For an activity with more than one immediate successor activity, its latest-finish time is equal to the

A) largest latest-finish time among its immediate successors.
B) smallest latest-finish time among its immediate successors.
C) largest latest-start time among its immediate successors.
D) smallest latest-start time among its immediate successors.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The critical path

A) is any path that goes from the starting node to the completion node.
B) is a combination of all paths.
C) is the shortest path.
D) is the longest path.
سؤال
PERT and CPM are applicable only when there is no dependence among activities.
سؤال
The earliest start time rule

A) compares the starting times of all activities for successors of an activity.
B) compares the finish times for all immediate predecessors of an activity.
C) determines when the project can begin.
D) determines when the project must begin.
سؤال
Arcs in a project network indicate

A) completion times.
B) precedence relationships.
C) activities.
D) the critical path.
سؤال
Slack equals

A) LF - EF.
B) EF-LF.
C) EF - LS.
D) LF - ES.
سؤال
Which is not a significant challenge of project scheduling?

A) deadlines exist.
B) activities are independent.
C) many employees could be required.
D) delays are costly.
سؤال
To determine how to crash activity times

A) normal activity costs and costs under maximum crashing must be known.
B) shortest times with crashing must be known.
C) realize that new paths may become critical.
D) All of the alternatives are true.
سؤال
Which of the following is always true about a critical activity?

A) LS = EF.
B) LF = LS.
C) ES = LS.
D) EF = ES.
سؤال
PERT and CPM

A) are most valuable when a small number of activities must be scheduled.
B) have different features and are not applied to the same situation.
C) do not require a chronological relationship among activities.
D) have been combined to develop a procedure that uses the best of each.
سؤال
Critical activities are those that can be delayed without delaying the entire project.
سؤال
Activities following a node

A) can begin as soon as any activity preceding the node has been completed.
B) have an earliest start time equal to the largest of the earliest finish times for all activities entering the node.
C) have a latest start time equal to the largest of the earliest finish times for all activities entering the node.
D) None of the alternatives is correct.
سؤال
In deciding which activities to crash, one must

A) crash all critical activities.
B) crash largest-duration activities.
C) crash lowest-cost activities.
D) crash activities on the critical path(s) only.
سؤال
Activities with zero slack

A) can be delayed.
B) must be completed first.
C) lie on a critical path.
D) have no predecessors.
سؤال
For an activity with more than one immediate predecessor activity, which of the following is used to compute its earliest finish (EF) time?

A) the largest EF among the immediate predecessors.
B) the average EF among the immediate predecessors.
C) the largest LF among the immediate predecessors.
D) the difference in EF among the immediate predecessors.
سؤال
Which of the following is a general rule for crashing activities?

A) Crash only non-critical activities.
B) Crash activities with zero slack.
C) Crash activities with the greatest number of predecessors.
D) Crash the path with the fewest activities.
سؤال
Activities G, P, and R are the immediate predecessors for activity W. If the earliest finish times for the three are 12, 15, and 10, then the earliest start time for W

A) is 10.
B) is 12.
C) is 15.
D) cannot be determined.
سؤال
Activities K, M and S immediately follow activity H, and their latest start times are 14, 18, and 11. The latest finish time for activity H

A) is 11.
B) is 14.
C) is 18.
D) cannot be determined.
سؤال
To calculate an activity's latest finish time, you should consider its

A) predecessors' latest finish times
C) successors' earliest start times
B) predecessors' latest start times
D) successors' latest start times
سؤال
When activity times are uncertain,

A) assume they are normally distributed.
B) calculate the expected time, using (a + 4m + b)/6.
C) use the most likely time.
D) calculate the expected time, using (a + m + b)/3.
سؤال
A cookie recipe gives the following numbered steps.
A cookie recipe gives the following numbered steps.   Although the steps are numbered, they do not always reflect immediate precedence relationships. Develop a table that lists the immediate predecessors for each activity.<div style=padding-top: 35px> Although the steps are numbered, they do not always reflect immediate precedence relationships. Develop a table that lists the immediate predecessors for each activity.
سؤال
The linear programming model for crashing presented in the textbook assumes that any portion of the activity crash time can be achieved for a corresponding portion of the activity crashing cost.
سؤال
The length of time an activity can be delayed without affecting the project completion time is the slack.
سؤال
The variance in the project completion time is the sum of the variances of all activities in the project.
سؤال
Crashing refers to an unanticipated delay in a critical path activity that causes the total time to exceed its limit.
سؤال
The earliest finish time for the final activity is the project duration.
سؤال
The project manager should monitor the progress of any activity with a large time variance even if the expected time does not identify the activity as a critical activity.
سؤال
Constraints in the LP models for crashing decisions are required to compare the activity's earliest finish time with the earliest finish time of each predecessor.
سؤال
The latest finish time for an activity is the largest of the latest start times for all activities that immediately follow the activity.
سؤال
It is possible to have more than one critical path at a time.
سؤال
The difference between an activity's earliest finish time and latest finish time equals the difference between its earliest start time and latest start time.
سؤال
A path through a project network must reach every node.
سؤال
From this schedule of activities, draw the PERT/CPM network.
From this schedule of activities, draw the PERT/CPM network.  <div style=padding-top: 35px>
سؤال
The earliest start time for an activity is equal to the smallest of the earliest finish times for all its immediate predecessors.
سؤال
When activity times are uncertain, total project time is normally distributed with mean equal to the sum of the means of all of the critical activities.
سؤال
All activities on a critical path have zero slack time.
سؤال
Generally, the more serial (as opposed to parallel) relationships present in a project network, the less time will be required to complete the project.
سؤال
A critical activity can be part of a noncritical path.
سؤال
When activity times are uncertain, an activity's most likely time is the same as its expected time.
سؤال
From this PERT/CPM network, determine the list of activities and their predecessors. From this PERT/CPM network, determine the list of activities and their predecessors.  <div style=padding-top: 35px>
سؤال
Joseph King has ambitions to be mayor of Williston, North Dakota. Joe has determined the breakdown of the steps to the nomination and has estimated normal and crash costs and times for the campaign as follows (times are in weeks).
Joseph King has ambitions to be mayor of Williston, North Dakota. Joe has determined the breakdown of the steps to the nomination and has estimated normal and crash costs and times for the campaign as follows (times are in weeks).   Joe King is not a wealthy man and would like to organize a 16-week campaign at minimum cost. Write and solve a linear program to accomplish this task.<div style=padding-top: 35px> Joe King is not a wealthy man and would like to organize a 16-week campaign at minimum cost. Write and solve a linear program to accomplish this task.
سؤال
Use the following network of related activities with their duration times (weeks) to complete a row for each activity under the column headings below. Use the following network of related activities with their duration times (weeks) to complete a row for each activity under the column headings below.    <div style=padding-top: 35px> Use the following network of related activities with their duration times (weeks) to complete a row for each activity under the column headings below.    <div style=padding-top: 35px>
سؤال
Use the following network of related activities with their duration times (weeks) to complete a row for each activity under the column headings below. Use the following network of related activities with their duration times (weeks) to complete a row for each activity under the column headings below.    <div style=padding-top: 35px> Use the following network of related activities with their duration times (weeks) to complete a row for each activity under the column headings below.    <div style=padding-top: 35px>
سؤال
A project network is shown below. Use a forward and a backward pass to determine the critical path, and then fill out the table below. Activity times are in weeks. A project network is shown below. Use a forward and a backward pass to determine the critical path, and then fill out the table below. Activity times are in weeks.     Now assume that the times listed are only the expected times instead of being fixed times. Is the probability of being finished in more than 28 weeks more or less than 50%?<div style=padding-top: 35px> A project network is shown below. Use a forward and a backward pass to determine the critical path, and then fill out the table below. Activity times are in weeks.     Now assume that the times listed are only the expected times instead of being fixed times. Is the probability of being finished in more than 28 weeks more or less than 50%?<div style=padding-top: 35px> Now assume that the times listed are only the expected times instead of being fixed times. Is the probability of being finished in more than 28 weeks more or less than 50%?
سؤال
A project network is shown below. Use a forward and a backward pass to determine the critical path, and then fill out the table below. Activity times are in weeks. A project network is shown below. Use a forward and a backward pass to determine the critical path, and then fill out the table below. Activity times are in weeks.     Now assume that the times listed are only the expected times instead of being fixed times. Is the probability of being finished in fewer than 25 weeks more or less than 50%?<div style=padding-top: 35px> A project network is shown below. Use a forward and a backward pass to determine the critical path, and then fill out the table below. Activity times are in weeks.     Now assume that the times listed are only the expected times instead of being fixed times. Is the probability of being finished in fewer than 25 weeks more or less than 50%?<div style=padding-top: 35px> Now assume that the times listed are only the expected times instead of being fixed times. Is the probability of being finished in fewer than 25 weeks more or less than 50%?
سؤال
A senior MIS design class project team has developed the following schedule of activities for their project, using their best estimate of completion times. Both written and oral reports are required. Draw the project network. Can they complete the project in the 38 class days remaining until the end of the semester?
A senior MIS design class project team has developed the following schedule of activities for their project, using their best estimate of completion times. Both written and oral reports are required. Draw the project network. Can they complete the project in the 38 class days remaining until the end of the semester?  <div style=padding-top: 35px>
سؤال
The critical path for this network is A - E - F and the project completion time is 22 weeks. The critical path for this network is A - E - F and the project completion time is 22 weeks.     If a deadline of 17 weeks is imposed, give the linear programming model for the crashing decision.<div style=padding-top: 35px> The critical path for this network is A - E - F and the project completion time is 22 weeks.     If a deadline of 17 weeks is imposed, give the linear programming model for the crashing decision.<div style=padding-top: 35px> If a deadline of 17 weeks is imposed, give the linear programming model for the crashing decision.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/47
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 9: Project Scheduling: Pertcpm
1
For an activity with more than one immediate successor activity, its latest-finish time is equal to the

A) largest latest-finish time among its immediate successors.
B) smallest latest-finish time among its immediate successors.
C) largest latest-start time among its immediate successors.
D) smallest latest-start time among its immediate successors.
D
2
The critical path

A) is any path that goes from the starting node to the completion node.
B) is a combination of all paths.
C) is the shortest path.
D) is the longest path.
D
3
PERT and CPM are applicable only when there is no dependence among activities.
False
4
The earliest start time rule

A) compares the starting times of all activities for successors of an activity.
B) compares the finish times for all immediate predecessors of an activity.
C) determines when the project can begin.
D) determines when the project must begin.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 47 في هذه المجموعة.
فتح الحزمة
k this deck
5
Arcs in a project network indicate

A) completion times.
B) precedence relationships.
C) activities.
D) the critical path.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 47 في هذه المجموعة.
فتح الحزمة
k this deck
6
Slack equals

A) LF - EF.
B) EF-LF.
C) EF - LS.
D) LF - ES.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 47 في هذه المجموعة.
فتح الحزمة
k this deck
7
Which is not a significant challenge of project scheduling?

A) deadlines exist.
B) activities are independent.
C) many employees could be required.
D) delays are costly.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 47 في هذه المجموعة.
فتح الحزمة
k this deck
8
To determine how to crash activity times

A) normal activity costs and costs under maximum crashing must be known.
B) shortest times with crashing must be known.
C) realize that new paths may become critical.
D) All of the alternatives are true.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 47 في هذه المجموعة.
فتح الحزمة
k this deck
9
Which of the following is always true about a critical activity?

A) LS = EF.
B) LF = LS.
C) ES = LS.
D) EF = ES.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 47 في هذه المجموعة.
فتح الحزمة
k this deck
10
PERT and CPM

A) are most valuable when a small number of activities must be scheduled.
B) have different features and are not applied to the same situation.
C) do not require a chronological relationship among activities.
D) have been combined to develop a procedure that uses the best of each.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 47 في هذه المجموعة.
فتح الحزمة
k this deck
11
Critical activities are those that can be delayed without delaying the entire project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 47 في هذه المجموعة.
فتح الحزمة
k this deck
12
Activities following a node

A) can begin as soon as any activity preceding the node has been completed.
B) have an earliest start time equal to the largest of the earliest finish times for all activities entering the node.
C) have a latest start time equal to the largest of the earliest finish times for all activities entering the node.
D) None of the alternatives is correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 47 في هذه المجموعة.
فتح الحزمة
k this deck
13
In deciding which activities to crash, one must

A) crash all critical activities.
B) crash largest-duration activities.
C) crash lowest-cost activities.
D) crash activities on the critical path(s) only.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 47 في هذه المجموعة.
فتح الحزمة
k this deck
14
Activities with zero slack

A) can be delayed.
B) must be completed first.
C) lie on a critical path.
D) have no predecessors.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 47 في هذه المجموعة.
فتح الحزمة
k this deck
15
For an activity with more than one immediate predecessor activity, which of the following is used to compute its earliest finish (EF) time?

A) the largest EF among the immediate predecessors.
B) the average EF among the immediate predecessors.
C) the largest LF among the immediate predecessors.
D) the difference in EF among the immediate predecessors.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 47 في هذه المجموعة.
فتح الحزمة
k this deck
16
Which of the following is a general rule for crashing activities?

A) Crash only non-critical activities.
B) Crash activities with zero slack.
C) Crash activities with the greatest number of predecessors.
D) Crash the path with the fewest activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 47 في هذه المجموعة.
فتح الحزمة
k this deck
17
Activities G, P, and R are the immediate predecessors for activity W. If the earliest finish times for the three are 12, 15, and 10, then the earliest start time for W

A) is 10.
B) is 12.
C) is 15.
D) cannot be determined.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 47 في هذه المجموعة.
فتح الحزمة
k this deck
18
Activities K, M and S immediately follow activity H, and their latest start times are 14, 18, and 11. The latest finish time for activity H

A) is 11.
B) is 14.
C) is 18.
D) cannot be determined.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 47 في هذه المجموعة.
فتح الحزمة
k this deck
19
To calculate an activity's latest finish time, you should consider its

A) predecessors' latest finish times
C) successors' earliest start times
B) predecessors' latest start times
D) successors' latest start times
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 47 في هذه المجموعة.
فتح الحزمة
k this deck
20
When activity times are uncertain,

A) assume they are normally distributed.
B) calculate the expected time, using (a + 4m + b)/6.
C) use the most likely time.
D) calculate the expected time, using (a + m + b)/3.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 47 في هذه المجموعة.
فتح الحزمة
k this deck
21
A cookie recipe gives the following numbered steps.
A cookie recipe gives the following numbered steps.   Although the steps are numbered, they do not always reflect immediate precedence relationships. Develop a table that lists the immediate predecessors for each activity. Although the steps are numbered, they do not always reflect immediate precedence relationships. Develop a table that lists the immediate predecessors for each activity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 47 في هذه المجموعة.
فتح الحزمة
k this deck
22
The linear programming model for crashing presented in the textbook assumes that any portion of the activity crash time can be achieved for a corresponding portion of the activity crashing cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 47 في هذه المجموعة.
فتح الحزمة
k this deck
23
The length of time an activity can be delayed without affecting the project completion time is the slack.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 47 في هذه المجموعة.
فتح الحزمة
k this deck
24
The variance in the project completion time is the sum of the variances of all activities in the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 47 في هذه المجموعة.
فتح الحزمة
k this deck
25
Crashing refers to an unanticipated delay in a critical path activity that causes the total time to exceed its limit.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 47 في هذه المجموعة.
فتح الحزمة
k this deck
26
The earliest finish time for the final activity is the project duration.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 47 في هذه المجموعة.
فتح الحزمة
k this deck
27
The project manager should monitor the progress of any activity with a large time variance even if the expected time does not identify the activity as a critical activity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 47 في هذه المجموعة.
فتح الحزمة
k this deck
28
Constraints in the LP models for crashing decisions are required to compare the activity's earliest finish time with the earliest finish time of each predecessor.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 47 في هذه المجموعة.
فتح الحزمة
k this deck
29
The latest finish time for an activity is the largest of the latest start times for all activities that immediately follow the activity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 47 في هذه المجموعة.
فتح الحزمة
k this deck
30
It is possible to have more than one critical path at a time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 47 في هذه المجموعة.
فتح الحزمة
k this deck
31
The difference between an activity's earliest finish time and latest finish time equals the difference between its earliest start time and latest start time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 47 في هذه المجموعة.
فتح الحزمة
k this deck
32
A path through a project network must reach every node.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 47 في هذه المجموعة.
فتح الحزمة
k this deck
33
From this schedule of activities, draw the PERT/CPM network.
From this schedule of activities, draw the PERT/CPM network.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 47 في هذه المجموعة.
فتح الحزمة
k this deck
34
The earliest start time for an activity is equal to the smallest of the earliest finish times for all its immediate predecessors.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 47 في هذه المجموعة.
فتح الحزمة
k this deck
35
When activity times are uncertain, total project time is normally distributed with mean equal to the sum of the means of all of the critical activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 47 في هذه المجموعة.
فتح الحزمة
k this deck
36
All activities on a critical path have zero slack time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 47 في هذه المجموعة.
فتح الحزمة
k this deck
37
Generally, the more serial (as opposed to parallel) relationships present in a project network, the less time will be required to complete the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 47 في هذه المجموعة.
فتح الحزمة
k this deck
38
A critical activity can be part of a noncritical path.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 47 في هذه المجموعة.
فتح الحزمة
k this deck
39
When activity times are uncertain, an activity's most likely time is the same as its expected time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 47 في هذه المجموعة.
فتح الحزمة
k this deck
40
From this PERT/CPM network, determine the list of activities and their predecessors. From this PERT/CPM network, determine the list of activities and their predecessors.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 47 في هذه المجموعة.
فتح الحزمة
k this deck
41
Joseph King has ambitions to be mayor of Williston, North Dakota. Joe has determined the breakdown of the steps to the nomination and has estimated normal and crash costs and times for the campaign as follows (times are in weeks).
Joseph King has ambitions to be mayor of Williston, North Dakota. Joe has determined the breakdown of the steps to the nomination and has estimated normal and crash costs and times for the campaign as follows (times are in weeks).   Joe King is not a wealthy man and would like to organize a 16-week campaign at minimum cost. Write and solve a linear program to accomplish this task. Joe King is not a wealthy man and would like to organize a 16-week campaign at minimum cost. Write and solve a linear program to accomplish this task.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 47 في هذه المجموعة.
فتح الحزمة
k this deck
42
Use the following network of related activities with their duration times (weeks) to complete a row for each activity under the column headings below. Use the following network of related activities with their duration times (weeks) to complete a row for each activity under the column headings below.    Use the following network of related activities with their duration times (weeks) to complete a row for each activity under the column headings below.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 47 في هذه المجموعة.
فتح الحزمة
k this deck
43
Use the following network of related activities with their duration times (weeks) to complete a row for each activity under the column headings below. Use the following network of related activities with their duration times (weeks) to complete a row for each activity under the column headings below.    Use the following network of related activities with their duration times (weeks) to complete a row for each activity under the column headings below.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 47 في هذه المجموعة.
فتح الحزمة
k this deck
44
A project network is shown below. Use a forward and a backward pass to determine the critical path, and then fill out the table below. Activity times are in weeks. A project network is shown below. Use a forward and a backward pass to determine the critical path, and then fill out the table below. Activity times are in weeks.     Now assume that the times listed are only the expected times instead of being fixed times. Is the probability of being finished in more than 28 weeks more or less than 50%? A project network is shown below. Use a forward and a backward pass to determine the critical path, and then fill out the table below. Activity times are in weeks.     Now assume that the times listed are only the expected times instead of being fixed times. Is the probability of being finished in more than 28 weeks more or less than 50%? Now assume that the times listed are only the expected times instead of being fixed times. Is the probability of being finished in more than 28 weeks more or less than 50%?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 47 في هذه المجموعة.
فتح الحزمة
k this deck
45
A project network is shown below. Use a forward and a backward pass to determine the critical path, and then fill out the table below. Activity times are in weeks. A project network is shown below. Use a forward and a backward pass to determine the critical path, and then fill out the table below. Activity times are in weeks.     Now assume that the times listed are only the expected times instead of being fixed times. Is the probability of being finished in fewer than 25 weeks more or less than 50%? A project network is shown below. Use a forward and a backward pass to determine the critical path, and then fill out the table below. Activity times are in weeks.     Now assume that the times listed are only the expected times instead of being fixed times. Is the probability of being finished in fewer than 25 weeks more or less than 50%? Now assume that the times listed are only the expected times instead of being fixed times. Is the probability of being finished in fewer than 25 weeks more or less than 50%?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 47 في هذه المجموعة.
فتح الحزمة
k this deck
46
A senior MIS design class project team has developed the following schedule of activities for their project, using their best estimate of completion times. Both written and oral reports are required. Draw the project network. Can they complete the project in the 38 class days remaining until the end of the semester?
A senior MIS design class project team has developed the following schedule of activities for their project, using their best estimate of completion times. Both written and oral reports are required. Draw the project network. Can they complete the project in the 38 class days remaining until the end of the semester?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 47 في هذه المجموعة.
فتح الحزمة
k this deck
47
The critical path for this network is A - E - F and the project completion time is 22 weeks. The critical path for this network is A - E - F and the project completion time is 22 weeks.     If a deadline of 17 weeks is imposed, give the linear programming model for the crashing decision. The critical path for this network is A - E - F and the project completion time is 22 weeks.     If a deadline of 17 weeks is imposed, give the linear programming model for the crashing decision. If a deadline of 17 weeks is imposed, give the linear programming model for the crashing decision.