Deck 15: Just-In-Time and Lean Production

ملء الشاشة (f)
exit full mode
سؤال
JIT type approaches have many different names. Lean operations is a :

A) JIT approach
B) Non-JIT approach
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The 'lean' concept has much wider implications for improving operations' performance beyond
planning and control issues.
سؤال
Within JIT, process owners are encouraged to assume ownership of their machines and undertake routine maintenance. This is called:

A) Preventative repairs
B) Routine checking
C) Total productive maintenance
D) Maintenance service
سؤال
JIT type approaches have many different names. Buffer inventories is a :

A) JIT approach
B) Non-JIT approach
سؤال
JIT type approaches have many different names. Short cycle time manufacturing is a :

A) JIT approach
B) Non-JIT approach
سؤال
The lean approach aims to:

A) Reduce buffer inventory, but increase safety inventory
B) Reduce the level of inventory
C) Maintain buffer inventory
D) None of the above
سؤال
JIT type approaches have many different names. Stockless production is a :

A) JIT approach
B) Non-JIT approach
سؤال
Which one of the following would be considered a prerequisite for successful lean production?

A) Suppliers in multiple locations.
B) Sophisticated production and materials planning computer systems.
C) Preventive maintenance of equipment.
D) The preparation of a Master Production Schedule.
E) High variety of product range.
سؤال
Is the following statement characteristic of MRP or JIT.Planning and control concepts are only part of a wider philosophy.

A) MRP
B) JIT
سؤال
Is the following statement characteristic of MRP or JIT. Highly dependent on the accuracy of data derived from bills of materials, stock records, etc.

A) Characteristic of MRP
B) Characteristic of JIT
سؤال
The traditional approach sees inventory as a 'blanket of obscurity' that lies over the production
system, preventing problems being noticed.
سؤال
Lean generally has a lower capacity utilisation than a traditional approach to operations.
سؤال
Just-in-time principles, which once were a radical departure from traditional operations practice,
have now themselves become orthodox.
سؤال
In lean it is usual to use one specialist large machine rather than several small machines.
سؤال
The lean approach aims to reduce which of the following?

A) Poor floor layout
B) Rework
C) Work in progress
D) All of the above
سؤال
Producing goods and services exactly when they are needed - not before they are needed, so they wait as inventory, nor after they are needed, so customers have to wait - is called:

A) Precision operations
B) Perfect operations
C) Just-in-time or lean
D) High flexibility
سؤال
The just-in-time approach assumes that each stage in the manufacturing process will place the
parts it produces in an inventory that buffers that stage from the next one downstream in the total
process.
سؤال
JIT type approaches have many different names. High capacity operations are a:

A) JIT approach
B) Non-JIT approach
سؤال
Lean does not require:

A) Customer demands met from production, not inventory
B) Focus on high capacity utilisation
C) Dependable supply parts and reliable equipment
D) disruption in production due to quality errors
سؤال
Is the following statement characteristic of MRP or JIT.Usually needs a complex, centralised, computer-based organisation to support the necessary hardware.

A) MRP
B) JIT
سؤال
What is the term given to the kanban used to signal to a previous stage that material can be withdrawn from inventory and transferred to a specific destination?

A) Customer kanban
B) Production kanban
C) Move or conveyance kanban
D) Vendor kanban
سؤال
Which of the following is NOT true of the 'traditional' view of capacity utilisation?

A) Lower capacity utilisation
B) More production at each stage
C) More stoppages
D) High inventory
سؤال
Which of the following is NOT a type of kanban?

A) Vendor kanban
B) Conveyance kanban
C) Customer kanban
D) Production kanban
سؤال
Which of the following basic working practices is NOT held to be the basic preparation for implementing lean?

A) Outsourcing
B) Total people involvement
C) Development of personnel
D) Quality of working life
سؤال
Which of the following is NOT true of kanban?

A) Parts are always pulled by a succeeding process.
B) No parts are started without a kanban card.
C) The time period should be made shorter.
D) The number of kanbans should remain the same.
سؤال
Which of the following is NOT a visibility measure?

A) SPC charts
B) Demand forecasts
C) Kanbans
D) Coloured lights indicating stoppages
سؤال
Heijunka is the Japanese name for:

A) Continuous improvement
B) Total productive maintenance
C) Levelled scheduling
D) Total people involvement
سؤال
The time taken to change over the process from one activity to the next is defined as:

A) Start-up time
B) Changeover time
C) Set-up time
D) Downtime
سؤال
Kaizen is the Japanese word for:

A) Respect-for-humans
B) Employee involvement
C) Continuous improvement
D) Elimination of waste
سؤال
Depending on the type of kanban being used, the principles applied will vary.
سؤال
Which of the following is NOT a major method of achieving the transfer of internal set-up work to external work?

A) Improving the loading and unloading of new tools.
B) Presetting tools.
C) Investing in fewer large machines.
D) Attaching different tools to a standard fixture.
سؤال
Which of the following basic working practices is NOT held to be the basic preparation for implementing lean?

A) Flexibility
B) High pay
C) Autonomy
D) Discipline
سؤال
Simply shouting 'send some more!' is a verbal form of kanban.
سؤال
Lean tends to involve using:

A) Large machines
B) Multiple-sourcing strategies
C) Few staff
D) Small machines
سؤال
Which of the following is NOT part of the lean philosophy of operations?

A) Continuous improvement
B) Elimination of waste
C) More production at each stage
D) Total people involvement
سؤال
Many companies implementing lean have consistent pay structures that do not differentiate
between full-time staff and hourly rated staff.
سؤال
Kanban is sometimes called the:

A) Invisible conveyor
B) Materials planner
C) Inventory destroyer
D) Signal system
سؤال
Which of the following methods is NOT used to reduce set-up time in the lean approach?

A) The reduction in search for tools and equipment.
B) The practice of set-up routines.
C) The investment in large machinery.
D) The pre-preparation of tasks.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/38
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 15: Just-In-Time and Lean Production
1
JIT type approaches have many different names. Lean operations is a :

A) JIT approach
B) Non-JIT approach
JIT approach
2
The 'lean' concept has much wider implications for improving operations' performance beyond
planning and control issues.
True
3
Within JIT, process owners are encouraged to assume ownership of their machines and undertake routine maintenance. This is called:

A) Preventative repairs
B) Routine checking
C) Total productive maintenance
D) Maintenance service
Total productive maintenance
4
JIT type approaches have many different names. Buffer inventories is a :

A) JIT approach
B) Non-JIT approach
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 38 في هذه المجموعة.
فتح الحزمة
k this deck
5
JIT type approaches have many different names. Short cycle time manufacturing is a :

A) JIT approach
B) Non-JIT approach
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 38 في هذه المجموعة.
فتح الحزمة
k this deck
6
The lean approach aims to:

A) Reduce buffer inventory, but increase safety inventory
B) Reduce the level of inventory
C) Maintain buffer inventory
D) None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 38 في هذه المجموعة.
فتح الحزمة
k this deck
7
JIT type approaches have many different names. Stockless production is a :

A) JIT approach
B) Non-JIT approach
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 38 في هذه المجموعة.
فتح الحزمة
k this deck
8
Which one of the following would be considered a prerequisite for successful lean production?

A) Suppliers in multiple locations.
B) Sophisticated production and materials planning computer systems.
C) Preventive maintenance of equipment.
D) The preparation of a Master Production Schedule.
E) High variety of product range.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 38 في هذه المجموعة.
فتح الحزمة
k this deck
9
Is the following statement characteristic of MRP or JIT.Planning and control concepts are only part of a wider philosophy.

A) MRP
B) JIT
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 38 في هذه المجموعة.
فتح الحزمة
k this deck
10
Is the following statement characteristic of MRP or JIT. Highly dependent on the accuracy of data derived from bills of materials, stock records, etc.

A) Characteristic of MRP
B) Characteristic of JIT
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 38 في هذه المجموعة.
فتح الحزمة
k this deck
11
The traditional approach sees inventory as a 'blanket of obscurity' that lies over the production
system, preventing problems being noticed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 38 في هذه المجموعة.
فتح الحزمة
k this deck
12
Lean generally has a lower capacity utilisation than a traditional approach to operations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 38 في هذه المجموعة.
فتح الحزمة
k this deck
13
Just-in-time principles, which once were a radical departure from traditional operations practice,
have now themselves become orthodox.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 38 في هذه المجموعة.
فتح الحزمة
k this deck
14
In lean it is usual to use one specialist large machine rather than several small machines.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 38 في هذه المجموعة.
فتح الحزمة
k this deck
15
The lean approach aims to reduce which of the following?

A) Poor floor layout
B) Rework
C) Work in progress
D) All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 38 في هذه المجموعة.
فتح الحزمة
k this deck
16
Producing goods and services exactly when they are needed - not before they are needed, so they wait as inventory, nor after they are needed, so customers have to wait - is called:

A) Precision operations
B) Perfect operations
C) Just-in-time or lean
D) High flexibility
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 38 في هذه المجموعة.
فتح الحزمة
k this deck
17
The just-in-time approach assumes that each stage in the manufacturing process will place the
parts it produces in an inventory that buffers that stage from the next one downstream in the total
process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 38 في هذه المجموعة.
فتح الحزمة
k this deck
18
JIT type approaches have many different names. High capacity operations are a:

A) JIT approach
B) Non-JIT approach
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 38 في هذه المجموعة.
فتح الحزمة
k this deck
19
Lean does not require:

A) Customer demands met from production, not inventory
B) Focus on high capacity utilisation
C) Dependable supply parts and reliable equipment
D) disruption in production due to quality errors
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 38 في هذه المجموعة.
فتح الحزمة
k this deck
20
Is the following statement characteristic of MRP or JIT.Usually needs a complex, centralised, computer-based organisation to support the necessary hardware.

A) MRP
B) JIT
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 38 في هذه المجموعة.
فتح الحزمة
k this deck
21
What is the term given to the kanban used to signal to a previous stage that material can be withdrawn from inventory and transferred to a specific destination?

A) Customer kanban
B) Production kanban
C) Move or conveyance kanban
D) Vendor kanban
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 38 في هذه المجموعة.
فتح الحزمة
k this deck
22
Which of the following is NOT true of the 'traditional' view of capacity utilisation?

A) Lower capacity utilisation
B) More production at each stage
C) More stoppages
D) High inventory
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 38 في هذه المجموعة.
فتح الحزمة
k this deck
23
Which of the following is NOT a type of kanban?

A) Vendor kanban
B) Conveyance kanban
C) Customer kanban
D) Production kanban
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 38 في هذه المجموعة.
فتح الحزمة
k this deck
24
Which of the following basic working practices is NOT held to be the basic preparation for implementing lean?

A) Outsourcing
B) Total people involvement
C) Development of personnel
D) Quality of working life
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 38 في هذه المجموعة.
فتح الحزمة
k this deck
25
Which of the following is NOT true of kanban?

A) Parts are always pulled by a succeeding process.
B) No parts are started without a kanban card.
C) The time period should be made shorter.
D) The number of kanbans should remain the same.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 38 في هذه المجموعة.
فتح الحزمة
k this deck
26
Which of the following is NOT a visibility measure?

A) SPC charts
B) Demand forecasts
C) Kanbans
D) Coloured lights indicating stoppages
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 38 في هذه المجموعة.
فتح الحزمة
k this deck
27
Heijunka is the Japanese name for:

A) Continuous improvement
B) Total productive maintenance
C) Levelled scheduling
D) Total people involvement
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 38 في هذه المجموعة.
فتح الحزمة
k this deck
28
The time taken to change over the process from one activity to the next is defined as:

A) Start-up time
B) Changeover time
C) Set-up time
D) Downtime
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 38 في هذه المجموعة.
فتح الحزمة
k this deck
29
Kaizen is the Japanese word for:

A) Respect-for-humans
B) Employee involvement
C) Continuous improvement
D) Elimination of waste
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 38 في هذه المجموعة.
فتح الحزمة
k this deck
30
Depending on the type of kanban being used, the principles applied will vary.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 38 في هذه المجموعة.
فتح الحزمة
k this deck
31
Which of the following is NOT a major method of achieving the transfer of internal set-up work to external work?

A) Improving the loading and unloading of new tools.
B) Presetting tools.
C) Investing in fewer large machines.
D) Attaching different tools to a standard fixture.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 38 في هذه المجموعة.
فتح الحزمة
k this deck
32
Which of the following basic working practices is NOT held to be the basic preparation for implementing lean?

A) Flexibility
B) High pay
C) Autonomy
D) Discipline
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 38 في هذه المجموعة.
فتح الحزمة
k this deck
33
Simply shouting 'send some more!' is a verbal form of kanban.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 38 في هذه المجموعة.
فتح الحزمة
k this deck
34
Lean tends to involve using:

A) Large machines
B) Multiple-sourcing strategies
C) Few staff
D) Small machines
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 38 في هذه المجموعة.
فتح الحزمة
k this deck
35
Which of the following is NOT part of the lean philosophy of operations?

A) Continuous improvement
B) Elimination of waste
C) More production at each stage
D) Total people involvement
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 38 في هذه المجموعة.
فتح الحزمة
k this deck
36
Many companies implementing lean have consistent pay structures that do not differentiate
between full-time staff and hourly rated staff.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 38 في هذه المجموعة.
فتح الحزمة
k this deck
37
Kanban is sometimes called the:

A) Invisible conveyor
B) Materials planner
C) Inventory destroyer
D) Signal system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 38 في هذه المجموعة.
فتح الحزمة
k this deck
38
Which of the following methods is NOT used to reduce set-up time in the lean approach?

A) The reduction in search for tools and equipment.
B) The practice of set-up routines.
C) The investment in large machinery.
D) The pre-preparation of tasks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 38 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 38 في هذه المجموعة.