Deck 19: Troubleshooting

ملء الشاشة (f)
exit full mode
سؤال
Control circuits, relay or PLC, should have ____ to identify logic and actuator status.

A) visual indicators
B) analog meters
C) ohmmeters
D) user manuals
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
____ is one result of low voltage that may not be noticed immediately in the functioning of a machine.

A) Shorting
B) Heat
C) Loose connections
D) Improper grounding
سؤال
In cases in which electrical heating is used, low voltage will cause the heat to be reduced by ____________________ of the voltage.
سؤال
Another problem that may occur with a double-pole, double-break contact is ____________________, that is, one contact of the double break travels across to the opposite contact, but the other remains in its original position.
سؤال
Effective troubleshooting begins with replacing components, one at a time.
سؤال
Most solenoid coils burn out because of a defect in the coil.
سؤال
Opens in a common line may be the result of an omitted ____________________ on the terminal block.
سؤال
The use of ____ in place of solid conductors has, in general, improved the loose connection problem.

A) fuses
B) wire markers
C) fiber optic cables
D) stranded conductors
سؤال
When measuring an AC signal, a DMM will display the ____ value of the signal.

A) minimum
B) maximum
C) mode
D) rms
سؤال
Success in troubleshooting results from the ability to segregate the problem area from other unrelated circuitry.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/10
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 19: Troubleshooting
1
Control circuits, relay or PLC, should have ____ to identify logic and actuator status.

A) visual indicators
B) analog meters
C) ohmmeters
D) user manuals
A
2
____ is one result of low voltage that may not be noticed immediately in the functioning of a machine.

A) Shorting
B) Heat
C) Loose connections
D) Improper grounding
B
3
In cases in which electrical heating is used, low voltage will cause the heat to be reduced by ____________________ of the voltage.
the square
4
Another problem that may occur with a double-pole, double-break contact is ____________________, that is, one contact of the double break travels across to the opposite contact, but the other remains in its original position.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
5
Effective troubleshooting begins with replacing components, one at a time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
6
Most solenoid coils burn out because of a defect in the coil.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
7
Opens in a common line may be the result of an omitted ____________________ on the terminal block.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
8
The use of ____ in place of solid conductors has, in general, improved the loose connection problem.

A) fuses
B) wire markers
C) fiber optic cables
D) stranded conductors
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
9
When measuring an AC signal, a DMM will display the ____ value of the signal.

A) minimum
B) maximum
C) mode
D) rms
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
10
Success in troubleshooting results from the ability to segregate the problem area from other unrelated circuitry.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.