Deck 10: Health Care Facilities

ملء الشاشة (f)
exit full mode
سؤال
The ____________________ is a system that provides light and power for the emergency systems of Article 700.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Where is the emergency wiring system for a hospital housed?
سؤال
Generally, a patient location is served by branch-circuits from more than one ____________________.
سؤال
What is the change to the 2011 Code regarding critical care area patient bed locations and multiwire branch-circuits?
سؤال
What is the general care area within a hospital?
سؤال
In a general care area, a minimum of ___________________ receptacle(s) is/are required to serve the patient bed location.
سؤال
What is the main goal of grounding in hospitals?
سؤال
The ____________________ is an area that is made intentionally wet for some specific purpose.
سؤال
A minimum of ____________________ branch-circuit(s) is/are required to serve a patient bed location in a general care area.
سؤال
The circuit wires from an isolated power system are permitted to share the same cable, raceway, box, or enclosure with circuit wires of any other system.
سؤال
Essential electrical systems must be connected to the normal power system and the standby power source through a(n) ____________________.
سؤال
Conductors are required to be identified by which two colors?
سؤال
What type of power system is required where flammable anesthetics are used?
سؤال
The patient equipment grounding point and the reference grounding point are frequently the same point for critical care areas.
سؤال
The ____________________ electrical system is an electrical system that is required to have an alternate source of power.
سؤال
How is the patient equipment grounding point installed?
سؤال
The receptacles at a general care patient bed location are permitted to be single receptacles, duplex receptacles, and now ____________________ receptacles.
سؤال
The wet procedure location is an area where a patient may be put in intimate contact with electrical equipment that may produce a real hazard of electrical shock to essential body organs, or where the reliability of the equipment is necessary for life support.
سؤال
A patient equipment grounding point is permitted but not required.
سؤال
Each operating room is required to have the circuits supplied by a separate isolation transformer.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/20
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 10: Health Care Facilities
1
The ____________________ is a system that provides light and power for the emergency systems of Article 700.
life safety branch
2
Where is the emergency wiring system for a hospital housed?
The emergency wiring system in a hospital shall be in metal raceway.
3
Generally, a patient location is served by branch-circuits from more than one ____________________.
panelboard
4
What is the change to the 2011 Code regarding critical care area patient bed locations and multiwire branch-circuits?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
5
What is the general care area within a hospital?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
6
In a general care area, a minimum of ___________________ receptacle(s) is/are required to serve the patient bed location.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
7
What is the main goal of grounding in hospitals?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
8
The ____________________ is an area that is made intentionally wet for some specific purpose.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
9
A minimum of ____________________ branch-circuit(s) is/are required to serve a patient bed location in a general care area.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
10
The circuit wires from an isolated power system are permitted to share the same cable, raceway, box, or enclosure with circuit wires of any other system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
11
Essential electrical systems must be connected to the normal power system and the standby power source through a(n) ____________________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
12
Conductors are required to be identified by which two colors?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
13
What type of power system is required where flammable anesthetics are used?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
14
The patient equipment grounding point and the reference grounding point are frequently the same point for critical care areas.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
15
The ____________________ electrical system is an electrical system that is required to have an alternate source of power.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
16
How is the patient equipment grounding point installed?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
17
The receptacles at a general care patient bed location are permitted to be single receptacles, duplex receptacles, and now ____________________ receptacles.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
18
The wet procedure location is an area where a patient may be put in intimate contact with electrical equipment that may produce a real hazard of electrical shock to essential body organs, or where the reliability of the equipment is necessary for life support.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
19
A patient equipment grounding point is permitted but not required.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
20
Each operating room is required to have the circuits supplied by a separate isolation transformer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.