Deck 11: Six Sigma And Process Improvement

ملء الشاشة (f)
exit full mode
سؤال
Bottom-up projects generally are tied to business strategy and are aligned with customer needs.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
In Six Sigma,a problem is defined as a deviation between what should be happening and what actually is happening that is important enough to need correcting.
سؤال
A Six Sigma project might span an entire division or be as narrow as a single production operation.
سؤال
"Low hanging fruit" refers to apparent quality problems that have existed for some time and past attempts to correct them have failed.
سؤال
A Six Sigma quality level means that the difference between the upper and lower specification limits is six standard deviations.
سؤال
Within the service sector,Six Sigma is beginning to be called "transactional Six Sigma."
سؤال
The expectations of customers that matter most to them are known as "critical to quality" issues in Six Sigma terminology.
سؤال
A change in the quality level from 3-sigma to 4-sigma represents a five-fold improvement.
سؤال
The improvement methodologies proposed by Deming,Juran,and Crosby have common themes which are shared in the Six Sigma approach.
سؤال
Idea gathering is done in the Analyze phase of DMAIC.
سؤال
Half the tolerance is equal to the distance from the target to the upper specification limit.
سؤال
Six Sigma represents a quality level of 3.4 defects per million opportunities when the process mean is held exactly on target.
سؤال
Unstructured problems require more creative approaches to solving them than structured problems.
سؤال
Lean production can easily be applied to non-manufacturing environments.
سؤال
At the outset of a Six Sigma initiative,projects chosen should have a high likelihood of success.
سؤال
The focus on optimizing CTQs for Six Sigma product and system performance by balancing cost,schedule,and quality is known as Design for Six Sigma.
سؤال
Determining the most likely causes of defects occurs during which DMAIC phase?

A)Define
B)Measure
C)Analyze
D)Improve
سؤال
One of the pitfalls experienced in organizations new to Six Sigma is the inability of senior managers to estimate what the resources,they allocate to Six Sigma projects,will "buy" in the way of bottom-line returns.
سؤال
The process of drilling down to a more specific problem statement is sometimes called "project scoping."
سؤال
The Control phase of DMAIC focuses on how to maintain improvements.
سؤال
Which phase is the idea-gathering phase of DMAIC?

A)Define
B)Analyze
C)Improve
D)Control
سؤال
A deviation between what should be happening and what is actually happening that is important enough to make someone think that the deviation ought to be corrected is known as:

A)a defect.
B)an error.
C)a problem.
D)a variance.
سؤال
At a Six Sigma quality level,if the process mean is held exactly on target,the expected result would be:

A)1.5 defects per thousand opportunities.
B)2.8 defects per ten thousand opportunities.
C)3.4 defects per million opportunities.
D)2.0 defects per billion opportunities.
سؤال
The Six-Sigma problem solving approach contains the phases of:

A)detect, measure, analyze, improve, and control.
B)define, measure, analyze, implement, and control.
C)define, monitor, analyze, improve, and confirm.
D)define, monitor, analyze, implement, and control.
سؤال
A change in quality level from 3-sigma to 4-sigma represents a:

A)1-fold improvement.
B)2-fold improvement.
C)5-fold improvement.
D)10-fold improvement.
سؤال
A k-sigma quality level satisfies the equation:

A)k = tolerance / process standard deviation
B)k * process standard deviation = tolerance / 2
C)k - process standard deviation = tolerance
D)process standard deviation = tolerance / k
سؤال
Focusing on how to maintain improvements occurs in which DMAIC phase?

A)Measure
B)Analyze
C)Improve
D)Control
سؤال
A bank's savings account statements contain 24 items of account information.Last month,2500 bank statements were checked and 52 errors were found in the account items.What is the dpmo value?

A)0.021
B)867
C)0.46
D)1154
سؤال
A level of 3.4 defects per million opportunities can be achieved in all of the following ways EXCEPT:

A)with 0.0-sigma off-centering and 4.5-sigma quality.
B)with 0.5-sigma off-centering and 5.0-sigma quality.
C)with 1.0-sigma off-centering and 5.5-sigma quality.
D)with 1.5-sigma off-centering and 6.0-sigma quality.
سؤال
The "5 Why" technique is useful in identifying:

A)important symptoms of a problem.
B)the importance of a problem.
C)a suitable solution to a problem.
D)the root cause of a problem.
سؤال
A grocery store finds that a patron typically purchases 20 items per visit.In one day,the grocer found that the checkout scanners made 240 price-reading errors in servicing 11,000 patrons.The dpmo is _____.

A)0.022
B)45.83
C)1091
D)1818
سؤال
An achievement which takes an organization to a level of performance not previously attained is called a:

A)breakthrough.
B)benchmark.
C)poka-yoke.
D)special cause.
سؤال
Which of the following constitutes an operational definition of a service quality measure?

A)Highly professional service
B)Few late deliveries
C)Phone calls answered within two rings
D)Very accurate customer billing
سؤال
Accomplishment of any improvement that takes an organization to unprecedented levels of performance is known as:

A)kaizen.
B)a breakthrough.
C)a real solution.
D)a leap forward.
سؤال
The distance from the target to the upper specification limit is equal to:

A)the tolerance.
B)twice the tolerance.
C)half the tolerance.
D)three times the tolerance.
سؤال
Six Sigma represents a quality level of at most:

A)1.5 defects per million opportunities.
B)2.0 defects per million opportunities.
C)3.4 defects per million opportunities.
D)4.5 defects per million opportunities.
سؤال
A delivery process has a target of 5 hours plus or minus one hour.The process standard deviation is estimated as 0.25 hours.The process has a _____ sigma quality level.

A)1.25
B)2
C)4
D)8
سؤال
The operative measure of quality in Six Sigma terminology is:

A)defects per unit.
B)defects per thousand units.
C)defects per ten thousand opportunities.
D)defects per million opportunities.
سؤال
Identifying CTQs can be an important step in evaluating and prioritizing potential Six Sigma projects."CTQ" denotes:

A)continuous-total-quality initiative.
B)critical-to-quality characteristic.
C)customer-to-quote feedback.
D)certain-to-qualify idea.
سؤال
At a Six Sigma quality level,3.4 defects per million opportunities are expected to occur with a mean shift of _____ standard deviations of the target.

A)0.5
B)1.0
C)1.5
D)2.0
سؤال
Lean production refers to approaches that originated at:

A)Ford.
B)Xerox.
C)Motorola.
D)Toyota.
سؤال
In a service context,lean production is referred to as:

A)lean operation.
B)lean enterprise.
C)lean process.
D)lean service.
سؤال
_____ show the performance and the variation of a process or some quality or productivity indicator over time in a graphical fashion that is easy to understand and interpret.

A)Histograms
B)Flowcharts
C)Run charts
D)Scatter diagrams
سؤال
_____ is defined as "that condition (or interrelated set of conditions)having allowed or caused a defect to occur,which once corrected properly,permanently prevents recurrence of the defect in the same,or subsequent,product or service generated by the process."

A)Design error
B)Defect
C)Problem
D)Root cause
سؤال
A _____ is a line graph in which data are plotted over time.

A)pareto diagram
B)run chart
C)flowchart
D)control chart
سؤال
The sequence of activities or the flow of materials and information in a process are identified in:

A)a process map.
B)a histogram.
C)a project charter.
D)the Deming cycle.
سؤال
_____ projects typically address small problems within a department or work function.

A)Green belt
B)Black belt
C)Master black belt
D)Champion
سؤال
Cause and effect diagrams are used at the _____ stage in DMAIC.

A)define
B)measure
C)analyze
D)control
سؤال
Terms such as "kanban","single minute exchange of dies",and "visual controls" are most closely associated with:

A)lean production.
B)DMAIC methodology.
C)Six Sigma projects.
D)re-engineering efforts.
سؤال
_____ are special types of data collection forms in which the results may be interpreted on the form directly without additional processing.

A)Control charts
B)Check sheets
C)Statistical process controls
D)Worksheets
سؤال
Which of the following is NOT a tool used in the Define stage of DMAIC?

A)Check sheets
B)Cost of quality analysis
C)Pareto analysis
D)High level process mapping
سؤال
The process of drilling down to a more specific problem statement is sometimes called:

A)project mapping.
B)project scoping.
C)project planning.
D)project definition.
سؤال
_____ problems are defined by unsatisfactory performance by a well-specified system.

A)Conformance
B)Efficiency
C)Process design
D)Unstructured performance
سؤال
Standard operating procedures are used at the _____ stage in DMAIC

A)define
B)measure
C)improve
D)control
سؤال
Efficiency problems:

A)involve designing new processes or substantially revising existing processes.
B)result from unsatisfactory performance by a poorly specified system.
C)involve designing new products that better satisfy user needs.
D)result from unsatisfactory performance from the standpoint of stakeholders other than customers.
سؤال
The commonly used quality tools in the Six Sigma toolbox are referred to by the Japanese as the:

A)Deming tools.
B)Seven QC tools.
C)DMAIC tools.
D)Sigma tools.
سؤال
Factors that should be considered when selecting Six Sigma projects include the following EXCEPT:

A)financial return.
B)impacts on customers and organizational effectiveness.
C)fit to existing government legislation(s)on quality.
D)probability of success.
سؤال
The _____ phase requires an understanding of the causal relationships between process performance and customer value.

A)define
B)measure
C)analyze
D)improve
سؤال
Places where defective product is sent to be revised,corrected,reworked,or scrapped are referred to as:

A)correction corners.
B)hidden factories.
C)sweat shops.
D)repair rooms.
سؤال
In Six Sigma terminology,the expectations of customers that matter most to them are known as:

A)CTQs.
B)MBBs.
C)DFSs.
D)DPUs.
سؤال
Explain each phase of the DMAIC methodology.
سؤال
Explain what is meant by "Six Sigma quality" with respect to defect expectations.Draw a picture that relates Six Sigma quality to the notions of design tolerance and process variability.
سؤال
Some have argued the Six Sigma programs are merely repackaged versions of older quality improvement programs that originally accompanied TQM initiatives in the 1980s.Present arguments that both support and refute this view.
سؤال
Which of the following is NOT a tool used in lean production?

A)The 5S's
B)Visual controls
C)Efficient layout and standardized work
D)Push production.
سؤال
_____ focuses on the elimination of waste in all forms,including defects requiring rework,unnecessary processing steps,unnecessary movement of materials or people,waiting time,excess inventory,and overproduction.

A)Lean approach
B)Six Sigma
C)Deming Quality Circles
D)Kaizen
سؤال
Describe the categories of problems that have been found to be approached by Six Sigma methodology.
سؤال
Specifications for the density of dustless chalk used in classrooms is 3.5 ± 1.5. (The unit of measure is grams per centimeter²,or g/cm².)A random sample of 100 pieces of chalk was selected and the density of each piece in the sample was recorded.The sample average was equal to 3.6 and the sample standard deviation was equal to 0.75.A histogram of the sample data is given below.
Specifications for the density of dustless chalk used in classrooms is 3.5 ± 1.5. (The unit of measure is grams per centimeter²,or g/cm².)A random sample of 100 pieces of chalk was selected and the density of each piece in the sample was recorded.The sample average was equal to 3.6 and the sample standard deviation was equal to 0.75.A histogram of the sample data is given below.   a.How many pieces of chalk in the sample are considered defective (not within the specifications)? b.Using your response to the above question,what is the dpmo value for this process? c.According to the concepts of Six-Sigma Quality,what the quality level for this process? (Use the appropriate table provided in the textbook.)<div style=padding-top: 35px>
a.How many pieces of chalk in the sample are considered defective (not within the specifications)?
b.Using your response to the above question,what is the dpmo value for this process?
c.According to the concepts of Six-Sigma Quality,what the quality level for this process? (Use the appropriate table provided in the textbook.)
سؤال
Lean approaches focus on:

A)innovation in product designs.
B)the elimination of waste in all forms.
C)employee involvement in process designing.
D)eliminating value-added activities in the process.
سؤال
Explain the concept of lean production.Describe its relation to Six Sigma.
سؤال
Some people assert that Six Sigma quality levels represent overkill in most industry situations.Counter this assertion with industry examples where less than six sigma quality would significantly impact industry performance and perhaps social welfare at large.
سؤال
The number of defects found in 20 samples of 100 Frost Ice-cream Company flavors taken on a daily basis from a production line over a five-week period is given below.Plot these data on a run chart,computing the average value (center line),and the upper control limit.Do you suspect that any special causes are present? Why?
The number of defects found in 20 samples of 100 Frost Ice-cream Company flavors taken on a daily basis from a production line over a five-week period is given below.Plot these data on a run chart,computing the average value (center line),and the upper control limit.Do you suspect that any special causes are present? Why?  <div style=padding-top: 35px>
سؤال
_____ is used to interpret scatter diagrams.

A)Process mapping
B)Benchmarking
C)Statistical correlation analysis
D)Cause and effect analysis
سؤال
_____ refers to rapid changeover of tooling and fixtures in machine shops so that multiple products in smaller batches can be run on the same equipment.

A)Single minute exchange of dies
B)Total productive maintenance
C)Pull production
D)Efficient layout and standardized work
سؤال
_____ provide clues about the characteristics of the parent population from which a sample is taken.

A)Histograms
B)Pareto analyses
C)Scatter diagrams
D)Check sheets
سؤال
Explain why,in the initial stages of Six Sigma implementation in a firm,it is advantageous to choose project that have a high likelihood of success.
سؤال
Which of the following is NOT a characteristic of a Six Sigma project?

A)A problem to be solved.
B)A process in which the problem exists.
C)A customer-panel to assess incremental improvements at different stages of the implementation.
D)One or more measures that quantify the gap to be closed and can be used to monitor progress.
سؤال
A _____ is a _____ of the data from the largest frequency to the smallest.

A)histogram; scatter diagram
B)pareto diagram ; histogram
C)scatter diagram; break-down chart
D)check sheet; chronological chart
سؤال
Analysis of customer complaints at Flash Apparel Company revealed errors in five categories.Data is provided below.Construct a Pareto diagram for these data.What conclusions can you reach?
Analysis of customer complaints at Flash Apparel Company revealed errors in five categories.Data is provided below.Construct a Pareto diagram for these data.What conclusions can you reach?  <div style=padding-top: 35px>
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/78
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 11: Six Sigma And Process Improvement
1
Bottom-up projects generally are tied to business strategy and are aligned with customer needs.
False
2
In Six Sigma,a problem is defined as a deviation between what should be happening and what actually is happening that is important enough to need correcting.
True
3
A Six Sigma project might span an entire division or be as narrow as a single production operation.
True
4
"Low hanging fruit" refers to apparent quality problems that have existed for some time and past attempts to correct them have failed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
5
A Six Sigma quality level means that the difference between the upper and lower specification limits is six standard deviations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
6
Within the service sector,Six Sigma is beginning to be called "transactional Six Sigma."
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
7
The expectations of customers that matter most to them are known as "critical to quality" issues in Six Sigma terminology.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
8
A change in the quality level from 3-sigma to 4-sigma represents a five-fold improvement.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
9
The improvement methodologies proposed by Deming,Juran,and Crosby have common themes which are shared in the Six Sigma approach.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
10
Idea gathering is done in the Analyze phase of DMAIC.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
11
Half the tolerance is equal to the distance from the target to the upper specification limit.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
12
Six Sigma represents a quality level of 3.4 defects per million opportunities when the process mean is held exactly on target.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
13
Unstructured problems require more creative approaches to solving them than structured problems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
14
Lean production can easily be applied to non-manufacturing environments.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
15
At the outset of a Six Sigma initiative,projects chosen should have a high likelihood of success.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
16
The focus on optimizing CTQs for Six Sigma product and system performance by balancing cost,schedule,and quality is known as Design for Six Sigma.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
17
Determining the most likely causes of defects occurs during which DMAIC phase?

A)Define
B)Measure
C)Analyze
D)Improve
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
18
One of the pitfalls experienced in organizations new to Six Sigma is the inability of senior managers to estimate what the resources,they allocate to Six Sigma projects,will "buy" in the way of bottom-line returns.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
19
The process of drilling down to a more specific problem statement is sometimes called "project scoping."
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
20
The Control phase of DMAIC focuses on how to maintain improvements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
21
Which phase is the idea-gathering phase of DMAIC?

A)Define
B)Analyze
C)Improve
D)Control
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
22
A deviation between what should be happening and what is actually happening that is important enough to make someone think that the deviation ought to be corrected is known as:

A)a defect.
B)an error.
C)a problem.
D)a variance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
23
At a Six Sigma quality level,if the process mean is held exactly on target,the expected result would be:

A)1.5 defects per thousand opportunities.
B)2.8 defects per ten thousand opportunities.
C)3.4 defects per million opportunities.
D)2.0 defects per billion opportunities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
24
The Six-Sigma problem solving approach contains the phases of:

A)detect, measure, analyze, improve, and control.
B)define, measure, analyze, implement, and control.
C)define, monitor, analyze, improve, and confirm.
D)define, monitor, analyze, implement, and control.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
25
A change in quality level from 3-sigma to 4-sigma represents a:

A)1-fold improvement.
B)2-fold improvement.
C)5-fold improvement.
D)10-fold improvement.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
26
A k-sigma quality level satisfies the equation:

A)k = tolerance / process standard deviation
B)k * process standard deviation = tolerance / 2
C)k - process standard deviation = tolerance
D)process standard deviation = tolerance / k
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
27
Focusing on how to maintain improvements occurs in which DMAIC phase?

A)Measure
B)Analyze
C)Improve
D)Control
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
28
A bank's savings account statements contain 24 items of account information.Last month,2500 bank statements were checked and 52 errors were found in the account items.What is the dpmo value?

A)0.021
B)867
C)0.46
D)1154
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
29
A level of 3.4 defects per million opportunities can be achieved in all of the following ways EXCEPT:

A)with 0.0-sigma off-centering and 4.5-sigma quality.
B)with 0.5-sigma off-centering and 5.0-sigma quality.
C)with 1.0-sigma off-centering and 5.5-sigma quality.
D)with 1.5-sigma off-centering and 6.0-sigma quality.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
30
The "5 Why" technique is useful in identifying:

A)important symptoms of a problem.
B)the importance of a problem.
C)a suitable solution to a problem.
D)the root cause of a problem.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
31
A grocery store finds that a patron typically purchases 20 items per visit.In one day,the grocer found that the checkout scanners made 240 price-reading errors in servicing 11,000 patrons.The dpmo is _____.

A)0.022
B)45.83
C)1091
D)1818
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
32
An achievement which takes an organization to a level of performance not previously attained is called a:

A)breakthrough.
B)benchmark.
C)poka-yoke.
D)special cause.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
33
Which of the following constitutes an operational definition of a service quality measure?

A)Highly professional service
B)Few late deliveries
C)Phone calls answered within two rings
D)Very accurate customer billing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
34
Accomplishment of any improvement that takes an organization to unprecedented levels of performance is known as:

A)kaizen.
B)a breakthrough.
C)a real solution.
D)a leap forward.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
35
The distance from the target to the upper specification limit is equal to:

A)the tolerance.
B)twice the tolerance.
C)half the tolerance.
D)three times the tolerance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
36
Six Sigma represents a quality level of at most:

A)1.5 defects per million opportunities.
B)2.0 defects per million opportunities.
C)3.4 defects per million opportunities.
D)4.5 defects per million opportunities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
37
A delivery process has a target of 5 hours plus or minus one hour.The process standard deviation is estimated as 0.25 hours.The process has a _____ sigma quality level.

A)1.25
B)2
C)4
D)8
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
38
The operative measure of quality in Six Sigma terminology is:

A)defects per unit.
B)defects per thousand units.
C)defects per ten thousand opportunities.
D)defects per million opportunities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
39
Identifying CTQs can be an important step in evaluating and prioritizing potential Six Sigma projects."CTQ" denotes:

A)continuous-total-quality initiative.
B)critical-to-quality characteristic.
C)customer-to-quote feedback.
D)certain-to-qualify idea.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
40
At a Six Sigma quality level,3.4 defects per million opportunities are expected to occur with a mean shift of _____ standard deviations of the target.

A)0.5
B)1.0
C)1.5
D)2.0
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
41
Lean production refers to approaches that originated at:

A)Ford.
B)Xerox.
C)Motorola.
D)Toyota.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
42
In a service context,lean production is referred to as:

A)lean operation.
B)lean enterprise.
C)lean process.
D)lean service.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
43
_____ show the performance and the variation of a process or some quality or productivity indicator over time in a graphical fashion that is easy to understand and interpret.

A)Histograms
B)Flowcharts
C)Run charts
D)Scatter diagrams
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
44
_____ is defined as "that condition (or interrelated set of conditions)having allowed or caused a defect to occur,which once corrected properly,permanently prevents recurrence of the defect in the same,or subsequent,product or service generated by the process."

A)Design error
B)Defect
C)Problem
D)Root cause
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
45
A _____ is a line graph in which data are plotted over time.

A)pareto diagram
B)run chart
C)flowchart
D)control chart
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
46
The sequence of activities or the flow of materials and information in a process are identified in:

A)a process map.
B)a histogram.
C)a project charter.
D)the Deming cycle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
47
_____ projects typically address small problems within a department or work function.

A)Green belt
B)Black belt
C)Master black belt
D)Champion
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
48
Cause and effect diagrams are used at the _____ stage in DMAIC.

A)define
B)measure
C)analyze
D)control
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
49
Terms such as "kanban","single minute exchange of dies",and "visual controls" are most closely associated with:

A)lean production.
B)DMAIC methodology.
C)Six Sigma projects.
D)re-engineering efforts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
50
_____ are special types of data collection forms in which the results may be interpreted on the form directly without additional processing.

A)Control charts
B)Check sheets
C)Statistical process controls
D)Worksheets
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
51
Which of the following is NOT a tool used in the Define stage of DMAIC?

A)Check sheets
B)Cost of quality analysis
C)Pareto analysis
D)High level process mapping
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
52
The process of drilling down to a more specific problem statement is sometimes called:

A)project mapping.
B)project scoping.
C)project planning.
D)project definition.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
53
_____ problems are defined by unsatisfactory performance by a well-specified system.

A)Conformance
B)Efficiency
C)Process design
D)Unstructured performance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
54
Standard operating procedures are used at the _____ stage in DMAIC

A)define
B)measure
C)improve
D)control
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
55
Efficiency problems:

A)involve designing new processes or substantially revising existing processes.
B)result from unsatisfactory performance by a poorly specified system.
C)involve designing new products that better satisfy user needs.
D)result from unsatisfactory performance from the standpoint of stakeholders other than customers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
56
The commonly used quality tools in the Six Sigma toolbox are referred to by the Japanese as the:

A)Deming tools.
B)Seven QC tools.
C)DMAIC tools.
D)Sigma tools.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
57
Factors that should be considered when selecting Six Sigma projects include the following EXCEPT:

A)financial return.
B)impacts on customers and organizational effectiveness.
C)fit to existing government legislation(s)on quality.
D)probability of success.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
58
The _____ phase requires an understanding of the causal relationships between process performance and customer value.

A)define
B)measure
C)analyze
D)improve
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
59
Places where defective product is sent to be revised,corrected,reworked,or scrapped are referred to as:

A)correction corners.
B)hidden factories.
C)sweat shops.
D)repair rooms.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
60
In Six Sigma terminology,the expectations of customers that matter most to them are known as:

A)CTQs.
B)MBBs.
C)DFSs.
D)DPUs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
61
Explain each phase of the DMAIC methodology.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
62
Explain what is meant by "Six Sigma quality" with respect to defect expectations.Draw a picture that relates Six Sigma quality to the notions of design tolerance and process variability.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
63
Some have argued the Six Sigma programs are merely repackaged versions of older quality improvement programs that originally accompanied TQM initiatives in the 1980s.Present arguments that both support and refute this view.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
64
Which of the following is NOT a tool used in lean production?

A)The 5S's
B)Visual controls
C)Efficient layout and standardized work
D)Push production.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
65
_____ focuses on the elimination of waste in all forms,including defects requiring rework,unnecessary processing steps,unnecessary movement of materials or people,waiting time,excess inventory,and overproduction.

A)Lean approach
B)Six Sigma
C)Deming Quality Circles
D)Kaizen
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
66
Describe the categories of problems that have been found to be approached by Six Sigma methodology.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
67
Specifications for the density of dustless chalk used in classrooms is 3.5 ± 1.5. (The unit of measure is grams per centimeter²,or g/cm².)A random sample of 100 pieces of chalk was selected and the density of each piece in the sample was recorded.The sample average was equal to 3.6 and the sample standard deviation was equal to 0.75.A histogram of the sample data is given below.
Specifications for the density of dustless chalk used in classrooms is 3.5 ± 1.5. (The unit of measure is grams per centimeter²,or g/cm².)A random sample of 100 pieces of chalk was selected and the density of each piece in the sample was recorded.The sample average was equal to 3.6 and the sample standard deviation was equal to 0.75.A histogram of the sample data is given below.   a.How many pieces of chalk in the sample are considered defective (not within the specifications)? b.Using your response to the above question,what is the dpmo value for this process? c.According to the concepts of Six-Sigma Quality,what the quality level for this process? (Use the appropriate table provided in the textbook.)
a.How many pieces of chalk in the sample are considered defective (not within the specifications)?
b.Using your response to the above question,what is the dpmo value for this process?
c.According to the concepts of Six-Sigma Quality,what the quality level for this process? (Use the appropriate table provided in the textbook.)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
68
Lean approaches focus on:

A)innovation in product designs.
B)the elimination of waste in all forms.
C)employee involvement in process designing.
D)eliminating value-added activities in the process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
69
Explain the concept of lean production.Describe its relation to Six Sigma.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
70
Some people assert that Six Sigma quality levels represent overkill in most industry situations.Counter this assertion with industry examples where less than six sigma quality would significantly impact industry performance and perhaps social welfare at large.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
71
The number of defects found in 20 samples of 100 Frost Ice-cream Company flavors taken on a daily basis from a production line over a five-week period is given below.Plot these data on a run chart,computing the average value (center line),and the upper control limit.Do you suspect that any special causes are present? Why?
The number of defects found in 20 samples of 100 Frost Ice-cream Company flavors taken on a daily basis from a production line over a five-week period is given below.Plot these data on a run chart,computing the average value (center line),and the upper control limit.Do you suspect that any special causes are present? Why?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
72
_____ is used to interpret scatter diagrams.

A)Process mapping
B)Benchmarking
C)Statistical correlation analysis
D)Cause and effect analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
73
_____ refers to rapid changeover of tooling and fixtures in machine shops so that multiple products in smaller batches can be run on the same equipment.

A)Single minute exchange of dies
B)Total productive maintenance
C)Pull production
D)Efficient layout and standardized work
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
74
_____ provide clues about the characteristics of the parent population from which a sample is taken.

A)Histograms
B)Pareto analyses
C)Scatter diagrams
D)Check sheets
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
75
Explain why,in the initial stages of Six Sigma implementation in a firm,it is advantageous to choose project that have a high likelihood of success.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
76
Which of the following is NOT a characteristic of a Six Sigma project?

A)A problem to be solved.
B)A process in which the problem exists.
C)A customer-panel to assess incremental improvements at different stages of the implementation.
D)One or more measures that quantify the gap to be closed and can be used to monitor progress.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
77
A _____ is a _____ of the data from the largest frequency to the smallest.

A)histogram; scatter diagram
B)pareto diagram ; histogram
C)scatter diagram; break-down chart
D)check sheet; chronological chart
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
78
Analysis of customer complaints at Flash Apparel Company revealed errors in five categories.Data is provided below.Construct a Pareto diagram for these data.What conclusions can you reach?
Analysis of customer complaints at Flash Apparel Company revealed errors in five categories.Data is provided below.Construct a Pareto diagram for these data.What conclusions can you reach?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.