Deck 10: Statistical Quality Control

ملء الشاشة (f)
exit full mode
سؤال
Control is the formalisation of what is intended to happen.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Flexible - the time slack in the system allows unexpected work to be loaded. This is an example of:

A) Forward scheduling
B) Backward scheduling
سؤال
The maximum output of an operations system in a given period is called the:

A) Master production schedule
B) Production forecast
C) Break-even point
D) Designed capacity
E) Capacity plan
سؤال
Objectives set in both financial and operations terms is an example of long-term, medium-term or short-term planning and control?.

A) Long-term planning and control
B) Medium-term planning and control
C) Short-term planning and control
سؤال
Determining when to do things is known as:

A) Scheduling
B) Loading
C) Sequencing
D) Monitoring and control
سؤال
Determining whether activities are going to plan is known as:

A) Scheduling
B) Loading
C) Sequencing
D) Monitoring and control
سؤال
The planning horizon tends to be short in a low-volume, high-variety operation.
سؤال
Finite loading is particularly relevant for operations where the cost of limiting the load is not
prohibitive.
سؤال
Tends to focus the operation on customer due dates. This is an example of:

A) Forward scheduling
B) Backward scheduling
سؤال
Ad hoc consideration of operations objectives is an example of long-term, medium-term or short-term planning and control?

A) Long-term planning and control
B) Medium-term planning and control
C) Short-term planning and control
سؤال
Scheduling the operation:

A) Decides on the start and finish times for each task
B) Determines the priority of tasks to be performed
C) Assumes that capacity must be infinite
D) Determines the volume that an operations system can cope with
E) Sequences work through a series of operations
سؤال
Objectives set in largely financial terms is an example of long-term, medium-term or short-term planning and control?

A) Long-term planning and control
B) Medium-term planning and control
C) Short-term planning and control
سؤال
Determining in what order to do things is known as:

A) Scheduling
B) Loading
C) Sequencing
D) Monitoring and control
سؤال
Aggregated demand forecasts are a key element of short-term planning and control.
سؤال
A drive-in tyre replacement operation is a good example of planning and control considerations
being driven by dependent demand.
سؤال
Less exposed to risk in case of schedule change by the customer is an advantage of:

A) Forward scheduling
B) Backward scheduling
سؤال
Determining how much to do is known as:

A) Scheduling
B) Loading
C) Sequencing
D) Monitoring and control
سؤال
A pull system is where material is moved only when the next stage wants it.
سؤال
High labour utilisation - workers always start work to keep busy. This is an example of:

A) Forward scheduling
B) Backward scheduling
سؤال
Which of the following operations is more likely to be a pull rather than push operation?

A) A food manufacturer
B) A farmer
C) A company that builds computers to order
D) A brewery
سؤال
In planning and control, planning is NOT:

A) A formalisation of what is intended to happen
B) A guarantee that an event will happen
C) A plan based on expectations
D) A statement of intention
سؤال
Independent demand is relatively predictable, because factors of demand are known.
سؤال
The nature of decisions taken to plan and control an operation will depend on:

A) The nature of demand and costs of supply
B) The nature of supply and its flexibility
C) The nature of demand and its elasticity
D) The nature of demand and supply for the operation
سؤال
In the long term, the emphasis of planning and control is on:

A) Planning
B) Planning and control
C) Control
سؤال
Sequencing the operation:

A) Decides on the start and finish times for each task
B) Determines the volume that an operations system can cope with
C) Determines the order in which work is to be processed
D) Determines the priority of tasks to be performed
E) Assumes that capacity must be infinite
سؤال
When an operation is sufficiently confident of the nature of demand, if not its volume and time, it will tend to:

A) Make to stock
B) Make to order
C) Resource to order
سؤال
When considering control tasks, loading is associated with work volume, sequencing is associated with work priorities, and scheduling is associated with:

A) Work order scheduled receipts
B) The order in which work is processed
C) Work start and finish times
D) The work rate from an operation or process
E) Work done relative to customer order delivery dates
سؤال
Loading the operation:

A) Decides on the start and finish times for each task
B) Determines the order in which work is to be processed
C) Determines the priority of tasks to be performed
D) Assumes that capacity must be infinite
E) Determines the volume that an operations system can cope with
سؤال
Which of the following is NOT true of long-term planning and control?

A) Determines resources in aggregated form.
B) Uses disaggregated forecasts and demand forecasts.
C) Objectives are set in largely financial terms.
D) None of the options above is true.
سؤال
Which of the following is true of short-term planning and control?

A) Makes interventions to resources to correct deviation from plans.
B) Usually partially disaggregated demand forecasts.
C) Objectives are set largely in financial terms.
D) Determines resources and contingencies.
سؤال
Which of the following is NOT true of medium planning and control?

A) Makes interventions to resources to correct deviations from plans.
B) Ad hoc consideration of operations objectives.
C) Uses aggregated demand forecasts.
D) None of the options above is true.
سؤال
In planning and control, control is NOT:

A) A process of coping with changes to supplier and/or demand
B) A statement of intention
C) An adjustment to planned events
D) An adjustment that allows the operation to achieve the objectives that a plan has set
سؤال
Most of the demand for tyre store in a car plant is dependent demand.
سؤال
Planning is a formalisation of what is intended to happen at some time in the future.
سؤال
Planning and control activities are concerned with providing long-term resources which are
capable of satisfying customers' demands
سؤال
Planning and control activities are concerned with operating resources on a day-to-day basis and
ensuring availability of materials and other variable resources in order to supply goods and
services which will fulfil customers' demands.
سؤال
To reconcile volume and time, four overlapping activities are performed:

A) Sequencing, scheduling, monitoring, evaluation
B) Loading, scheduling, sequencing, monitoring
C) Loading, monitoring, evaluation, scheduling
D) Evaluation, loading, sequencing, scheduling
سؤال
In the short term, the emphasis of planning and control is on:

A) Control
B) Planning and control
C) Planning
سؤال
Planning is the process of coping with changes in supply and demand.
سؤال
Different aspects of planning and control can be viewed as representing the reconciliation of
supply with demand.
سؤال
Which of the following is seen as a disadvantage of self-rostering?

A) Less teamwork
B) Creates a 'them and 'us' culture
C) Lack of control
D) Reduced motivation
سؤال
When the dominant resource of the operation is its staff, then the schedule of work time
determines the demand for the operation.
سؤال
Which of the following is NOT seen as an advantage of self-rostering?

A) Nurtures teamwork
B) Staff ownership of problems
C) Balanced rosters
D) Improves morale
سؤال
When the cost of limiting the load is prohibitive, infinite loading is commonly applied.
سؤال
The most common method of scheduling is by use of a Gantt Chart.
سؤال
The approach to loading which does not limit accepting work, but instead tries to cope with it, is called:

A) Classic loading
B) Infinite loading
C) Finite loading
D) Determined loading
سؤال
LIFO sequencing is more equitable that FIFO sequencing.
سؤال
The allocation of work to a work centre up to a set limit is called:

A) Sequencing
B) Finite loading
C) Physical constraint
D) Infinite loading
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/48
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 10: Statistical Quality Control
1
Control is the formalisation of what is intended to happen.
False
2
Flexible - the time slack in the system allows unexpected work to be loaded. This is an example of:

A) Forward scheduling
B) Backward scheduling
Forward scheduling
3
The maximum output of an operations system in a given period is called the:

A) Master production schedule
B) Production forecast
C) Break-even point
D) Designed capacity
E) Capacity plan
Designed capacity
4
Objectives set in both financial and operations terms is an example of long-term, medium-term or short-term planning and control?.

A) Long-term planning and control
B) Medium-term planning and control
C) Short-term planning and control
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
5
Determining when to do things is known as:

A) Scheduling
B) Loading
C) Sequencing
D) Monitoring and control
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
6
Determining whether activities are going to plan is known as:

A) Scheduling
B) Loading
C) Sequencing
D) Monitoring and control
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
7
The planning horizon tends to be short in a low-volume, high-variety operation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
8
Finite loading is particularly relevant for operations where the cost of limiting the load is not
prohibitive.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
9
Tends to focus the operation on customer due dates. This is an example of:

A) Forward scheduling
B) Backward scheduling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
10
Ad hoc consideration of operations objectives is an example of long-term, medium-term or short-term planning and control?

A) Long-term planning and control
B) Medium-term planning and control
C) Short-term planning and control
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
11
Scheduling the operation:

A) Decides on the start and finish times for each task
B) Determines the priority of tasks to be performed
C) Assumes that capacity must be infinite
D) Determines the volume that an operations system can cope with
E) Sequences work through a series of operations
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
12
Objectives set in largely financial terms is an example of long-term, medium-term or short-term planning and control?

A) Long-term planning and control
B) Medium-term planning and control
C) Short-term planning and control
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
13
Determining in what order to do things is known as:

A) Scheduling
B) Loading
C) Sequencing
D) Monitoring and control
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
14
Aggregated demand forecasts are a key element of short-term planning and control.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
15
A drive-in tyre replacement operation is a good example of planning and control considerations
being driven by dependent demand.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
16
Less exposed to risk in case of schedule change by the customer is an advantage of:

A) Forward scheduling
B) Backward scheduling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
17
Determining how much to do is known as:

A) Scheduling
B) Loading
C) Sequencing
D) Monitoring and control
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
18
A pull system is where material is moved only when the next stage wants it.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
19
High labour utilisation - workers always start work to keep busy. This is an example of:

A) Forward scheduling
B) Backward scheduling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
20
Which of the following operations is more likely to be a pull rather than push operation?

A) A food manufacturer
B) A farmer
C) A company that builds computers to order
D) A brewery
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
21
In planning and control, planning is NOT:

A) A formalisation of what is intended to happen
B) A guarantee that an event will happen
C) A plan based on expectations
D) A statement of intention
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
22
Independent demand is relatively predictable, because factors of demand are known.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
23
The nature of decisions taken to plan and control an operation will depend on:

A) The nature of demand and costs of supply
B) The nature of supply and its flexibility
C) The nature of demand and its elasticity
D) The nature of demand and supply for the operation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
24
In the long term, the emphasis of planning and control is on:

A) Planning
B) Planning and control
C) Control
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
25
Sequencing the operation:

A) Decides on the start and finish times for each task
B) Determines the volume that an operations system can cope with
C) Determines the order in which work is to be processed
D) Determines the priority of tasks to be performed
E) Assumes that capacity must be infinite
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
26
When an operation is sufficiently confident of the nature of demand, if not its volume and time, it will tend to:

A) Make to stock
B) Make to order
C) Resource to order
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
27
When considering control tasks, loading is associated with work volume, sequencing is associated with work priorities, and scheduling is associated with:

A) Work order scheduled receipts
B) The order in which work is processed
C) Work start and finish times
D) The work rate from an operation or process
E) Work done relative to customer order delivery dates
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
28
Loading the operation:

A) Decides on the start and finish times for each task
B) Determines the order in which work is to be processed
C) Determines the priority of tasks to be performed
D) Assumes that capacity must be infinite
E) Determines the volume that an operations system can cope with
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
29
Which of the following is NOT true of long-term planning and control?

A) Determines resources in aggregated form.
B) Uses disaggregated forecasts and demand forecasts.
C) Objectives are set in largely financial terms.
D) None of the options above is true.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
30
Which of the following is true of short-term planning and control?

A) Makes interventions to resources to correct deviation from plans.
B) Usually partially disaggregated demand forecasts.
C) Objectives are set largely in financial terms.
D) Determines resources and contingencies.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
31
Which of the following is NOT true of medium planning and control?

A) Makes interventions to resources to correct deviations from plans.
B) Ad hoc consideration of operations objectives.
C) Uses aggregated demand forecasts.
D) None of the options above is true.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
32
In planning and control, control is NOT:

A) A process of coping with changes to supplier and/or demand
B) A statement of intention
C) An adjustment to planned events
D) An adjustment that allows the operation to achieve the objectives that a plan has set
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
33
Most of the demand for tyre store in a car plant is dependent demand.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
34
Planning is a formalisation of what is intended to happen at some time in the future.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
35
Planning and control activities are concerned with providing long-term resources which are
capable of satisfying customers' demands
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
36
Planning and control activities are concerned with operating resources on a day-to-day basis and
ensuring availability of materials and other variable resources in order to supply goods and
services which will fulfil customers' demands.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
37
To reconcile volume and time, four overlapping activities are performed:

A) Sequencing, scheduling, monitoring, evaluation
B) Loading, scheduling, sequencing, monitoring
C) Loading, monitoring, evaluation, scheduling
D) Evaluation, loading, sequencing, scheduling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
38
In the short term, the emphasis of planning and control is on:

A) Control
B) Planning and control
C) Planning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
39
Planning is the process of coping with changes in supply and demand.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
40
Different aspects of planning and control can be viewed as representing the reconciliation of
supply with demand.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
41
Which of the following is seen as a disadvantage of self-rostering?

A) Less teamwork
B) Creates a 'them and 'us' culture
C) Lack of control
D) Reduced motivation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
42
When the dominant resource of the operation is its staff, then the schedule of work time
determines the demand for the operation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
43
Which of the following is NOT seen as an advantage of self-rostering?

A) Nurtures teamwork
B) Staff ownership of problems
C) Balanced rosters
D) Improves morale
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
44
When the cost of limiting the load is prohibitive, infinite loading is commonly applied.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
45
The most common method of scheduling is by use of a Gantt Chart.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
46
The approach to loading which does not limit accepting work, but instead tries to cope with it, is called:

A) Classic loading
B) Infinite loading
C) Finite loading
D) Determined loading
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
47
LIFO sequencing is more equitable that FIFO sequencing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
48
The allocation of work to a work centre up to a set limit is called:

A) Sequencing
B) Finite loading
C) Physical constraint
D) Infinite loading
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.