This poka-yoke is an example of:

A)customer errors in preparation.
B)customer errors at the resolution.
C)a task error.
D)a tangible error.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
67
Removing the causes of abnormalities and maintaining consistent performance is the essence of _____.

A)control
B)quality assurance
C)feedback
D)process design
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
68
A successful kaizen program within a company requires all of the following EXCEPT:

A)total employee involvement.
B)significant training.
C)substantial financial investment.
D)operating practices.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
69
_____ force an organization to think in a radically different way,and to encourage major improvements as well as incremental ones.

A)Kaizen blitzes
B)Stretch goals
C)Quality circles
D)Strategy maps
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
70
A _____ is an intense and rapid improvement process in which a team or a department throws all its resources into an improvement project over a short time period,as opposed to traditional applications,which are performed on a part-time basis.

A)continuous improvement team
B)quality circle
C)kaizen blitz
D)poka-yoke
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
71
Two approaches for breakthrough improvement that help companies achieve stretch goals are _____ and _____.

A)brainstorming; team development
B)Kaizen blitzes; quality circles
C)benchmarking; reengineering
D)innovation; feedback
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
72
Which of the following is NOT a feature of Kaizen blitz teams?

A)It is comprised of employees from all areas involved in the process.
B)Compared to other approaches, this is long-term approach.
C)The team can implement changes on the spot.
D)Improvement is immediate and satisfying for all those involved in the process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
73
In the Deming cycle,the three fundamental questions to consider are all of the following EXCEPT:

A)What are we trying to accomplish?
B)What changes can we make that will result in improvement?
C)What time period will it take for the improvement to be standardized?
D)How will we know that a change is an improvement?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
74
According to Deming and Juran,the majority of quality problems are management controllable - the result of:

A)special cause variation.
B)common cause variation.
C)short-term variation.
D)long-term variation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
75
Documented control procedures are usually written down in a(n):

A)operations manual.
B)flow chart.
C)data control sheet.
D)process control plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
76
Long-term improvements in a process cannot be made until:

A)the process is considered a value-creation process.
B)process improvement teams reach a consensus.
C)the process in under control.
D)the defect rate is defined.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
77
The four stages (PDSA)of the Deming cycle are:

A)plan, do, study, and act.
B)product, delivery, systems, and accounts.
C)plan, discuss, structure, and assess.
D)prepare, deliver, simplify, and act.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
78
_____ refers to discontinuous change,as opposed to gradual,continuous improvement.

A)Quality circles
B)Poka-yoke
C)Kaizen
D)Breakthrough improvement
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
79
Which of the following are the quality characteristics in services that are easily measurable as opposed to observable?

A)Competency
B)Wrong delivery
C)Promptness
D)Nonconformance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
80
Breakthrough improvements are often motivated by _____.

A)stretch goals
B)business objectives
C)cost drivers
D)economies of scale
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.