Deck 8: Process Management: Lean and Six Sigma in the Supply Chain

ملء الشاشة (f)
exit full mode
سؤال
A lean system is also known as a push system.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
When designing a manufacturing or service process, a Pareto chart would be an essential tool for evaluating the process in terms of its action elements, waiting periods, and process flow.
سؤال
A weakness of lean systems is that none of its practices are related to the environment or sustainability.
سؤال
The primary design objective with lean layouts is to reduce wasted movements of workers, customers, and/or work-in-process.
سؤال
Lean thinking and Six Sigma quality are both concerned with achieving low cost and high quality throughout the supply chain.
سؤال
The Malcolm Baldrige National Quality Award recognizes firms for their quality achievements but is only given to U.S.firms.
سؤال
Lean production, JIT, and Six Sigma quality mean the same thing.
سؤال
Statistical process control (SPC) allows firms to compare process performance to desired levels or required standards.
سؤال
Deming, Crosby, and Juran are all prominent quality professionals whose ideas were vital to the development of Six Sigma.
سؤال
Toyota initially designed their JIT program on Ford's manufacturing system.
سؤال
Some of Deming's 14 points actually conflict with many Six Sigma concepts.
سؤال
When lean firms share their best practices with supply chain members, this is referred to as yokoten.
سؤال
Statistical process control uses control charts to monitor the outputs of a process to identify variations due to assignable causes and variations due to common causes.
سؤال
Organizations practicing lean production often increase their inventory levels in order to create a cushion against variability so that they can investigate and eliminate the weaknesses in their systems.
سؤال
Lean production is an operating philosophy or mindset that essentially attempts to minimize the impact of system variability and flaws in forecasting through the use of high safety stock inventories.
سؤال
A type of card called a kanban is used to signal when a process is out of control in a JIT production process.
سؤال
Acceptance sampling is a statistical technique that enables a shipment reject or accept decision to be made based on information obtained from a representative sample drawn from the population.
سؤال
A cause-and-effect diagram is a useful tool for presenting data in an organized fashion, indicating process problems from most to least severe.
سؤال
Manufacturing cells are often U-shaped to make operator and material movements easier within the cell.
سؤال
The term "lean production" essentially refers to the Toyota Production System in its entirety.
سؤال
Which of the following is an example of how lean programs can help to protect the environment?

A) Parts made from recycled materials
B) Using rubber from used tires in auto parts
C) Batch size reduction to reduce plastics
D) All of the above
سؤال
Calculate the inventory container size required given the following: Demand rate = 10 parts per hour, Safety stock required = 16%
Number of containers = 14, Time to cycle through entire system = 6 hours

A) 2 parts
B) 3 parts
C) 4 parts
D) 5 parts
سؤال
Lean production emphasizes all of the following EXCEPT:

A) Continuous improvement
B) Reduction of waste
C) Synchronization of material flows
D) Long production runs
سؤال
Which person was a key figure in developing the Toyota Production System and also developed the concept of poka-yoke?

A) Deming
B) Ohno
C) Toyoda
D) Shingo
سؤال
Which company probably played the largest role in the development of the Toyota Production System?

A) General Motors
B) Chrysler
C) Ford
D) Boeing
سؤال
Which tool is useful for presenting data in an organized fashion, indicating process problems from most to least severe:

A) Pareto Charts
B) Check Sheets
C) Cause-and-Effect Diagrams
D) Fishbone Diagrams
سؤال
Lean production systems are sometimes referred to as pull systems because demand from customers activates the production actions of the manufacturing facilities.In order for this demand to be communicated to everyone in the supply chain/manufacturing facility a signal must be passed from downstream processing centers to the upstream processing centers.This system of relaying signals is referred to as a:

A) Kanban System
B) Semaphore System
C) Keiretsu Network
D) TQM Network
سؤال
Efficient Consumer Response was initially developed in the 1990's for the following industry:

A) Fashion
B) Grocery
C) Small Electronics
D) Automobile
سؤال
If lot sizes are reduced by 50 percent, what impact will this have on average inventory levels?

A) Increase by 50%
B) Increase by 100%
C) Decrease by 25%
D) Decrease by 50%
سؤال
The following is a term that refers to error or mistake proofing:

A) Kaizen
B) Muda
C) Kanban
D) Poka-yoke
سؤال
Which of the following are among the MOST important elements of the lean production philosophy?

A) Quality inspections and a standardized product line
B) Fully automated assembly lines and a large supplier base
C) Large inventories and quality inspections
D) Waste reduction and continuous improvement
سؤال
The Five-Ss refer to:

A) Overspending habits
B) Keiretsu relationships
C) Industrial housekeeping
D) Robust evaluation techniques
سؤال
The Quick Response program, developed in the 1980's, was an offshoot of the following supply chain concept:

A) Efficient Consumer Response
B) Six Sigma
C) Just-in-Time
D) Kaisen
سؤال
Japanese manufacturing firms sometimes create cooperative coalitions with their suppliers in order to provide the suppliers with a certain degree of financial support.What are these cooperative coalitions called?

A) Jidoka Networks
B) Keiretsu Networks
C) Kanban Networks
D) Kaizen Networks
سؤال
Which of the following quality gurus believed that companies should strive for zero defects and that quality was, in a sense, free since quality improvement programs invariably paid for themselves?

A) Juran
B) Deming
C) Baldrige
D) Crosby
سؤال
Waste in Japan is also referred to as:

A) Muda
B) Kanban
C) Poka-yoke
D) Sakichi
سؤال
Which of the following is NOT consistent with the lean philosophy?

A) Cross-training employees to increase processing flexibility
B) Developing a culture of continuous improvement within the organization
C) Increasing batch sizes to take advantage of economies of scale
D) Positioning WIP inventories near each processing center
سؤال
When compared to their U.S.counterparts, a benchmarking study found that Japanese auto manufacturers used:

A) Twice the manufacturing labor
B) Double the manufacturing space
C) Half the engineering hours to produce a new automobile model
D) All of the above
سؤال
Which of the following layouts is primarily designed to process parts, components, or jobs requiring the same or similar processing steps, saving duplication of equipment and labor:

A) Work centers
B) Production kanbans
C) Work-in-process
D) Manufacturing Cells
سؤال
Which of the following is NOT one of the Seven Wastes?

A) Excess inventory
B) Environmental waste
C) Waiting
D) Scrap and rework
سؤال
A Nevada Bank keeps track of errors from 20 clerks.Each sample has 100 records.They want to construct a P-chart to track the proportion of errors in each sample.The table below shows the number of errors per sample.(Use z = 3 for control limit calculations.)
A Nevada Bank keeps track of errors from 20 clerks.Each sample has 100 records.They want to construct a P-chart to track the proportion of errors in each sample.The table below shows the number of errors per sample.(Use z = 3 for control limit calculations.)   a.Determine P. b.Determine ?P. c.Determine the 3-sigma UCL and LCL. d.Does the process appear to be in statistical control?<div style=padding-top: 35px>
a.Determine P.
b.Determine ?P.
c.Determine the 3-sigma UCL and LCL.
d.Does the process appear to be in statistical control?
سؤال
Discuss the linkages between lean production and environmental sustainability.
سؤال
Briefly explain THREE of the statistical tools of Six Sigma.
سؤال
A company that produces 8 pound bags of cat litter gathered 5 samples of 6 bags each.The weights of each bags' contents are listed below.What would you plot on the chart for sample 2? <strong>A company that produces 8 pound bags of cat litter gathered 5 samples of 6 bags each.The weights of each bags' contents are listed below.What would you plot on the chart for sample 2?  </strong> A) All of the following numbers: 8.33, 8.22, 8.08, 8.51, 8.41, 8.28 B) All of the following numbers: 8.34, 8.22, 7.77, 8.18, 8.13 C) 8.130 D) 8.305 <div style=padding-top: 35px>

A) All of the following numbers: 8.33, 8.22, 8.08, 8.51, 8.41, 8.28
B) All of the following numbers: 8.34, 8.22, 7.77, 8.18, 8.13
C) 8.130
D) 8.305
سؤال
Describe SPC and Acceptance Sampling.What is the key difference between the two?
سؤال
A company produces 8-pound bags of cat litter; as shown below, it gathered 5 samples with 6 bags in each sample for quality control purposes.The weights of each of the bags are listed below. Determine .
<strong>A company produces 8-pound bags of cat litter; as shown below, it gathered 5 samples with 6 bags in each sample for quality control purposes.The weights of each of the bags are listed below. Determine .  </strong> A) 8.26 B) 8.06 C) 7.97 D) 7.92 <div style=padding-top: 35px>

A) 8.26
B) 8.06
C) 7.97
D) 7.92
سؤال
Provide an overview of the beliefs of each of the following quality professionals:
W.E.Deming
Philip Crosby
Joseph Juran
سؤال
Why is the workforce considered such an important element of lean production?
سؤال
What are the TWO primary techniques/philosophies discussed in Chapter 8 that are used to manage processes in the supply chain such that they'll meet the needs of customers today.Provide the prime objectives for each of the two techniques/philosophies.Also, for each technique, provide three elements used to achieve the prime objectives.
سؤال
An important outcome of statistical process control is:

A) Firms can take corrective actions before process variabilities get out of control
B) Firms can visually monitor process performance
C) Firms can minimize total inventory cost
D) Both A & B
E) None of these
سؤال
Calculate the defects per million opportunities (DPMO) given the following: Blake, owner of Blakester's T-shirt Shoppe, keeps track of customer complaints.For each T-shirt sold, there are four possible complaints: T-shirt shrinks, poor quality, design wears off, and doesn't fit right.Each week, Blake calculates the rate of T-shirt "defects" per total T-shirts sold, and then uses this information to determine his company's DPMO.During the past week, his company sold 1200 T-shirts.His company received 22 customer shrinkage complaints, 16 poor quality complaints, 12 design wears off complaints, 8 doesn't fit right complaints.
Calculate his firm's DPMO.

A) 69,600
B) 0.193
C) 5.8 x 10^6
D) 12,083
سؤال
A company sells eggs in boxes with 12 cartons and 12 eggs in each carton, thus there are 144 eggs in each box.The organization wants to construct a P-chart to track the proportion of broken eggs in each sample (shown below).If the company used one box of eggs in each sample in the dataset below, what would be the centerline, upper control limit (UCL), and lower control limit (LCL) for the appropriate P-chart? (Use z = 3.) Choose the closest answer. <strong>A company sells eggs in boxes with 12 cartons and 12 eggs in each carton, thus there are 144 eggs in each box.The organization wants to construct a P-chart to track the proportion of broken eggs in each sample (shown below).If the company used one box of eggs in each sample in the dataset below, what would be the centerline, upper control limit (UCL), and lower control limit (LCL) for the appropriate P-chart? (Use z = 3.) Choose the closest answer.  </strong> A) Centerline = 0.50, UCL = 0.625, LCL = 0.375 B) Centerline = 0.025, UCL = 0.64, LCL = 0 C) Centerline = 0.30, UCL = 0.70, LCL = 0 D) Centerline = 0.083, UCL = 0.152, LCL = 0.014 <div style=padding-top: 35px>

A) Centerline = 0.50, UCL = 0.625, LCL = 0.375
B) Centerline = 0.025, UCL = 0.64, LCL = 0
C) Centerline = 0.30, UCL = 0.70, LCL = 0
D) Centerline = 0.083, UCL = 0.152, LCL = 0.014
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/52
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 8: Process Management: Lean and Six Sigma in the Supply Chain
1
A lean system is also known as a push system.
False
2
When designing a manufacturing or service process, a Pareto chart would be an essential tool for evaluating the process in terms of its action elements, waiting periods, and process flow.
False
3
A weakness of lean systems is that none of its practices are related to the environment or sustainability.
False
4
The primary design objective with lean layouts is to reduce wasted movements of workers, customers, and/or work-in-process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
5
Lean thinking and Six Sigma quality are both concerned with achieving low cost and high quality throughout the supply chain.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
6
The Malcolm Baldrige National Quality Award recognizes firms for their quality achievements but is only given to U.S.firms.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
7
Lean production, JIT, and Six Sigma quality mean the same thing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
8
Statistical process control (SPC) allows firms to compare process performance to desired levels or required standards.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
9
Deming, Crosby, and Juran are all prominent quality professionals whose ideas were vital to the development of Six Sigma.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
10
Toyota initially designed their JIT program on Ford's manufacturing system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
11
Some of Deming's 14 points actually conflict with many Six Sigma concepts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
12
When lean firms share their best practices with supply chain members, this is referred to as yokoten.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
13
Statistical process control uses control charts to monitor the outputs of a process to identify variations due to assignable causes and variations due to common causes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
14
Organizations practicing lean production often increase their inventory levels in order to create a cushion against variability so that they can investigate and eliminate the weaknesses in their systems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
15
Lean production is an operating philosophy or mindset that essentially attempts to minimize the impact of system variability and flaws in forecasting through the use of high safety stock inventories.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
16
A type of card called a kanban is used to signal when a process is out of control in a JIT production process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
17
Acceptance sampling is a statistical technique that enables a shipment reject or accept decision to be made based on information obtained from a representative sample drawn from the population.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
18
A cause-and-effect diagram is a useful tool for presenting data in an organized fashion, indicating process problems from most to least severe.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
19
Manufacturing cells are often U-shaped to make operator and material movements easier within the cell.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
20
The term "lean production" essentially refers to the Toyota Production System in its entirety.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
21
Which of the following is an example of how lean programs can help to protect the environment?

A) Parts made from recycled materials
B) Using rubber from used tires in auto parts
C) Batch size reduction to reduce plastics
D) All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
22
Calculate the inventory container size required given the following: Demand rate = 10 parts per hour, Safety stock required = 16%
Number of containers = 14, Time to cycle through entire system = 6 hours

A) 2 parts
B) 3 parts
C) 4 parts
D) 5 parts
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
23
Lean production emphasizes all of the following EXCEPT:

A) Continuous improvement
B) Reduction of waste
C) Synchronization of material flows
D) Long production runs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
24
Which person was a key figure in developing the Toyota Production System and also developed the concept of poka-yoke?

A) Deming
B) Ohno
C) Toyoda
D) Shingo
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
25
Which company probably played the largest role in the development of the Toyota Production System?

A) General Motors
B) Chrysler
C) Ford
D) Boeing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
26
Which tool is useful for presenting data in an organized fashion, indicating process problems from most to least severe:

A) Pareto Charts
B) Check Sheets
C) Cause-and-Effect Diagrams
D) Fishbone Diagrams
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
27
Lean production systems are sometimes referred to as pull systems because demand from customers activates the production actions of the manufacturing facilities.In order for this demand to be communicated to everyone in the supply chain/manufacturing facility a signal must be passed from downstream processing centers to the upstream processing centers.This system of relaying signals is referred to as a:

A) Kanban System
B) Semaphore System
C) Keiretsu Network
D) TQM Network
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
28
Efficient Consumer Response was initially developed in the 1990's for the following industry:

A) Fashion
B) Grocery
C) Small Electronics
D) Automobile
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
29
If lot sizes are reduced by 50 percent, what impact will this have on average inventory levels?

A) Increase by 50%
B) Increase by 100%
C) Decrease by 25%
D) Decrease by 50%
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
30
The following is a term that refers to error or mistake proofing:

A) Kaizen
B) Muda
C) Kanban
D) Poka-yoke
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
31
Which of the following are among the MOST important elements of the lean production philosophy?

A) Quality inspections and a standardized product line
B) Fully automated assembly lines and a large supplier base
C) Large inventories and quality inspections
D) Waste reduction and continuous improvement
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
32
The Five-Ss refer to:

A) Overspending habits
B) Keiretsu relationships
C) Industrial housekeeping
D) Robust evaluation techniques
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
33
The Quick Response program, developed in the 1980's, was an offshoot of the following supply chain concept:

A) Efficient Consumer Response
B) Six Sigma
C) Just-in-Time
D) Kaisen
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
34
Japanese manufacturing firms sometimes create cooperative coalitions with their suppliers in order to provide the suppliers with a certain degree of financial support.What are these cooperative coalitions called?

A) Jidoka Networks
B) Keiretsu Networks
C) Kanban Networks
D) Kaizen Networks
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
35
Which of the following quality gurus believed that companies should strive for zero defects and that quality was, in a sense, free since quality improvement programs invariably paid for themselves?

A) Juran
B) Deming
C) Baldrige
D) Crosby
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
36
Waste in Japan is also referred to as:

A) Muda
B) Kanban
C) Poka-yoke
D) Sakichi
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
37
Which of the following is NOT consistent with the lean philosophy?

A) Cross-training employees to increase processing flexibility
B) Developing a culture of continuous improvement within the organization
C) Increasing batch sizes to take advantage of economies of scale
D) Positioning WIP inventories near each processing center
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
38
When compared to their U.S.counterparts, a benchmarking study found that Japanese auto manufacturers used:

A) Twice the manufacturing labor
B) Double the manufacturing space
C) Half the engineering hours to produce a new automobile model
D) All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
39
Which of the following layouts is primarily designed to process parts, components, or jobs requiring the same or similar processing steps, saving duplication of equipment and labor:

A) Work centers
B) Production kanbans
C) Work-in-process
D) Manufacturing Cells
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
40
Which of the following is NOT one of the Seven Wastes?

A) Excess inventory
B) Environmental waste
C) Waiting
D) Scrap and rework
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
41
A Nevada Bank keeps track of errors from 20 clerks.Each sample has 100 records.They want to construct a P-chart to track the proportion of errors in each sample.The table below shows the number of errors per sample.(Use z = 3 for control limit calculations.)
A Nevada Bank keeps track of errors from 20 clerks.Each sample has 100 records.They want to construct a P-chart to track the proportion of errors in each sample.The table below shows the number of errors per sample.(Use z = 3 for control limit calculations.)   a.Determine P. b.Determine ?P. c.Determine the 3-sigma UCL and LCL. d.Does the process appear to be in statistical control?
a.Determine P.
b.Determine ?P.
c.Determine the 3-sigma UCL and LCL.
d.Does the process appear to be in statistical control?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
42
Discuss the linkages between lean production and environmental sustainability.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
43
Briefly explain THREE of the statistical tools of Six Sigma.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
44
A company that produces 8 pound bags of cat litter gathered 5 samples of 6 bags each.The weights of each bags' contents are listed below.What would you plot on the chart for sample 2? <strong>A company that produces 8 pound bags of cat litter gathered 5 samples of 6 bags each.The weights of each bags' contents are listed below.What would you plot on the chart for sample 2?  </strong> A) All of the following numbers: 8.33, 8.22, 8.08, 8.51, 8.41, 8.28 B) All of the following numbers: 8.34, 8.22, 7.77, 8.18, 8.13 C) 8.130 D) 8.305

A) All of the following numbers: 8.33, 8.22, 8.08, 8.51, 8.41, 8.28
B) All of the following numbers: 8.34, 8.22, 7.77, 8.18, 8.13
C) 8.130
D) 8.305
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
45
Describe SPC and Acceptance Sampling.What is the key difference between the two?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
46
A company produces 8-pound bags of cat litter; as shown below, it gathered 5 samples with 6 bags in each sample for quality control purposes.The weights of each of the bags are listed below. Determine .
<strong>A company produces 8-pound bags of cat litter; as shown below, it gathered 5 samples with 6 bags in each sample for quality control purposes.The weights of each of the bags are listed below. Determine .  </strong> A) 8.26 B) 8.06 C) 7.97 D) 7.92

A) 8.26
B) 8.06
C) 7.97
D) 7.92
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
47
Provide an overview of the beliefs of each of the following quality professionals:
W.E.Deming
Philip Crosby
Joseph Juran
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
48
Why is the workforce considered such an important element of lean production?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
49
What are the TWO primary techniques/philosophies discussed in Chapter 8 that are used to manage processes in the supply chain such that they'll meet the needs of customers today.Provide the prime objectives for each of the two techniques/philosophies.Also, for each technique, provide three elements used to achieve the prime objectives.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
50
An important outcome of statistical process control is:

A) Firms can take corrective actions before process variabilities get out of control
B) Firms can visually monitor process performance
C) Firms can minimize total inventory cost
D) Both A & B
E) None of these
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
51
Calculate the defects per million opportunities (DPMO) given the following: Blake, owner of Blakester's T-shirt Shoppe, keeps track of customer complaints.For each T-shirt sold, there are four possible complaints: T-shirt shrinks, poor quality, design wears off, and doesn't fit right.Each week, Blake calculates the rate of T-shirt "defects" per total T-shirts sold, and then uses this information to determine his company's DPMO.During the past week, his company sold 1200 T-shirts.His company received 22 customer shrinkage complaints, 16 poor quality complaints, 12 design wears off complaints, 8 doesn't fit right complaints.
Calculate his firm's DPMO.

A) 69,600
B) 0.193
C) 5.8 x 10^6
D) 12,083
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
52
A company sells eggs in boxes with 12 cartons and 12 eggs in each carton, thus there are 144 eggs in each box.The organization wants to construct a P-chart to track the proportion of broken eggs in each sample (shown below).If the company used one box of eggs in each sample in the dataset below, what would be the centerline, upper control limit (UCL), and lower control limit (LCL) for the appropriate P-chart? (Use z = 3.) Choose the closest answer. <strong>A company sells eggs in boxes with 12 cartons and 12 eggs in each carton, thus there are 144 eggs in each box.The organization wants to construct a P-chart to track the proportion of broken eggs in each sample (shown below).If the company used one box of eggs in each sample in the dataset below, what would be the centerline, upper control limit (UCL), and lower control limit (LCL) for the appropriate P-chart? (Use z = 3.) Choose the closest answer.  </strong> A) Centerline = 0.50, UCL = 0.625, LCL = 0.375 B) Centerline = 0.025, UCL = 0.64, LCL = 0 C) Centerline = 0.30, UCL = 0.70, LCL = 0 D) Centerline = 0.083, UCL = 0.152, LCL = 0.014

A) Centerline = 0.50, UCL = 0.625, LCL = 0.375
B) Centerline = 0.025, UCL = 0.64, LCL = 0
C) Centerline = 0.30, UCL = 0.70, LCL = 0
D) Centerline = 0.083, UCL = 0.152, LCL = 0.014
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.