There are three main files kept in MRP systems. Determine which file is being described.This file keeps a record of receipts into stock, issues from stock and a running balance.

A) Location file
B) Transaction file
C) Item master file
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Optimized production technology (OPT) is a computer-based technique and tool that helps to schedule production systems. Which of the following are not principles of OPT?

A) Balance flow is what is required.
B) Capacity is 'king'.
C) Process batch should be variable.
D) Bottlenecks govern throughput.
سؤال
MRP II involves using the closed loop MRP system to generate financial figures.
سؤال
Back scheduling takes into account the lead time at each level of assembly to determine the time to
start.
سؤال
Enterprise Resource Planning (ERP) is one of the most significant developments of the basic MRP philosophy. Determine whether this statement is a feature of ERP: It is only able to function on a
Unix platform.

A) Feature of ERP
B) Not a feature of ERP
سؤال
Is the following statement a principles underlying Optimised Production technology (OPT) or not:
An hour lost at a bottleneck is an hour lost forever out of the entire system.
سؤال
There are three main files kept in MRP systems. Determine which file is being described.This file contains the part number and all the stable data on a part.

A) Transaction file
B) Item master file
C) Location file
سؤال
There are three main files kept in MRP systems. Determine which file is being described.This file details where the part is kept.

A) Item master file
B) Location file
C) Transaction file
سؤال
Enterprise Resource Planning (ERP) is one of the most significant developments of the basic MRP philosophy. Determine whether this statement is a feature of ERP: It allows decisions and
Databases from all parts of the organisation to be integrated.

A) Feature of ERP
B) Not a feature of ERP
سؤال
Enterprise Resource Planning (ERP) is one of the most significant developments of the basic MRP philosophy. Determine whether this statement is a feature of ERP: It is often linked to external
Extranet systems.

A) Feature of ERP
B) Not a feature of ERP
سؤال
Enterprise Resource Planning (ERP) is one of the most significant developments of the basic MRP philosophy. Determine whether this statement is a feature of ERP: It can only be interfaced with
Specially designed applications programs.

A) Feature of ERP
B) Not a feature of ERP
سؤال
Enterprise Resource Planning (ERP) is one of the most significant developments of the basic MRP philosophy. Determine whether this statement is a feature of ERP: It is based on a client/server
Architecture.

A) Feature of ERP
B) Not a feature of ERP
سؤال
In MRP (Materials Requirements Planning) the Bill of Materials is:

A) A list of required safety stock items.
B) The difference between planned receipts and current stocks.
C) The sum of stock-on-hand and work-in-progress.
D) The required output from a process over time.
E) The product structure showing where common parts are used.
سؤال
MPS stands for:

A) Master Production Schedule
B) Material Production Schedule
C) Material Planning System
D) Master Planning System
سؤال
Enterprise Resource Planning (ERP) is one of the most significant developments of the basic MRP philosophy. Determine whether this statement is a feature of ERP: It is cheap and easy to install.

A) Feature of ERP
B) Not a feature of ERP
سؤال
MRP II uses technology-based decision making to close the loop.
سؤال
MPS stands for:

A) Material Production Schedule
B) Material Planning System
C) Master Production Schedule
D) Master Planning System
سؤال
Is the following statement a principles underlying Optimised Production technology (OPT) or not:
Utilisation and activation of a resource are the same.
سؤال
MRP stands for:

A) Materials Requirements Planning
B) Management Reaction Planning
C) Manufacturing Resource Planning
D) Master Resources Production
سؤال
Enterprise Resource Planning (ERP) has been criticised on a number of grounds. Which of the following is NOT a common criticism of ERP?

A) Implementation is expensive.
B) It can have a disruptive effect on the organisation's operations.
C) It doesn't allow decisions and databases from all parts of the organisation to be integrated.
D) The effect it has on businesses is disappointing.
سؤال
Complete the MRP spreadsheet below for a component which is ordered in varying quantities over weeks 1 - 7.  Week 01234567 Gross  Requirement 5201010201025 Scheduled  Receipts 03003025030 Available  Balance 12XXXXXXX\begin{array} { | l | l | l | l | l | l | l | l | l | } \hline \text { Week } & 0 & 1 & 2 & 3 & 4 & 5 & 6 & 7 \\\hline \begin{array} { l } \text { Gross } \\\text { Requirement }\end{array} & & 5 & 20 & 10 & 10 & 20 & 10 & 25 \\\hline \begin{array} { l } \text { Scheduled } \\\text { Receipts }\end{array} & & 0 & 30 & 0 & 30 & 25 & 0 & 30 \\\hline \begin{array} { l } \text { Available } \\\text { Balance }\end{array} & 12 & \mathrm { X } & \mathrm { X } & \mathrm { X } & \mathrm { X } & \mathrm { X } & \mathrm { X } & \mathrm { X } \\\hline\end{array} Which answer should correctly replace the Xs?

A) 7 / 17 / 7 / 27 / 32 / 22 / 27
B) 7 / 37 / 57 / 37 / 12 / 22 / 17
C) 17 / 22 / 32 / 52 / 47 / 37 / 32
D) 17 / 27 / 17 / 37 / 12 / 2 / 7
E) 7 / 17 / 27 / 47 / 22 / 12 / 17
سؤال
Relative to a consumer durables manufacturer, a jobbing printer has:

A) Greater visibility of known orders
B) Less visibility of known orders
C) Greater focus on forecast demand
سؤال
What is the most important planning and control schedule in a business?

A) The Master Production Schedule
B) The Staff Requirements Plan
C) The Production Map
D) The Inventory Plan
سؤال
The management of customer orders and sale forecasts is called:

A) Forecast prediction
B) Demand management
C) Order management
D) Key account management
سؤال
Which of the following is unlikely to be included in demand management?

A) Supply negotiation
B) Order promising
C) Physical distribution
D) Demand forecasting
سؤال
ERP is set firmly within the context of the far broader MRP concept.
سؤال
Physical distribution is not part of demand management.
سؤال
Total demand is made up of:

A) Forecast demand
B) Known orders
C) Forecast demand and known orders
D) Average demand over a time period
سؤال
MRP ii's extra sophistication allowed forward modelling of 'what if' scenarios.
سؤال
Known orders are increasingly critical in predicting total demand in the long term.
سؤال
The sales function can load known sales orders against the Master Production Schedule. This information is called:

A) Guaranteed availability
B) Available to promise
C) Assured orders
D) Assured availability
سؤال
Master Production Schedules can be used when chasing demand, when lagging demand or in
level scheduling.
سؤال
Which of the following is NOT of particular interest to the MRP process of calculating materials requirements?

A) The price of goods and services
B) What has been ordered
C) The number of orders
D) The delivery date
سؤال
Which of the following is NOT an input of materials requirements planning?

A) Inventory records
B) Forecast demand
C) Materials plans
D) Bill of materials
سؤال
Which of the following is NOT integrated within an ERP database?

A) Delivery and logistics applications
B) Operations applications
C) Human resource management applications
D) None of the above
سؤال
Materials requirements planning became popular during which decade?

A) 1960s
B) 1970s
C) 1980s
D) 1990s
سؤال
A jobbing printer would typically:

A) Resource to order
B) Make to order
C) Make for stock
D) Resource for stock
سؤال
Which of the following ERP systems does Rolls Royce use?

A) SAP
B) Oracle
C) PeopleSoft
D) Bann
سؤال
The Enterprise Resource Plan drives the whole operation in terms of what is assembled, what is
manufactured and what is bought.
سؤال
Which of the following is NOT an input into the Master Production Schedule?

A) Spares demand
B) Known orders
C) Customer satisfaction feedback
D) Forecast demand
سؤال
What is the name given to the file that keeps a record of receipts into stock, issues from stock and a running balance?

A) Transaction file
B) Item master file
C) Product file
D) Location file
سؤال
Level 1 refers to:

A) The parts that go into sub-assemblies
B) The finished product
C) The parts and sub-assemblies that go into the finished product
D) None of the above
سؤال
A product file contains a unique standard identification code for each part or component.
سؤال
A simplified diagram showing parts required to make a product is termed:

A) Components structure
B) Product structure
C) Product diagram
D) Components diagram
سؤال
The finished product is said to be at which level?

A) 0
B) 1
C) 2
D) 3
سؤال
Parts that go into sub-assemblies are at which level?

A) 0
B) 1
C) 2
D) 3
سؤال
The components required for a product are called:

A) The product map
B) The components package
C) The Master Production Schedule
D) The bill of materials
سؤال
MRP systems that started to include feedback-loops became known as:

A) Open-loop MRP
B) Closed-loop MRP
C) Value-added MRP
D) Feedback-loop MRP
سؤال
The MRP netting process involves:

A) Moving from Level 0 to Level 2
B) Moving from Level 1 to Level 2
C) Moving from Level 2 to Level 0
D) None of the above
سؤال
Considering product structure shape, the more components and parts used at each level:

A) The rounder the shape
B) The longer the shape
C) The wider the shape
D) The flatter the shape
سؤال
Rough cut capacity plans are static level plans that involve looking forward in the long term to
predict the requirements for large structural parts of the operation.
سؤال
On a day-to-day basis, works orders intended to be issued from the MRP will often have a variable effect on the loading of particular machines or individual workers. Which plans project
This load ahead?

A) Organisational work plans
B) Rough cut capacity plans
C) Capacity requirements plans
D) Resource requirements plans
سؤال
Which of the following is considered a disadvantage of manufacturing resource planning?

A) It does not help integrate different systems.
B) It depends on people-based decision making to close the loop.
C) It increases the cost of information.
D) All of the above.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/53
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 14: Material Requirements Planning and Enterprise Resource Planning
1
There are three main files kept in MRP systems. Determine which file is being described.This file keeps a record of receipts into stock, issues from stock and a running balance.

A) Location file
B) Transaction file
C) Item master file
Transaction file
2
Optimized production technology (OPT) is a computer-based technique and tool that helps to schedule production systems. Which of the following are not principles of OPT?

A) Balance flow is what is required.
B) Capacity is 'king'.
C) Process batch should be variable.
D) Bottlenecks govern throughput.
Capacity is 'king'.
3
MRP II involves using the closed loop MRP system to generate financial figures.
True
4
Back scheduling takes into account the lead time at each level of assembly to determine the time to
start.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
5
Enterprise Resource Planning (ERP) is one of the most significant developments of the basic MRP philosophy. Determine whether this statement is a feature of ERP: It is only able to function on a
Unix platform.

A) Feature of ERP
B) Not a feature of ERP
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
6
Is the following statement a principles underlying Optimised Production technology (OPT) or not:
An hour lost at a bottleneck is an hour lost forever out of the entire system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
7
There are three main files kept in MRP systems. Determine which file is being described.This file contains the part number and all the stable data on a part.

A) Transaction file
B) Item master file
C) Location file
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
8
There are three main files kept in MRP systems. Determine which file is being described.This file details where the part is kept.

A) Item master file
B) Location file
C) Transaction file
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
9
Enterprise Resource Planning (ERP) is one of the most significant developments of the basic MRP philosophy. Determine whether this statement is a feature of ERP: It allows decisions and
Databases from all parts of the organisation to be integrated.

A) Feature of ERP
B) Not a feature of ERP
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
10
Enterprise Resource Planning (ERP) is one of the most significant developments of the basic MRP philosophy. Determine whether this statement is a feature of ERP: It is often linked to external
Extranet systems.

A) Feature of ERP
B) Not a feature of ERP
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
11
Enterprise Resource Planning (ERP) is one of the most significant developments of the basic MRP philosophy. Determine whether this statement is a feature of ERP: It can only be interfaced with
Specially designed applications programs.

A) Feature of ERP
B) Not a feature of ERP
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
12
Enterprise Resource Planning (ERP) is one of the most significant developments of the basic MRP philosophy. Determine whether this statement is a feature of ERP: It is based on a client/server
Architecture.

A) Feature of ERP
B) Not a feature of ERP
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
13
In MRP (Materials Requirements Planning) the Bill of Materials is:

A) A list of required safety stock items.
B) The difference between planned receipts and current stocks.
C) The sum of stock-on-hand and work-in-progress.
D) The required output from a process over time.
E) The product structure showing where common parts are used.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
14
MPS stands for:

A) Master Production Schedule
B) Material Production Schedule
C) Material Planning System
D) Master Planning System
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
15
Enterprise Resource Planning (ERP) is one of the most significant developments of the basic MRP philosophy. Determine whether this statement is a feature of ERP: It is cheap and easy to install.

A) Feature of ERP
B) Not a feature of ERP
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
16
MRP II uses technology-based decision making to close the loop.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
17
MPS stands for:

A) Material Production Schedule
B) Material Planning System
C) Master Production Schedule
D) Master Planning System
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
18
Is the following statement a principles underlying Optimised Production technology (OPT) or not:
Utilisation and activation of a resource are the same.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
19
MRP stands for:

A) Materials Requirements Planning
B) Management Reaction Planning
C) Manufacturing Resource Planning
D) Master Resources Production
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
20
Enterprise Resource Planning (ERP) has been criticised on a number of grounds. Which of the following is NOT a common criticism of ERP?

A) Implementation is expensive.
B) It can have a disruptive effect on the organisation's operations.
C) It doesn't allow decisions and databases from all parts of the organisation to be integrated.
D) The effect it has on businesses is disappointing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
21
Complete the MRP spreadsheet below for a component which is ordered in varying quantities over weeks 1 - 7.  Week 01234567 Gross  Requirement 5201010201025 Scheduled  Receipts 03003025030 Available  Balance 12XXXXXXX\begin{array} { | l | l | l | l | l | l | l | l | l | } \hline \text { Week } & 0 & 1 & 2 & 3 & 4 & 5 & 6 & 7 \\\hline \begin{array} { l } \text { Gross } \\\text { Requirement }\end{array} & & 5 & 20 & 10 & 10 & 20 & 10 & 25 \\\hline \begin{array} { l } \text { Scheduled } \\\text { Receipts }\end{array} & & 0 & 30 & 0 & 30 & 25 & 0 & 30 \\\hline \begin{array} { l } \text { Available } \\\text { Balance }\end{array} & 12 & \mathrm { X } & \mathrm { X } & \mathrm { X } & \mathrm { X } & \mathrm { X } & \mathrm { X } & \mathrm { X } \\\hline\end{array} Which answer should correctly replace the Xs?

A) 7 / 17 / 7 / 27 / 32 / 22 / 27
B) 7 / 37 / 57 / 37 / 12 / 22 / 17
C) 17 / 22 / 32 / 52 / 47 / 37 / 32
D) 17 / 27 / 17 / 37 / 12 / 2 / 7
E) 7 / 17 / 27 / 47 / 22 / 12 / 17
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
22
Relative to a consumer durables manufacturer, a jobbing printer has:

A) Greater visibility of known orders
B) Less visibility of known orders
C) Greater focus on forecast demand
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
23
What is the most important planning and control schedule in a business?

A) The Master Production Schedule
B) The Staff Requirements Plan
C) The Production Map
D) The Inventory Plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
24
The management of customer orders and sale forecasts is called:

A) Forecast prediction
B) Demand management
C) Order management
D) Key account management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
25
Which of the following is unlikely to be included in demand management?

A) Supply negotiation
B) Order promising
C) Physical distribution
D) Demand forecasting
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
26
ERP is set firmly within the context of the far broader MRP concept.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
27
Physical distribution is not part of demand management.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
28
Total demand is made up of:

A) Forecast demand
B) Known orders
C) Forecast demand and known orders
D) Average demand over a time period
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
29
MRP ii's extra sophistication allowed forward modelling of 'what if' scenarios.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
30
Known orders are increasingly critical in predicting total demand in the long term.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
31
The sales function can load known sales orders against the Master Production Schedule. This information is called:

A) Guaranteed availability
B) Available to promise
C) Assured orders
D) Assured availability
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
32
Master Production Schedules can be used when chasing demand, when lagging demand or in
level scheduling.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
33
Which of the following is NOT of particular interest to the MRP process of calculating materials requirements?

A) The price of goods and services
B) What has been ordered
C) The number of orders
D) The delivery date
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
34
Which of the following is NOT an input of materials requirements planning?

A) Inventory records
B) Forecast demand
C) Materials plans
D) Bill of materials
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
35
Which of the following is NOT integrated within an ERP database?

A) Delivery and logistics applications
B) Operations applications
C) Human resource management applications
D) None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
36
Materials requirements planning became popular during which decade?

A) 1960s
B) 1970s
C) 1980s
D) 1990s
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
37
A jobbing printer would typically:

A) Resource to order
B) Make to order
C) Make for stock
D) Resource for stock
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
38
Which of the following ERP systems does Rolls Royce use?

A) SAP
B) Oracle
C) PeopleSoft
D) Bann
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
39
The Enterprise Resource Plan drives the whole operation in terms of what is assembled, what is
manufactured and what is bought.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
40
Which of the following is NOT an input into the Master Production Schedule?

A) Spares demand
B) Known orders
C) Customer satisfaction feedback
D) Forecast demand
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
41
What is the name given to the file that keeps a record of receipts into stock, issues from stock and a running balance?

A) Transaction file
B) Item master file
C) Product file
D) Location file
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
42
Level 1 refers to:

A) The parts that go into sub-assemblies
B) The finished product
C) The parts and sub-assemblies that go into the finished product
D) None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
43
A product file contains a unique standard identification code for each part or component.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
44
A simplified diagram showing parts required to make a product is termed:

A) Components structure
B) Product structure
C) Product diagram
D) Components diagram
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
45
The finished product is said to be at which level?

A) 0
B) 1
C) 2
D) 3
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
46
Parts that go into sub-assemblies are at which level?

A) 0
B) 1
C) 2
D) 3
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
47
The components required for a product are called:

A) The product map
B) The components package
C) The Master Production Schedule
D) The bill of materials
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
48
MRP systems that started to include feedback-loops became known as:

A) Open-loop MRP
B) Closed-loop MRP
C) Value-added MRP
D) Feedback-loop MRP
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
49
The MRP netting process involves:

A) Moving from Level 0 to Level 2
B) Moving from Level 1 to Level 2
C) Moving from Level 2 to Level 0
D) None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
50
Considering product structure shape, the more components and parts used at each level:

A) The rounder the shape
B) The longer the shape
C) The wider the shape
D) The flatter the shape
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
51
Rough cut capacity plans are static level plans that involve looking forward in the long term to
predict the requirements for large structural parts of the operation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
52
On a day-to-day basis, works orders intended to be issued from the MRP will often have a variable effect on the loading of particular machines or individual workers. Which plans project
This load ahead?

A) Organisational work plans
B) Rough cut capacity plans
C) Capacity requirements plans
D) Resource requirements plans
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
53
Which of the following is considered a disadvantage of manufacturing resource planning?

A) It does not help integrate different systems.
B) It depends on people-based decision making to close the loop.
C) It increases the cost of information.
D) All of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.