Deck 15: Detention Design

ملء الشاشة (f)
exit full mode
سؤال
When does most pollutant transport occur?

A)early in a rainfall event
C)after a rainfall event
B)late in a rainfall event
D)before a rainfall event
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
A detention basin functions by storing water in a pond or ___________________.
سؤال
Detention basins are designed to release stormwater ____.

A)quickly
C)not at all
B)slowly
D)after treatment
سؤال
The primary goal of on-site detention is to reduce the peak rate of runoff leaving the site to a level equal to or less than the predevelopment peak rate.
سؤال
A basin designed to have a permanent pond at the bottom is called a dry basin.
سؤال
A non-structural strategy for mitigating the effects of development on stormwater runoff is ____.

A)maximizing impervious surfaces
B)minimizing compaction of soil
C)introducing pollutants to water
D)increasing parking space size
سؤال
Design storms should be chosen to reflect the potential for ____________________.
سؤال
In addition to controlling the quantity of runoff, detention basins can serve effectively to control water ____ as well.

A)planning
C)quality
B)temperature
D)color
سؤال
Off-site detention is intended to protect land in the immediate vicinity of the site from the effects of development.
سؤال
The first flow of runoff is called first ___________________.
سؤال
Topographic conditions peculiar to individual sites have no bearing on the approach to detention design.
سؤال
Reduction in peak runoff rate can refer to total ___________________ runoff or it can refer to runoff leaving the site at a specific location.
سؤال
___________________ detention is difficult to accomplish but often is more effective and less costly than allowing a proliferation of small on-site facilities.
سؤال
A basin that promotes recharge by storing stormwater for an extended period of time is called ____.

A)a wet basin
C)a sediment basin
B)an infiltration basin
D)a dry basin
سؤال
Underground basins require additional measures to control pollution.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/15
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 15: Detention Design
1
When does most pollutant transport occur?

A)early in a rainfall event
C)after a rainfall event
B)late in a rainfall event
D)before a rainfall event
A
2
A detention basin functions by storing water in a pond or ___________________.
reservoir
3
Detention basins are designed to release stormwater ____.

A)quickly
C)not at all
B)slowly
D)after treatment
B
4
The primary goal of on-site detention is to reduce the peak rate of runoff leaving the site to a level equal to or less than the predevelopment peak rate.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
5
A basin designed to have a permanent pond at the bottom is called a dry basin.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
6
A non-structural strategy for mitigating the effects of development on stormwater runoff is ____.

A)maximizing impervious surfaces
B)minimizing compaction of soil
C)introducing pollutants to water
D)increasing parking space size
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
7
Design storms should be chosen to reflect the potential for ____________________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
8
In addition to controlling the quantity of runoff, detention basins can serve effectively to control water ____ as well.

A)planning
C)quality
B)temperature
D)color
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
9
Off-site detention is intended to protect land in the immediate vicinity of the site from the effects of development.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
10
The first flow of runoff is called first ___________________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
11
Topographic conditions peculiar to individual sites have no bearing on the approach to detention design.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
12
Reduction in peak runoff rate can refer to total ___________________ runoff or it can refer to runoff leaving the site at a specific location.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
13
___________________ detention is difficult to accomplish but often is more effective and less costly than allowing a proliferation of small on-site facilities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
14
A basin that promotes recharge by storing stormwater for an extended period of time is called ____.

A)a wet basin
C)a sediment basin
B)an infiltration basin
D)a dry basin
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
15
Underground basins require additional measures to control pollution.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.